CN114221312B - Power distribution network protection rapid setting and checking method based on topological relation - Google Patents

Power distribution network protection rapid setting and checking method based on topological relation Download PDF

Info

Publication number
CN114221312B
CN114221312B CN202111652521.1A CN202111652521A CN114221312B CN 114221312 B CN114221312 B CN 114221312B CN 202111652521 A CN202111652521 A CN 202111652521A CN 114221312 B CN114221312 B CN 114221312B
Authority
CN
China
Prior art keywords
distribution network
setting
protection
value
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111652521.1A
Other languages
Chinese (zh)
Other versions
CN114221312A (en
Inventor
胡铁斌
汪娇娇
叶睆
黄子千
贺臣
邓刘毅
胡子侯
何磊
魏千钧
凌炬
梁德来
陈槾露
丁健
王汉军
卢苇舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202111652521.1A priority Critical patent/CN114221312B/en
Publication of CN114221312A publication Critical patent/CN114221312A/en
Application granted granted Critical
Publication of CN114221312B publication Critical patent/CN114221312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/261Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/51Indexing; Data structures therefor; Storage structures
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/021Details concerning the disconnection itself, e.g. at a particular instant, particularly at zero value of current, disconnection in a predetermined order
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/04Details with warning or supervision in addition to disconnection, e.g. for indicating that protective apparatus has functioned
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a power distribution network protection rapid setting and checking method based on topological relation, which is characterized by comprising the following steps: acquiring a GIS system single line diagram, identifying protection equipment and generating a protection configuration simplified diagram in real time; converting the image into characters, outputting structured data, and storing the structured data in a database; generating a constant value by one key of the topological relation identified by the GIS map; then, device-level programming of a fixed-value single template is carried out, and principle-level data are automatically read after the template programming is completed; s4: and calculating and judging the fixed value position where the problems of improper fixed value matching, out-of-order matching, out-of-limit matching and the like occur through intelligent association drawings and topology technology, intelligently finding out the abnormal fixed value, pushing messages, realizing accident reproduction, and giving out modification comments. According to the invention, the protection setting calculation time of a single automatic switch is shortened from 17.5 minutes to 3.5 minutes, the relay protection setting working efficiency of the distribution network is improved to be more than or equal to 400%, the relay protection setting calculation time of the distribution network is shortened to the limit, and the working efficiency is improved.

Description

Power distribution network protection rapid setting and checking method based on topological relation
Technical Field
The invention relates to the field of power distribution network checking, in particular to a power distribution network protection rapid setting and checking method based on topological relation.
Background
The existing 35/10kV distribution network line has complex structure and numerous brand models of protection equipment, the fixed value setting of the 35/10kV distribution network line needs more factors to be considered, the unified fixed value setting standard is lacking at present, the distribution network fixed value setting calculation mainly depends on manual calculation, the workload is huge, the workload of the ground distribution network setting calculation is greatly increased along with the comprehensive collecting and ground adjustment of the distribution network setting calculation, the situation that the repeatability exists, the errors exist in the calculation result and the like exists in the work exists, the work of parameter data management, expert rule library management, fixed value data management, setting calculation, calculation book generation, fixed value list generation, statistical analysis and the like of fixed value setting is finished only by manpower, the workload is huge and is easy to make mistakes, and a complete set of software system support does not exist. In addition, with the overall receiving and returning of the setting calculation of the distribution network, the setting calculation workload of the ground distribution network is greatly increased, and the requirement of actual work cannot be met in the aspect of improving the overall efficiency of relay protection work.
Disclosure of Invention
The invention aims to provide a power distribution network protection rapid setting and checking method based on a topological relation, so as to solve the problems in the background technology.
In order to achieve the above purpose, the invention adopts the following technical scheme:
a power distribution network protection rapid setting and checking method based on topological relation is characterized by comprising the following steps:
s1: acquiring a GIS system single line diagram, identifying protection equipment and generating a protection configuration simplified diagram in real time;
s2: the image is converted into characters by means of an image-text recognition technology, structured data are output, and the characters are automatically recorded to the background, so that labor can be greatly saved, the efficiency is improved, and the characters are stored in a database;
s3: setting the structured data to a principle level to calculate and generate a constant value, and particularly generating the constant value by one key of the topological relation identified by the GIS map; then, device-level programming of a fixed-value single template is carried out, and principle-level data are automatically read after the template programming is completed;
s4: and calculating and judging the fixed value position where the problems of improper fixed value matching, out-of-order matching, out-of-limit matching and the like occur through intelligent association drawings and topology technology, intelligently finding out the abnormal fixed value, pushing messages, realizing accident reproduction, and giving out modification comments.
In step S2, the graphic recognition technology is specifically used to report the device parameters, the distribution network single line diagram and the real-time data by using the OCS, the graphic model system data interface and the device parameters with various formats, so as to provide basic data support for subsequent calculation.
In the step S3, a standardized expert intelligent configuration rule base is built by a digital visualization method to realize visual interactive configuration of a setting principle formula, so that various principle level computing requirements are met, a standardized value setting single template is formulated, and a basic template is provided for quick programming of various equipment model value setting single templates.
In the step S4, accident reproduction is specifically implemented based on the network topology method and dynamic data, and the accident is intelligently analyzed to provide an auxiliary decision.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, the protection setting calculation time of a single automatic switch is shortened from 17.5 minutes to 3.5 minutes, the relay protection setting working efficiency of the distribution network is improved to be more than or equal to 400%, the relay protection setting calculation time of the distribution network is shortened to the limit, and the working efficiency is improved. The distribution network intelligent protection setting calculation and fault analysis platform based on the full information data stream effectively shortens the relay protection setting calculation time of the distribution network, improves the relay protection setting working efficiency of the distribution network, and further avoids human false setting events caused by false parameter data.
Drawings
FIG. 1 is a schematic diagram of a flow frame structure of a power distribution network protection rapid setting and checking method based on topological relation;
fig. 2 is a schematic diagram of a power distribution network protection rapid setting platform page based on a topological relation.
Detailed Description
The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments, and all other embodiments obtained by persons skilled in the art without making creative efforts based on the embodiments in the present invention are all within the protection scope of the present invention.
Examples
As shown in FIG. 1, a method for quickly setting and checking protection of a power distribution network based on topological relation is characterized by comprising the following steps of
S1: acquiring a GIS system single line diagram, identifying protection equipment and generating a protection configuration simplified diagram in real time;
s2: the image is converted into characters by means of an image-text recognition technology, structured data are output, and the characters are automatically recorded to the background, so that labor can be greatly saved, the efficiency is improved, and the characters are stored in a database;
s3: setting the structured data to a principle level to calculate and generate a constant value, and particularly generating the constant value by one key of the topological relation identified by the GIS map; then, device-level programming of a fixed-value single template is carried out, and principle-level data are automatically read after the template programming is completed;
s4: and calculating and judging the fixed value position where the problems of improper fixed value matching, out-of-order matching, out-of-limit matching and the like occur through intelligent association drawings and topology technology, intelligently finding out the abnormal fixed value, pushing messages, realizing accident reproduction, and giving out modification comments.
In step S2, the graphic recognition technology is specifically used to report the device parameters, the distribution network single line diagram and the real-time data by using the OCS, the graphic model system data interface and the device parameters with various formats, so as to provide basic data support for subsequent calculation.
In the step S3, a standardized expert intelligent configuration rule base is built by a digital visualization method to realize visual interactive configuration of a setting principle formula, so that various principle level computing requirements are met, a standardized value setting single template is formulated, and a basic template is provided for quick programming of various equipment model value setting single templates.
In the step S4, accident reproduction is specifically implemented based on the network topology method and dynamic data, and the accident is intelligently analyzed to provide an auxiliary decision.
Fig. 2 is a schematic diagram of a power distribution network protection rapid setting platform page based on a topological relation in the embodiment.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the foregoing embodiments, and that the foregoing embodiments and description are merely preferred embodiments of the invention, and are not intended to limit the invention, but that various changes and modifications may be made therein without departing from the novel spirit and scope of the invention, which is defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (2)

1. A power distribution network protection rapid setting and checking method based on topological relation is characterized by comprising the following steps:
s1: acquiring a GIS system single line diagram, identifying protection equipment and generating a protection configuration simplified diagram in real time;
s2: converting the image into characters by means of image-text recognition technology, outputting structured data, and storing the structured data in a database;
s3: setting the structured data to a principle level to calculate and generate a constant value, and particularly generating the constant value by one key of the topological relation identified by the GIS map; then, device-level programming of a fixed-value single template is carried out, and principle-level data are automatically read after the template programming is completed;
s4: calculating and judging the fixed value position where the fixed value is improperly matched and matched with the out-of-order limit problem through intelligent association drawings and topology technology, intelligently finding out the abnormal fixed value and pushing messages, realizing accident reproduction, and giving out modification comments;
in the step S2, the graphic recognition technology is specifically used to report the parameters of the equipment in various formats, such as the distribution network OCS, the graphic model system data interface and the equipment parameters, so as to obtain the equipment parameters, the distribution network single line diagram and the real-time data, and provide basic data support for subsequent calculation;
in the step S3, a standardized expert intelligent configuration rule base is built by a digital visualization method to realize visual interactive configuration of a setting principle formula, so that various principle level computing requirements are met, a standardized value setting single template is formulated, and a basic template is provided for quick programming of various equipment model value setting single templates.
2. The topology-based power distribution network protection rapid setting and checking method according to claim 1, wherein the method comprises the following steps: in the step S4, accident reproduction is specifically implemented based on the network topology method and dynamic data, and the accident is intelligently analyzed to provide an auxiliary decision.
CN202111652521.1A 2021-12-30 2021-12-30 Power distribution network protection rapid setting and checking method based on topological relation Active CN114221312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111652521.1A CN114221312B (en) 2021-12-30 2021-12-30 Power distribution network protection rapid setting and checking method based on topological relation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111652521.1A CN114221312B (en) 2021-12-30 2021-12-30 Power distribution network protection rapid setting and checking method based on topological relation

Publications (2)

Publication Number Publication Date
CN114221312A CN114221312A (en) 2022-03-22
CN114221312B true CN114221312B (en) 2023-07-07

Family

ID=80707037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111652521.1A Active CN114221312B (en) 2021-12-30 2021-12-30 Power distribution network protection rapid setting and checking method based on topological relation

Country Status (1)

Country Link
CN (1) CN114221312B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114971938A (en) * 2022-06-07 2022-08-30 上海山源电子科技股份有限公司 Method and device for detecting override-proof network topology of coal mine power supply system and storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240045A (en) * 2014-10-14 2014-12-24 国家电网公司 Method for analyzing coordination and safety of protective relaying of regional power grid

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110231530A (en) * 2019-07-08 2019-09-13 国网天津市电力公司 A kind of relay protection automatic Verification method
CN110601158B (en) * 2019-10-11 2021-10-29 国网福建省电力有限公司 Method for online setting of distribution automation protection constant value
CN111884181A (en) * 2020-07-16 2020-11-03 广东电网有限责任公司 Method for configuring simplified diagram through fixed value setting
CN111985500B (en) * 2020-07-28 2024-03-29 国网山东省电力公司禹城市供电公司 Verification method, system and device for relay protection fixed value input
CN112736866B (en) * 2020-12-16 2023-08-22 国网安徽省电力有限公司 Relay protection self-adaptive real-time evaluation method and system based on wide area information
CN113644637B (en) * 2021-10-18 2022-02-15 广东电网有限责任公司佛山供电局 Self-adaptive setting method of automatic switch and related device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240045A (en) * 2014-10-14 2014-12-24 国家电网公司 Method for analyzing coordination and safety of protective relaying of regional power grid

Also Published As

Publication number Publication date
CN114221312A (en) 2022-03-22

Similar Documents

Publication Publication Date Title
CN110704518A (en) Business data processing method and device based on Flink engine
CN102436523A (en) Method for automatically mapping digital substation interval wiring diagram
CN111461520B (en) Intelligent analysis method for distribution network line automatic switch distribution
CN110188150A (en) The modeling method and computer readable storage medium of distribution network line figure
CN114221312B (en) Power distribution network protection rapid setting and checking method based on topological relation
CN111585344A (en) Substation intelligent checking method and device based on total station IED simulation
CN111507001A (en) Method and system for calculating construction cost of power transformation project, readable storage medium and computer
CN112365167A (en) Dynamic ontology model-based power grid equipment digital twin construction method and device
CN113094932A (en) Method, device, equipment and storage medium for acquiring construction cost of power transformation project
CN107748819B (en) Natural language processing-based electrical secondary equipment modeling method and system
CN104112183A (en) Plug-and-play intelligent scheduling model management system and management method of intelligent substation
CN114936442B (en) System and method for accurately positioning power distribution network equipment and forming topological graph
CN108510164B (en) Online generation method for external network equivalent model of designated area in power system
CN114820868A (en) Method, device and system for intelligently mapping distribution network line
CN112532432B (en) Automatic mapping method and system based on LTU terminal
CN112446619B (en) Power distribution network rush-repair processing method and device
CN114389242B (en) Distribution network protection setting fault analysis method based on multi-source data integration
CN112800035A (en) GIS (geographic information System) -based power grid data communication sharing system
CN111783391A (en) Online artificial text marking system and method
CN111258431A (en) Steam turbine overhauls auxiliary system based on mix reality
CN111555445B (en) Automatic graph assembly method for intelligent substation
CN109272564B (en) Plant station diagram automatic generation method based on machine learning
CN115455824A (en) Process simulation method and system based on cross attribute influence
CN115169964A (en) Electric power digital space twin system for monitoring real-time data of industrial equipment
CN114066299A (en) Power grid engineering three-dimensional design index difference analysis method based on expert knowledge base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant