CN114166459B - Wind tunnel group medium-voltage scheduling method - Google Patents
Wind tunnel group medium-voltage scheduling method Download PDFInfo
- Publication number
- CN114166459B CN114166459B CN202210128967.2A CN202210128967A CN114166459B CN 114166459 B CN114166459 B CN 114166459B CN 202210128967 A CN202210128967 A CN 202210128967A CN 114166459 B CN114166459 B CN 114166459B
- Authority
- CN
- China
- Prior art keywords
- queue
- wind tunnel
- unit
- medium
- compressor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M9/00—Aerodynamic testing; Arrangements in or on wind tunnels
- G01M9/02—Wind tunnels
- G01M9/04—Details
Abstract
The invention is suitable for the technical field of wind tunnel group test operation scheduling and provides a wind tunnel group medium-voltage scheduling method. Firstly, determining a wind tunnel queue and a resource queue, and calculating the capacity of a wind tunnel group request target and the current targetCapacity, according to the requested target capacity QqAnd current standard square capacity QdDetermining the start and stop of the compressor set; the compressor unit queue comprises a work unit queue, a shutdown unit queue and an emptying unit queueWhen the working unit queue is empty, the first compressor of the emptying unit queue or the shutdown unit queue is moved out and is discharged to the tail of the working unit queue; when in useIn time, removing from emptying unit queue and/or shutdown unit queueiThe platform compressor is arranged at the tail of the work unit queue; when in useAnd the first compressor of the working unit compressor queue is moved out and discharged to the tail of the emptying unit queue, so that the operation scheduling of the multi-factor hybrid system is realized, and the operation of the medium-pressure air system is intelligently scheduled and controlled.
Description
Technical Field
The invention relates to the field of wind tunnel group test operation scheduling, in particular to a wind tunnel group medium-pressure scheduling method.
Background
Large wind tunnel equipment and facilities are major strategic resources in China, and wind tunnel tests need multiple power resources such as pure water, electric power, high-pressure air, medium-pressure air, vacuum, nitrogen, hydrogen, oxygen and the like. Particularly, along with the centralized construction and the centralized management of the wind tunnels, the high-frequency and various pneumatic tests developed by the wind tunnel group provide great challenges for timely guarantee and reasonable allocation of power resources.
The requirement of medium-pressure air resources greatly fluctuates along with the development of test tasks and the guarantee period, and the reasonable scheduling of large-scale medium-pressure compressor units has the relation to energy conservation and emission reduction, the completion of wind tunnel test tasks and the stability of power supply. The current scheduling method is that once a wind tunnel has a test power resource demand, a power guarantee department starts a medium-pressure compressor unit to pump air, so that frequent impact on a power grid and excessive guarantee of power resources are easily formed on one hand, and on the other hand, the medium-pressure compressor system has the maximum limitation of the number of start-stop times per day, and the frequent start causes the performance degradation and equipment loss of the medium-pressure compressor unit, a dryer and other systems, thereby seriously affecting the economic benefit of an enterprise.
The medium-pressure compressor has large current at the moment of starting, and the compressor is quite energy-consuming and easy to damage due to frequent switching. Therefore, under the condition of meeting the power requirement of the wind tunnel test, in the face of uncertainty of medium-pressure resource requirement, how to formulate a reasonable operation scheduling strategy of the medium-pressure compressor unit is the primary consideration of medium-pressure aerodynamic scheduling of the wind tunnel test, frequent starting of the medium-pressure compressor unit is avoided while the wind tunnel test is guaranteed, and supply pressure conflict and the like are avoided.
An integrated test scheduling system ISS appears in 2019, the system reduces the influence on the aspects of work delay and the like caused by insufficient test resources and test schedule conflict, and ensures that various equipment facilities and related personnel can meet the requirement of a high-priority test task to the greatest extent. The ISS system takes project management software P6 as a core, realizes the compilation and real-time update of a test plan, and the balance and distribution of resources and cost, and focuses on short-term (week unit), medium-term and long-term test task planning and personnel allocation.
However, the technology is mainly used for medium and long-term test planning and wind tunnel staggered starting, and a method for intelligently scheduling the medium-pressure compressor unit according to different test task requirements is not developed for wind power groups.
Disclosure of Invention
Aiming at the problems that the existing wind tunnel group has large uncertainty of medium-pressure air resource demand, a rough operation mode and high energy and material consumption caused by frequent start of a large-sized medium-pressure compressor unit, a reasonable medium-pressure compressor unit operation scheduling strategy is formulated under the condition of meeting the power demand of a wind tunnel test, the wind tunnel test is efficiently ensured, and meanwhile, the medium-pressure compressor unit is prevented from being frequently started, so that the energy is saved, the efficiency is improved, and the safe and reliable operation of equipment is ensured.
The invention provides a wind tunnel group medium-pressure scheduling method, which comprises the following steps:
s10, determining a wind tunnel queue W and a resource queue Q;
s20, calculating the wind tunnel group request standard square capacity QqAnd current standard square capacity Qd;
The sum of all resource application amount in the resource queue Q is the request target capacity Qq;
The sum of the current tank group capacity of the tank groups related in the wind tunnel queue W is the current standard square capacity Qd;
S30, capacity Q is marked according to the requestqAnd current standard square capacity QdDetermining the start and stop of a compressor set;
s301, determining a compressor queue Y, wherein the compressor queue Y comprises a work unit queue YworkShutdown unit queue YhaltAnd emptying unit queue Yunload;
S302 whenWhen the compressor is started, starting a first compressor unit; will empty the air unit queue Y promptlyunloadThe head of the queue is moved out and arranged in a work unit queue YworkAt the end, the emptying unit queues are moved forward one by one; if the emptying unit queue Y is at the momentunloadIf the system is empty, the shutdown unit queue Y is sethaltThe head of the queue is moved out and arranged in a work unit queue YworkAt the end, the shutdown unit queues are moved forward one by one;
s303, whenIf so, the emptying unit queue Y is put into useunloadTo (1)iThe compressor set before the compressor is moved out and arranged in the work set queue YworkAt the end, the emptying unit queues are moved forward one by one; if the emptying unit queue is empty in the process, the shortage will be causediCompressor unit slave shutdown unit queue Y of bitshaltIs moved out and is arranged in a work unit queue YworkEnd, shutdown unit queueShifting forward one by one;
when in useAnd the work unit queue YworkIf not, moving out the first unit of the work queue, and moving the work unit queues forward one by one;
wherein Q isminThe minimum early-warning capacity is set as the minimum early-warning capacity,L i is as followsiThe starting threshold of the set of the station,L i+1is as followsiAnd C is a constant value, and the starting threshold of +1 unit is set.
Further, the wind tunnel queue W is a wind tunnel queue applying for medium-pressure air resources, W = { W = { (W)1,w2,…,wn,…wNThe resource queue Q is a queue of medium-pressure air resource application amount corresponding to the wind tunnel queue, and Q = { Q = { Q }1,q2,…,qn,…,qN};
Wherein, w1For applying for wind tunnels arranged at the head in a medium-pressure air resource, w2For applying to wind tunnels arranged at the second level in medium-pressure air resources, wnThe method comprises the steps of applying for a wind tunnel arranged at the nth position in a medium-pressure air resource; q. q.s1Request for Medium pressure air resources, q, for a wind tunnel arranged in the head2Request amount of medium pressure air resource, q, for wind tunnel arranged at second positionnThe application quantity of the medium-pressure air resources corresponding to the wind tunnel arranged at the nth position is shown, and N is the total quantity of the wind tunnels applying the medium-pressure air resources.
Further, at the end of step S30, it further includes S40: when a new wind tunnel test request exists, adding the newly requested wind tunnel to the tail of the wind tunnel queue W, arranging the corresponding medium-pressure air resource application amount at the tail of the resource queue Q, and executing the step S20 and the step S30.
Further, at the end of step S40, it further includes S50: when a test ending signal of a certain wind tunnel is received, the wind tunnel is moved out from the wind tunnel queue W, and the wind tunnels behind the wind tunnel queue W are moved forwards one by one; simultaneously, the medium-pressure air resource application amount corresponding to the wind tunnel is removed from the resource queue Q, and the resource amounts behind the medium-pressure air resource application amount are shifted forward one by one; and performs steps S20 and S30.
where K is the number of compressor strings in the compressor train Y,iis a positive integer and is a non-zero integer,,Qmaxthe highest early warning capacity.
wherein J is the total number of wind tunnels in the test system,the lowest requested target capacity for the jth wind tunnel,a and B are constants for the third tank group to scale the square capacity.
Further, the air conditioner is provided with a fan,,for the lowest pressure requirement of the jth wind tunnel,the volume of a medium-pressure air tank group in the jth wind tunnel;
Further, the air conditioner is provided with a fan,,for the current tank farm pressure to be,is the volume of the medium-pressure air tank group.
Further, in step S30, whenIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T; after setting the emptying time T, ifIf so, the emptying unit queue Y is put into useunloadIs moved out to a shutdown unit queue YhaltThe last bit of (1); if it isIf so, the emptying unit queue Y is put into useunloadIs moved out and arranged in a work unit queue YhaltThe last bit of (1);
when in useIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T; after setting the emptying time T, if QdIf there is no change, the emptying unit queue Y is usedunloadHead displacement ofDischarging to the stop train queue YhaltThe last bit of (c).
Further, step S302 and/or step S303 further include: when the compressor unit is started and the required standard volume of the experiment is reached, returning a test permission signal to the wind tunnels in the wind tunnel queue, and opening the valves corresponding to the wind tunnels;
step S50 further includes: when a test ending signal of a certain wind tunnel is received, according to the judgment of the step S30, after the corresponding amount of compressors are stopped or emptied, a signal allowing the test ending is returned to the corresponding wind tunnel, and the valve of the corresponding wind tunnel is closed.
Compared with the prior art, the wind tunnel group medium-pressure scheduling method at least has the following beneficial effects: the invention queues mixed factors in a queue form respectively, makes a reasonable control strategy by using the requirements and the execution relation among the factors, reasonably distributes resources according to the principle of first arrival and first acquisition, completes independent control and scheduling in each factor, finally realizes intelligent control on test wind tunnels, compressors, valves and the like in a wind tunnel group, and completes different tests of each wind tunnel in a matching way.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments of the present invention or in the description of the prior art will be briefly described below, and it is obvious that the drawings described below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a wind tunnel group medium-voltage scheduling method according to an embodiment of the present invention;
fig. 2 is another schematic flow chart of a wind tunnel group medium voltage scheduling method according to an embodiment of the present invention.
Detailed Description
The following description provides many different embodiments, or examples, for implementing different features of the invention. The particular examples set forth below are illustrative only and are not intended to be limiting.
Example 1
A wind tunnel group medium-voltage dispatching method, as shown in fig. 1, includes:
s10, determining a wind tunnel queue W and a resource queue Q;
the wind tunnel queue W is a wind tunnel queue applying for medium-pressure air resources, and W = { W1,w2,…,wn,…wNThe resource queue Q is a queue of medium-pressure air resource application amount corresponding to the wind tunnel queue, and Q = { Q = { Q }1,q2,…,qn,…,qN};
Wherein, w1For applying to wind tunnels arranged at the head in a medium-pressure air resource, W2For applying to wind tunnels arranged at the second level in medium-pressure air resources, wnThe method comprises the steps of applying for a wind tunnel arranged at the nth position in a medium-pressure air resource; q. q.s1Request for Medium pressure air resources, q, for a wind tunnel arranged in the head2Request amount of medium pressure air resource, q, for wind tunnel arranged at second positionnThe application quantity of the medium-pressure air resources corresponding to the wind tunnel arranged at the nth position is obtained, and N is the total quantity of the wind tunnels applying the medium-pressure air resources;
it is worth to be noted that the number of wind tunnels in the whole test system is J, N wind tunnels need to be subjected to wind tunnel tests, so that medium-pressure air resources are requested to enter a wind tunnel queue W and are sequenced according to time sequence, the wind tunnel applied first is arranged at the first position, the medium-pressure air resources are obtained first, and W = { W =1,w2,…,wn,…wN};
S20, calculating the wind tunnel group request standard square capacity QqAnd current standard square capacity Qd;
The sum of all resource application amount in the resource queue Q is the request target capacity Qq;
It is worth to be noted that, according to different wind tunnel test types, the pressure requirements of the wind tunnels are different, so that the standard square capacity of each wind tunnel test request is also different, when the wind tunnel test request is sent, the standard square capacity required by the test is added into a resource queue Q, and the total standard square capacity currently required by the whole wind tunnel group is obtained by adding all the resource application amounts in the resource queue, and is defined as the requested standard square capacity;
the sum of the current capacities of the tank groups involved in the wind tunnel queue W is the current standard square capacity Qd;
S30, capacity Q is marked according to the requestqAnd current standard square capacity QdDetermining the start and stop of a compressor set, specifically, the method comprises the following steps:
s301, determining a compressor queue Y, wherein the compressor queue Y comprises a work unit queue YworkShutdown unit queue YhaltAnd emptying unit queue Yunload;
S302 whenWhen the compressor is started, starting a first compressor unit; will empty the air unit queue Y promptlyunloadThe head of the queue is moved out and arranged in a work unit queue YworkAt the end, the emptying unit queues are moved forward one by one; if the emptying unit queue Y is at the momentunloadIf the system is empty, the shutdown unit queue Y is sethaltThe head of the queue is moved out and arranged in a work unit queue YworkAt the end, the shutdown unit queues are moved forward one by one;
s303, whenIf so, the emptying unit queue Y is put into useunloadTo (1)iThe compressor set before the compressor is moved out and arranged in the work set queue YworkAt last, putThe empty unit queues are moved forward one by one; if the emptying unit queue is empty in the process, the shortage will be causediCompressor unit slave shutdown unit queue Y of bitshaltIs moved out and is arranged in a work unit queue YworkAt the end, the shutdown unit queues are moved forward one by one;
for example, whenIf so, 4 compressor units need to be started, firstly, the compressor units are extracted from the emptying unit queue, and when the number of the compressor units in the emptying unit queue is not enough, the compressor units are extracted from the shutdown unit, and meanwhile, the emptying unit queue, the working unit queue and the shutdown unit queue are updated;
Qminthe minimum early-warning capacity is set as the minimum early-warning capacity,L i is as followsiThe starting threshold of the set of the station,L i+1is as followsi+1 starting threshold of the unit;
where K is the number of compressor strings in the compressor train Y, i.e., the total number of available compressor strings in the test system,iis a positive integer and is a non-zero integer,。
those skilled in the art will appreciate that in step S30, the first compressor unit is started first according to the current target capacity value, and then more compressor units are started according to the requested target capacity. There are two cases, 1) whenGenerally, this is the case when the test system is initially running and there is no compressor set on, in which case the first pressure is directly activatedShrinking the unit, judging the condition of requesting the volume of the target party, and executing the step S302; 2) when in useIf the compressor is already running, then the process goes directly to step S302.
In step 302, in order to simplify the control strategy, the lowest early warning capacity and the highest early warning capacity are calculated as follows:
wherein J is the total number of wind tunnels in the test system,the lowest nominal capacity of the jth wind tunnel,the method comprises the steps of calibrating square capacity for a tank group, wherein A and B are constants and are artificially set empirical values;
,for the lowest pressure requirement of the jth wind tunnel,is the volume of the medium-pressure air tank group;
In the invention, the total quantity of the wind tunnels of the test system is determined, the lowest pressure requirement of each wind tunnel is determined, the rated pressure of the tank group is also determined, and the calculated lowest early warning capacity and the calculated highest early warning capacity are determined and cannot change along with the change of the requirement of the wind tunnel test, so that the control strategy is simplified.
When in useAnd the work unit queue YworkAnd if not, moving out the first unit of the work queue, moving the work unit queues forward one by one, and considering the value as the set value.
Preferably, whenIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T;
after setting the emptying time T, ifIf so, the emptying unit queue Y is put into useunloadIs moved out to a shutdown unit queue YhaltThe last bit of (1); if it isIf so, the emptying unit queue Y is put into useunloadIs moved out and arranged in a work unit queue YhaltThe last bit of (c).
That is, when the current standard capacity is temporarily larger than the requested standard capacity by a certain value, a working compressor unit is moved out first and idled for a certain time, and if the rest compressor units can always meet the requirement of medium-pressure air resources of a test wind tunnel in the system, the idle-moved compressor unit is stopped; if the rest compressor units can not meet the requirement of the medium-pressure air resource of the test wind tunnel in the system after idling for a certain time, the idle compressor units are moved out and put into the working unit again; it will be appreciated by those skilled in the art that this process may be repeated and the time of idle may also need to be adjusted manually, empirically or during the course of the test.
Preferably, the control strategy may also be tailored such that when a detection of a detected event occursAnd moving out the head of the emptying unit queue and discharging the head to the last position of the working unit queue, namely putting the idling compressor unit into operation when the current standard square capacity is detected to be not capable of meeting the requirement of the medium-pressure air resource of the test wind tunnel in the system.
The above are according toThe determination condition(s) of (1) is applied only when the requested target capacity Qq is small, and when the requested target capacity is large, the rated capacity of the medium-pressure tank group needs to be taken into consideration, and in order to ensure system safety, the determination condition(s) is (are) applied when the requested target capacity Qq is largeIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T; after setting the emptying time T, if QdIf there is no change, the emptying unit queue Y is usedunloadIs moved out and is arranged in a machine stopping unit queue YhaltThe last bit of (c).
As will be appreciated by those skilled in the art, whenIn time, if one compressor is emptied, the requirement is still metThen, one compressor is emptied again until the condition is not satisfied。
Those skilled in the art will understand that the pump set, the dryer and other systems related to the compressor unit are all stopped when the compressor is stopped; when the compressor unit runs in an idling mode, the compressor unit continues to operate but does not have a load, inflation is stopped, and the compressor unit can be quickly switched to a loaded inflation state when needed, so that the starting and stopping times of the compressor unit are reduced, and the compressor unit is in a loaded state when working.
S40, when a new wind tunnel test request exists, adding the newly requested wind tunnel to the tail of the wind tunnel queue W, arranging the corresponding medium-pressure air resource application amount at the tail of the resource queue Q, and executing the step S20 and the step S30, as shown in the attached figure 2;
as can be understood by those skilled in the art, when a new wind tunnel test request exists, the newly requested wind tunnel is added to the tail of the wind tunnel queue W, and the corresponding medium-pressure air resource application amount is arranged at the tail of the resource queue Q; recalculating wind farm request target capacity Q according to step S20qAnd current standard square capacity Qd(ii) a Re-determining start-stop and idling strategies of the compressor;
s50, when a test ending signal of a certain wind tunnel is received, the wind tunnel is moved out of the wind tunnel queue W, and the wind tunnels behind the wind tunnel queue W are shifted forwards one by one; simultaneously, the medium-pressure air resource application amount corresponding to the wind tunnel is removed from the resource queue Q, and the resource amounts behind the medium-pressure air resource application amount are shifted forward one by one; and performs steps S20 and S30.
That is, when a test end signal of a certain wind tunnel is received, the requested standard square capacity and the current standard square capacity of the wind tunnel group after the wind tunnel group is moved out of the wind tunnel need to be recalculated, and a new start-stop and idle-run strategy of the compressor is formulated according to the standard square capacity and the current standard square capacity.
Meanwhile, each test wind tunnel is provided with a corresponding valve, when the compressor unit is started and reaches the standard volume required by the test, a test permission signal or a test termination permission signal is returned to the corresponding wind tunnel in the wind tunnel queue, and the valve of the corresponding wind tunnel is opened or closed;
it can be understood that, for the wind tunnel of the test request, the corresponding valves are opened according to the sequence of the wind tunnels in the wind tunnel queue, and medium-pressure air resources are provided for the wind tunnel queue according to the principle of first-come first-serve; for the end of the test request, the corresponding valve is closed according to the principle of who requests and ends.
In order to ensure the safety of the system, the whole pressure condition of the wind tunnel group is monitored through the pressure monitoring module, when the current standard volume is lower than the lowest early warning volume or higher than the highest early warning volume, an early warning signal is sent out to remind a tester that the current system has risks, and the tester can determine whether to manually control the start and stop or the idling of the compressor according to experience or actual conditions.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.
Claims (9)
1. A wind tunnel group medium-pressure scheduling method is characterized by comprising the following steps:
s10, determining a wind tunnel queue W and a resource queue Q;
s20, calculating the wind tunnel group request standard square capacity QqAnd current standard square capacity Qd;
The sum of all resource application amount in the resource queue Q is the request target capacity Qq;
The sum of the current capacities of the tank groups involved in the wind tunnel queue W is the current standard square capacity Qd;
S30, capacity Q is marked according to the requestqAnd current standard square capacity QdDetermining the start and stop of a compressor set;
s301, determining a compressor queue Y, wherein the compressor queue Y comprises a work unit queue YworkShutdown unit queue YhaltAnd emptying unit queue Yunload;
S302 whenWhen the compressor is started, starting a first compressor unit; will empty the air unit queue Y promptlyunloadThe first position in the middle is moved out and arranged to workTrain of units YworkAt the end, the emptying unit queues are moved forward one by one; if the emptying unit queue Y is at the momentunloadIf the system is empty, the shutdown unit queue Y is sethaltThe head of the queue is moved out and arranged in a work unit queue YworkAt the end, the shutdown unit queues are moved forward one by one;
s303, whenIf so, the emptying unit queue Y is put into useunloadTo (1)iThe compressor set before the compressor is moved out and arranged in the work set queue YworkAt the end, the emptying unit queues are moved forward one by one; if the emptying unit queue is empty in the process, the shortage will be causediCompressor unit slave shutdown unit queue Y of bitshaltIs moved out and is arranged in a work unit queue YworkAt the end, the shutdown unit queues are moved forward one by one;
when in useAnd the work unit queue YworkIf not, the first unit of the work queue is moved out and discharged to the emptying unit queue YunloadAt the end, the work unit queues are shifted forward one by one;
wherein Q isminThe minimum early-warning capacity is set as the minimum early-warning capacity,L i is as followsiThe starting threshold of the set of the station,L i+1is as followsi+1 starting threshold of the unit, C is constant;
step S303 further includes: when in useIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T; after setting the emptying time T, ifIf so, the emptying unit queue Y is put into useunloadThe first bit of the bit is shifted out,is arranged to a stop unit queue YhaltThe last bit of (1); if it isIf so, the emptying unit queue Y is put into useunloadIs moved out and arranged in a work unit queue YhaltThe last bit of (1);
when in useIn the process, the first unit of the work queue is moved out and discharged to an emptying unit queue YunloadThe last position in the middle, and running and setting the emptying time T; after setting the emptying time T, if QdIf no change, the emptying unit queue Y is usedunloadIs moved out and is arranged in a machine stopping unit queue YhaltLast bit of (1), QmaxThe highest early warning capacity.
2. The wind tunnel group medium-pressure scheduling method according to claim 1, wherein the wind tunnel queue W is a wind tunnel queue applying for medium-pressure air resources, W = { W = { W =1,w2,…,wn,…wNThe resource queue Q is a queue of medium-pressure air resource application amount corresponding to the wind tunnel queue, and Q = { Q = { Q }1,q2,…,qn,…,qN};
Wherein, w1For applying for wind tunnels arranged at the head in a medium-pressure air resource, w2For applying to wind tunnels arranged at the second level in medium-pressure air resources, wnThe method comprises the steps of applying for a wind tunnel arranged at the nth position in a medium-pressure air resource; q. q.s1Request for Medium pressure air resources, q, for a wind tunnel arranged in the head2Request amount of medium pressure air resource, q, for wind tunnel arranged at second positionnThe application quantity of the medium-pressure air resources corresponding to the wind tunnel arranged at the nth position is shown, and N is the total quantity of the wind tunnels applying the medium-pressure air resources.
3. The wind tunnel group medium voltage dispatching method of claim 2, further comprising, at the end of step S30, step S40: when a new wind tunnel test request exists, adding the newly requested wind tunnel to the tail of the wind tunnel queue W, arranging the corresponding medium-pressure air resource application amount at the tail of the resource queue Q, and executing the step S20 and the step S30.
4. The wind tunnel group medium voltage dispatching method of claim 3, further comprising, at the end of step S40, S50: when a test ending signal of a certain wind tunnel is received, the wind tunnel is moved out from the wind tunnel queue W, and the wind tunnels behind the wind tunnel queue W are moved forwards one by one; simultaneously, the medium-pressure air resource application amount corresponding to the wind tunnel is removed from the resource queue Q, and the resource amounts behind the medium-pressure air resource application amount are shifted forward one by one; and performs steps S20 and S30.
9. The wind tunnel group medium voltage dispatching method according to any one of claims 4-8, wherein step S302 and/or step S303 further comprises: when the compressor unit is started and the required standard volume of the experiment is reached, returning a test permission signal to the wind tunnels in the wind tunnel queue, and opening the valves corresponding to the wind tunnels;
step S50 further includes: when a test ending signal of a certain wind tunnel is received, according to the judgment of the step S30, after the corresponding amount of compressors are stopped or emptied, a signal allowing the test ending is returned to the corresponding wind tunnel, and the valve of the corresponding wind tunnel is closed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210128967.2A CN114166459B (en) | 2022-02-11 | 2022-02-11 | Wind tunnel group medium-voltage scheduling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210128967.2A CN114166459B (en) | 2022-02-11 | 2022-02-11 | Wind tunnel group medium-voltage scheduling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114166459A CN114166459A (en) | 2022-03-11 |
CN114166459B true CN114166459B (en) | 2022-04-19 |
Family
ID=80489729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210128967.2A Active CN114166459B (en) | 2022-02-11 | 2022-02-11 | Wind tunnel group medium-voltage scheduling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114166459B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114926071B (en) * | 2022-06-02 | 2023-05-09 | 中国空气动力研究与发展中心计算空气动力研究所 | Dynamic scheduling method and storage medium for wind tunnel group vacuum system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101559706A (en) * | 2008-10-27 | 2009-10-21 | 董鹏 | Liquid nitrogen cold drive power |
CN113049145A (en) * | 2021-03-29 | 2021-06-29 | 中国空气动力研究与发展中心设备设计与测试技术研究所 | Equipment for carrying out full-system-width low-temperature comprehensive calibration on temperature measurement system |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE515509A (en) * | 1951-11-30 | 1952-11-29 | ||
JP3805885B2 (en) * | 1998-01-23 | 2006-08-09 | ダイセル化学工業株式会社 | Wind tunnel equipment |
JP3757269B2 (en) * | 2001-08-24 | 2006-03-22 | 独立行政法人 宇宙航空研究開発機構 | Method and apparatus for reducing pressure fluctuation in wind path in recirculating supersonic wind tunnel |
CN103195662A (en) * | 2011-03-14 | 2013-07-10 | 罗琮贵 | Wing ring, wing ring mechanism and method |
CN103123504A (en) * | 2012-12-18 | 2013-05-29 | 中国空气动力研究与发展中心高速空气动力研究所 | Speed change pressure flow field control method applicable to intermittent transonic speed wind tunnel |
CN103852234A (en) * | 2014-03-10 | 2014-06-11 | 西北工业大学 | Surge limit measurement method for continuous transonic wind tunnel |
CN104932565B (en) * | 2015-06-04 | 2017-06-06 | 中国空气动力研究与发展中心高速空气动力研究所 | A kind of temporary stamp injector powered transonic wind tunnel flow field control structure of high accuracy |
CN105403378B (en) * | 2015-12-01 | 2018-06-26 | 苟仲武 | A kind of method and its device for improving air storing type wind-tunnel |
CN107991055A (en) * | 2017-11-20 | 2018-05-04 | 重庆交通大学 | Gobi Integrated environment wind tunnel simulation device |
WO2019204394A2 (en) * | 2018-04-17 | 2019-10-24 | Kayara Sammy | Wind-funneling for gas turbines |
CN111006841B (en) * | 2019-11-29 | 2022-07-05 | 中国航天空气动力技术研究院 | Wide-area air inlet pressure regulating system for hypersonic wind tunnel |
CN110954290A (en) * | 2019-12-09 | 2020-04-03 | 中国航天空气动力技术研究院 | Automatic adjusting system and method for wind tunnel jet test pressure |
CN112069462B (en) * | 2020-08-28 | 2022-05-31 | 中国空气动力研究与发展中心计算空气动力研究所 | Large icing wind tunnel high-pressure air resource consumption calculation method |
CN112069463B (en) * | 2020-08-28 | 2022-06-03 | 中国空气动力研究与发展中心计算空气动力研究所 | Method for calculating high-pressure air resource consumption of wind tunnel group |
CN112069446B (en) * | 2020-08-28 | 2022-04-01 | 中国空气动力研究与发展中心计算空气动力研究所 | Wind tunnel group high-pressure air resource scheduling method and system |
CN112729747B (en) * | 2020-12-30 | 2023-04-14 | 中国航天空气动力技术研究院 | Automobile environment wind tunnel process equipment control system |
CN112985741B (en) * | 2021-02-07 | 2022-05-10 | 中国空气动力研究与发展中心超高速空气动力研究所 | Piston type wind tunnel special gas inflation method utilizing compressed air power |
-
2022
- 2022-02-11 CN CN202210128967.2A patent/CN114166459B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101559706A (en) * | 2008-10-27 | 2009-10-21 | 董鹏 | Liquid nitrogen cold drive power |
CN113049145A (en) * | 2021-03-29 | 2021-06-29 | 中国空气动力研究与发展中心设备设计与测试技术研究所 | Equipment for carrying out full-system-width low-temperature comprehensive calibration on temperature measurement system |
Also Published As
Publication number | Publication date |
---|---|
CN114166459A (en) | 2022-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111516543B (en) | Charging equipment power distribution method, storage medium and system | |
CN114166459B (en) | Wind tunnel group medium-voltage scheduling method | |
CN108909514A (en) | More AGV power management systems and method based on automatic battery replacement | |
CN103297505B (en) | The On-Line Control Method of data center's multiple-energy-source and system under dynamic cloud service request | |
CN109617103B (en) | Energy control method and system for gradient utilization energy storage battery of energy storage unit | |
CN110460079A (en) | A kind of echelon utilizes energy-storage system downrating method | |
CN111191875B (en) | Method for mixed dispatching of unit | |
CN112886623A (en) | Energy storage converter VSG mode energy management coordination control method and system | |
CN116131400B (en) | Battery management method, device, equipment and medium for energy storage system | |
CN109213221B (en) | Temperature control method of direct-current power transmission converter valve combined type external cooling system | |
CN116430755A (en) | Automatic optimizing start-stop control method for equipment, storage medium and equipment | |
CN109560553A (en) | A kind of switching method of electric power electric transformer low-pressure side switchable power module | |
CN108874517A (en) | The stand-by system availability of fixed priority divides energy consumption optimization method | |
CN115118002A (en) | Mass low-voltage distributed new energy regulation and control method, device, equipment and storage medium | |
CN113595195A (en) | Power scheduling method, energy router, power scheduling system and storage medium | |
Song et al. | Unit commitment optimization model of wind storage combined system considering peak load regulation of energy storage system | |
CN113401167B (en) | Turnout action optimization control method, equipment and medium under energy constraint condition | |
KR20190107888A (en) | Apparatus and metho for managing peak power of zero energy town | |
CN117698487B (en) | Dynamic scheduling method for electric energy of mobile charging and storing vehicle | |
CN114069662B (en) | Energy storage power station active scheduling control method and system with peak regulation and frequency modulation functions | |
CN110034570B (en) | Control method and device of energy storage equipment and photovoltaic power station | |
CN116979573A (en) | Power management method of intelligent flywheel energy storage array | |
CN106648868A (en) | Scheduling algorithm for providing continuous service by cloud system in power failure | |
Han et al. | Dispatching Model of a Certain Test Platform | |
CN115617483A (en) | Method for optimizing earliest deadline first energy consumption of hybrid critical system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |