CN114314056A - Adjustable building site steel pipe quick loading device - Google Patents

Adjustable building site steel pipe quick loading device Download PDF

Info

Publication number
CN114314056A
CN114314056A CN202210063626.1A CN202210063626A CN114314056A CN 114314056 A CN114314056 A CN 114314056A CN 202210063626 A CN202210063626 A CN 202210063626A CN 114314056 A CN114314056 A CN 114314056A
Authority
CN
China
Prior art keywords
plate
plates
loading device
support frame
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210063626.1A
Other languages
Chinese (zh)
Other versions
CN114314056B (en
Inventor
刘旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou City Fenlida Car Motorcycle Accessories Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210063626.1A priority Critical patent/CN114314056B/en
Publication of CN114314056A publication Critical patent/CN114314056A/en
Application granted granted Critical
Publication of CN114314056B publication Critical patent/CN114314056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a quick loading device, in particular to an adjustable quick loading device for steel pipes in a construction site. The invention aims to provide an adjustable building site steel pipe rapid loading device with adjustable height. The invention provides an adjustable building site steel pipe rapid loading device which comprises a support frame, hinged plates, mounting plates, conveying mechanisms, adjusting mechanisms and power mechanisms, wherein the hinged plates are rotatably arranged on the upper portions of the right sides of the front side and the rear side of the support frame, the mounting plates are arranged on the upper portions of the hinged plates, the conveying mechanisms used for conveying steel pipes are arranged on the mounting plates, the adjusting mechanisms used for adjusting the height of the support frame are arranged on the support frame, and the power mechanisms used for providing power are arranged on the inner sides of the support frame. According to the invention, the second double-shaft motor is started, so that the missing gear is meshed with the straight gear, the mounting plate and the hinged plate can rotate, the height of the mounting plate is adjusted, the height-adjustable double-shaft hinge joint can be further suitable for vehicle types with different heights of containers, and the application range is wider.

Description

Adjustable building site steel pipe quick loading device
Technical Field
The invention relates to a quick loading device, in particular to an adjustable quick loading device for steel pipes in a construction site.
Background
At present, after the steel pipe is used up at one construction site, the steel pipe can be detached and conveyed to another construction site, so that the steel pipe needs to be frequently loaded for transportation, and when people load the steel pipe, the steel pipe is generally conveyed to a trailer by manpower.
Patent application CN206634779U, granted bulletin date 20171114, discloses a steel tube loading auxiliary conveying device, which comprises a support, wherein the support comprises two support legs and two vertical frameworks which are respectively fixed on the two support legs; the two vertical frameworks are connected through a first roller which is horizontally arranged, and the lower parts of the two vertical frameworks are connected through a transverse framework; the first roller bearing outer wall cover that is located between two vertical frameworks is equipped with the cylinder, and the device is simple and practical, and convenient operation alone alright eminence high-tube loading can effectively improve the efficiency of steel pipe loading, saves the labour. Although the above-mentioned patent can make things convenient for people to carry out the loading to the steel pipe, because the height of above-mentioned patent is difficult to adjust, lead to people when loading to the steel pipe, can only single going on to the motorcycle type, be difficult to go on to the motorcycle type of some packing box height differences, the application scope is narrower.
Therefore, to above-mentioned weak point, provide an adjustable building site steel pipe quick loading device that can height-adjusting.
Disclosure of Invention
In order to overcome the defect that the height of the device is difficult to adjust when most of the conventional auxiliary conveying devices for steel pipe loading are used by people, the invention provides an adjustable device for quickly loading steel pipes on a construction site, which can adjust the height.
The invention is realized by the following technical approaches:
the utility model provides an adjustable building site steel pipe quick loading device, is including support frame, articulated slab, mounting panel, conveying mechanism, adjustment mechanism and power unit, and the equal rotary type in right side upper portion of both sides is equipped with the articulated slab around the support frame, and articulated slab upper portion all is equipped with the mounting panel, is equipped with the conveying mechanism who is used for conveying the steel pipe on the mounting panel, is equipped with the adjustment mechanism who is used for height-adjusting on the support frame, and the support frame inboard is equipped with the power unit that is used for providing power.
In one embodiment, the conveying mechanism comprises a first double-shaft motor, transmission wheels, a conveying belt, a first connecting plate, first pulling plates, transmission rods and a second fixing plate, the second fixing plate is arranged between the left parts of the inner sides of the mounting plates, the first double-shaft motor is arranged in the middle of the left side of the second fixing plate, output shafts of the front side and the rear side of the first double-shaft motor are rotatably connected with the mounting plates on the same side, the transmission rods are rotatably arranged between the right parts of the inner sides of the mounting plates, the transmission wheels are arranged on the output shafts of the front side and the rear side of the first double-shaft motor and on the front side and the rear side of the transmission rods, the conveying belts are wound between the transmission wheels on the same transverse side, the first connecting plates are arranged between the conveying belts at uniform intervals, and three first pulling plates are arranged on the outer sides of the first connecting plates at uniform intervals.
In one embodiment, the adjusting mechanism comprises a supporting plate, first clamping blocks and second pulling plates, the supporting plate is rotatably arranged on the upper portion of the left side of the front side and the rear side of the supporting frame, the six first clamping blocks are arranged at intervals on the bottom of the mounting plate, the supporting plate is in contact with the first clamping block on the same side and on the rightmost side, and the second pulling plates are arranged on the left side of the lower portion of the inner side of the supporting plate.
In one embodiment, the power mechanism comprises a second double-shaft motor, a gear lack wheel, mounting blocks, straight gears and a pull rope, the second double-shaft motor is arranged in the middle of the inner side of the support frame, the gear lack wheel is arranged on output shafts of the front side and the rear side of the second double-shaft motor, the mounting blocks are arranged on the front side and the rear side of the right side of the top of the support frame, the straight gears are rotatably arranged on the upper portions of the mounting blocks, the gear lack wheels are meshed with the straight gears on the same side, the pull rope is connected to the inner sides of the straight gears, and the other ends of the pull ropes are connected with a second pull plate on the same side.
In one embodiment, the movable mechanism for facilitating movement is further included, the movable mechanism comprises a movable wheel, a connecting block, a sliding rod, a second connecting plate, a pressing plate, a first fixing plate and a first return spring, the left side and the right side of the top of the support frame are symmetrically provided with the first fixing plate front and back, the sliding rod is arranged in the middle of the upper portion of the first fixing plate in a sliding mode, the bottom of the sliding rod is rotatably provided with the connecting block, the movable wheel is rotatably arranged on the lower portion of the connecting block, the second connecting plate is arranged between the tops of the sliding rods on the same lateral side, the pressing plate is arranged on the upper portion of the right side of the support plate and is in contact with the second connecting plate on the same side, the first return spring is arranged between the tops of the first fixing plate and the second connecting plate on the same side, and the first return spring is wound on the sliding rod on the same side.
In one of them embodiment, still including the complementary unit who is used for hooking bottom in the packing box, complementary unit is including the rotor plate, the ratchet wheel, the second fixture block, second reset spring and guide block, the rotary type is equipped with the rotor plate between the mounting panel outside left part, mounting panel outside left part all is equipped with the ratchet wheel, the ratchet wheel is located the outside of rotor plate, the upper right side of both sides all is equipped with the guide block around the rotor plate, all slidingtype is equipped with the second fixture block on the guide block, the ratchet wheel of homonymy is all blocked to the second fixture block, all be equipped with second reset spring between the second fixture block of guide block right side and homonymy.
In one embodiment, the protection device further comprises a protection mechanism for protecting people, the protection mechanism comprises a first protection plate, a pull rod and a second protection plate, the first protection plate is arranged between the right sides of the mounting plates, the pull rod is arranged on the front side and the rear side of the upper portion of the right side of the first protection plate, the second protection plate is arranged on the right portion of the outer side of the mounting plates, and the second protection plate is connected with the first protection plate on the same side.
In one embodiment, the pull rods are all sleeved with rubber leather sleeves.
The invention provides an adjustable building site steel pipe rapid loading device, which has the advantages that:
1. according to the invention, the second double-shaft motor is started, so that the missing gear is meshed with the straight gear, the mounting plate and the hinged plate can rotate, the height of the mounting plate is adjusted, the height-adjustable double-shaft hinge joint can be further suitable for vehicle types with different heights of containers, and the application range is wider.
2. According to the invention, the first connecting plate and the first pull plate can be rotated by starting the first double-shaft motor, and after the steel pipes are sequentially placed on the first pull plate, the first pull plate can automatically drive the steel pipes to rotate, so that the steel pipes roll into a container of a truck, the steel pipes are automatically loaded, and the work efficiency of people is improved.
3. Under the action of the moving wheels, people can conveniently move the adjustable rapid steel pipe loading device for the construction site to a specified position, and time and physical strength of people are saved.
4. According to the adjustable type construction site steel pipe rapid loading device, the rotating plate can be hooked on the inner bottom of the container of the truck by pulling the rotating plate to rotate, so that the adjustable type construction site steel pipe rapid loading device is prevented from being disjointed with the inner bottom of the container of the truck.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of a first embodiment of the conveying mechanism of the present invention.
Fig. 3 is a schematic perspective view of a second conveying mechanism according to the present invention.
Fig. 4 is a partial perspective view of the present invention.
Fig. 5 is a schematic perspective view of a part of the adjusting mechanism, the actuating mechanism and the moving mechanism according to the present invention.
Fig. 6 is a schematic perspective view of a part of the moving mechanism of the present invention.
Fig. 7 is a schematic perspective view of the auxiliary mechanism of the present invention.
Fig. 8 is an enlarged view of the invention at a.
Fig. 9 is a schematic perspective view of a first protection mechanism according to the present invention.
Fig. 10 is a schematic perspective view of a second protection mechanism according to the present invention.
Labeled as: 1-a support frame, 2-a hinged plate, 3-a mounting plate, 4-a conveying mechanism, 41-a first double-shaft motor, 42-a transmission wheel, 43-a conveying belt, 44-a first connecting plate, 45-a first pulling plate, 46-a transmission rod, 47-a second fixing plate, 5-an adjusting mechanism, 51-a support plate, 52-a first clamping block, 53-a second pulling plate, 6-a power mechanism, 61-a second double-shaft motor, 62-a gear lacking, 63-a mounting block, 64-a straight gear, 65-a pulling rope, 7-a moving mechanism, 71-a moving wheel, 72-a connecting block, 73-a sliding rod, 74-a second connecting plate, 75-a pressing plate, 76-a first fixing plate, 77-a first return spring and 8-an auxiliary mechanism, 81-rotating plate, 82-ratchet wheel, 83-second clamping block, 84-second return spring, 85-guide block, 9-protection mechanism, 91-first protection plate, 92-pull rod and 93-second protection plate.
Detailed Description
The invention is further explained by combining the drawings in the specification, and the embodiments of the invention are given by combining the drawings in the specification.
Example 1
The utility model provides an adjustable building site steel pipe quick loading device, includes support frame 1, articulated slab 2, mounting panel 3, conveying mechanism 4, adjustment mechanism 5 and power unit 6, refer to fig. 1-5 and show that the right side upper portion of both sides all articulates on support frame 1 front and back has articulated slab 2, and mounting panel 3 has all been welded on articulated slab 2 upper portion, is equipped with conveying mechanism 4 on the mounting panel 3, is equipped with adjustment mechanism 5 on the support frame 1, and 1 inboard of support frame is equipped with power unit 6.
The conveying mechanism 4 comprises a first double-shaft motor 41, a transmission wheel 42, a conveying belt 43, a first connecting plate 44, a first pulling plate 45, a transmission rod 46 and a second fixing plate 47, referring to fig. 2 and 3, a second fixing plate 47 is arranged between the left parts of the inner sides of the mounting plates 3, the first double-shaft motor 41 is bolted in the middle of the left side of the second fixing plate 47, output shafts of the front and rear sides of the first double-shaft motor 41 are rotatably connected with the mounting plates 3 on the same side, the transmission rod 46 is rotatably arranged between the right parts of the inner sides of the mounting plates 3, the transmission wheels 42 are arranged on the output shafts of the front and rear sides of the first double-shaft motor 41 and the front and rear sides of the transmission rod 46, the conveying belt 43 is wound between the transmission wheels 42 on the same side transversely, the first connecting plates 44 are uniformly arranged between the conveying belts 43 at intervals, three first pulling plates 45 are arranged at intervals outside the first connecting plates 44, and when a steel pipe is placed on the first pulling plates 45 through the rotation of the first pulling plates 45, the first pulling plate 45 can automatically load the steel pipes.
Adjusting mechanism 5 is including backup pad 51, first fixture block 52 and second arm-tie 53, refer to fig. 4 and fig. 5 and show, the equal rotary type in left side upper portion of both sides is equipped with backup pad 51 around support frame 1, the equal interval in mounting panel 3 bottom is equipped with six first fixture blocks 52, first fixture block 52 rotates the back, can drive mounting panel 3 and rotate to adjust the height of mounting panel 3, backup pad 51 all contacts with the first fixture block 52 on homonymy and rightmost side, the inboard lower part left side of backup pad 51 all welds second arm-tie 53.
The power mechanism 6 comprises a second double-shaft motor 61, a missing gear 62, an installation block 63, a straight gear 64 and a pull rope 65, as shown in fig. 4 and 5, the second double-shaft motor 61 is bolted to the middle part of the inner side of the support frame 1, after the second double-shaft motor 61 is opened, the height of the power adjusting installation plate 3 can be provided, the missing gear 62 is arranged on the output shafts of the front side and the rear side of the second double-shaft motor 61, the installation block 63 is arranged on the front side and the rear side of the right side of the top of the support frame 1, the straight gear 64 is arranged on the upper part of the installation block 63 in an equal rotating mode, the missing gear 62 is engaged with the straight gear 64 on the same side, the pull rope 65 is connected to the inner side of the straight gear 64, and the other end of the pull rope 65 is connected with the second pull plate 53 on the same side.
When people need to use the adjustable quick loading device for steel pipes on a construction site, firstly, the adjustable quick loading device for steel pipes on the construction site is placed at a specified position, then the second double-shaft motor 61 is started to enable the output shaft of the second double-shaft motor 61 to rotate so as to drive the missing gear 62 to rotate, when the missing gear 62 is meshed with the straight gear 64, the missing gear 62 drives the straight gear 64 to rotate so as to enable the straight gear 64 to drive the second pull plate 53 to rotate through the pull rope 65, thereby driving the support plate 51 to rotate, enabling the support plate 51 to extrude the first clamping block 52 to rotate, thereby driving the mounting plate 3 and the hinged plate 2 to rotate, further adjusting the height of the mounting plate 3 so as to enable the mounting plate 3 and the bottom of a cargo box of a truck to be at the same height, when the support plate 51 passes over the rightmost first clamping block 52, the rightmost first clamping block 52 can clamp the support plate 51 can be clamped, when the support plate 51 continues to rotate, the support plate 51 can be separated from the rightmost first clamping block 52, then the steel pipes are contacted with the rest first clamping blocks 52 from right to left in sequence, so that the rest first clamping blocks 52 clamp the supporting plate 51 in sequence, when the missing gear 62 is separated from the straight gear 64, the second pull plate 53 and the supporting plate 51 stop rotating, after people adjust the height of the mounting plate 3, the second double-shaft motor 61 is closed, the first double-shaft motor 41 is started, the output shaft of the first double-shaft motor 41 drives the transmission rod 46 to rotate through the transmission wheel 42 and the conveying belt 43, so as to drive the first connecting plate 44 and the first pull plate 45 to rotate, then people can place the steel pipes on the first pull plate 45 in sequence, so that the first pull plate 45 drives the steel pipes to rotate, so as to convey the steel pipes downwards and upwards, further, the conveyed steel pipes are rolled into a container of the truck, so as to load the steel pipes, and the circulation is that all the steel pipes can be loaded into the container of the truck, after people put all steel pipes into the cargo box of the truck, the first double-shaft motor 41 is closed, the transmission rod 46, the first connecting plate 44 and the first pull plate 45 stop rotating, then the mounting plate 3 is pulled to rotate, so that the hinged plate 2 and the first clamping block 52 are driven to rotate, the first clamping block 52 is separated from the support plate 51, the support plate 51 is loosened from the first clamping block 52, at the moment, under the action of gravity, the support plate 51 and the second pull plate 53 reversely reset, the second pull plate 53 drives the straight gear 64 to reversely reset through the pull rope 65, then the mounting plate 3 reversely resets, so that the hinged plate 2 and the first clamping block 52 are driven to reversely reset, the rightmost first clamping block 52 is in contact with the support plate 51, and then the mounting plate 3 is loosened.
Example 2
On the basis of embodiment 1, the device further comprises a moving mechanism 7, the moving mechanism 7 comprises a moving wheel 71, a connecting block 72, a sliding rod 73, a second connecting plate 74, a pressing plate 75, a first fixing plate 76 and a first return spring 77, as shown in fig. 1, fig. 2, fig. 4, fig. 5 and fig. 6, the first fixing plates 76 are symmetrically welded on the left and right sides of the top of the support frame 1 in a front-back manner, the sliding rod 73 is slidably arranged in the middle of the upper portion of the first fixing plate 76, the connecting block 72 is rotatably arranged at the bottom of the sliding rod 73, the moving wheel 71 is rotatably arranged at the lower portion of the connecting block 72, under the action of the moving wheel 71, people can conveniently move the adjustable steel pipe rapid loading device, the second connecting plates 74 are arranged between the tops of the sliding rods 73 on the same lateral side, the pressing plate 75 is welded on the upper portion of the right side of the support plate 51, the pressing plate 75 is in contact with the second connecting plates 74 on the same side, the first return spring 77 is arranged between the tops of the first fixing plate 76 and the second connecting plates 74 on the same side, the first return springs 77 are wound around the same side of the slide rod 73.
In an initial state, the first return spring 77 is in a compressed state, when people need to place the adjustable steel pipe rapid loading device on a designated position, the mounting plate 3 can be pushed to move, under the action of the moving wheel 71, the adjustable steel pipe rapid loading device on a construction site is driven to move to the designated position, when the supporting plate 51 rotates, the supporting plate 51 drives the pressing plate 75 to rotate, when the pressing plate 75 is separated from the second connecting plate 74, the first return spring 77 returns to the original state, the first return spring 77 drives the second connecting plate 74 to move upwards, so as to drive the sliding rod 73, the connecting block 72 and the moving wheel 71 to move upwards, so that the moving wheel 71 is separated from the ground, so that the supporting frame 1 is contacted with the ground, when the supporting plate 51 returns reversely, the supporting plate 51 drives the pressing plate 75 to return reversely, when the pressing plate 75 is contacted with the second connecting plate 74, the pressing plate 75 presses the second connecting plate 74 to move downwards to return, first reset spring 77 compresses to drive slide bar 73, connecting block 72 and remove wheel 71 and move down and reset, make and remove wheel 71 and ground contact, thereby make support frame 1 and ground separation, thereby make things convenient for people to remove this adjustable building site steel pipe quick loading device.
The auxiliary mechanism 8 is further included, the auxiliary mechanism 8 includes a rotating plate 81, a ratchet gear 82, a second fixture block 83, a second return spring 84 and a guide block 85, referring to fig. 1, fig. 7 and fig. 8, the rotating plate 81 is rotatably arranged between the left portions of the outer sides of the mounting plates 3, people can rotate the rotating plate 81 to enable the rotating plate 81 to hook the bottom of the cargo box of the truck, the ratchet gear 82 is arranged at the left portion of the outer side of the mounting plates 3, the ratchet gear 82 is located at the outer side of the rotating plate 81, the guide blocks 85 are welded at the upper sides of the right portions of the front side and the rear side of the rotating plate 81, the second fixture block 83 is arranged on the guide blocks 85 in a sliding mode, the ratchet gear 82 on the same side is clamped by the second fixture block 83, and the second return spring 84 is arranged between the right side of the guide block 85 and the second fixture block 83 on the same side.
When people adjust the mounting plate 3 to be at the same height with the inner bottom of the cargo box of the truck, the rotating plate 81 can be pulled to rotate, the rotating plate 81 is enabled to hook the inner bottom of the cargo box of the truck, so that the adjustable construction site steel pipe rapid loading device is prevented from being disconnected with the inner bottom of the cargo box of the truck, meanwhile, the rotating plate 81 drives the guide block 85 and the second fixture block 83 to rotate, the ratchet gear 82 is enabled to extrude the second fixture block 83 to move leftwards, the second fixture block 83 is enabled to release the ratchet gear 82, the second return spring 84 is compressed, when the second fixture block 83 is separated from the ratchet gear 82, the second return spring 84 is restored to the original state, the second return spring 84 drives the second fixture block 83 to move rightwards and return, the second fixture block 83 is enabled to clamp the ratchet gear 82 again, then the rotating plate 81 is released, when people load all steel pipes into the cargo box of the truck, the second fixture block 83 is pulled leftwards, the second fixture block 83 is enabled to release the ratchet gear 82, the second return spring 84 is compressed, and then the rotating plate 81 is pulled to reversely return, so that the rotating plate 81 releases the bottom in the cargo box of the truck, meanwhile, the rotating plate 81 drives the guide block 85 and the second latch 83 to reversely return, and then the second latch 83 is released, the second return spring 84 returns to the original state, the second return spring 84 drives the second latch 83 to rightwards return, so that the second latch 83 re-latches the ratchet gear 82.
Still including protection machanism 9, protection machanism 9 is including first guard plate 91, pull rod 92 and second guard plate 93, refer to fig. 1, fig. 9 and fig. 10 show, the welding has first guard plate 91 between the 3 right sides of mounting panel, both sides all are equipped with pull rod 92 around the upper portion on first guard plate 91 right side, all the cover has the rubber leather sheath on the pull rod 92, the second guard plate 93 has all been welded to 3 outside right parts of mounting panel, when people place the steel pipe on first guard plate 45 in proper order, people can be protected to first guard plate 91 and second guard plate 93, second guard plate 93 all is connected with the first guard plate 91 of homonymy.
When people need remove this adjustable building site steel pipe quick loading device to the assigned position, can promote pull rod 92 and remove, the rubber leather sheath on the pull rod 92 can prevent the hand and skid this moment, after this adjustable building site steel pipe quick loading device removes the assigned position, loosen pull rod 92 can, when people are placing the steel pipe on first arm-tie 45 in proper order, first guard plate 91 and second guard plate 93 can protect people, prevent that first arm-tie 45 from hooking people's clothing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention.

Claims (8)

1. The utility model provides an adjustable building site steel pipe quick loading device, including support frame (1), articulated slab (2) and mounting panel (3), the equal rotary type in right side upper portion of both sides is equipped with articulated slab (2) around support frame (1), articulated slab (2) upper portion all is equipped with mounting panel (3), characterized by, still including conveying mechanism (4), adjustment mechanism (5) and power unit (6), be equipped with conveying mechanism (4) that are used for conveying the steel pipe on mounting panel (3), be equipped with on support frame (1) and be used for height-adjusting's adjustment mechanism (5), support frame (1) inboard is equipped with power unit (6) that are used for providing power.
2. The adjustable quick loading device for steel pipes on a construction site as claimed in claim 1, wherein the conveying mechanism (4) comprises a first double-shaft motor (41), a transmission wheel (42), a conveying belt (43), a first connecting plate (44), a first pulling plate (45), a transmission rod (46) and a second fixing plate (47), the second fixing plate (47) is arranged between the left parts of the inner sides of the mounting plates (3), the first double-shaft motor (41) is arranged in the middle of the left side of the second fixing plate (47), output shafts on the front side and the rear side of the first double-shaft motor (41) are rotatably connected with the mounting plates (3) on the same side, the transmission rod (46) is rotatably arranged between the right parts of the inner sides of the mounting plates (3), the transmission wheels (42) are arranged on the output shafts on the front side and the rear side of the first double-shaft motor (41) and on the front side and the rear side of the transmission rod (46), the conveying belt (43) is wound between the transmission wheels (42) on the same side in the transverse direction, first connecting plates (44) are arranged between the conveying belts (43) at uniform intervals, and three first pulling plates (45) are arranged on the outer sides of the first connecting plates (44) at uniform intervals.
3. The adjustable quick loading device for steel pipes on a construction site as claimed in claim 2, wherein the adjusting mechanism (5) comprises a support plate (51), first clamping blocks (52) and second pulling plates (53), the support plate (51) is rotatably arranged on the upper portions of the left sides of the front side and the rear side of the support frame (1), six first clamping blocks (52) are arranged at the bottom of the mounting plate (3) at intervals, the support plate (51) is in contact with the first clamping blocks (52) on the same side and the rightmost side, and the second pulling plates (53) are arranged on the left sides of the lower portions of the inner sides of the support plate (51).
4. The adjustable quick steel pipe loading device for the construction site as claimed in claim 3, wherein the power mechanism (6) comprises a second double-shaft motor (61), a missing gear (62), an installation block (63), a straight gear (64) and a pull rope (65), the second double-shaft motor (61) is arranged in the middle of the inner side of the support frame (1), the missing gear (62) is arranged on output shafts of the front side and the rear side of the second double-shaft motor (61), the installation block (63) is arranged on the front side and the rear side of the right side of the top of the support frame (1), the straight gear (64) is rotatably arranged on the upper portion of the installation block (63), the missing gear (62) is meshed with the straight gear (64) on the same side, the pull rope (65) is connected to the inner side of the straight gear (64), and the other end of the pull rope (65) is connected with the second pull plate (53) on the same side.
5. The adjustable quick loading device for steel pipes on a construction site as claimed in claim 4, further comprising a moving mechanism (7) for facilitating moving, wherein the moving mechanism (7) comprises moving wheels (71), connecting blocks (72), sliding rods (73), second connecting plates (74), pressing plates (75), first fixing plates (76) and first return springs (77), the first fixing plates (76) are symmetrically arranged at the front and the back of the left and the right sides of the top of the support frame (1), the sliding rods (73) are arranged in the middle of the upper portion of the first fixing plates (76) in a sliding manner, the connecting blocks (72) are rotatably arranged at the bottoms of the sliding rods (73), the moving wheels (71) are rotatably arranged at the lower portions of the connecting blocks (72), the second connecting plates (74) are arranged between the tops of the sliding rods (73) on the same lateral side, the pressing plates (75) are arranged at the upper portions of the right sides of the support plates (51), and the pressing plates (75) are in contact with the second connecting plates (74) on the same side, first return springs (77) are arranged between the top of the first fixing plate (76) and the second connecting plate (74) on the same side, and the first return springs (77) are wound on the sliding rods (73) on the same side.
6. The adjustable quick loading device for steel pipes on construction sites as claimed in claim 5, further comprising an auxiliary mechanism (8) for hooking the bottom of the container, wherein the auxiliary mechanism (8) comprises a rotating plate (81) and a ratchet gear (82), second fixture block (83), second reset spring (84) and guide block (85), the rotary type is equipped with rotor plate (81) between mounting panel (3) the outside left part, mounting panel (3) outside left part all is equipped with ratchet wheel (82), ratchet wheel (82) are located the outside of rotor plate (81), the right part upside of both sides all is equipped with guide block (85) around rotor plate (81), all slidingtype is equipped with second fixture block (83) on guide block (85), ratchet wheel (82) of homonymy are all blocked in second fixture block (83), all be equipped with second reset spring (84) between second fixture block (83) of guide block (85) right side and homonymy.
7. The adjustable type quick loading device for steel pipes on a construction site as claimed in claim 6, which is characterized by further comprising a protection mechanism (9) for protecting people, wherein the protection mechanism (9) comprises a first protection plate (91), a pull rod (92) and a second protection plate (93), the first protection plate (91) is arranged between the right sides of the mounting plates (3), the pull rod (92) is arranged on the front side and the rear side of the upper portion of the right side of the first protection plate (91), the second protection plate (93) is arranged on the right portion of the outer side of the mounting plate (3), and the second protection plate (93) is connected with the first protection plate (91) on the same side.
8. The adjustable quick loading device for steel pipes on a construction site as claimed in claim 7, wherein the pull rod (92) is sleeved with a rubber leather sheath.
CN202210063626.1A 2022-01-20 2022-01-20 Adjustable building site steel pipe quick loading device Active CN114314056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210063626.1A CN114314056B (en) 2022-01-20 2022-01-20 Adjustable building site steel pipe quick loading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210063626.1A CN114314056B (en) 2022-01-20 2022-01-20 Adjustable building site steel pipe quick loading device

Publications (2)

Publication Number Publication Date
CN114314056A true CN114314056A (en) 2022-04-12
CN114314056B CN114314056B (en) 2023-10-13

Family

ID=81029283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210063626.1A Active CN114314056B (en) 2022-01-20 2022-01-20 Adjustable building site steel pipe quick loading device

Country Status (1)

Country Link
CN (1) CN114314056B (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2470706A1 (en) * 1979-11-30 1981-06-12 Blatchford Ralph Co Ltd APPARATUS FOR HANDLING LOADS, IN PARTICULAR CONTAINERS
JPH07300042A (en) * 1994-03-07 1995-11-14 Kimio Higuchi Pallet device for motor-truck
US20090294246A1 (en) * 2004-06-18 2009-12-03 Pogue Richard W Extendible conveyor system
US20100008750A1 (en) * 2008-07-08 2010-01-14 Dan Jones, Inc. Trailers,systems and methods for transferring material
US20130277175A1 (en) * 2010-10-26 2013-10-24 Engineered Lifting Systems & Equipment Inc. Conveyor apparatus for loading or unloading packages from shipping containers
KR101637134B1 (en) * 2015-12-01 2016-07-06 서경산업주식회사 Salt collecting and stacking apparatus
CN107985955A (en) * 2017-12-27 2018-05-04 成都市旭泰仓储设备有限公司 Double-vane conveyer
WO2018228217A1 (en) * 2017-06-16 2018-12-20 廊坊景隆重工机械有限公司 Complementary transportation and support system used after rapid excavation
CN109849761A (en) * 2019-03-14 2019-06-07 万仕鑫 A kind of lorry wagon box facilitating unloading
CN110065829A (en) * 2019-04-15 2019-07-30 万仕鑫 Inclined plate is used in a kind of unloading of fork truck
CN110626826A (en) * 2019-10-08 2019-12-31 杭州筱趣贸易有限公司 Steel pipe quick loading device that construction was used
JP6726827B1 (en) * 2019-06-17 2020-07-22 广州思天汽車用品有限公司 A mobile vehicle that handles large stones and debris used on sandy beaches
CN211380431U (en) * 2020-01-13 2020-09-01 浙江康德意休闲椅有限公司 Adjusting device for angle of backrest of leisure chair
CN112339085A (en) * 2020-10-20 2021-02-09 广州好未来科技研究有限公司 Energy-concerving and environment-protective ceramic plate production facility
CN213201600U (en) * 2020-09-07 2021-05-14 河北昊蕴天成木业有限公司 Special transfer machine for wood
CN213294094U (en) * 2020-09-30 2021-05-28 荆州市保平环保科技有限公司 A conveyer for fertilizer loading
CN213833300U (en) * 2020-12-04 2021-07-30 刘晓峰 Auxiliary conveying device for coal mine production loading
CN214030956U (en) * 2020-12-26 2021-08-24 济南市基仁建安有限公司 Steel pipe quick loading device that construction was used
CN113424669A (en) * 2021-06-30 2021-09-24 翁丽彤 Portable soil turning equipment for saline and alkaline land oat planting

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2470706A1 (en) * 1979-11-30 1981-06-12 Blatchford Ralph Co Ltd APPARATUS FOR HANDLING LOADS, IN PARTICULAR CONTAINERS
JPH07300042A (en) * 1994-03-07 1995-11-14 Kimio Higuchi Pallet device for motor-truck
US20090294246A1 (en) * 2004-06-18 2009-12-03 Pogue Richard W Extendible conveyor system
US20100008750A1 (en) * 2008-07-08 2010-01-14 Dan Jones, Inc. Trailers,systems and methods for transferring material
US20130277175A1 (en) * 2010-10-26 2013-10-24 Engineered Lifting Systems & Equipment Inc. Conveyor apparatus for loading or unloading packages from shipping containers
KR101637134B1 (en) * 2015-12-01 2016-07-06 서경산업주식회사 Salt collecting and stacking apparatus
WO2018228217A1 (en) * 2017-06-16 2018-12-20 廊坊景隆重工机械有限公司 Complementary transportation and support system used after rapid excavation
CN107985955A (en) * 2017-12-27 2018-05-04 成都市旭泰仓储设备有限公司 Double-vane conveyer
CN109849761A (en) * 2019-03-14 2019-06-07 万仕鑫 A kind of lorry wagon box facilitating unloading
CN110065829A (en) * 2019-04-15 2019-07-30 万仕鑫 Inclined plate is used in a kind of unloading of fork truck
JP6726827B1 (en) * 2019-06-17 2020-07-22 广州思天汽車用品有限公司 A mobile vehicle that handles large stones and debris used on sandy beaches
CN110626826A (en) * 2019-10-08 2019-12-31 杭州筱趣贸易有限公司 Steel pipe quick loading device that construction was used
CN211380431U (en) * 2020-01-13 2020-09-01 浙江康德意休闲椅有限公司 Adjusting device for angle of backrest of leisure chair
CN213201600U (en) * 2020-09-07 2021-05-14 河北昊蕴天成木业有限公司 Special transfer machine for wood
CN213294094U (en) * 2020-09-30 2021-05-28 荆州市保平环保科技有限公司 A conveyer for fertilizer loading
CN112339085A (en) * 2020-10-20 2021-02-09 广州好未来科技研究有限公司 Energy-concerving and environment-protective ceramic plate production facility
CN213833300U (en) * 2020-12-04 2021-07-30 刘晓峰 Auxiliary conveying device for coal mine production loading
CN214030956U (en) * 2020-12-26 2021-08-24 济南市基仁建安有限公司 Steel pipe quick loading device that construction was used
CN113424669A (en) * 2021-06-30 2021-09-24 翁丽彤 Portable soil turning equipment for saline and alkaline land oat planting

Also Published As

Publication number Publication date
CN114314056B (en) 2023-10-13

Similar Documents

Publication Publication Date Title
US20080302404A1 (en) Dust-proof end closure for contractible canopy
CA2858542C (en) Container loading and unloading system
US3866532A (en) Firehose retractor
EP3151653B1 (en) Improvements in and relating to bale wrapping machines
US3958707A (en) Container transport trailer
CN108100693B (en) Cargo loading and unloading vehicle for large logistics truck
AU608024B2 (en) Vehicle-mounted load hoisting device
US7111444B1 (en) Lawn tractor lift
US5269642A (en) Container loading and unloading system
CN114314056A (en) Adjustable building site steel pipe quick loading device
US6598855B1 (en) Motorcycle and small vehicle lift
JPH09173493A (en) Automatic recovery device for cloth hose for fire fighting
US5701812A (en) Device for scrapping cars
CN207190881U (en) A kind of semitrailer equipped with automatic goods loading device
CA2788439A1 (en) Comminuting device and method for comminuting material
CN210618175U (en) Safety device of moving trolley
CN114809556A (en) Multifunctional scaffold for building wall in construction site
US3301420A (en) Wheel mounted unloading fork
CN113335356B (en) Foldable movable material rack
CN220222328U (en) Retractable material loading track
CN214085002U (en) Dairy products automatic packaging machine that leakproofness is good
CN209921354U (en) Novel sugarcane transfer car (buggy)
CN215796865U (en) Mortar transfer equipment in bags
CN115075581B (en) Anti withstand voltage construction equipment of wall body integrated into one piece
US20020110445A1 (en) Apparatus and method for transporting with an automotive vehicle a straddled sports vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230913

Address after: 318050, Zhejiang, Taizhou province Luqiao district on the town of clouds on the side of the village

Applicant after: TAIZHOU CITY FENLIDA CAR MOTORCYCLE ACCESSORIES Ltd.

Address before: 518102 room 703, 7 / F, building 4, Taoyuanju District 1, Xixiang street, Bao'an District, Shenzhen, Guangdong Province

Applicant before: Liu Xuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant