CN114109488A - Rapid construction method of paste filling retaining wall - Google Patents

Rapid construction method of paste filling retaining wall Download PDF

Info

Publication number
CN114109488A
CN114109488A CN202111354055.9A CN202111354055A CN114109488A CN 114109488 A CN114109488 A CN 114109488A CN 202111354055 A CN202111354055 A CN 202111354055A CN 114109488 A CN114109488 A CN 114109488A
Authority
CN
China
Prior art keywords
retaining wall
filling
woven bag
strength woven
paste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111354055.9A
Other languages
Chinese (zh)
Inventor
吴爱祥
王少勇
陈冲
阮竹恩
王贻明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN202111354055.9A priority Critical patent/CN114109488A/en
Publication of CN114109488A publication Critical patent/CN114109488A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Revetment (AREA)

Abstract

The invention provides a method for quickly constructing a paste filling retaining wall, and belongs to the technical field of filling mining. The method is characterized in that a high-strength woven bag with controllable shape is directly hung at the opening of a to-be-filled area, and filling materials are filled into the high-strength woven bag to form the closed retaining wall. The method is characterized in that a high-strength woven bag is provided with a hanging ring, the high-strength woven bag is directly hung on a hanging pile, the construction condition of the retaining wall can be quickly formed, the high-strength woven bag is provided with transverse ribs for perforation, and the transverse ribs are used for controlling the side bulging of the high-strength woven bag during filling; the section size of the high-strength woven bag is 10% -15% larger than the size of a roadway, the retaining wall can be tightly attached to the irregular rock wall and completely seal the gob, the length of the high-strength woven bag is 1-5 m, and the thick retaining wall has better stability. Compared with the traditional concrete filling retaining wall construction, the method has the advantages of lower cost, more convenient construction method and higher retaining wall stability, and provides a quick, safe and economic method for manufacturing the underground mine filling retaining wall.

Description

Rapid construction method of paste filling retaining wall
Technical Field
The invention relates to the technical field of mining filling, in particular to a method for quickly constructing a paste filling retaining wall.
Background
The filling mining method has the advantages of high safety guarantee and low loss and dilution, can effectively reduce the discharge of solid waste on the ground surface, and adopts a filling mining method, particularly a paste filling mining method, in more and more mines.
In a filling mining method, the construction of a filling retaining wall is one of important construction procedures, and a goaf to be filled is sealed, so that paste slurry is prevented from leaking, and the filling safety is guaranteed.
At present, the construction method of the retaining wall at home and abroad adopts a concrete retaining wall and a brick retaining wall, and simultaneously, the novel retaining walls such as a novel flexible retaining wall and a detachable retaining wall are subjected to industrial tests. The defects of complicated construction procedures, high labor intensity of workers and high cost of the concrete retaining wall and the brick retaining wall can not be overcome all the time. Novel flexible barricade is difficult to ensure with the barricade construction quality of dismantling, and constructor professional requires highly. The efficient and economical manufacture of the filling retaining wall becomes one of important works for the field application of the paste filling mining method.
In view of the above deficiencies of the retaining wall construction method, a need exists for an efficient and rapid retaining wall construction method that meets the requirements of simple process, reduced cost, and improved quality.
Disclosure of Invention
The invention provides a quick construction method of a paste filling retaining wall, which aims to quickly construct the filling retaining wall and reduce the construction cost of the retaining wall.
The method is characterized in that a filling high-strength woven bag is used for quickly manufacturing the closed retaining wall in the paste filling process, specifically, the filling high-strength woven bag is directly hung on a hanging pile of a dead zone roadway through a hanging ring, a transverse rib is installed in a reinforcing rib hole and connected into a filling pipe, a liquid accelerating agent is connected through a filling pipe tee joint during filling, the filling high-strength woven bag is filled, and the closed retaining wall can be quickly formed.
The filling high-strength woven bag comprises a bag body, a filling feed inlet, an exhaust port, reinforcing rib holes and hanging rings, wherein the filling feed inlet is arranged on one side of the top of the bag body, the exhaust port is arranged on one side of a to-be-filled space, the reinforcing rib holes are formed in the side face of the middle of the bag body, and the hanging rings are arranged on the side face of the bag body.
The section size of the filled high-strength woven bag is 10% -20% larger than that of a stoping roadway, and the length of the bag body is 1-5 m.
The high-strength woven bag is filled with a high-strength plastic woven bag material, and the thickness of the high-strength woven bag is 0.75-2 mm.
The reinforcing rib hole spacing is 0.8 ~ 1.2m, and the hole is the rectangle and distributes, and quantity is set for according to the bag body specification, and the reinforcing rib passes the reinforcing rib hole site of the both sides that correspond, connects the tray at both ends, and the reinforcing rib can adopt round steel or screw-thread steel stock, and the model is not less than phi 18.
And hanging rings filled with high-strength woven bags are directly hung on the inverted wedge hanging piles, and the inverted wedge hanging piles are respectively constructed at the top and two sides of the roadway.
And a filling pipe tee joint is arranged at the filling feed inlet and connected with a liquid setting accelerator, and the liquid setting accelerator is fed into a filling high-strength woven bag to realize the rapid coagulation of the retaining wall.
The technical scheme of the invention has the following beneficial effects:
according to the scheme, the filled high-strength woven bag can be directly hung in a roadway in the dead zone through the hanging ring, the transverse ribs can be installed to effectively prevent side bulging, the high-strength woven bag is controllable in shape, the filling pipe is connected into the high-strength woven bag, the filling material is directly utilized to manufacture the partition wall, the cost of the retaining wall is reduced, the high-strength woven bag can be tightly attached to an irregular rock wall in the filling process, the dead zone is closed, and the method for manufacturing the quick-filling retaining wall is safe, reliable, convenient to construct and low in cost and is provided for filling a mine with paste.
Drawings
Fig. 1 is a schematic diagram of an implementation process of the rapid paste-filled retaining wall construction method of the invention.
Wherein: 1-bag body; 2-filling the feed inlet; 3-an exhaust port; 4-reinforcing ribs; 5-hanging a ring; 6, hanging piles; 7-a filling pipe; 8-liquid accelerator; 9-filling the tee joint.
Detailed Description
In order to make the technical problems, technical solutions and advantages of the present invention more apparent, the following detailed description is given with reference to the accompanying drawings and specific embodiments.
The invention provides a method for quickly constructing a paste-filled retaining wall.
As shown in figure 1, in the method, a sealed retaining wall is quickly manufactured by using a filling high-strength woven bag in a paste filling process, the filling high-strength woven bag is fixed in a stoping roadway through a hanging ring 5 and a hanging pile 6, a transverse rib is installed, a filling pipe 7 is connected, a liquid accelerating agent 8 is connected, a filling material is filled into the filling high-strength woven bag to form the filling retaining wall, and a filling empty area is sealed.
The following description is given with reference to specific examples.
An approach type paste filling mining method is adopted for a certain mine, and after the stoping of an approach ore is finished, retaining wall sealing is carried out on a goaf, and then paste filling is carried out. The width of the stope lane is 3m, and the height of the stope lane is 3 m.
The filled high-strength woven bag is manufactured by manufacturers, and is made of a high-strength plastic woven bag with the thickness of 0.75mm, the shape of a cuboid, the width of the cuboid is 3m, the height of the cuboid is 3m, and the length of the cuboid is 2 m.
Constructing an inverted wedge hanging pile at the end part of a road to be filled, hanging the top of a filled high-strength woven bag on a top plate hanging pile, installing transverse ribs and fixing the transverse ribs by using gaskets, hanging a wall hanging ring on the hanging pile, connecting a filling pipe, connecting a liquid accelerating agent, filling a filling material into the filled high-strength woven bag, and forming a closed retaining wall after the filling.
While the foregoing is directed to the preferred embodiment of the present invention, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (7)

1. A quick construction method of a paste filling retaining wall is characterized in that a filling high-strength woven bag is used for quickly manufacturing a closed retaining wall in the paste filling process, and the method comprises the following steps: the filling high-strength woven bag is directly hung on a hanging pile (6) of a roadway in the dead zone through a hanging ring (5), a transverse rib is installed in a reinforcing rib hole (4), a filling pipe (7) is connected, a liquid accelerating agent (8) is connected through a filling pipe tee joint (9) during filling, the filling high-strength woven bag is filled, and a closed retaining wall is quickly formed.
2. The method for quickly constructing a paste-filled retaining wall according to claim 1, wherein: fill high-strength woven bag by the bag body (1), fill feed inlet (2), gas vent (3), strengthening rib hole (4), link (5) are constituteed, and bag body (1) top one side sets up and fills feed inlet (2), waits to fill dead zone one side and sets up gas vent (3), and bag body (1) middle part side sets up strengthening rib hole (4), and bag body (1) side sets up link (5).
3. The method for quickly constructing a paste-filled retaining wall according to claim 1, wherein: the section size of the filling high-strength woven bag is 10% -20% larger than that of a stoping roadway, and the length of the bag body (1) is 1-5 m.
4. The method for quickly constructing a paste-filled retaining wall according to claim 2, wherein: the bag body (1) is made of a high-strength plastic woven bag, and the thickness of the bag body (1) is 0.75-2 mm.
5. The method for quickly constructing a paste-filled retaining wall according to claim 2, wherein: the hole spacing of the reinforcing rib holes (4) is 0.8-1.2 m, the holes are distributed in a rectangular mode, the reinforcing ribs penetrate through the reinforcing rib holes (4) on the two corresponding sides, the trays are connected to the two ends of the reinforcing rib holes, the reinforcing ribs are round steel or threaded steel anchor rods, and the type of the reinforcing rib holes is not lower than phi 18.
6. The method for quickly constructing a paste-filled retaining wall according to claim 1, wherein: the hanging ring (5) is directly hung on the inverted wedge hanging pile (6) and is respectively used for constructing the inverted wedge hanging pile (6) at the top and two sides of the roadway.
7. The method for quickly constructing a paste-filled retaining wall according to claim 2, wherein: fill feed inlet (2) department and set up filling pipe tee bend (9), connect liquid accelerator (8), send liquid accelerator (8) into and fill in the high strength woven bag, realize that the barricade condenses fast.
CN202111354055.9A 2021-11-12 2021-11-12 Rapid construction method of paste filling retaining wall Pending CN114109488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111354055.9A CN114109488A (en) 2021-11-12 2021-11-12 Rapid construction method of paste filling retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111354055.9A CN114109488A (en) 2021-11-12 2021-11-12 Rapid construction method of paste filling retaining wall

Publications (1)

Publication Number Publication Date
CN114109488A true CN114109488A (en) 2022-03-01

Family

ID=80395735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111354055.9A Pending CN114109488A (en) 2021-11-12 2021-11-12 Rapid construction method of paste filling retaining wall

Country Status (1)

Country Link
CN (1) CN114109488A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821559A (en) * 2014-02-13 2014-05-28 山西晋煤集团技术研究院有限责任公司 Mould bag type rapidly-formed hermetic retaining wall
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall
CN108952804A (en) * 2018-08-08 2018-12-07 长沙矿山研究院有限责任公司 For blocking the tailing-filled barricade and construction method of dead zone mining tunnel to be filled
CN111550284A (en) * 2020-06-28 2020-08-18 长沙矿山研究院有限责任公司 Cofferdam type filling retaining wall
CN212272291U (en) * 2020-09-09 2021-01-01 长沙矿山研究院有限责任公司 Bag type stacked drainage filling retaining wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821559A (en) * 2014-02-13 2014-05-28 山西晋煤集团技术研究院有限责任公司 Mould bag type rapidly-formed hermetic retaining wall
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall
CN108952804A (en) * 2018-08-08 2018-12-07 长沙矿山研究院有限责任公司 For blocking the tailing-filled barricade and construction method of dead zone mining tunnel to be filled
CN111550284A (en) * 2020-06-28 2020-08-18 长沙矿山研究院有限责任公司 Cofferdam type filling retaining wall
CN212272291U (en) * 2020-09-09 2021-01-01 长沙矿山研究院有限责任公司 Bag type stacked drainage filling retaining wall

Similar Documents

Publication Publication Date Title
CN104481568B (en) A kind of fully mechanized coal face gob side entry retaining technique and method of ventilation
CA3022748C (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
CN102337906A (en) Construction method for pouring airtight partition wall between recovered roadway and reserved roadway
CN110939443B (en) Annular arrangement route mining method
CN110130978B (en) Method for plugging broken coal side of thick coal seam in broken area of filling and re-mining small kiln
CN203756230U (en) Mold bag type sealed retaining wall capable of being quickly formed
WO2022247176A1 (en) Filling caving mining method
CN106837418A (en) A kind of trapezoidal fire dam of mine anti-explosion and its construction method
CN106968676A (en) The method that cavity is passed through in tunnelling
CN113107489A (en) High-ground-pressure three-soft coal seam along-empty crossheading advanced grouting reinforcement method
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN109972627A (en) A kind of fashioned iron assembled foundation pit enclosure structure and its construction method
CN208718690U (en) The reparation plugging structure of windowing in long range shield tunnel
CN114109488A (en) Rapid construction method of paste filling retaining wall
CN113027519A (en) Filling material self-built retaining wall and construction method
CN102619215A (en) Lock catch type steel pipe pile structure and construction method thereof
CN204456070U (en) Diaphragm wall shutoff stopping means
CN113982597B (en) Tunneling construction method suitable for karst subsidence area strong water permeability unconsolidated formation tunnel
CN106121678B (en) A kind of detection of top plate empty top zone and roadway repair method based on the radar exploration technique
CN213360180U (en) Side roadway side wall plugging prefabricated part for roof cutting roadway mining area of high-gas mine
CN103982187A (en) Sinking drum reinforcing device for shaft construction
CN111322097B (en) Supporting method for coordinating deformation of surrounding rock of roadway
CN109611134B (en) Grouting anchor cable for filling loose body strips and strip filling method
CN207944987U (en) A kind of high concentration tailing cemented filling hollow block construction barricade
CN207093141U (en) A kind of underground airtight wall with biological modeling self-healing performance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220301

RJ01 Rejection of invention patent application after publication