CN114208535A - Construction process of three-dimensional greening landscape wall - Google Patents

Construction process of three-dimensional greening landscape wall Download PDF

Info

Publication number
CN114208535A
CN114208535A CN202111219310.9A CN202111219310A CN114208535A CN 114208535 A CN114208535 A CN 114208535A CN 202111219310 A CN202111219310 A CN 202111219310A CN 114208535 A CN114208535 A CN 114208535A
Authority
CN
China
Prior art keywords
group
groups
box
construction process
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111219310.9A
Other languages
Chinese (zh)
Inventor
林振长
宋喆
方壮强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Construction Engineering Co ltd
Original Assignee
Guangdong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Construction Engineering Co ltd filed Critical Guangdong Construction Engineering Co ltd
Priority to CN202111219310.9A priority Critical patent/CN114208535A/en
Publication of CN114208535A publication Critical patent/CN114208535A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/005Reservoirs connected to flower-pots through conduits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls

Abstract

The application relates to a construction process of a three-dimensional greening landscape wall, which comprises a steel structure and a plurality of groups of planting boxes prefabricated in batch, wherein each group of planting boxes is of a rectangular net box structure, green plants are planted in the planting boxes, the steel structure comprises a plurality of groups of square steel pipes which are fixedly connected with a wall surface and are vertically distributed at equal intervals and a plurality of groups of supporting plates which are horizontally distributed from top to bottom, each group of supporting plates is fixedly connected with each group of square steel pipes, and the distance between two adjacent groups of supporting plates from top to bottom is not less than the height of the planting boxes; each group the backup pad is kept away from the protruding limiting plate that is equipped with of up end of square steel pipe one end, the limiting plate is apart from the size of square steel pipe is not less than plant the width of box, each group plant the box and vertically place the up end of backup pad, adjacent two sets of plant mutual butt between the box. Each group's supporting plate forms the stable support of planting the box to each group in this application, so plant in this application and plant each group and plant the difficult emergence of box and break.

Description

Construction process of three-dimensional greening landscape wall
Technical Field
The application relates to the field of landscape wall construction, in particular to a three-dimensional greening landscape wall construction process.
Background
The greening landscape wall is a wall body covered by green plants on the wall surface of the wall body, and the greening landscape wall can make up the defects of flat land greening, enrich greening levels and contribute to improving the artistic effect of urban and garden buildings. In the construction process of the greening landscape wall, vertical greening plants, mainly vine plants, climbing shrubs, hanging plants and the like are commonly used for plants suitable for the greening wall. The ecological landscape wall can be used for greening in a three-dimensional space, the artistic effect of a building can be increased, the environment is more neat and attractive, vivid and lively, and the ecological landscape wall has the advantages of small occupied area, quick response, high greening rate and the like.
In the construction process of the greening landscape wall, each group of green plants are planted in a prefabricated planting box, a steel structure is installed on the wall body, and then each group of planting boxes are respectively hung on the steel structure; each group of planting boxes are abutted to each other on the wall body, and the planting boxes below support the planting boxes above, so that the planting boxes continuously cover the wall surface.
With respect to the related art in the above, the inventors consider that there are the following drawbacks: in the work progress of current afforestation view wall, under the great condition of wall height, each group plants the box and plants after the green planting at the filled soil matter, the weight of planting the box is great, each group plants the box and is mostly plastics material, the event is under long-time outdoor environment, it is ageing to plant the box easily, each group articulates the planting box on the steel construction this moment and takes place the unhook between the steel construction, the wholeness of afforestation view wall suffers destruction when so, the event has the space of improvement.
Disclosure of Invention
In order to improve the mounting means of planting the box on the wall body that plants each group of green plants, make the installation of each group of planting box on the wall more stable, this application provides three-dimensional green landscape wall construction technology.
The construction process of the three-dimensional greening landscape wall adopts the following technical scheme:
the three-dimensional greening landscape wall construction process comprises a steel structure and a plurality of groups of batch prefabricated planting boxes, wherein each group of planting boxes is of a cuboid net box structure, green plants are planted in the planting boxes, the steel structure comprises a plurality of groups of square steel pipes which are fixedly connected with a wall surface and are vertically and equidistantly distributed and a plurality of groups of supporting plates which are horizontally distributed from top to bottom, each group of supporting plates is fixedly connected with each group of square steel pipes, and the distance between two adjacent groups of supporting plates from top to bottom is not less than the height of the planting boxes; each group the backup pad is kept away from the protruding limiting plate that is equipped with of up end of square steel pipe one end, the limiting plate is apart from the size of square steel pipe is not less than plant the width of box, each group plant the box and vertically place the up end of backup pad, adjacent two sets of plant mutual butt between the box.
By adopting the technical scheme, the steel structure is installed before the construction of the greening landscape wall, the square steel pipes in the steel structure are fixedly connected with the wall surface, then all groups of supporting plates are connected with the square steel pipes, all groups of supporting plates are distributed at equal intervals from top to bottom, and the installation of the steel structure on the wall surface is completed at the moment; install each group's planting box in to the backup pad, the vertical setting of each group's planting box this moment, the up end butt of a side end face and the backup pad of each group's planting box, and the spacing plate-type after the installation finishes is spacing to the joint of planting the box, it breaks away from to make the planting box difficult from the backup pad, the installation of planting the box on the wall with each group has been realized to the above-mentioned in-process, for current direct through hanging the mounting means on the steel construction through planting the box, planting box in this application only need place in the backup pad, each group's support plate-type is to the outrigger of each group's planting box, the event is planted in this application and is had each group's planting box of green and is difficult for taking place to break.
Preferably, one side of each group of square steel pipes, which is far away from the wall surface, is provided with a plurality of groups of connecting pieces, each connecting piece comprises a first steel plate and two groups of second steel plates which are vertically connected with the first steel plates, the first steel plates and the square steel pipes jointly penetrate through bolts which are fixedly inserted into the wall surface, and the support plates are matched with the notches between the two groups of second steel plates in an inserted manner and jointly penetrate through vertically arranged bolts; each group plant the box towards a side end face of wall with the terminal surface butt that first steel sheet deviates from the wall, the limiting plate towards a side end face of wall with plant an entry side end face butt of box.
By adopting the technical scheme, the second steel plates are installed by means of the connecting pieces, the first steel plates in the connecting pieces are connected with the square steel pipes through bolts, the two groups of second steel plates in the connecting pieces form an installation foundation for the supporting plates, the bolts penetrate through the two groups of second steel plates and the supporting plates together by means of the bolts, the connection between the supporting plates and the connecting pieces is realized, the connection between the square steel pipes and the supporting plates is realized by means of the connecting pieces in the arrangement, and the connection strength is improved; and the planting box after the installation keeps all keeping the butt with first steel sheet and limiting plate, so the planting box forms the tight effect of clamp on the steel construction at this moment, so the planting box is difficult for taking place to drop from the steel construction.
Preferably, a plurality of groups of through holes are vertically formed in the upper end face of each group of the second steel plate in a penetrating mode, bolts are inserted into the through holes of each group, the length of each group of the bolts is larger than the thickness of the second steel plate, and the lower end parts of the bolts of each group are inserted into the planting boxes below the second steel plate; at least two groups of bolts are inserted into each group of planting boxes.
Through adopting above-mentioned technical scheme, each group forms a plurality of groups of through-holes in the backup pad, each group is inside to peg graft there is the bolt, when planting the box installation, this moment with each group inside the vertical plug-in through-hole of plug-in pin, and a set of bolt of planting on the box is no less than two sets ofly, the event each group plug-in pin forms the spacing to each group planting box, combine limiting plate and each group bolt this moment, it is fixed to the joint that plants lower tip and upper end portion respectively, the stability of box on the steel construction of planting is promoted.
Preferably, the wall surface is provided with a vertically arranged pipeline which is communicated with a municipal pipeline; a plurality of groups of horizontally collinearly arranged circular rings are fixed on the edge of one side, far away from the wall surface, of the lower end surface of each group of second steel plates, water pipes are jointly inserted and fixed in each group of circular rings positioned at the same vertical height, each group of water pipes are communicated with the pipeline, and a plurality of groups of spray heads facing the planting boxes are communicated on each group of water pipes; and each group of the second steel plates is provided with a water drainage hole which is distributed with each group of the through holes in a staggered way.
By adopting the technical scheme, the pipeline is vertically arranged on the wall surface and is kept connected with the municipal pipeline, so that the inside of the pipeline is filled with water; the rings of each group of water pipes are fixed on the supporting plate and support the water pipes, the water pipes are kept to be communicated with the pipelines, when green plants are irrigated, water is continuously conveyed to the inside of each group of water pipes, the water is continuously sprayed out through each group of spray heads, redundant water can flow out downwards from each group of water holes, irrigation operation of each group of green plants on the planting box is achieved at the moment, the water pipes are stably installed, and water supply in the green plant growth process is guaranteed.
Preferably, each group the planting box is stamped geotechnological cloth on deviating from one side opening of wall, planting box inside packing soil, geotechnological cloth covers soil.
Through adopting above-mentioned technical scheme, geotechnological cloth covers the one side entry of planting the box, and after each group planted the box and placed in the backup pad, the inside soil of filling of box was planted to each group this moment easily drops from entry one side, so setting up of geotechnological cloth has reduced dropping of soil, and especially when irrigating the operation, soil is difficult at this moment by dashing and dropping.
Preferably, the subaerial concave canal that is equipped with of wall below, the ground of canal both sides is the ladder groove structure, the canal upper berth is equipped with a plurality of groups apron.
Through adopting above-mentioned technical scheme, the ditch is located subaerially, and when irrigating the operation, the water constantly drips downwards this moment, and the water that drips constantly converges into the ditch, and the apron covers the ditch, has avoided pedestrian and vehicle to fall into the ditch.
Preferably, the pipeline is laid inside the ditch, and the pipeline penetrates through the cover plate and is vertically fixed on the wall surface.
Through adopting above-mentioned technical scheme, the pipe laying is inside the ditch, and the ditch forms the protection to the pipeline, for laying the pipeline subaerial, the damage of pipeline has been avoided in the protection of ditch this moment.
Preferably, coiled materials are paved between the first steel plates and the second steel plates of each group, and bolts on the first steel plates of each group penetrate through the coiled materials and the square steel pipes and then are fixedly connected with the wall surface.
Through adopting above-mentioned technical scheme, the coiled material is spread and is pasted between square steel pipe and backup pad, when irrigating the operation, the setting up of coiled material this moment has realized playing the isolation effect with the water, and when the rainfall, the coiled material plays the isolation operation with the rainwater this moment, and then has reduced the wall and has washed, has promoted the protection to the wall.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the components of the steel pipes and the support plate are connected at the moment by means of the groups of connecting pieces, the support plate is in inserted fit with the notches between the two groups of second steel plates, the square steel pipes and the support plate are connected by means of bolts, the planting boxes with green plants planted in each group are placed on the support plate at the moment, and the stability of the planting boxes in each group on the support plate is improved by means of the limiting effect of the limiting plates and the bolts;
2. carry out the installation of pipeline on the wall to inside inserting each group's water pipe into each group's ring of collineation setting, when carrying out green irrigation operation of planting, the water constantly to each group's water pipe inside transport along the pipeline this moment, realized the irrigation of planting green each group, and the water can collect through the ditch that each group's sewer hole constantly goes down, realize the drainage operation to the water.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a schematic view, partially in section, of the case of the present application;
fig. 4 is an enlarged view at B in fig. 3.
Description of reference numerals: 1. a wall surface; 11. a ditch; 12. a cover plate; 2. a steel structure; 21. a square steel pipe; 22. a support plate; 221. a limiting plate; 3. planting boxes; 31. planting green; 4. a connecting member; 41. a first steel plate; 42. a second steel plate; 421. a through hole; 422. a bolt; 423. a drain hole; 5. a pipeline; 51. a circular ring; 52. a water pipe; 521. a spray head; 6. geotextile; 7. and (4) rolling the material into a roll.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses a construction process of a three-dimensional greening landscape wall. Referring to fig. 1, a wall surface 1 is vertically arranged, a ground below the wall surface 1 is horizontally arranged, and the wall surface 1 is used for constructing a landscape greening wall.
Referring to fig. 1 and 2, a water channel 11 is concavely formed on the ground under the wall surface 1, the water channel 11 is close to the corner of the wall, and the water channel 11 extends horizontally. The ground on both sides of the ditch 11 is in a step groove structure, a plurality of groups of cover plates 12 with the same specification are laid on the ditch 11, each group of cover plates 12 is in a grid plate shape, and the upper end surfaces of the groups of cover plates 12 are coplanar with the ground. The wall surface 1 is provided with a vertically arranged pipeline 5, the pipeline 5 is clamped and fixed with the wall surface 1 by virtue of a plurality of groups of hoops which are distributed at equal intervals up and down, the pipeline 5 is communicated with a municipal pipeline, and a water body is conveyed inside the municipal pipeline; the pipeline 5 is laid inside the canal 11, and the pipeline 5 penetrates through the cover plate 12 and is vertically fixed on the wall surface 1.
Referring to fig. 3 and 4, the three-dimensional greening landscape wall construction process comprises a steel structure 2 and a plurality of groups of prefabricated planting boxes 3 in batch, each group of planting boxes 3 is in a cuboid net cage shape, soil is filled in the planting boxes 3, a plurality of groups of green plants 31 are planted, the steel structure 2 comprises a plurality of group steel pipes 21 and supporting plates 22, each group steel pipe 21 is vertically distributed at equal intervals and fixedly connected with a wall surface 1, each group of supporting plates 22 are horizontally distributed at equal intervals from top to bottom, the distance between every two adjacent groups of supporting plates 22 is not less than the height of the planting boxes 3, and each group of supporting plates 22 is fixedly connected with each group steel pipe 21. For a specific connection mode, the design of the connecting pieces 4 is performed in the present application, and the connection between the square steel tube 21 and the support plate 22 is realized by the aid of each group of connecting pieces 4. Connecting piece 4 is located the one side that square steel pipe 21 deviates from wall 1, and connecting piece 4 includes first steel sheet 41 and two sets of second steel sheets 42 of being connected perpendicularly with first steel sheet 41, first steel sheet 41 and square steel pipe 21 bolted connection, and the bolt run through square steel pipe 21 and with wall 1 fixed connection. The support plate 22 is in inserting fit with the notches between the two groups of second steel plates 42 and vertically arranged bolts penetrate through the support plate and the notches together; the end surface of one side of each group of planting boxes 3 facing the wall surface 1 is abutted against the end surface of the first steel plate 41 departing from the wall surface 1.
The upper end surface of one end of each group of the supporting plates 22 far away from the square steel tube 21 is convexly provided with a limiting plate 221, and the size of the limiting plate 221 far away from the square steel tube 21 is not smaller than the width of the planting box 3, and preferably the size is the same as the width of the planting box 3. Each group plants box 3 and vertically places at the up end of backup pad 22, and each group is green plants 31 and deviates from one side of wall 1, and adjacent two sets of mutual butt between planting box 3. The end surface of the stopper plate 221 facing the wall surface 1 abuts against the end surface of the planting box 3 at the inlet. Each group plants box 3 and deviates from one side opening of wall 1 and coats and be stamped geotechnological cloth 6, plants the inside soil of filling of box 3, and geotechnological cloth 6 covers soil.
A plurality of groups of through holes 421 are vertically formed in the upper end surface of each group of second steel plates 42 in a penetrating manner, and bolts 422 are inserted into the through holes 421; the entrance of the through hole 421 is reamed so that the upper end surface of the plug 422 is not higher than the upper end surface of the second steel plate 42. The length of each group of bolts 422 is greater than the thickness of the second steel plate 42, and the lower end part of each group of bolts 422 is inserted into the planting box 3 below the second steel plate 42; at least two groups of bolts 422 are inserted in each group of planting boxes 3.
A plurality of groups of horizontally collinear circular rings 51 are fixed on the lower end face of each group of second steel plates 42 at the edge of one side far away from the wall surface 1, water pipes 52 are jointly inserted and fixed in each group of circular rings 51 positioned at the same vertical height, the water pipes 52 horizontally extend, each group of water pipes 52 are communicated with the pipeline 5, and a plurality of groups of spray heads 521 facing the planting boxes 3 are communicated on each group of water pipes 52; a plurality of sets of water drainage holes 423 which are distributed in a staggered manner with respect to the sets of through holes 421 are formed through each set of the second steel plates 42.
Coiled materials 7 are paved between the first steel plates 41 and the second steel plates 42 of each group, and the coiled materials 7 are used for fully paving the whole wall surface 1; the bolts of each set of first steel plates 41 penetrate through the coil 7 and the square steel pipe 21 and are fixedly connected with the wall surface 1.
The implementation principle of the three-dimensional greening landscape wall construction process of the embodiment of the application is as follows:
before the construction of this kind of three-dimensional view wall, prefabricate steel construction 2 according to the size of wall 1, carry on the job site after each group's steel pipe 21 and backup pad 22 accomplish prefabrication.
Carry out the installation of steel construction 2 on wall 1, with the vertical setting of each group's steel pipe 21 this moment, spread coiled material 7 and paste, refer to the size that box 3 was planted to each group, carry out the demarcation of each group's connecting piece 4 position on square steel pipe 21, this moment with the help of the electric drill to 1 trompil of wall, fill in the trompil inside in advance with the inflation body, with the help of the bolt of each group's inflation structure, the bolt runs through first steel sheet 41 and coiled material 7, and further run through square steel pipe 21, at last peg graft with the trompil on the wall 1, make the bolt constantly with inflation body threaded connection.
After the installation of each set of connecting elements 4 is completed, the supporting plate 22 is inserted and fixed with each set of connecting elements 4, and the connecting elements 4 and the supporting plate 22 are connected by bolts. At this time, the pipes 5 and the water pipes 52 are installed, the respective sets of rings 51 are connected to the support plate 22 in advance, the water pipes 52 are inserted into the respective sets of rings 51, the rings 51 and the water pipes 52 are fixed by a partial adhesive, the respective sets of heads 521 are oriented toward the coil 7, and the respective sets of heads 521 are installed in an inclined manner. The lower end portion of the pipeline 5 is laid in the raceway 11 and each set of cover plates 12 is laid.
Finally, the planting boxes 3 with the green plants 31 planted in each group are placed on the second steel plate 42, and the soil inside the planting boxes 3 is covered by the geotextile 6 on each group of the planting boxes 3. When the irrigation operation is needed, at the moment, the water inside the municipal pipeline 5 is continuously conveyed to the inside of each group of water pipes 52, and the water is sprayed out from each group of spray heads 521, so that the irrigation operation of the green plants 31 inside each group of planting boxes 3 is realized. In the application, before the construction of the greening landscape wall, the steel structure 2 is installed, the square steel pipe 21 in the steel structure 2 is fixedly connected with the wall surface 1, the specific connection mode can be carried out by means of installing expansion bolts and the like, then, each group of supporting plates 22 are connected with the square steel pipe 21, each group of supporting plates 22 are distributed at equal intervals from top to bottom, and at the moment, the installation of the steel structure 2 on the wall surface 1 is completed; install each group planting box 3 to backup pad 22 is gone up, each group plants the vertical setting of box 3 this moment, each group plants a side end face of box 3 and backup pad 22's up end butt, and the limiting plate 221 after the installation finishes forms spacing to the joint of planting box 3, make and plant box 3 and be difficult for breaking away from in backup pad 22, the above-mentioned in-process has realized the installation of planting box 3 on wall 1, direct through the mounting means of hanging on steel construction 2 through planting box 3 for current, planting box 3 in this application only need place in backup pad 22, each group's backup pad 22 forms the stable support of planting box 3 to each group, so it plants 31 each group and plants difficult emergence of box 3 and break to plant in this application.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The construction process of the three-dimensional greening landscape wall is characterized by comprising the following steps: the planting box comprises a steel structure (2) and a plurality of groups of planting boxes (3) which are prefabricated in batches, wherein each group of planting boxes (3) is of a cuboid net box structure, green plants (31) are planted in the planting boxes (3), the steel structure (2) comprises a plurality of groups of square steel pipes (21) which are fixedly connected with a wall surface (1) and are vertically distributed at equal intervals and a plurality of groups of supporting plates (22) which are horizontally distributed from top to bottom, each group of supporting plates (22) is fixedly connected with each group of square steel pipes (21), and the distance between every two adjacent groups of supporting plates (22) is not less than the height of the planting boxes (3); each group the backup pad (22) is kept away from protruding limiting plate (221) that is equipped with of up end of square steel pipe (21) one end, limiting plate (221) distance the size of square steel pipe (21) is not less than plant the width of box (3), each group plant box (3) vertical the placing the up end of backup pad (22), adjacent two sets of plant mutual butt between box (3).
2. The construction process of the three-dimensional greening landscape wall as claimed in claim 1, wherein the construction process comprises the following steps: a plurality of groups of connecting pieces (4) are installed on one side, away from the wall surface (1), of each group of square steel pipes (21), each connecting piece (4) comprises a first steel plate (41) and two groups of second steel plates (42) which are perpendicularly connected with the first steel plates (41), bolts which are fixedly connected with the wall surface in an inserting mode penetrate through the first steel plates (41) and the square steel pipes (21), a supporting plate (22) and notches between the two groups of second steel plates (42) are matched in an inserting mode and penetrate through the bolts which are vertically arranged, one side end face, towards the wall surface (1), of each group of planting boxes (3) is abutted to the end face, away from the wall surface (1), of the first steel plate (41), of each group of planting boxes, and one side end face, towards the wall surface (1), of each limiting plate (221) is abutted to the end face of one side of an inlet of each group of planting boxes (3).
3. The construction process of the three-dimensional greening landscape wall as claimed in claim 2, wherein the construction process comprises the following steps: a plurality of groups of through holes (421) vertically penetrate through the upper end surface of each group of second steel plates (42), bolts (422) are inserted into the through holes (421), the length of each group of bolts (422) is greater than the thickness of the second steel plates (42), and the lower ends of the bolts (422) are inserted into the planting boxes (3) below the second steel plates (42); at least two groups of bolts (422) are inserted into each group of planting boxes (3).
4. The construction process of the three-dimensional greening landscape wall as claimed in claim 3, wherein the construction process comprises the following steps: a pipeline (5) which is vertically arranged is arranged on the wall surface (1), and the pipeline (5) is communicated with a municipal pipeline; a plurality of groups of horizontally collinear circular rings (51) are fixed on the edge of one side, far away from the wall surface (1), of the lower end face of each group of second steel plates (42), water pipes (52) are jointly inserted and fixed in each group of circular rings (51) positioned at the same vertical height, each group of water pipes (52) are communicated with the pipeline (5), and a plurality of groups of spray heads (521) facing the planting boxes (3) are communicated with each group of water pipes (52); and a lower water hole (423) which is distributed in a staggered way with the through hole (421) is formed in each group of the second steel plate (42) in a penetrating way.
5. The construction process of the three-dimensional greening landscape wall as claimed in claim 4, wherein the construction process comprises the following steps: each group one side opening that planting box (3) deviates from wall (1) coats and is stamped geotechnological cloth (6), plant the inside soil that fills of box (3), geotechnological cloth (6) cover soil.
6. The construction process of the three-dimensional greening landscape wall as claimed in claim 5, wherein the construction process comprises the following steps: the subaerial concave ditch (11) that are equipped with of wall (1) below, the ground of ditch (11) both sides is the ladder groove structure, ditch (11) upper berth is equipped with a plurality of groups apron (12).
7. The construction process of the three-dimensional greening landscape wall as claimed in claim 6, wherein the construction process comprises the following steps: pipeline (5) are laid inside ditch (11), pipeline (5) run through apron (12) and vertical the fixing on wall (1).
8. The construction process of the three-dimensional greening landscape wall as claimed in claim 7, wherein the construction process comprises the following steps: coiled materials (7) are paved between the first steel plates (41) and the second steel plates (42), and bolts on the first steel plates (41) penetrate through the coiled materials (7) and the square steel pipes (21) and then are fixedly connected with a wall surface (1).
CN202111219310.9A 2021-10-20 2021-10-20 Construction process of three-dimensional greening landscape wall Pending CN114208535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111219310.9A CN114208535A (en) 2021-10-20 2021-10-20 Construction process of three-dimensional greening landscape wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111219310.9A CN114208535A (en) 2021-10-20 2021-10-20 Construction process of three-dimensional greening landscape wall

Publications (1)

Publication Number Publication Date
CN114208535A true CN114208535A (en) 2022-03-22

Family

ID=80696152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111219310.9A Pending CN114208535A (en) 2021-10-20 2021-10-20 Construction process of three-dimensional greening landscape wall

Country Status (1)

Country Link
CN (1) CN114208535A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2808917A1 (en) * 2012-03-21 2013-09-21 Mitek Holdings, Inc. Thermally-isolated anchoring systems for cavity walls
CN205830508U (en) * 2016-06-30 2016-12-28 金阳阳 Vertical greening device
CN207505531U (en) * 2017-10-16 2018-06-19 杭州竣阳建设工程有限公司 A kind of vertical greening device
CN108396862A (en) * 2018-02-24 2018-08-14 桐乡聚业钢结构有限公司 A kind of steel structure member and its pre- construction technology
CN212851893U (en) * 2020-04-30 2021-04-02 杭州玖米环境艺术工程有限公司 Vertical greening planting device
CN113383660A (en) * 2021-06-18 2021-09-14 中国建筑第八工程局有限公司 Modular planting system structure for vertical greening of wall surface and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2808917A1 (en) * 2012-03-21 2013-09-21 Mitek Holdings, Inc. Thermally-isolated anchoring systems for cavity walls
CN205830508U (en) * 2016-06-30 2016-12-28 金阳阳 Vertical greening device
CN207505531U (en) * 2017-10-16 2018-06-19 杭州竣阳建设工程有限公司 A kind of vertical greening device
CN108396862A (en) * 2018-02-24 2018-08-14 桐乡聚业钢结构有限公司 A kind of steel structure member and its pre- construction technology
CN212851893U (en) * 2020-04-30 2021-04-02 杭州玖米环境艺术工程有限公司 Vertical greening planting device
CN113383660A (en) * 2021-06-18 2021-09-14 中国建筑第八工程局有限公司 Modular planting system structure for vertical greening of wall surface and construction method thereof

Similar Documents

Publication Publication Date Title
CN210151758U (en) Side slope ecological protection structure with water storage and supply system
CN114208535A (en) Construction process of three-dimensional greening landscape wall
CN210684361U (en) Garden floor tile
JP4226708B2 (en) Container for greening of walls, etc.
CN211646425U (en) Assembled ecological protection device suitable for rock slope
CN210562280U (en) Steel-plastic composite plant-growing retaining wall
CN209643503U (en) A kind of irrigation system for greenbelt
CN113853981A (en) Landscape ecological slope intelligent greening maintenance structure and construction method thereof
CN113236015A (en) Dustproof plant fiber screen and combined structure thereof
CN207219655U (en) A kind of sand ground water and soil conservation device
CN206635782U (en) Slope vegetation restoration structure
KR100880016B1 (en) Green roof system using the unit for green roof
CN214695937U (en) Drainage system for top plate of underground garage
CN220166565U (en) Brick for ecological greening
CN214463203U (en) Three-dimensional city gardens ecological landscape wall
CN113293666B (en) Ecological floor structure
CN212116365U (en) Automatic roof greening device who irrigates
CN113330971B (en) Heavy saline and alkaline land tree planting system based on water and salt migration principle
CN211817467U (en) Green environment-friendly building roof waterproof construction
CN210262916U (en) Fully assembled grouting type flood control device
CN210641547U (en) Planting frame for green fabricated building roof
CN213847853U (en) Flower bed structure for planting roof
JP2013223473A (en) Planting base, method for constructing the same and border part treatment structure of greening area
CN214460523U (en) Landscape plant afforests abrupt slope
CN216664014U (en) Steep slope and oblique roofing afforestation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220322