CN114278074A - Manned platform suitable for installation of fan foundation anchor bolt assembly - Google Patents

Manned platform suitable for installation of fan foundation anchor bolt assembly Download PDF

Info

Publication number
CN114278074A
CN114278074A CN202210103356.2A CN202210103356A CN114278074A CN 114278074 A CN114278074 A CN 114278074A CN 202210103356 A CN202210103356 A CN 202210103356A CN 114278074 A CN114278074 A CN 114278074A
Authority
CN
China
Prior art keywords
bracket
platform
anchor plate
installation
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210103356.2A
Other languages
Chinese (zh)
Inventor
杨薛亮
陈建东
余登敏
谢树琛
韦廷辉
何建宏
尚玉龙
刘海棠
陈绍志
吴军
汪航
黎光军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202210103356.2A priority Critical patent/CN114278074A/en
Publication of CN114278074A publication Critical patent/CN114278074A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a manned platform suitable for installing a fan foundation anchor bolt assembly, which comprises: the platform mechanism is positioned in the center of the inner diameter of the upper anchor plate when in use; the bracket mechanisms are uniformly distributed and fixed on the platform mechanism at intervals; the rigid safety barrier mechanism is arranged on the platform mechanism. After the anchor bolts for positioning are installed on the lower anchor plate, the manned platform is installed with the upper anchor plate through the bracket mechanism, the manned platform and the upper anchor plate are lifted to the position right above the lower anchor plate by the crane, so that the upper anchor plate and the anchor bolts for positioning are installed, and when other anchor bolts are installed, an operator can simultaneously install the anchor bolts from any surface of the upper anchor plate in a straight line or a cross diagonal position on the platform mechanism under the protection of the rigid safety barrier mechanism.

Description

Manned platform suitable for installation of fan foundation anchor bolt assembly
Technical Field
The invention relates to a manned platform suitable for installation of a fan foundation anchor bolt assembly, and belongs to the technical field of fan foundation installation.
Background
For the anchor bolt assembly constituting one of the foundations of a wind turbine (abbreviated as a wind turbine), it is necessary to install a plurality of anchor bolts on the upper anchor plate and the lower anchor plate which are vertically spaced apart, as shown in fig. 1. During installation, the lower anchor plate is provided with the positioning anchor bolts, the upper anchor plate is hoisted to a certain height by the crane and slowly moved to the position right above the lower anchor plate, and the temporary steel nuts are screwed in the anchor bolt holes which are symmetrically penetrated into the upper anchor plate by the installer standing on the upper anchor plate and uniformly distributed at the upper ends of the positioning anchor bolts. And after the installation and adjustment of the positioning anchor bolts are finished, all the common anchor bolts are penetrated. When the installation, the installer who stands at last anchor plate is in high altitude construction, has the problem of potential safety hazard, and the concrete expression is in:
1. during hoisting, constructors sit on the anchor plate, and the regulation that 'no person is on the hoisted object' of the safety regulation is violated;
2. in the whole construction operation process, constructors can only sit on the upper anchor plate, the inner part of the upper anchor plate is completely hollow, the inner part of the upper anchor plate is hollow, the distance between a safety belt hanging point and a lifting hook plumb line is more than 2m, and secondary damage caused by falling and swinging collision is easy to occur;
3. a constructor sits on the upper anchor plate to position a plurality of one hundred anchor bolts one by one, and the levelness of the upper anchor plate is adjusted, the concentricity of the upper anchor plate and the lower anchor plate is adjusted, the exposure length value of the anchor bolts is adjusted, the upper anchor plate and the lower anchor plate are exposed to the high altitude for a long time, and the safety risk is extremely high;
4. the installation area of the anchor bolt assembly is concentrated with intensive personnel and needs to work simultaneously, and the cross operation of the two ends of the anchor bolt in the vertical space of the upper anchor plate and the lower anchor plate easily causes the safety accidents of people injury by falling objects, high falling, mechanical striking and the like.
At chinese patent publication CN 209277509U's portable scaffold frame for installation of fan prestressed anchor bolt, the staff can install the crab-bolt on the scaffold frame that lies in anchor bolt board one side, the above-mentioned problem that has the potential safety hazard is solved, however, in the crab-bolt installation, in order to prevent the toppling that whole focus skew caused, must install simultaneously at a word or cross diagonal position, there is the problem that needs frequent removal scaffold frame, and in later stage survey crew measures and adjusts the concentricity of anchor slab and lower anchor slab, the levelness of upper anchor slab, when anchor slab length value is exposed to the crab-bolt upper end, also there is the problem that needs frequent removal scaffold frame.
Disclosure of Invention
In order to solve the technical problem, the invention provides a manned platform suitable for mounting a fan foundation anchor bolt assembly.
The invention is realized by the following technical scheme.
The invention provides a manned platform suitable for installing a fan foundation anchor bolt assembly, which comprises:
the platform mechanism is positioned in the center of the inner diameter of the upper anchor plate when in use;
the bracket mechanisms are uniformly distributed and fixed on the platform mechanism at intervals;
the rigid safety barrier mechanism is arranged on the platform mechanism.
The lifting lug is screwed with the anchor bolt hole of the upper anchor plate through a bolt.
The platform mechanism includes: the table top is provided with a manual through hole;
a cover plate is rotatably arranged on the table top positioned at the side edge of the artificial through hole;
the periphery of the table top is connected with a platform foot baffle plate.
The platform foot baffle plate is fixedly connected with the periphery of the table top through screws or welding.
The cover plate is rotatably arranged on the table top at the side of the artificial through hole through a hinge.
The table top is formed by welding steel plates and/or steel beams into a whole or is formed into a detachable whole through bolts.
The bracket mechanism includes: the bracket vertical pieces of the plurality of bracket mechanisms are distributed at intervals and fixedly connected with the periphery of the table top;
the bracket transverse piece is connected with the bracket vertical piece, and four bracket connecting through holes are formed in the bracket transverse piece and correspondingly connected with the anchor bolt holes of the upper anchor plate through bolts;
and the bracket reinforcing plate is connected with the bracket vertical piece and the bracket transverse piece.
The rigid safety barrier mechanism comprising: the connecting pins are uniformly distributed on the table board at intervals;
the first upright stanchion is detachably connected with each connecting foot;
the first four-way joint is detachably connected with the top of the first upright stanchion, the second upright stanchion is detachably connected with the top of the first four-way joint, and the second four-way joint is detachably connected with the top of the second upright stanchion;
the cross rod is detachably connected with the left side and the right side of the four-way joint, and two ends of the cross rod are inserted and installed with the left side joint and the right side joint of the adjacent first four-way joint and the second four-way joint.
The second four-way joint is provided with a cap in a positioning hole.
The invention has the beneficial effects that: after the anchor bolts for positioning are installed on the lower anchor plate, the manned platform is installed with the upper anchor plate through the bracket mechanism, the manned platform and the upper anchor plate are lifted to the position right above the lower anchor plate by the crane, the upper anchor plate and the anchor bolts for positioning are installed, and when other anchor bolts are installed, an operator can simultaneously install the anchor bolts from any side of the upper anchor plate in a straight line or a cross diagonal position on the platform mechanism under the protection of the rigid safety guardrail mechanism on the platform mechanism, so that the problem that the scaffold needs to be frequently moved is solved, and the scaffold does not need to be frequently moved when later-stage measuring personnel can measure and adjust the concentricity of the upper anchor plate and the lower anchor plate, the levelness of the upper anchor plate and the length value of the upper anchor bolt on the platform mechanism.
Drawings
FIG. 1 is a schematic structural view of an anchor bolt, an upper anchor plate and a lower anchor plate;
FIG. 2 is a schematic structural view of the people platform of the present invention;
FIG. 3 is a schematic structural view of the manned platform and the upper anchor plate of the present invention;
FIG. 4 is a schematic structural view of the bracket mechanism of the present invention in use with the upper anchor plate;
FIG. 5 is a schematic view of a portion of the rigid safety barrier mechanism of the present invention;
in the figure: 1-a platform mechanism; 11-a table top; 12-a cover plate; 13-platform toe board; 2-a bracket mechanism; 21-corbel erector; 22-corbel cross member; 23-bracket connecting through holes; 24-a corbel stiffener; 3-a rigid safety barrier mechanism; 31-connecting pin; 32-a first upright; 33-a first four-way joint; 34-a second upright post; 35-a second four-way joint; 36-a cross-bar; 37-a cap; 41-anchor bolt; 43-lower anchor plate; 42-upper anchor plate; 5-lifting lugs.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
See the structure shown in fig. 1-5.
The invention relates to a manned platform suitable for installing a fan foundation anchor bolt assembly, which comprises:
a platform means 1 located centrally within the internal diameter of the upper anchor plate 42 in use;
the bracket mechanisms 2 are detachably fixed with the anchor bolt holes of the upper anchor plate 42 through screws or bolts during installation, and the plurality of bracket mechanisms 2 are uniformly distributed and fixed on the platform mechanism 1 at intervals;
through the rigidity safety barrier mechanism 3 of screw or bolt demountable installation on platform mechanism 1, rigidity safety barrier mechanism 3 protects the operating personnel who lies in on platform mechanism 1.
After the anchor bolts 41 for positioning are installed on the lower anchor plate 43, the manned platform is installed with the upper anchor plate 42 through the bracket mechanism 2, the manned platform and the upper anchor plate 42 are lifted by the crane to be right above the lower anchor plate 43, the upper anchor plate 42 and the anchor bolts 41 for positioning are installed, when the rest of the anchor bolts 41 are installed, an operator installs the anchor bolts 43 on the platform mechanism 1 at the same time in a straight line or a cross diagonal position from any surface of the upper anchor plate 42 under the protection of the rigid safety guardrail mechanism 3, the problem that the scaffold needs to be frequently moved when the scaffold is used is solved, and the scaffold does not need to be frequently moved when a later-stage measuring person can measure and adjust the concentricity of the upper anchor plate and the lower anchor plate, the levelness of the upper anchor plate and the length value of the upper anchor plate exposed at the upper end of the anchor bolts on the platform mechanism 1.
The lifting lug 5 is screwed with the anchor bolt hole of the upper anchor plate 42 during use, the lifting lugs 5 are screwed in the anchor bolt holes of the upper anchor plate 42 at uniform intervals, and the manned platform and the upper anchor plate 42 are conveniently lifted to be right above the lower anchor plate 43 through the lifting lugs 5 by a crane through a binding band.
The platform mechanism 1 comprises a table top 11 which is formed by welding steel plates and/or steel beams into a whole or forming a detachable whole through bolts;
the table top 11 is provided with a manual through hole, and an operator can conveniently and temporarily mount and build a stair to go up and down through the manual through hole;
a cover plate 12 is rotatably arranged on the table top 11 positioned at the side of the artificial through hole through hinge, and the artificial through hole can be covered by the cover plate 12 for safety;
the periphery of the table top 11 is fixedly connected with a platform foot baffle plate 13 through screws or welding, and because during installation, the periphery of the table top 11 is separated from the bottom of the upper anchor plate, the installation platform foot baffle plate 13 can protect the feet of workers.
The platform mechanism 1 is installed in the inner diameter space of the upper anchor plate 42, so that a person operating the anchor bolt 41 can obtain a standing foundation, and although the problem of potential safety hazard is solved, the operation requirements of measuring and adjusting the concentricity of the upper anchor plate and the lower anchor plate, the levelness of the upper anchor plate and the length value of the upper anchor plate exposed at the upper end of the anchor bolt at the later stage are considered in the installation of the platform mechanism 1.
In order to support the platform mechanism 1 in the space of the inner diameter of the upper anchor plate 42 and to support the platform mechanism 1 directly from the ground at the bottom of the inner diameter of the upper anchor plate 42, for example, in an anchor type pile foundation of chinese patent publication No. CN207130726U, an anchor member is rammed into the ground from the middle of the inner diameter of the upper anchor plate, although the anchor member can support the platform mechanism 1 in the space of the inner diameter of the upper anchor plate 42, when the platform mechanism 1 is lifted up for measurement, the anchor member located in the space below the inner diameter of the upper anchor plate 42 is shaken in a large arc, the bottom of the anchor member easily collides with the lower anchor plate 43 or the lower part of the anchor bolt 41, and there is a problem that the lower anchor plate 43 or the anchor bolt 41 is damaged by the anchor member located in the space below the inner diameter of the upper anchor plate 42.
The bracket mechanism 2 comprises: the bracket vertical pieces 21 are welded or fixed by bolts in a state of being vertical to the table top 11 during installation, and the bracket vertical pieces 21 of the plurality of bracket mechanisms 2 are distributed at intervals and fixedly connected with the periphery of the table top 11;
the bracket transverse member 22 is welded with the bracket upright member 21 to be integrally fixed or detachably and fixedly connected with a bolt, a bracket connecting through hole 23 is formed in the bracket transverse member 22, and the four bracket connecting through holes 23 are correspondingly connected with the anchor bolt holes of the upper anchor plate 42 through bolts;
a bracket reinforcing plate 24 connected with the bracket upright member 21 and the bracket transverse member 22, the bracket reinforcing plate 24 being located in the middle of the bracket connecting through hole 23; when the bracket mechanism 2 is connected with the upper anchor plate 42, the bracket connecting through hole 23 penetrating through the bracket transverse member 22 through a bolt is screwed with the anchor bolt hole of the upper anchor plate 42, so that the platform mechanism 1 is fixed with the anchor bolt hole of the upper anchor plate 42 through the bracket mechanism 2; after the other anchor bolts 41 are installed, the bolts on the bracket transverse member 22 are unscrewed, the bracket mechanism 2 is lifted away from the upper anchor plate 42 by a crane, a measurer is positioned on the table top 11 of the platform mechanism 1, the later-stage measurement is carried out, the concentricity of the upper anchor plate and the lower anchor plate, the levelness of the upper anchor plate and the length value of the upper anchor plate exposed at the upper end of the anchor bolt are adjusted, and the problem that the lower anchor plate 43 or the anchor bolt 41 is damaged by the impact of the anchor part positioned in the space below the inner diameter of the upper anchor plate 42 is solved because the bracket mechanism 2 is lifted away from the upper anchor plate 42.
After manned platform installation was on last anchor plate 42, rigidity safety barrier mechanism 3 made operating personnel obtain effectual protection in platform mechanism 1 operation, though, solved the problem of potential safety hazard, however, in a wind field, can have one section distance between the fan, manned platform need transport to next fan basis after accomplishing the operation on a fan basis, uses current rail, can have the problem that part damages difficult the change, and the transportation occupies the too much space of transport vechicle.
At the scalable guardrail of a hanging hole of a fan tower section of thick bamboo that chinese patent publication is CN207499492U, second horizontal pole and montant have constituted a whole, and after a second horizontal pole local damage, there is the whole just problem that can not use that whole second horizontal pole and montant constitute to the whole that second horizontal pole and montant constitute, there is the problem that occupies too much space of transport vechicle when the loading short distance transportation.
A rigid safety barrier mechanism 3 as described above, comprising: the connecting feet 31 are fixedly connected with the table top 11 of the platform mechanism 1 through screws or bolts when the platform mechanism is installed and used, the connecting feet 31 are uniformly distributed on the table top 11 at intervals, and the upper parts of the connecting feet 31 are provided with mounting holes;
a first upright rod 32 which is fixedly connected with the mounting hole of each connecting pin 31 through a shaft hole in an interference insertion manner and is fixed through a screw or welded;
a first four-way joint 33 which is in interference insertion connection with a shaft hole at the top of the first upright stanchion 32 and is fixed by a screw, a second upright stanchion 34 which is in interference insertion connection with a shaft hole at the top of the first four-way joint 33 and is fixed by a screw, and a second four-way joint 35 which is in interference insertion connection with a shaft hole at the top of the second upright stanchion 34 and is fixed by a screw;
a cross rod 36 fixed by screws is inserted into the left and right side shaft holes of the four-way joint 33 in an interference manner, and two ends of the cross rod 36 are inserted into left and right side joints of the adjacent first four-way joint 33 and second four-way joint 35;
the second four-way joint 35 has a cap 37 installed in a portion hole, and the cap 37 prevents entry of foreign matter or raindrops.
The connecting feet 31, the first upright rod 32, the first four-way joint 33, the second upright rod 34, the second four-way joint 35 and the cross rod 36 are all rigid members made of rigid materials such as hollow steel pipes, plastic pipes and the like, and the rigid safety barrier mechanism 3 is formed after connection.
Accomplish the operation back on a fan basis, when needing to transport to next fan basis, the pine of screwing off connects foot 31 and 11 connecting bolt on mesa of platform mechanism 1 and dismantles, the first pole setting 32 of the pine of screwing off simultaneously, second pole setting 34, horizontal pole 36 and first four-way connection 33, second four-way connection 35, the bolt or the screw of connecting foot 31, make rigid connecting foot 31, first pole setting 32, first four-way connection 33, second pole setting 34, second four-way connection 35, each part of horizontal pole 36 is categorised and is stacked in order, the space that occupies the transport vechicle has been reduced, when the transportation, even damage appears in part, whole unable problem that can not appear, the whole problem that just can not use after having solved current local damage.
The construction method of the manned platform comprises the following steps:
1. the crane hangs down the anchor plate 43 and is installed on the concrete embedded part and adjusts the levelness of the lower anchor plate 43;
2. assembling the manned platform beside the anchor bolt assembly mounting site;
3. splicing the upper anchor plates 42 into a whole ring;
4. hoisting the upper anchor plate 42 by a crane, and connecting the upper anchor plate 42 with the bracket connecting through holes 23 of the eight bracket transverse parts 22 of the manned platform by bolts;
5. a constructor enters the platform surface 11 of the manned platform and hangs a safety belt on the lifting hook;
6. hoisting the upper anchor plate 42 and the manned platform by using a crane, after reaching the installation height, symmetrically penetrating the positioned anchor bolts 41 into the anchor bolt holes of the upper anchor plate 42 by a constructor in the manned platform by matching with ground personnel, and screwing temporary steel nuts on the top ends of the positioned anchor bolts 41;
7. the constructor in the platform penetrates the upper end of the common anchor bolt 41 into the anchor bolt hole of the upper anchor plate 42, and the installer beside the lower anchor plate 43 penetrates the lower end of the anchor bolt 41 (which is provided with the nut and is screwed in the anchor bolt hole of the corresponding lower anchor plate 43;
8. after all anchor bolts 41 which do not influence the installation are in place, bolts of the bracket connecting through holes 23 for connecting the upper anchor plate 42 and the eight bracket transverse parts 22 of the manned platform are removed;
9. the manned platform is lifted, the bracket transverse straight piece 22 is higher than the upper anchor plate 42, and the anchor bolts 41 at the bracket transverse straight piece 22 are supplemented;
10. a measuring person is matched with the measuring person in the table top 11 of the manned platform to measure and adjust the concentricity of the upper anchor plate and the lower anchor plate, the levelness of the upper anchor plate and the length value of the upper anchor plate exposed at the upper end of the anchor bolt;
11. after the anchor assemblies are installed, the people platform is suspended from the upper anchor plate 42.

Claims (9)

1. The utility model provides a manned platform suitable for installation of fan basis crab-bolt sub-assembly which characterized in that includes:
the platform mechanism (1) is positioned in the center of the inner diameter of the upper anchor plate (42) when the platform mechanism (1) is used;
the bracket mechanisms (2) are uniformly distributed on the platform mechanism (1) at intervals;
the rigid safety barrier mechanism (3) is arranged on the platform mechanism (1).
2. The manned platform suitable for installation of a wind turbine foundation anchor bolt assembly according to claim 1, wherein: the lifting lug (5) is screwed with an anchor bolt hole of the upper anchor plate (42) through a bolt.
3. The manned platform suitable for installation of a wind turbine foundation anchor bolt assembly according to claim 1, wherein: the platform mechanism (1) comprises: the table top (11), the table top (11) is provided with a manual through hole;
a cover plate (12) is rotatably arranged on the table top (11) positioned at the side edge of the artificial through hole;
the periphery of the table top (11) is connected with a platform foot baffle plate (13).
4. The manned platform suitable for installation of a wind turbine foundation anchor bolt assembly according to claim 3, wherein: the platform foot baffle plate (13) is fixedly connected with the periphery of the table top (11) through screws or welding.
5. The manned platform suitable for installation of a wind turbine foundation anchor bolt assembly according to claim 3, wherein: the cover plate (12) is rotatably arranged on the table top (11) at the side of the artificial through hole through folding.
6. The manned platform suitable for installation of a wind turbine foundation anchor bolt assembly according to claim 3, wherein: the table top (11) is formed by welding steel plates and/or steel beams into a whole or can be disassembled through bolts.
7. The manned platform of claim 1 or 3 adapted for installation of a wind turbine foundation anchor assembly, wherein: the corbel mechanism (2) comprises: the bracket standing pieces (21) of the plurality of bracket mechanisms (2) are distributed at intervals and fixedly connected with the periphery of the table top (11);
the bracket transverse and straight piece (22) is connected with the bracket vertical piece (21), bracket connecting through holes (23) are formed in the bracket transverse and straight piece (22), and the number of the bracket connecting through holes (23) is four, and the four bracket connecting through holes are correspondingly connected with anchor bolt holes of the upper anchor plate (42) through bolts;
a bracket reinforcing plate (24) connected with the bracket upright piece (21) and the bracket transverse piece (22).
8. The manned platform suitable for installation of a wind turbine foundation anchor assembly according to claim 7, wherein: the rigid safety barrier mechanism (3) comprises: the connecting pins (31), the connecting pins (31) are distributed on the table board (11) at intervals;
a first upright (32) detachably connected to each connecting leg (31);
the first four-way joint (33) is detachably connected with the top of the first upright rod (32), the second upright rod (34) is detachably connected with the top of the first four-way joint (33), and the second four-way joint (35) is detachably connected with the top of the second upright rod (34);
and the cross rod (36) is detachably connected with the left side and the right side of the four-way joint (33), and the two ends of the cross rod (36) are inserted and installed with the left side and the right side of the adjacent first four-way joint (33) and second four-way joint (35).
9. The manned platform suitable for installation of a wind turbine foundation anchor assembly according to claim 8, wherein: and a cap (37) is installed on the part hole of the second four-way joint (35).
CN202210103356.2A 2022-01-27 2022-01-27 Manned platform suitable for installation of fan foundation anchor bolt assembly Pending CN114278074A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210103356.2A CN114278074A (en) 2022-01-27 2022-01-27 Manned platform suitable for installation of fan foundation anchor bolt assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210103356.2A CN114278074A (en) 2022-01-27 2022-01-27 Manned platform suitable for installation of fan foundation anchor bolt assembly

Publications (1)

Publication Number Publication Date
CN114278074A true CN114278074A (en) 2022-04-05

Family

ID=80881797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210103356.2A Pending CN114278074A (en) 2022-01-27 2022-01-27 Manned platform suitable for installation of fan foundation anchor bolt assembly

Country Status (1)

Country Link
CN (1) CN114278074A (en)

Similar Documents

Publication Publication Date Title
AU2011220341B2 (en) Scaffolding
CN107697818B (en) Construction method and special construction equipment for wall of prestressed concrete wind power tower
CA1059490A (en) Apparatus for use in buildings
JPH11514063A (en) Top-to-foundation lifting method for building construction
CN111119497B (en) Ultra-large box-type steel column installation system and construction method
CN110805289A (en) Plug-in type discharging platform and construction method
US6679025B1 (en) Modular tower
CN216740637U (en) Manned platform suitable for installation of fan foundation anchor bolt assembly
CN114278074A (en) Manned platform suitable for installation of fan foundation anchor bolt assembly
CN216740614U (en) Connecting bracket mechanism
CN216740624U (en) Rigid safety barrier mechanism
CN212532065U (en) Gantry crane capable of being used in different height difference places
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
GB1563298A (en) Drophead attachments for builder props
CN212613656U (en) Elevator shaft support
CN212897455U (en) Prevent portable scaffold frame that topples
CN212897502U (en) Assembled lifting scaffold
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN212478487U (en) Construction platform for building construction
CN114427304A (en) Assembled type edge-facing protection device for cast-in-place concrete stairs
CN220978791U (en) Elevator shaft inner formwork support frame
CN112302320A (en) Building stand column modularized assembly type scaffold module, system and construction method
CN220059026U (en) A can assemble, adjustable interim fixed stay device for steel construction hoist and mount
CN218346228U (en) Steel-pipe pile prefabricated extension basis
CN220267151U (en) Lifting type supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination