CN114232633A - Open-close type gabion underwater construction method - Google Patents

Open-close type gabion underwater construction method Download PDF

Info

Publication number
CN114232633A
CN114232633A CN202111541882.9A CN202111541882A CN114232633A CN 114232633 A CN114232633 A CN 114232633A CN 202111541882 A CN202111541882 A CN 202111541882A CN 114232633 A CN114232633 A CN 114232633A
Authority
CN
China
Prior art keywords
gabion
main body
device main
sling
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111541882.9A
Other languages
Chinese (zh)
Inventor
张绍华
陈栋
张艳霞
徐文俊
程晓明
高静
陈治海
汪精云
许涛
韦应堂
王世珍
贺鹏
祁大明
马成彪
张慕尧
何睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shunshunlong Information Technology Co ltd
Original Assignee
Jiangsu Shunshunlong Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shunshunlong Information Technology Co ltd filed Critical Jiangsu Shunshunlong Information Technology Co ltd
Priority to CN202111541882.9A priority Critical patent/CN114232633A/en
Publication of CN114232633A publication Critical patent/CN114232633A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/10Placing gravel or light material under water inasmuch as not provided for elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses an open-close type gabion underwater construction method, relates to the technical field of gabion underwater installation auxiliary devices, and aims to solve the problems that an existing gabion is low in underwater construction speed, high in cost and high in difficulty. Step one, placing a gabion in a gabion placing cavity in a device main body in a dry environment, wherein a bottom turning plate at the bottom of the device main body is in a closing device, and then filling a proper amount of stones into the gabion; after the filling is finished, preferentially lifting a second sling through a crane, then lifting the device main body through the first sling, and moving the device main body to a specified position; and step three, after the device with the gabion and the stones is lifted to the underwater position by the first sling below the device after reaching the designated position, gradually loosening the second sling by the crane, and gradually rotating one end of the bottom turning plate by the axis of the hinge after the second lifting lug loses the pulling force, so that the lower opening of the gabion is opened, and the gabion sinks to the water bottom under the action of gravity.

Description

Open-close type gabion underwater construction method
Technical Field
The invention relates to the technical field of underwater installation auxiliary devices for gabions, in particular to an open-close type gabion underwater construction method.
Background
The gabion refers to a cage filled with stones and arranged for preventing a river bank or a structure from being washed by water flow, and is nowadays successfully applied to protection engineering of water conservancy projects, roads, railway projects and embankments as a novel ecological grid structure of a new process, a new technology and a new material. The organic combination of the engineering structure and the ecological environment is well realized, and meanwhile, compared with some traditional rigid structures, the structure has the advantages of itself, so that the structure becomes a preferred structure type for protecting riverbeds, governing landslides, preventing mud-rock flow and preventing rockfall and protecting the environment in the world.
However, the gabion is generally constructed in a dry environment and cannot be constructed underwater, the existing underwater construction method adopts frogman diving operation, the gabion is firstly placed at a position where the gabion is to be placed underwater, and then filler block stones are filled in the gabion, so that the construction speed is low, the cost is high, the difficulty is high, and the construction quality cannot be guaranteed, so that the existing requirements cannot be met, and the open-close type gabion underwater construction method is provided.
Disclosure of Invention
The invention aims to provide an underwater construction method of an open-close type gabion, and aims to solve the problems that the gabion provided by the background technology is low in underwater construction speed, high in cost and high in difficulty.
In order to achieve the purpose, the invention provides the following technical scheme: an open-close type gabion underwater construction method comprises the following steps:
step one, placing a gabion in a gabion placing cavity in a device main body in a dry environment, wherein a bottom turning plate at the bottom of the device main body is in a closing device, and then filling a proper amount of stones into the gabion;
after the filling is finished, preferentially lifting a second sling through a crane, enabling the bottom turning plate to tightly abut against the lower end of the device main body under the tension of the second sling, and then lifting the device main body through the first sling and moving the device main body to a specified position;
and step three, after the device with the gabion and the stones is lifted to the underwater position by the first sling below the device after reaching the designated position, gradually loosening the second sling by the crane, and gradually rotating one end of the bottom turning plate by the axis of the hinge after the second lifting lug loses the pulling force, so that the lower opening of the gabion is opened, and the gabion sinks to the water bottom under the action of gravity.
Preferably, the device main part all around by first fixed plate and second fixed plate composition, and first fixed plate and second fixed plate all are provided with two, first fixed plate is located the both sides of device main part, and the second fixed plate is located the front and back end of device main part, the inside of device main part is provided with the gabion and places the chamber, and the upper end that the chamber was placed to the gabion is for opening the structure, the both sides of terminal surface all install the end and turn over the board under the device main part, and the hinge normal running fit is passed through with first fixed plate to one side that turns over the board at the end.
Preferably, both sides of the upper end of the second fixing plate are provided with first lifting lugs, the first lifting lugs are welded and fixed with the second fixing plate, the second lifting lugs are arranged on the other side of the bottom turning plate, and the second lifting lugs are welded and fixed with the bottom turning plate.
Preferably, a first sling penetrates through the first lifting lug.
Preferably, a second sling penetrates through the second lifting lug.
Preferably, sling through holes are formed in the first lifting lug and the second lifting lug.
Preferably, a gabion lower opening is arranged between the bottom turning plates, and a gabion is preset in the gabion placing cavity.
Compared with the prior art, the invention has the beneficial effects that:
1. the device comprises a device body, a bottom turning plate, a stone cage, a crane and a lifting machine, wherein the device body is provided with a stone cage placing cavity, the bottom turning plate is arranged at the bottom of the device body, the stone cage placing cavity is arranged at the bottom of the device body, the bottom turning plate is arranged at the bottom of the device body, the stone cage is arranged at the bottom of the device body, the bottom turning plate is arranged at the bottom of the device body, the device body is provided with a closing device, the closing device is arranged at the bottom of the device body, the stone cage is arranged at the bottom of the device body, and the closing device is connected with the lifting machine.
2. According to the invention, in a hoisting mode, the first lifting lugs are arranged at the four corners of the upper end of the device main body, the second lifting lugs are arranged on one sides of the bottom turning plates, the first lifting cables matched with the first lifting lugs are used for supporting the device main body through a crane so as to realize position adjustment, the second lifting cables matched with the second lifting lugs are also matched with the crane, before and during hoisting, the second lifting cables are stretched by the crane to form tight tightening on the second lifting lugs all the time, so that the condition that the gabion falls down due to the opening of the bottom turning plates is avoided, after the specified position is reached, the crane gradually loosens the second lifting cables, and after the tensile force is lost, one end of the bottom turning plates gradually rotates along the axis of the hinge, so that the lower opening of the gabion is opened, and the gabion is convenient to sink.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a perspective view of the bottom flap of the present invention in an expanded state;
FIG. 3 is a front view of the main body of the apparatus of the present invention during gabion lifting;
figure 4 is a front view of the body of the apparatus of the present invention as the gabion is lowered.
In the figure: 1. a device main body; 2. a first fixing plate; 3. a second fixing plate; 4. a gabion placing cavity; 5. a first lifting lug; 6. a bottom turning plate; 7. a hinge; 8. a second lifting lug; 9. opening the lower part of the gabion; 10. punching a sling; 11. a first sling; 12. a second sling.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, an embodiment of the present invention is shown: an open-close type gabion underwater construction method comprises the following steps: firstly, placing a gabion in a gabion placing cavity 4 in a device main body 1 in a dry environment, wherein a bottom turning plate 6 at the bottom of the device main body 1 is in a closed device, and then filling a proper amount of stones into the gabion;
after the filling is finished, preferentially lifting a second sling 12 through a crane, enabling the bottom turning plate 6 to tightly abut against the lower end of the device main body 1 under the tension of the second sling 12, and then lifting the device main body 1 through the first sling 11 and moving the device main body to a specified position;
and step three, after the device with the gabion and the stones is lifted to the underwater position by the first sling 11 below the device after reaching the designated position, gradually loosening the second sling 12 by the crane, gradually rotating one end of the bottom turning plate 6 by the axis of the hinge 7 after the second lifting lug 8 loses the pulling force, and accordingly opening the gabion lower opening 9 and enabling the gabion to sink to the water bottom under the action of gravity.
Further, device main part 1 is all constituteed by first fixed plate 2 and second fixed plate 3 all around, and first fixed plate 2 and second fixed plate 3 all are provided with two, first fixed plate 2 is located device main part 1's both sides, and second fixed plate 3 is located device main part 1's front and back end, device main part 1's inside is provided with the gabion and places chamber 4, and the upper end that chamber 4 was placed to the gabion is for opening the structure, turn over board 6 with the end all installed to the both sides of device main part 1 lower terminal surface, and turn over one side of board 6 and pass through hinge 7 normal running fit with first fixed plate 2 at the end, transfer the gabion through the device main part, can cancel the frogman operation, the difficult problem that the stone can't load at the bottom has also been solved, construction speed is greatly improved, construction cost is reduced.
Furthermore, both sides of the upper end of the second fixing plate 3 are provided with first lifting lugs 5, the first lifting lugs 5 are fixedly welded with the second fixing plate 3, the second lifting lugs 8 are arranged on the other side of the bottom turning plate 6, the second lifting lugs 8 are fixedly welded with the bottom turning plate 6, and the lifting lugs are convenient for installation and operation of slings.
Further, a first sling 11 penetrates through the first lifting lug 5 to support the device main body 1, so that the position can be adjusted conveniently.
Further, a second sling 12 penetrates through the inside of the second lifting lug 8, and the second sling 12 is stretched by the crane to tighten the second lifting lug 8 all the time, so that the condition that the bottom turning plate 6 is opened to cause the gabion to fall down cannot occur.
Further, sling through holes 10 are formed in the first lifting lug 5 and the second lifting lug 8.
Further, it puts a mouthful 9 under the gabion to be provided with between the board 6 turns over at the bottom, and the gabion is placed and has been preset the gabion in the chamber 4, turns over the board 6 at the bottom and opens the back, and the gabion sinks in aqueous through putting a mouthful 9 under the gabion.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. An open-close type gabion underwater construction method is characterized by comprising the following steps:
firstly, placing a gabion in a gabion placing cavity (4) inside a device main body (1) in a dry environment, wherein a bottom turning plate (6) at the bottom of the device main body (1) is in a closed device, and then filling a proper amount of stones into the gabion;
after the filling is finished, preferentially lifting a second sling (12) through a crane, enabling the bottom turning plate (6) to tightly abut against the lower end of the device main body (1) under the tension of the second sling (12), and then lifting the device main body (1) through the first sling (11) and moving towards a specified position;
and step three, after the device reaches the designated position, a first sling (11) is arranged below the device, the device provided with the gabion and the stones is hoisted to the underwater position, the crane gradually loosens a second sling (12), and one end of the bottom turning plate (6) gradually rotates around the axis of the hinge (7) after the second lifting lug (8) loses the pulling force, so that the lower opening (9) of the gabion is opened, and the gabion sinks to the bottom of the water under the action of gravity.
2. The underwater construction method of the open-close type gabion according to claim 1, characterized in that: the device is characterized in that the periphery of the device main body (1) is composed of a first fixing plate (2) and a second fixing plate (3), the first fixing plate (2) and the second fixing plate (3) are arranged in two numbers, the first fixing plate (2) is located on two sides of the device main body (1), the second fixing plate (3) is located at the front end and the rear end of the device main body (1), a gabion placing cavity (4) is arranged inside the device main body (1), the upper end of the gabion placing cavity (4) is of an open structure, bottom turning plates (6) are arranged on two sides of the lower end face of the device main body (1), and one sides of the bottom turning plates (6) are in rotating fit with the first fixing plate (2) through hinges (7).
3. The underwater construction method of the open-close type gabion according to claim 2, characterized in that: the two sides of the upper end of the second fixing plate (3) are provided with first lifting lugs (5), the first lifting lugs (5) are welded and fixed with the second fixing plate (3), the other side of the bottom turning plate (6) is provided with second lifting lugs (8), and the second lifting lugs (8) are welded and fixed with the bottom turning plate (6).
4. The underwater construction method of the open-close type gabion according to claim 3, characterized in that: first slings (11) penetrate through the first lifting lugs (5).
5. The underwater construction method of the open-close type gabion according to claim 3, characterized in that: and second slings (12) penetrate through the second lifting lugs (8).
6. The underwater construction method of the open-close type gabion according to claim 3, characterized in that: and sling through holes (10) are formed in the first lifting lug (5) and the second lifting lug (8).
7. The underwater construction method of the open-close type gabion according to claim 2, characterized in that: a gabion lower opening (9) is arranged between the bottom turning plates (6), and a gabion is preset in the gabion placing cavity (4).
CN202111541882.9A 2021-12-16 2021-12-16 Open-close type gabion underwater construction method Pending CN114232633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111541882.9A CN114232633A (en) 2021-12-16 2021-12-16 Open-close type gabion underwater construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111541882.9A CN114232633A (en) 2021-12-16 2021-12-16 Open-close type gabion underwater construction method

Publications (1)

Publication Number Publication Date
CN114232633A true CN114232633A (en) 2022-03-25

Family

ID=80756961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111541882.9A Pending CN114232633A (en) 2021-12-16 2021-12-16 Open-close type gabion underwater construction method

Country Status (1)

Country Link
CN (1) CN114232633A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203475437U (en) * 2013-08-09 2014-03-12 中交第二航务工程局有限公司 Underwater installing lifting sling for gabion mesh
CN107761738A (en) * 2017-10-11 2018-03-06 中国建筑第六工程局有限公司 The mask gabion string bag is without throwing construction method of colliding with
CN111017701A (en) * 2019-12-18 2020-04-17 柳州市俊星工程机械租赁有限公司 Open-at-bottom gabion hoisting device on water

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203475437U (en) * 2013-08-09 2014-03-12 中交第二航务工程局有限公司 Underwater installing lifting sling for gabion mesh
CN107761738A (en) * 2017-10-11 2018-03-06 中国建筑第六工程局有限公司 The mask gabion string bag is without throwing construction method of colliding with
CN111017701A (en) * 2019-12-18 2020-04-17 柳州市俊星工程机械租赁有限公司 Open-at-bottom gabion hoisting device on water

Similar Documents

Publication Publication Date Title
CN110029691A (en) A kind of automatic mounting structure of offshore wind power foundation erosion control brush layer and installation method
CN108086326A (en) A kind of underwater concreting construction method and device
CN216689419U (en) Open-close type gabion underwater construction device
CN114232633A (en) Open-close type gabion underwater construction method
CN109059700B (en) Flying stone protector for blasting
CN207176642U (en) Novel water conservancy gate
KR101982162B1 (en) Interlocking type caisson using tire, caisson structure using the caisson and constructing method of caisson structure
CN201162208Y (en) Floater horizontal opening door
CN206872269U (en) Caisson ballast lifts tank
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
CN209493943U (en) A kind of safeguard for construction of prefabricated piles
CN208792265U (en) A kind of hydraulic engineering cylinder iron gate
CN213358866U (en) Well lid for urban sewer
CN210031724U (en) A absorption field that is used for geomembrane mud field hydraulic reclamation mouth
CN110468803B (en) Tidal bore prevention open-top type plane gate
JP3803172B2 (en) Method of forming work opening of caisson structure
CN207245193U (en) A kind of concrete placing installation
JP5372194B2 (en) Opening and closing type polluted water outflow prevention method
CN220953281U (en) Novel spillway chute bottom protection reinforcing structure
CN219033172U (en) Mud water installations is prevented to on-water switching formula
CN208328862U (en) A kind of gates of segmental shape
CN209779566U (en) Gate for hydropower station
CN213014338U (en) Precipitation well shutoff construction structures
CN216948138U (en) Pull rod opening and closing type gate
CN213978813U (en) Gate type wave wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220325

RJ01 Rejection of invention patent application after publication