CN1141479C - Method for drawing out bean and prop of workshop without stopping production - Google Patents
Method for drawing out bean and prop of workshop without stopping production Download PDFInfo
- Publication number
- CN1141479C CN1141479C CNB021026211A CN02102621A CN1141479C CN 1141479 C CN1141479 C CN 1141479C CN B021026211 A CNB021026211 A CN B021026211A CN 02102621 A CN02102621 A CN 02102621A CN 1141479 C CN1141479 C CN 1141479C
- Authority
- CN
- China
- Prior art keywords
- trestle
- lift
- pump drainage
- desire
- monolithics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a method for lifting beams and drawing out pillars for a workshop without stopping production. The present invention is characterized in that the present invention is completed through following steps: pillar foundation and pillar bodies supporting bent frame pillars are reinforced, corbel lug bosses are additionally provided, and lifting beams are manufactured and installed; finally, pillar sections of the bent frame pillars to be drawn out under the lifting beams are cut, and the task of enlarging pillar space is completed. The present invention can complete all workshop reformation and enlarge the pillar space under the condition that the production is not stopped, the production time can be retrieved, the improvement project investment can be saved, and the appreciable economic benefit is provided. The present invention can be widely used in the improvement project of enlarging the pillar space of an old workshop.
Description
Technical field:
The present invention relates to a kind of renovation of building technical method, particularly a kind of under not stopping production condition, take out part factory building framed bent post, form wide post distance to satisfy the old factory rehabilitation technical method that new production technology layout requires.
Background technology:
In old old factory rehabilitation, the post of former factory building is apart from the too small obstacle that often becomes technology arrangement.For enlarging the post distance, must take out part framed bent post to form the post distance of new broad, as the framed bent post with 6 meters original post distances, the centre is taken out one can form 12 meters posts apart from the space.When prior art is taken out post, must under the stopping production condition, carry out.Main method is, does a steel joist holder earlier and props up roof truss (being roof system) on the framed bent post of desiring to take out, reinforces the supporting row frame post at steel joist two ends then; Remove and desire crane girder system, framed bent post and the base for post that the pump drainage trestle is supported; Then, do a Pin length and be and take out the new crane girder system of new post behind the post, after treating two end supports framed bent post and base for post reinforced, newer crane girder system is installed and adjusts, resume production apart from length.Like this from steel joist holder support roof truss being installed, being removed crane girder system, dismounting framed bent post and patten to reinforcing two end supports framed bent post and patten, the new steel crane beam system of installation, overhead traveling crane in the whole reforming technology process factory building all can't move in this section factory building zone, also promptly must stop production.And minimumly need stopping production 3-4 month, will be many economic loss for enterprise during this.
Summary of the invention:
The purpose of this invention is to provide a kind of method of under not stopping production condition, taking out factory building part framed bent post with the drawing out bean and prop of expansion post distance.
The object of the present invention is achieved like this: a kind of under not stopping production condition the method for factory building drawing out bean and prop, it is characterized in that forming by following steps:
A) patten, the cylinder of reinforcing two end supports framed bent post are set up the bracket boss that beam is lifted in installation at the following position of crane girder, cylinder both sides;
B) make and install and lift beam: will lift on the bracket boss that beam is installed in the supporting row frame post both sides after the reinforcing respectively by two monolithics that measuring and calculating load designs and produces, make two monolithics lift beam and clamp and desire the pump drainage trestle, and finish the connection of lifting beam and supporting row frame post and bracket boss, connection, two monolithics of lifting beam and desire pump drainage trestle are lifted interconnecting between the beam;
C) beam of lifting that will desire the pump drainage trestle blocks removal with the lower part.
Purpose of the present invention can also realize like this: lifting beam with the bind mode of desiring the pump drainage trestle is: lift the desire pump drainage trestle left and right sides that beam clamps at two monolithics and be connected crossbeam respectively, on desire pump drainage trestle, hole, insert rod iron in the hole, the two end supports of rod iron also is bound up on the crossbeam, after adjustment pushes against, two monolithics are lifted desire pump drainage trestle that beam and both sides crossbeam surround lift in " well " font groove of centre and pour into the expansion concrete, make this place become a rigid connection point.
The bind mode of lifting beam and supporting row frame post and bracket boss is: at the supporting row frame post corresponding site of reinforcing and the end face pre-buried steel ironware of bracket boss, after lifting beam and being in place, will lift beam and the pre-buried steel ironware welds together.
The present invention has following advantage and positive social effect: need not stop production or not stop production substantially in whole old factory rehabilitation process, compared with prior art can save many engineering costs, so both solved the stopping production problem of prior art pump drainage trestle, retrieved the production time, also save the improvement project investment, thereby had very considerable economic.
Description of drawings:
Fig. 1 is for lifting the beam schematic diagram by the inventive method installation
Fig. 2 is that Fig. 1 is along the 1-1 sectional view
Fig. 3 is that Fig. 1 is along the 2-2 sectional view
The specific embodiment
Prior art is the roof system that holds up factory building with the steel joist, crane girder and walk the guidance tape system and must dismantle, make again and installation and joist with long steel crane beam and walk the guidance tape system, thereby need the stopping production several months to finish.Method of the present invention is directly to lift the crane girder of desiring to take out post part factory building and walk guidance tape and above roof system thereof with lifting beam.For this reason, at first reinforce the supporting row frame post (being the support column that steel is lifted the beam two ends) and the patten at two ends, the following suitable position of crane girder is set up the bracket boss in the cylinder both sides.Make two monolithics simultaneously and lift beam (two " I " font welded steel beams).After the intensity for the treatment of supporting row frame post footing meets design requirement, steel can be installed lift beam.Make two lift beam clamp to desire pump drainage trestle (position is below the crane girder bracket) and with its connection firmly (because of framed bent post section has the branch of rectangle, " I " font, two limb or is steel column, its bind mode is different).Two monolithics are lifted beam and are also interconnected into an integrated member, and the steel that forms an integral body is lifted beam.The two end supports that steel is lifted beam is on the newly-increased bracket boss of the supporting row frame post at two ends, and is and firm with its connection, cuts out at last to desire the pump drainage trestle and lift shell of column below the beam at steel.
In implementation process, the relevant instrument of general application is tested, is monitored, during monitoring, face mutually and the overhead traveling crane of lift heavy maximum is placed on steel is lifted beam least favorable position whenever striding two, hang the normal back and forth speed operation of lumping weight amount, the observation steel is lifted the amount of deflection of beam and whether the stressing conditions of main rod member conforms to design calculated value.
Be that the rectangle steel tendon concrete structure is the operating procedure of example explanation drawing out bean and prop method of the present invention with factory building framed bent post section below.
Referring to accompanying drawing 1,2,3,1 is the supporting row frame post among the figure, and 2 is the bracket boss, and 3 for desiring the pump drainage trestle, and 4 for lifting beam, and 5 is crossbeam, and 6 is rod iron.
The first, the working drawing of original factory building is examined, simultaneously the structure present situation of original factory building is checked, see that it has or not breakage, splits members such as bad, reinforces the needs of transforming to satisfy in case of necessity.
The second, according to patten, the cylinder of design reinforcement two end supports framed bent post 1 and set up bracket boss 2.The beam operate as normal is lifted in supposition earlier, and the supporting row frame post 1 at two ends has just been reformulated two new framed bent computing units.By checking computations to these two new computing units, just can draw desire and reinforce the reasonable arrangement of reinforcement of framed bent post and the concrete jacket thickness of section, can be regarded as equally its basis institute form and the size that should reinforce, designing and mapping and constructing then.According to the profile height of lifting beam, when reinforcing the framed bent post, below crane girder, suitably highly set up two bracket boss simultaneously.
The 3rd, design and produce and install and lift beam.
1, lifts the design of beam: dead load (and live load), the crane girder of statistics factory building roof system and walk the static load (and live load) of guidance tape system and desire the weight of the left upper semisection of pump drainage trestle (being generally the 1-3 root), the every post of desiring to take out the above-mentioned load that should support concentrate in together, be this post and be added in the permanent load of lifting this permanent position of beam.
whenever stride two adjacent overhead traveling cranes of maximum tonnage hang fully loaded heavy be placed in simultaneously to lift on the beam least favorable position and above-mentioned bracket in live load also be placed on simultaneously and desire to take out on the post, by desire to take out post should pass to the vertical force of lifting beam, be the dynamic load of lifting beam.
Calculate to such an extent that permanent load and dynamic load design are lifted each member of beam according to above-mentioned, calculate its monolithic by 50% of above-mentioned two kinds of load summations and lift beam, when lifting the beam calculation Design, each monolithic undertaken by real abdomen steel crane beam, steel is lifted beam and just can be designed to two real abdomen steel crane beams like this, is coupled as one into as a whole steel when installing then again and lifts beam.
2, lift the connection of beam and two end supports framed bent post: lift the bottom flange, two ends of beam and the pre-buried steel ironware of bracket boss end face and weld, supporting row frame post side pre-buried steel ironware after top flange and the reinforcing welds, and the bind mode bind mode with crane girder and framed bent post basically is identical.
3, lift beam and the connection of desiring the pump drainage trestle: lift the beam two ends in place after, the last bottom flange of lifting beam just in time reinforces thickness at a distance of one with desire pump drainage trestle both sides, respectively adding one or two crossbeam near desiring pump drainage trestle both sides, bore two holes at the suitable position of desiring the pump drainage trestle, insert two rod irons (hole and rod iron diameter are calculated by the load that desire pump drainage trestle hands down) then, the two end supports of rod iron also is bound up on the crossbeam, after adjusting and pushing against, lift " well " font groove (groove depth is for lifting deck-molding) and pour into expansion concrete (desire in the groove pump drainage trestle surface will cut a hole hair in advance strip off the skin) in the centre lift desire pump drainage trestle that beam " I " Zee bar steel Z web and two crossbeams surround by two monolithics.
4, two monolithics are lifted beam and are interconnected: two monolithics lift on the beam bottom flange respectively with angle steel as diagonal web member mutually with high-strength bolt connect (or firm welding) and can be in the middle of two monolithics be lifted beam suitable position add vertical scissors and support, make it into as a whole.
The 4th, amputation is desired the pump drainage trestle and is lifted beam with the lower part: wait to lift when concrete reaches requirement of strength in beam and " well " font groove of desiring pump drainage trestle junction, can finish the expansion factory building columns at last apart from task lifting the disconnected desire of lower flange of girder edge bottom cutter pump drainage trestle (should monitor during truncated cylinder).
Claims (3)
1, a kind of under not stopping production condition the method for factory building drawing out bean and prop, it is characterized in that forming by following steps:
A) patten, the cylinder of reinforcing two end supports framed bent post (1) are set up the bracket boss (2) that beam is lifted in installation at the following position of crane girder, cylinder both sides;
B) make and install and lift beam: will lift on the bracket boss (2) that beam (4) is installed in the supporting row frame post both sides after the reinforcing respectively by two monolithics that measuring and calculating load designs and produces, make two monolithics lift beam (4) and clamp and desire pump drainage trestle (3), and finish the connection of lifting beam (4) and supporting row frame post (1) and bracket boss (2), connection, two monolithics of lifting beam (4) and desire pump drainage trestle (3) are lifted interconnecting between the beam (4);
C) beam of lifting that will desire pump drainage trestle (3) blocks removal with the lower part.
2, according to claim 1 under not stopping production condition the method for factory building drawing out bean and prop, it is characterized in that: lifting beam (4) with the bind mode of desiring pump drainage trestle (3) is: lift desire pump drainage trestle (3) left and right sides that beam (4) clamps at two monolithics and be connected crossbeam (5) respectively, desiring upward boring of pump drainage trestle (3), insert rod iron (6) in the hole, the two end supports of rod iron (6) also is bound up on the crossbeam (5), after adjustment pushes against, two monolithics are lifted desire pump drainage trestle (3) that beam (4) and both sides crossbeam (5) surround lift in " well " font groove of centre and pour into the expansion concrete, make this place become a rigid connection point.
3, according to claim 1 under not stopping production condition the method for factory building drawing out bean and prop, it is characterized in that: the bind mode of lifting beam (4) and supporting row frame post (1) and bracket boss (2) is: at the supporting row frame post corresponding site of reinforcing and the end face pre-buried steel ironware of bracket boss (2), after lifting beam (4) and being in place, will lift beam (4) and weld together with the pre-buried steel ironware.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021026211A CN1141479C (en) | 2002-01-18 | 2002-01-18 | Method for drawing out bean and prop of workshop without stopping production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021026211A CN1141479C (en) | 2002-01-18 | 2002-01-18 | Method for drawing out bean and prop of workshop without stopping production |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1358919A CN1358919A (en) | 2002-07-17 |
CN1141479C true CN1141479C (en) | 2004-03-10 |
Family
ID=4739719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB021026211A Expired - Fee Related CN1141479C (en) | 2002-01-18 | 2002-01-18 | Method for drawing out bean and prop of workshop without stopping production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1141479C (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031876B (en) * | 2009-09-29 | 2015-02-04 | 中冶天工上海十三冶建设有限公司 | Method for newly adding upright column for building |
CN102191866A (en) * | 2010-03-19 | 2011-09-21 | 上海市第五建筑有限公司 | Device and method for removal construction of vertical posts positioned on lower part of large-span net rack |
CN101839072A (en) * | 2010-04-09 | 2010-09-22 | 中国第一冶金建设有限责任公司 | Method for replacing column by supporting roof |
CN102242569B (en) * | 2010-05-11 | 2015-09-02 | 五冶集团上海有限公司 | Industrial premises high vacancy takes out post expansion method after changing beam |
CN102051983B (en) * | 2010-12-01 | 2012-09-26 | 西安建筑科技大学 | Method of reconstructing steel rolling workshop into teaching building |
CN102140849A (en) * | 2011-01-24 | 2011-08-03 | 中冶赛迪工程技术股份有限公司 | Method for underpinning roof structure and expanding column space of steel structure factory building |
CN102518317B (en) * | 2011-12-15 | 2014-05-28 | 攀钢集团工程技术有限公司 | Method for increasing heights of roof truss beams of large-span workshops in online manner |
CN103114736A (en) * | 2013-01-31 | 2013-05-22 | 攀钢集团工程技术有限公司 | Online renovation method of sintering material-loading system |
CN106285028A (en) * | 2015-05-28 | 2017-01-04 | 中国二十冶集团有限公司 | Reinforcement of factory building construction method in long-span heavy type crane girder based on BIM technology dismounting |
CN105781142B (en) * | 2016-04-26 | 2017-10-17 | 中南大学 | The ruggedized construction and reinforcement means of post are taken out for building structure top layer |
CN106836848A (en) * | 2017-01-16 | 2017-06-13 | 山东飞越钢结构工程有限公司 | A kind of 3D modules take out column method |
CN107762174A (en) * | 2017-09-29 | 2018-03-06 | 中国二十冶集团有限公司 | A kind of method for ensureing that factory building side wall is stable when crane girder is changed |
CN109403654B (en) * | 2018-11-05 | 2021-03-26 | 广东赛力克建筑技术工程有限公司 | Underpinning and reinforcing method for existing building structure |
-
2002
- 2002-01-18 CN CNB021026211A patent/CN1141479C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1358919A (en) | 2002-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1141479C (en) | Method for drawing out bean and prop of workshop without stopping production | |
CN106948268B (en) | Variable-section steel box girder pushing combined device and using method thereof | |
CN101839070B (en) | Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column | |
CN111794119B (en) | Temporary supporting system and hoisting method for basket type steel box tie bar arch | |
CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
CN111525487A (en) | Utility tunnel self-supporting pipeline support | |
CN212052371U (en) | Hanging basket device for variable width concrete box girder suspension casting construction | |
CN115341482A (en) | Single-side widening non-balancing weight cantilever box girder hanging basket and construction method thereof | |
CN214573768U (en) | Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot | |
CN112502473B (en) | Supporting bearing capacity conversion device and method for dismantling large steel framework by using same | |
CN114263114A (en) | Construction system and construction method of large-section steel box girder | |
CN211645995U (en) | Composite hoop support structure | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN112502475A (en) | Supporting bearing capacity conversion device and using method thereof | |
CN218177641U (en) | Connection structure and support frame | |
CN217517340U (en) | Tie beam bracket structure | |
CN219430532U (en) | Cast-in-situ supporting structure of bridge concrete box girder | |
CN214462572U (en) | Support frame for concrete construction | |
CN217652374U (en) | Heavy overhanging platform sliding construction system | |
CN217352141U (en) | Construction system of large-section steel box girder | |
CN216566606U (en) | Structure of overhanging reverse-hanging steel truss | |
CN218712226U (en) | Segment box girder prestress tensioning platform | |
CN219604164U (en) | Variable cross-section special-shaped steel tower crown mounting device | |
CN118481288B (en) | Beam-slab integrated floor structure supported on steel frame and installation method thereof | |
CN220283269U (en) | Construction hanger for spliced wide bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |