Prior art keywords
module
intermediate storage
storage module
planning
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111568515.8A
Other languages
Chinese (zh)
Inventor
何媛妩
陈光鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Situ Architectural Design Shanghai Co ltd
Original Assignee
Situ Architectural Design Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Situ Architectural Design Shanghai Co ltd filed Critical Situ Architectural Design Shanghai Co ltd
Priority to CN202111568515.8A priority Critical patent/CN114201805A/en
Publication of CN114201805A publication Critical patent/CN114201805A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a building project design software system which comprises a first intermediate storage module, a site selection input module, a foundation setting planning module, a project planning module, a cost estimation module, a total plane planning module, a second intermediate storage module, a primary design module, a construction drawing design module and a network module, wherein a geographic information storage module is arranged between the site selection input module and the foundation setting planning module, and a foundation setting information module is arranged between the project planning module and the foundation setting planning module. The invention belongs to the technical field of building projects, and particularly provides a building project design software system which is safe in data storage, intercommunicates common resources, does not generate reference deviation, is communicated with data in the design process, improves the design efficiency and is convenient for information exchange of customers and personnel.

Description

Building project design software system
Technical Field
The invention belongs to the technical field of building projects, and particularly relates to a building project design software system.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
Architectural Design (Architectural Design) refers to that before a building is built, a designer makes a general idea of problems existing or possibly occurring in the construction process and the use process in advance according to a construction task, plans a method and a scheme for solving the problems and expresses the problems by using a drawing and a file. As a common basis for the mutual cooperation of material preparation, construction organization work and various kinds of work in the manufacturing and construction work. The whole project can be carried out in a unified and step-by-step manner within a preset investment quota range according to a carefully considered preset scheme. And the built building can fully meet various requirements and purposes expected by users and society.
The design of the existing building project needs to be carried out step by step in the design process, so that the time consumption of the design process is too long, and all personnel and clients can only exchange required information through point-to-point communication, so that the information exchange reduces the design and construction efficiency.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a building project design software system which has the advantages of safe data storage, intercommunication of public resources, no reference deviation, data communication in the design process, improved design efficiency and convenient information exchange of customers and various personnel.
The technical scheme adopted by the invention is as follows: the invention relates to a building project design software system, which comprises a first intermediate storage module, an address selection input module, a foundation setting planning module, a project planning module, a cost estimation module, a total plane planning module, a second intermediate storage module, a primary design module, a construction drawing design module and a network module, the site selection input module is communicated with the first intermediate storage module, the basic setting planning module is communicated with the first intermediate storage module, the project planning module is communicated with the first intermediate storage module, the total plane planning module is communicated with the first intermediate storage module, the fake making estimation module is communicated with the first intermediate storage module, the second intermediate storage module is communicated with the first intermediate storage module, the preliminary design module is communicated with the second intermediate storage module, the construction drawing design module is communicated with the second intermediate storage module, and the network module is communicated with the second intermediate storage module.
Furthermore, a geographic information storage module is arranged between the addressing input module and the basic setting planning module, and a basic setting information module is arranged between the project planning module and the basic setting planning module.
Further, the first intermediate storage module and the second intermediate storage module are storage servers, and the first intermediate storage module and the second intermediate storage module are backups of each other.
Furthermore, the geographic information storage module and the basic setting information module are stored in a network-attached manner, the geographic information storage module is connected with the address selection input module through a local area network, the geographic information storage module is connected with the basic setting module through the local area network, the basic setting information module is connected with the basic setting module through the local area network, and the basic setting information module is connected with the project planning module through the local area network.
Further, the first intermediate storage module and the second intermediate storage module are connected through optical fibers.
Further, the network module is a gateway device, and the network module is connected with field personnel, purchasing personnel and clients through a network.
Further, the basic setting planning module, the address selection input module, the project planning module, the total plan planning module, the cost estimation module, the preliminary design module and the construction drawing design module are personal computers.
The invention with the structure has the following beneficial effects: according to the building project design software system, due to the arrangement of the first intermediate storage module and the second intermediate storage module, data storage is safe, due to the arrangement of the geographic information storage module and the basic setting module, shared resources are communicated, reference deviation cannot occur, due to the arrangement of the first intermediate storage module, data are communicated in the design process, design efficiency is improved, and due to the arrangement of the network module, information exchange between a client and each person is convenient.
Drawings
Fig. 1 is a schematic diagram of the overall structure of a software system for designing a building project according to the present invention.
The system comprises a first intermediate storage module, a second intermediate storage module, a site selection input module, a third intermediate storage module, a basic setting planning module, a fourth intermediate storage module, a fifth intermediate storage module, a sixth intermediate storage module, a fifth intermediate storage module, a sixth storage module, a fifth storage module, a sixth storage module, a fifth storage module, a sixth storage module, a fifth storage module, a fourth storage module, a fifth storage module, a cost estimation module, a total plane planning module, a fifth storage module, a sixth storage module, a fifth storage module, a total plane, a sixth storage module, a total plane estimation module, a fourth storage module, a network module, a 6, a network module, a total plane planning module, a network module, a fifth storage module, a sixth storage module, a network module, a sixth storage module, a fourth storage module, a sixth storage module, a fourth storage module, a sixth storage module, a fourth storage module, a sixth storage module, a fourth storage module, a.
Further, the basic setting planning module, the address selection input module, the project planning module, the total plan planning module, the cost estimation module, the preliminary design module and the construction drawing design module are personal computers.
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments; all other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the invention relates to a building project design software system, which comprises a first intermediate storage module 1, an address selection input module 2, a foundation setting planning module 3, a project planning module 4, a cost estimation module 5, a total plane planning module 6, a second intermediate storage module 7, a preliminary design module 8, a construction drawing design module 9 and a network module 10, wherein the address selection input module 2 is communicated with the first intermediate storage module 1, the foundation setting planning module 3 is communicated with the first intermediate storage module 1, the project planning module 4 is communicated with the first intermediate storage module 1, the total plane planning module 6 is communicated with the first intermediate storage module 1, the fake estimation module is communicated with the first intermediate storage module 1, the second intermediate storage module 7 is communicated with the first intermediate storage module 1, the preliminary design module 8 is communicated with the second intermediate storage module 7, the construction drawing design module 9 is communicated with the second intermediate storage module 7, the network module 10 is communicated with the second intermediate storage module 7.
A geographic information storage module 11 is arranged between the addressing input module 2 and the basic setting planning module 3, and a basic setting information module 12 is arranged between the project planning module 4 and the basic setting planning module 3. The first intermediate storage module 1 and the second intermediate storage module 7 are storage servers, and the first intermediate storage module 1 and the second intermediate storage module 7 are backups of each other. The geographic information storage module 11 and the basic setting information module 12 are stored in a network-attached mode, the geographic information storage module 11 is connected with the address selection input module 2 through a local area network, the geographic information storage module 11 is connected with the basic setting module through the local area network, the basic setting information module 12 is connected with the basic setting module through the local area network, and the basic setting information module 12 is connected with the project planning module 4 through the local area network. The network module 10 is a gateway device, and the network module 10 is connected with field personnel 13, purchasing personnel 14 and clients 15 through a network. The basic setting planning module 3, the site selection input module 2, the project planning module 4, the total plan view planning module, the cost estimation module 5, the preliminary design module 8 and the construction drawing design module 9 are personal computers.
When the system is used specifically, the site selection area is defined through a project site selection module, basic setting planning is carried out through a basic setting planning module 3 according to the geography of the site selection, project planning is carried out through a project planning module 4 according to the basic setting planning, the information can be stored in a first intermediate storage module 1 and mutually backed up with a second intermediate storage module 7 all the time, a total plane planning module 6, a fake making estimation module, a primary setting module and a construction drawing design module 9 carry out design in all aspects according to determined data, and site personnel 13, purchasing personnel 14 and clients 15 carry out information exchange through a network module 10.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (6)

1. A building project design software system, characterized by: the construction plan planning system comprises a first intermediate storage module, a site selection input module, a foundation setting planning module, a project planning module, a construction cost estimation module, a total plane planning module, a second intermediate storage module, a primary design module, a construction plan design module and a network module, wherein the site selection input module is communicated with the first intermediate storage module, the foundation setting planning module is communicated with the first intermediate storage module, the project planning module is communicated with the first intermediate storage module, the total plane planning module is communicated with the first intermediate storage module, the fake estimation module is communicated with the first intermediate storage module, the second intermediate storage module is communicated with the first intermediate storage module, the primary design module is communicated with the second intermediate storage module, the construction plan design module is communicated with the second intermediate storage module, and the network module is communicated with the second intermediate storage module.
2. A building project design software system according to claim 1, wherein: a geographic information storage module is arranged between the addressing input module and the basic setting planning module, and a basic setting information module is arranged between the project planning module and the basic setting planning module.
3. A building project design software system according to claim 1, wherein: the first intermediate storage module and the second intermediate storage module are storage servers, and the first intermediate storage module and the second intermediate storage module are backups of each other.
4. A building project design software system according to claim 1, wherein: the geographic information storage module and the basic setting information module are stored in a network-attached mode, the geographic information storage module is connected with the site selection input module through a local area network, the geographic information storage module is connected with the basic setting module through the local area network, the basic setting information module is connected with the basic setting module through the local area network, and the basic setting information module is connected with the project planning module through the local area network.
5. A building project design software system according to claim 1, wherein: the network module is a gateway device and is connected with field personnel, purchasing personnel and clients through a network.
6. A building project design software system according to claim 1, wherein: the basic setting planning module, the address selecting input module, the project planning module, the general plan diagram planning module, the cost estimation module, the preliminary design module and the construction diagram design module are personal computers.
CN202111568515.8A 2021-12-21 2021-12-21 Building project design software system Pending CN114201805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111568515.8A CN114201805A (en) 2021-12-21 2021-12-21 Building project design software system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111568515.8A CN114201805A (en) 2021-12-21 2021-12-21 Building project design software system

Publications (1)

Publication Number Publication Date
CN114201805A true CN114201805A (en) 2022-03-18

Family

ID=80655562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111568515.8A Pending CN114201805A (en) 2021-12-21 2021-12-21 Building project design software system

Country Status (1)

Country Link
CN (1) CN114201805A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102722919A (en) * 2012-05-31 2012-10-10 株洲南车时代电气股份有限公司 Train monitoring recording device data updating equipment and method
CN107135365A (en) * 2017-05-19 2017-09-05 湖北三江航天红林探控有限公司 A kind of high speed image missile-borne data recording equipment
CN107958328A (en) * 2017-11-22 2018-04-24 北京善筑科技股份有限公司 Green assembled architecture digitlization construct platform and its method of work
CN111401688A (en) * 2020-02-17 2020-07-10 温州电力设计有限公司 Engineering cost system and device based on geological estimation
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102722919A (en) * 2012-05-31 2012-10-10 株洲南车时代电气股份有限公司 Train monitoring recording device data updating equipment and method
CN107135365A (en) * 2017-05-19 2017-09-05 湖北三江航天红林探控有限公司 A kind of high speed image missile-borne data recording equipment
CN107958328A (en) * 2017-11-22 2018-04-24 北京善筑科技股份有限公司 Green assembled architecture digitlization construct platform and its method of work
CN111401688A (en) * 2020-02-17 2020-07-10 温州电力设计有限公司 Engineering cost system and device based on geological estimation
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method

Similar Documents

Publication Publication Date Title
Attia Evaluation of adaptive facades: The case study of Al Bahr Towers in the UAE
Du et al. Modular facade retrofit with renewable energy technologies: The definition and current status in Europe
Mata et al. A map of roadmaps for zero and low energy and carbon buildings worldwide
Lee et al. High-performance commercial building façades
Pullen et al. A preliminary overview of emerging trends for industrialized construction in the United States
Cumbie et al. Choice of governance mechanisms to promote information sharing via boundary objects in the disaster recovery process
O'Neill-Carrillo et al. The long road to community microgrids: Adapting to the necessary changes for renewable energy implementation
Rovers New energy retrofit concept:‘renovation trains’ for mass housing
CN111988173A (en) Tenant management platform and tenant management method based on multi-layer parent-child structure tenant
Kallushi et al. Think bigger: net-zero communities
Zhang et al. A micro-scale study on the spontaneous spatial improvement of in-between spaces in Chinese traditional districts considering the relationship between modifications and encroachment
CN114201805A (en) Building project design software system
CN112734507A (en) House lease distribution method, distribution system and storage medium based on block chain
Mitchell et al. Building a National Network through peered community area networks: realising ICTs within developing countries
CN201508546U (en) Enterprise-level database backup system
JP7378291B2 (en) Building development system and building development method using the same
Garmston Decision-making in the selection of retrofit facades for non-domestic buildings
CN109377158A (en) A kind of real estate and house property integrated management system
JP2002304539A (en) Tenant mediation system for individual housing
Zhongying et al. Establishing a Renewable Energy Industries Association in China
Hansen Including commissioning during design phase benefits new construction: A qualitative case study
Thomas et al. Installing Solar for Haitian Civil Society with Emphases on Maintenance and Empowerment
Gunarathna et al. Opportunities for using blockchain in distributed solar energy projects
ESCAP Enhancing the role of ICTs for disaster risk management
Clarke et al. City Building (Glasgow): an inspirational model of low energy social housing and public building production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination