CN216566606U - A structure of a cantilevered anti-hanging steel truss - Google Patents

A structure of a cantilevered anti-hanging steel truss Download PDF

Info

Publication number
CN216566606U
CN216566606U CN202120590504.9U CN202120590504U CN216566606U CN 216566606 U CN216566606 U CN 216566606U CN 202120590504 U CN202120590504 U CN 202120590504U CN 216566606 U CN216566606 U CN 216566606U
Authority
CN
China
Prior art keywords
steel truss
steel
structure frame
truss
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120590504.9U
Other languages
Chinese (zh)
Inventor
童小飞
林瀛洲
申乐园
强石家
顾凌峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Navigation Engineering Bureau Co ltd Shanghai Construction Engineering Branch
CCCC Third Harbor Engineering Co Ltd
Original Assignee
Cccc Third Navigation Engineering Bureau Co ltd Shanghai Construction Engineering Branch
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Third Navigation Engineering Bureau Co ltd Shanghai Construction Engineering Branch, CCCC Third Harbor Engineering Co Ltd filed Critical Cccc Third Navigation Engineering Bureau Co ltd Shanghai Construction Engineering Branch
Priority to CN202120590504.9U priority Critical patent/CN216566606U/en
Application granted granted Critical
Publication of CN216566606U publication Critical patent/CN216566606U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a structure of an overhanging reverse-hanging steel truss, which comprises a steel structure frame, a construction operation platform and embedded bolts, wherein the steel structure frame is positioned above a capping beam, and the length of the steel structure frame is more than 5 times of the width of the capping beam; the construction operation platform is fixed above the steel structure frame, and the lower surface of the construction operation platform is fixedly connected with the upper surface of the steel structure frame; the embedded bolts are fixed on the bent cap and connected with the steel structure frame, and the steel structure frame is fixed on the bent cap by the embedded bolts. According to the structure of the overhanging reverse-hanging steel truss, the steel truss is adopted for overhanging reverse-hanging construction, so that the construction progress is not influenced, and the normal passage of a road below the construction can be ensured.

Description

一种悬挑反吊钢桁架的结构A structure of a cantilevered anti-hanging steel truss

技术领域technical field

本实用新型涉及箱梁施工领域,尤其涉及一种悬挑反吊钢桁架的结构。The utility model relates to the field of box girder construction, in particular to a structure of a cantilevered anti-suspended steel truss.

背景技术Background technique

在特殊施工场所,箱梁的施工不能影响施工结构正下方的车辆通行,故急需研究出一种下方通行车辆、上方施工的钢结构,满足施工和正常通行的双重要求。In a special construction site, the construction of the box girder cannot affect the passage of vehicles directly under the construction structure, so it is urgent to develop a steel structure for vehicles passing below and construction above to meet the dual requirements of construction and normal traffic.

有鉴于此,有必要研究出一种施工用钢结构,为道路上方施工创造有利条件。In view of this, it is necessary to develop a construction steel structure to create favorable conditions for the construction above the road.

实用新型内容Utility model content

本实用新型的目的在于提供一种悬挑反吊钢桁架的结构,采用钢桁架悬挑反吊施工,既不影响施工进度又能保证施工下方的道路正常通行。The purpose of the utility model is to provide a cantilever-reverse-hoisting steel truss structure, which adopts the cantilever-reverse-hoisting construction of the steel truss, which not only does not affect the construction progress but also ensures the normal passage of the road below the construction.

实现本实用新型目的的技术方案如下:The technical scheme that realizes the purpose of the present utility model is as follows:

一种悬挑反吊钢桁架的结构,包括:A structure of a cantilevered anti-hanging steel truss, comprising:

钢结构架,位于盖梁的上方,所述钢结构架的长度大于所述盖梁宽度的5倍;The steel structure frame is located above the cover beam, and the length of the steel structure frame is greater than 5 times the width of the cover beam;

固定在所述钢结构架上方的施工作业平台,所述施工作业平台的下表面与所述钢结构架的上表面固定连接;a construction work platform fixed above the steel structure frame, the lower surface of the construction work platform is fixedly connected with the upper surface of the steel structure frame;

固定在盖梁上的预埋螺栓,所述预埋螺栓与所述钢结构架连接,所述预埋螺栓将所述钢结构架固定在所述盖梁上。Pre-embedded bolts fixed on the cover beam, the pre-embedded bolts are connected with the steel structure frame, and the pre-embedded bolts fix the steel structure frame on the cover beam.

作为本实用新型的进一步改进,还包括底模和侧模,所述底模和侧模均安装在所述施工作业平台上,所述施工平台上还划分出钢筋绑扎区域。As a further improvement of the present invention, it also includes a bottom mold and a side mold. The bottom mold and the side mold are both installed on the construction work platform, and the construction platform is further divided into a steel bar binding area.

作为本实用新型的进一步改进,所述钢结构架包括第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架,所述第一钢衍架、所述第二钢衍架、所述第三钢衍架和所述第四钢衍架沿其长度方向依次拼接,所述第二钢衍架和所述第三钢衍架的拼接缝位于所述盖梁的正中间。As a further improvement of the present invention, the steel structure frame includes a first steel truss, a second steel truss, a third steel truss and a fourth steel truss, the first steel truss, the second steel truss The steel truss, the third steel truss and the fourth steel truss are spliced in sequence along their length direction, and the splicing seam of the second steel truss and the third steel truss is located on the cover beam in the middle.

在本实用新型的实施例中,还包括多根并行设置的次梁,每根所述次梁均固定在所述钢结构架的上表面,所述施工作业平台位于所述次梁上方。In the embodiment of the present invention, it also includes a plurality of secondary beams arranged in parallel, each of the secondary beams is fixed on the upper surface of the steel structure frame, and the construction operation platform is located above the secondary beams.

在本实用新型的实施例中,所述钢结构架的下方锚固有多根工字钢反吊杆,多根工字钢反吊杆平行设置,多根工字钢反吊杆的顶端均固定在所述钢结构架的下表面;In the embodiment of the present invention, a plurality of I-beam anti-suspenders are anchored at the bottom of the steel structure frame, the plurality of I-beam anti-suspenders are arranged in parallel, and the tops of the plurality of I-beam anti-suspenders are fixed on the lower surface of the steel structure frame;

每根工字钢反吊杆的底端均固定在所述预埋螺栓。The bottom end of each I-beam anti-suspender is fixed on the embedded bolt.

在本实用新型的实施例中,还包括多根横向连接杆,每根所述横向连接杆与一个所述预埋螺栓固定连接,所述预埋螺栓承托所述横向连接杆,所述工字钢反吊杆的底端固定在不同的所述横向连接杆。In the embodiment of the present invention, it also includes a plurality of transverse connecting rods, each of the transverse connecting rods is fixedly connected with one of the embedded bolts, the embedded bolts support the transverse connecting rods, and the work The bottom end of the steel anti-suspender is fixed on the different transverse connecting rods.

在本实用新型的实施例中,所述钢结构架的第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架各自固定至少一个工字钢反吊杆;In the embodiment of the present utility model, the first steel truss, the second steel truss, the third steel truss and the fourth steel truss of the steel structure frame respectively fix at least one I-beam anti-suspender;

所述钢结构架的第一钢衍架和第二钢衍架共用至少一根横向连接杆;所述钢结构架的第三钢衍架和第四钢衍架共用至少一根横向连接杆。The first steel truss and the second steel truss of the steel structure frame share at least one transverse connecting rod; the third steel truss and the fourth steel truss of the steel structure frame share at least one transverse connecting rod.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

本实用新型的一种悬挑反吊钢桁架的结构,采用钢桁架悬挑反吊施工,既不影响施工进度又能保证施工下方的道路正常通行。The structure of the utility model cantilevered and reversely hoisted a steel truss, which adopts the cantilevered and reversed hoisting of the steel truss for construction, which does not affect the construction progress and can ensure the normal passage of the road below the construction.

附图说明Description of drawings

图1为本实用新型提供的一种悬挑反吊钢桁架的结构示意图;Fig. 1 is the structural representation of a kind of cantilevered anti-hanging steel truss provided by the utility model;

图2为钢结构架的结构示意图一;Fig. 2 is the structural schematic diagram 1 of the steel structure frame;

图3为钢结构架的结构示意图二;Fig. 3 is the structural schematic diagram II of the steel structure frame;

附图标记,100、钢结构架;200、施工作业平台;300、预埋螺栓;400、次梁;500、工字钢反吊杆;600、横向连接杆;700、盖梁。Reference numerals, 100, steel structure frame; 200, construction work platform; 300, embedded bolts; 400, secondary beam; 500, I-beam reverse boom; 600, transverse connecting rod; 700, cover beam.

具体实施方式Detailed ways

下面结合附图所示的各实施方式对本实用新型进行详细说明,但应当说明的是,这些实施方式并非对本实用新型的限制,本领域普通技术人员根据这些实施方式所作的功能、方法、或者结构上的等效变换或替代,均属于本实用新型的保护范围之内。The present invention will be described in detail below with reference to the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments do not limit the present invention, and those of ordinary skill in the art can perform functions, methods, or structures according to these embodiments. Equivalent transformation or replacement of the above all belong to the protection scope of the present invention.

在本实施例的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明创造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明创造的限制。In the description of this embodiment, it should be understood that the terms "center", "portrait", "horizontal", "top", "bottom", "front", "rear", "left", "right", The orientation or positional relationship indicated by "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention The description is created and simplified rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention.

此外,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明创造的描述中,除非另有说明,“多个”的含义是两个或两个以上。In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second", etc., may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明创造中的具体含义。The terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be a direct connection The connection can also be indirectly connected through an intermediate medium, and it can be the internal communication of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.

请参阅图1,本实用新型的实施例提供了一种悬挑反吊钢桁架的结构,包括:钢结构架100、施工作业平台200和预埋螺栓300,钢结构架100位于盖梁700的上方,钢结构架100的长度大于盖梁700宽度的5倍;施工作业平台200固定在钢结构架100上方,施工作业平台200的下表面与钢结构架100的上表面固定连接;预埋螺栓300固定在盖梁700上,预埋螺栓300与钢结构架100连接,预埋螺栓300将钢结构架100固定在盖梁700上。Referring to FIG. 1 , an embodiment of the present invention provides a structure of a cantilevered and reverse-hanging steel truss, including: a steel structure frame 100 , a construction work platform 200 and embedded bolts 300 , and the steel structure frame 100 is located on the cover beam 700 . Above, the length of the steel structure frame 100 is greater than 5 times the width of the cover beam 700; the construction work platform 200 is fixed above the steel structure frame 100, and the lower surface of the construction work platform 200 is fixedly connected with the upper surface of the steel structure frame 100; embedded bolts 300 is fixed on the cover beam 700 , the embedded bolts 300 are connected with the steel structure frame 100 , and the embedded bolts 300 fix the steel structure frame 100 on the cover beam 700 .

本实用新型实施例的一种悬挑反吊钢桁架的结构,还包括底模和侧模,底模和侧模均安装在施工作业平台200上,施工平台上还划分出钢筋绑扎区域。The structure of a cantilevered and reverse-hanging steel truss according to the embodiment of the present utility model further includes a bottom form and a side form.

本实用新型实施例的一种悬挑反吊钢桁架的结构,钢结构架100包括第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架,第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架沿其长度方向依次拼接,第二钢衍架和第三钢衍架的拼接缝位于盖梁700的正中间。In the structure of a cantilevered and reverse-suspended steel truss according to an embodiment of the present invention, the steel structure frame 100 includes a first steel truss, a second steel truss, a third steel truss, and a fourth steel truss. The first steel truss The frame, the second steel truss, the third steel truss and the fourth steel truss are spliced in sequence along the length direction thereof, and the splicing seam of the second steel truss and the third steel truss is located in the middle of the cover beam 700 .

本实用新型实施例的一种悬挑反吊钢桁架的结构,还包括多根并行设置的次梁400,每根次梁400均固定在钢结构架100的上表面,施工作业平台200位于次梁400上方。The structure of a cantilevered anti-hanging steel truss according to the embodiment of the present invention further includes a plurality of secondary beams 400 arranged in parallel, each secondary beam 400 is fixed on the upper surface of the steel structure frame 100, and the construction operation platform 200 is located on the secondary beam 400. Above beam 400.

本实用新型实施例的一种悬挑反吊钢桁架的结构,钢结构架100的下方锚固有多根工字钢反吊杆500,多根工字钢反吊杆500平行设置,多根工字钢反吊杆500的顶端均固定在钢结构架100的下表面;每根工字钢反吊杆500的底端均固定在预埋螺栓300。In the structure of a cantilevered reverse-hanging steel truss according to the embodiment of the present invention, a plurality of I-beam reverse suspension rods 500 are anchored at the bottom of the steel structure frame 100, and the multiple I-beam reverse suspension rods 500 are arranged in parallel. The top ends of the steel anti-suspender rods 500 are fixed on the lower surface of the steel structure frame 100 ; the bottom ends of each I-beam anti-suspender rod 500 are fixed on the embedded bolts 300 .

本实用新型实施例的一种悬挑反吊钢桁架的结构,还包括多根横向连接杆600,每根横向连接杆600与一个预埋螺栓300固定连接,预埋螺栓300承托横向连接杆600,工字钢反吊杆500的底端固定在不同的横向连接杆600。The structure of a cantilevered anti-hanging steel truss according to the embodiment of the present invention further includes a plurality of transverse connecting rods 600, each of which is fixedly connected with a pre-embedded bolt 300, and the pre-embedded bolt 300 supports the transverse connecting rod 600 , the bottom ends of the I-beam anti-boom 500 are fixed on different transverse connecting rods 600 .

本实用新型实施例的一种悬挑反吊钢桁架的结构,钢结构架100的第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架各自固定至少一个工字钢反吊杆500;钢结构架100的第一钢衍架和第二钢衍架共用至少一根横向连接杆600;钢结构架100的第三钢衍架和第四钢衍架共用至少一根横向连接杆600。In the structure of the cantilevered and reverse-suspended steel truss according to the embodiment of the present invention, the first steel truss, the second steel truss, the third steel truss and the fourth steel truss of the steel structure frame 100 are each fixed at least one steel truss. The steel anti-suspender 500; the first steel truss and the second steel truss of the steel structure frame 100 share at least one transverse connecting rod 600; the third steel truss and the fourth steel truss of the steel structure frame 100 share at least one A transverse connecting rod 600.

本实用新型实施例的悬挑反吊钢桁架,AP130#块长12m,采用盖梁700一样类型支架,将会影响0#块下方道路正常通行,影响项目进度。经过与设计的分析讨论,决定采用钢桁架悬挑反吊施工。风作用于它经过的所有表面。它以最大风速和工作风情况作用于脚手架和临时支撑的组成部分。当有例如缺乏垂直性等实际缺陷时,额外的水平力将会变大。为了保证临时支撑的横向稳定性,它应该被设计成能抵御在每个施工阶段的垂直荷载和水平干扰力。The cantilevered anti-hanging steel truss of the embodiment of the utility model, AP130# block is 12m long, and adopts the same type of cover beam 700 bracket, which will affect the normal passage of the road below the 0# block and affect the progress of the project. After analysis and discussion with the design, it was decided to use the steel truss cantilever and reverse hoisting construction. The wind acts on all surfaces it passes over. It acts on the components of the scaffolding and temporary supports at maximum wind speed and working wind conditions. When there are practical imperfections such as lack of verticality, the additional horizontal force will become larger. In order to ensure the lateral stability of the temporary support, it should be designed to resist vertical loads and horizontal disturbance forces during each construction phase.

本实用新型实施例的悬挑反吊钢桁架的结构,安装临时工作平台,安装支撑系统和模板混凝土浇筑部分。悬挑反吊钢桁架的安装与施工:悬挑反吊钢桁架通过预埋螺栓300固定在已浇筑完成达到强度的盖梁700上,结构及施工荷载通过钢桁架与螺栓传递给盖梁700。1、盖梁700绑扎钢筋时准确的将48个M30等级8.8的高强螺栓固定在钢筋上,下方加螺母垫片,点焊固定。2、提前处理钢桁架吊装场地,结合现场情况确定采用200t吊机进行吊装。钢桁架安装到位后立即锁好预埋螺栓300固定,待成对钢桁架安装就位后立即安装305工字钢对拉。3、连续两天时间装好四片钢桁架后,进行底部悬挑反吊系统的安装。利用钢桁架上锚固精轧钢下拉两根350工字钢反吊,再安装次梁400,次梁400上铺木方与木模,调整高度完成底模铺设与施工平台。4、利用现有匝道,通过吊机调整位置,安装侧模,并用对拉杆固定住侧模。5、绑扎底腹板钢筋,安装内模,绑扎顶板钢筋,浇筑混凝土。6、待混凝土强度达到等级后,分步拆除底模,侧模。7、租赁200t吊机进行四片钢桁架拆卸,完成后进行下一步挂篮施工,现浇后续梁段。The structure of the cantilevered anti-hanging steel truss according to the embodiment of the present invention is to install a temporary working platform, install a support system and a formwork concrete pouring part. Installation and construction of the cantilevered anti-hanging steel truss: The cantilevered anti-hanging steel truss is fixed on the cover beam 700 that has been poured to reach the strength through embedded bolts 300, and the structural and construction loads are transmitted to the cover beam 700 through the steel truss and bolts. 1. When the cover beam 700 binds the steel bars, 48 high-strength bolts of M30 grade 8.8 are accurately fixed on the steel bars, and nuts and washers are added below to fix them by spot welding. 2. Treat the steel truss hoisting site in advance, and determine to use a 200t crane for hoisting according to the site conditions. After the steel truss is installed in place, lock the embedded bolts 300 to fix it immediately, and install the 305 I-beam pair immediately after the pair of steel trusses are installed in place. 3. After the four steel trusses are installed for two consecutive days, the installation of the bottom cantilever and anti-hoisting system is carried out. Use the steel truss to anchor the finish-rolled steel and pull down the two 350 I-beams to reverse the hanging, then install the secondary beam 400, lay the wooden square and wooden form on the secondary beam 400, and adjust the height to complete the bottom form laying and construction platform. 4. Using the existing ramp, adjust the position through the crane, install the side mold, and fix the side mold with the tie rod. 5. Bind the steel bars of the bottom web, install the inner mold, bind the steel bars of the top plate, and pour concrete. 6. After the concrete strength reaches the grade, remove the bottom formwork and side formwork step by step. 7. Rent a 200t crane to disassemble the four-piece steel truss. After completion, proceed to the next step of hanging basket construction and cast-in-place subsequent beam sections.

上文所列出的一系列的详细说明仅仅是针对本实用新型的可行性实施方式的具体说明,它们并非用以限制本实用新型的保护范围,凡未脱离本实用新型技艺精神所作的等效实施方式或变更均应包含在本实用新型的保护范围之内。The series of detailed descriptions listed above are only specific descriptions for the feasible embodiments of the present invention, and they are not intended to limit the protection scope of the present invention. Any equivalents made without departing from the technical spirit of the present invention Embodiments or changes should all be included within the protection scope of the present invention.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes within the meaning and range of the required equivalents are embraced within the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.

Claims (7)

1.一种悬挑反吊钢桁架的结构,其特征在于,包括:1. a structure of an overhanging anti-hanging steel truss, is characterized in that, comprises: 钢结构架,位于盖梁的上方,所述钢结构架的长度大于所述盖梁宽度的5倍;The steel structure frame is located above the cover beam, and the length of the steel structure frame is greater than 5 times the width of the cover beam; 固定在所述钢结构架上方的施工作业平台,所述施工作业平台的下表面与所述钢结构架的上表面固定连接;a construction work platform fixed above the steel structure frame, the lower surface of the construction work platform is fixedly connected with the upper surface of the steel structure frame; 固定在盖梁上的预埋螺栓,所述预埋螺栓与所述钢结构架连接,所述预埋螺栓将所述钢结构架固定在所述盖梁上。Pre-embedded bolts fixed on the cover beam, the pre-embedded bolts are connected with the steel structure frame, and the pre-embedded bolts fix the steel structure frame on the cover beam. 2.根据权利要求1所述的悬挑反吊钢桁架的结构,其特征在于,还包括底模和侧模,所述底模和侧模均安装在所述施工作业平台上,所述施工作业平台上还划分出钢筋绑扎区域。2. The structure of the cantilevered anti-hanging steel truss according to claim 1, characterized in that it further comprises a bottom form and a side form, and the bottom form and the side form are both installed on the construction work platform, and the construction Reinforcing bar binding areas are also demarcated on the work platform. 3.根据权利要求1所述的悬挑反吊钢桁架的结构,其特征在于,所述钢结构架包括第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架,所述第一钢衍架、所述第二钢衍架、所述第三钢衍架和所述第四钢衍架沿其长度方向依次拼接,所述第二钢衍架和所述第三钢衍架的拼接缝位于所述盖梁的正中间。3. The structure of the cantilevered anti-suspended steel truss according to claim 1, wherein the steel structure frame comprises a first steel truss, a second steel truss, a third steel truss and a fourth steel truss The first steel truss, the second steel truss, the third steel truss and the fourth steel truss are sequentially spliced along their length direction, the second steel truss and the The splicing seam of the third steel truss is located in the middle of the cover beam. 4.根据权利要求1所述的悬挑反吊钢桁架的结构,其特征在于,还包括多根并行设置的次梁,每根所述次梁均固定在所述钢结构架的上表面,所述施工作业平台位于所述次梁上方。4. The structure of the cantilevered anti-hanging steel truss according to claim 1, characterized in that, further comprising a plurality of secondary beams arranged in parallel, and each of the secondary beams is fixed on the upper surface of the steel structure frame, The construction work platform is located above the secondary beam. 5.根据权利要求1所述的悬挑反吊钢桁架的结构,其特征在于,所述钢结构架的下方锚固有多根工字钢反吊杆,多根工字钢反吊杆平行设置,多根工字钢反吊杆的顶端均固定在所述钢结构架的下表面;5. The structure of the cantilevered anti-hanging steel truss according to claim 1, characterized in that, a plurality of I-beam anti-suspenders are anchored at the bottom of the steel structure frame, and a plurality of I-beam anti-suspenders are arranged in parallel , the tops of the multiple I-beam anti-suspenders are fixed on the lower surface of the steel structure frame; 每根工字钢反吊杆的底端均固定在所述预埋螺栓。The bottom end of each I-beam anti-suspender is fixed on the embedded bolt. 6.根据权利要求5所述的悬挑反吊钢桁架的结构,其特征在于,还包括多根横向连接杆,每根所述横向连接杆与一个所述预埋螺栓固定连接,所述预埋螺栓承托所述横向连接杆,所述工字钢反吊杆的底端固定在不同的所述横向连接杆。6 . The structure of the cantilevered and reversed steel truss according to claim 5 , further comprising a plurality of transverse connecting rods, each of which is fixedly connected to one of the embedded bolts, and the pre-embedded bolts are fixedly connected. Buried bolts support the transverse connecting rods, and the bottom ends of the I-beam anti-hanging rods are fixed on different transverse connecting rods. 7.根据权利要求1所述的悬挑反吊钢桁架的结构,其特征在于,所述钢结构架的第一钢衍架、第二钢衍架、第三钢衍架和第四钢衍架各自固定至少一个工字钢反吊杆;7. The structure of the cantilevered anti-suspended steel truss according to claim 1, wherein the first steel truss, the second steel truss, the third steel truss and the fourth steel truss of the steel structure frame Each frame is fixed with at least one I-beam anti-suspender; 所述钢结构架的第一钢衍架和第二钢衍架共用至少一根横向连接杆;所述钢结构架的第三钢衍架和第四钢衍架共用至少一根横向连接杆。The first steel truss and the second steel truss of the steel structure frame share at least one transverse connecting rod; the third steel truss and the fourth steel truss of the steel structure frame share at least one transverse connecting rod.
CN202120590504.9U 2021-03-23 2021-03-23 A structure of a cantilevered anti-hanging steel truss Active CN216566606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120590504.9U CN216566606U (en) 2021-03-23 2021-03-23 A structure of a cantilevered anti-hanging steel truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120590504.9U CN216566606U (en) 2021-03-23 2021-03-23 A structure of a cantilevered anti-hanging steel truss

Publications (1)

Publication Number Publication Date
CN216566606U true CN216566606U (en) 2022-05-20

Family

ID=81592834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120590504.9U Active CN216566606U (en) 2021-03-23 2021-03-23 A structure of a cantilevered anti-hanging steel truss

Country Status (1)

Country Link
CN (1) CN216566606U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378424A (en) * 2023-03-30 2023-07-04 中建科工集团有限公司 A construction method for hanging steel structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378424A (en) * 2023-03-30 2023-07-04 中建科工集团有限公司 A construction method for hanging steel structures

Similar Documents

Publication Publication Date Title
CN106351132B (en) A kind of bridge using corrugated sheet steel connector spells wide construction and its construction method
CN110387822B (en) Cast-in-situ bent cap assembly type steel pipe support and construction method thereof
CN110820561A (en) Large cantilever prestress bent cap support device and construction method
CN105803947B (en) A kind of cast-in-situ box girder gate-type full framing whole lateral moving system and method for traversing
CN110331675B (en) Construction method for rebuilding and expanding bridge
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
JP3240244U (en) Split-type horizontal beam construction structure erected on the gate-type bridge pier of the existing railway line
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN111877182A (en) Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge
CN111533003B (en) A cable-stayed bridge cable installation and lifting device
CN212315371U (en) Cable installation lifting device for cable-stayed bridge
CN216566606U (en) A structure of a cantilevered anti-hanging steel truss
CN111926715A (en) Installation method of steel box girder bridge
CN205116025U (en) Hanger device is pour to self -balancing concrete case roof beam and T beam bridge cantilever edge of a wing secondary
CN205257790U (en) Fixed high -low leg handle portal crane
CN207998793U (en) A kind of multifunctional box shaped steel bracket structure
CN110820565A (en) Suspended casting method for corrugated steel web hanging basket
CN114032791A (en) A construction method for integral jacking of large-span steel truss bridges
CN102392417A (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN113073558B (en) Construction technology combining suspended bracket and overhanging anti-suspension construction
CN211498483U (en) Hollow wall pier tie beam formwork system
CN217203595U (en) Variable cross-section continuous beam bridge structure suitable for incremental launching construction
CN111139745A (en) Construction method for cast-in-place concrete top plate of combined box girder
CN117604870A (en) Swivel bridge provided with stiff framework cast-in-situ section and rapid construction method
CN106087753A (en) A kind of Cast-in-situ Beam beam-type support is without Temporary Piers construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant