CN114102502A - Landscape garden construction project installation construction method - Google Patents

Landscape garden construction project installation construction method Download PDF

Info

Publication number
CN114102502A
CN114102502A CN202111353643.0A CN202111353643A CN114102502A CN 114102502 A CN114102502 A CN 114102502A CN 202111353643 A CN202111353643 A CN 202111353643A CN 114102502 A CN114102502 A CN 114102502A
Authority
CN
China
Prior art keywords
seat
plate
box body
support frame
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111353643.0A
Other languages
Chinese (zh)
Other versions
CN114102502B (en
Inventor
陈爱国
靖响林
熊军
陈国政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dianxiyuan Ecological Landscape Development Co ltd
Original Assignee
Wuhan Dianxiyuan Ecological Landscape Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Dianxiyuan Ecological Landscape Development Co ltd filed Critical Wuhan Dianxiyuan Ecological Landscape Development Co ltd
Priority to CN202111353643.0A priority Critical patent/CN114102502B/en
Publication of CN114102502A publication Critical patent/CN114102502A/en
Application granted granted Critical
Publication of CN114102502B publication Critical patent/CN114102502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47CCHAIRS; SOFAS; BEDS
    • A47C7/00Parts, details, or accessories of chairs or stools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C11/00Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
    • B05C11/10Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
    • B05C11/1044Apparatus or installations for supplying liquid or other fluent material to several applying apparatus or several dispensing outlets, e.g. to several extrusion nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/02Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for connecting objects by press fit or detaching same
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Machines (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses an installation and construction method for landscape garden construction engineering, which belongs to the technical field of landscape garden construction and comprises an installation and construction device, wherein the installation and construction device comprises a seat support frame, a box body is arranged on the inner side of the seat support frame, the lower surface of the box body is lapped with the upper surface of a bottom plate, and the upper surface of the bottom plate is lapped with the lower surfaces of six installation blocks. According to the seat support, the support plate drives the connecting plate and the plurality of partition plates to move upwards through the connecting rods and penetrate through the two through holes, the seat plates are sequentially placed between the two partition plates due to the fact that the distance between every two adjacent partition plates is equal, glue can flow into the two guide grooves through the four guide pipes, the embedded portion between the seat plates and the seat support frame is reinforced, the seat plates are placed at equal intervals and are installed and fixed at the same time, the situation that the seat plates are staggered is avoided, the work load is relieved, and the purpose of efficiently and accurately assembling the seat is achieved.

Description

Landscape garden construction project installation construction method
Technical Field
The invention belongs to the technical field of landscape garden construction, and particularly relates to a landscape garden construction project installation construction method.
Background
The basic components of landscape architecture can be divided into two main categories: one is soft things such as trees, water, wind, light rain, sunlight, sky; the other is hard things such as paving, walls, railings and landscape construction, and the soft things are called soft landscape and are usually natural; hard things, called as hard landscapes, are usually artificial and add a strong artistic interest to cultural squares, parks and districts. The protection of limited forest resources on the earth is to protect the home gardens on which the human beings rely to live, the wood-like series garden landscape products are used as a novel ecological landscape product, and the application and popularization of the product are the actual actions of protecting the environment and making love for the nature.
At present, in the engineering is built in the view gardens, public seat can often be seen in the view gardens, public seat provides the rest area for giving tourist, the seat mostly forms for the combination of support frame and seat board, through evenly arranging a plurality of seat boards on the support frame, consolidate it again, but at the in-process to the seat installation, need the staff to place a plurality of seat board on the support frame, arrange a plurality of seat boards in proper order and consolidate single seat board again, make it unable accurate fix a position the seat board, seat board staggered arrangement brings the discomfort for tourist's rest, greatly increase work burden when consolidating to the great seat board installation of size, can't realize high-efficiently, the accurate purpose of assembling the seat, consequently, it solves above-mentioned problem to need a view gardens construction engineering installation construction method.
Disclosure of Invention
Technical problem to be solved
In order to overcome the defects of the prior art, the invention provides a landscape garden construction project installation construction method, which solves the problems that in the seat installation process, a plurality of seat plates need to be placed on a support frame by workers, the seat plates are sequentially arranged, and then a single seat plate is reinforced, so that the seat plates cannot be accurately positioned, the seat plates are arranged in a staggered mode to bring discomfort to rest of tourists, the workload is greatly increased when the seat plates with larger sizes are installed and reinforced, and the purpose of efficiently and accurately assembling seats cannot be realized.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a landscape architecture construction project installation construction method, includes the installation construction device, and the installation construction device includes the seat support frame, seat support frame inboard is provided with the box body, the lower surface of box body and the upper surface overlap joint of bottom plate, the upper surface of bottom plate and the lower surface overlap joint of six installation pieces correspond the one side that three installation pieces are close to each other respectively with the left and right sides face fixed connection of seat support frame, the rear of bottom plate upper surface and the bottom fixed connection of two hydraulic stems, the top of two hydraulic stems all is connected with the lower fixed surface of roof.
The upper surface of roof is provided with row material subassembly, arrange the material subassembly joint on the roof, the through-hole has been seted up to seat support frame's upper surface, three guiding gutter has been seted up to seat support frame's upper surface, is provided with same range subassembly in two through-holes, range subassembly's bottom and four supporting component's top fixed connection, the equal sliding connection of four supporting component are at the top of box body, four supporting component's bottom all with the last fixed surface of layer board be connected, the lower surface of layer board and the last fixed surface of hang plate are connected, the lower surface of hang plate and the top overlap joint of sliding component, the back of sliding component is provided with the lead screw.
As a further scheme of the invention: the discharging assembly comprises a glue discharging mechanism, the glue discharging mechanism is arranged on the upper surface of the top plate, the left side and the right side of the glue discharging mechanism are communicated with material guide pipes, the four material guide pipes penetrate through the top plate, and the four material guide pipes are located at four corners of the lower surface of the top plate respectively.
As a further scheme of the invention: the arrangement component comprises a connecting plate, a plurality of partition plates are arranged on the upper surface of the connecting plate, the partition plates are arranged at equal intervals, and the lower surface of the connecting plate is fixedly connected with the top ends of the four supporting components.
As a further scheme of the invention: the supporting component comprises a connecting rod, the top end of the connecting rod is fixedly connected with the lower surface of the connecting plate, the bottom end of the connecting rod is fixedly connected with the upper surface of the supporting plate, a spring is sleeved on the outer surface of the connecting rod, the top end of the spring is fixedly connected with the lower surface of the connecting plate, and the bottom end of the spring is fixedly connected with the upper surface of the box body.
As a further scheme of the invention: the sliding assembly comprises a sliding block, the upper surface of the sliding block is fixedly connected with the bottom ends of the two pulleys, the top ends of the two pulleys are in lap joint with the lower surface of the inclined plate, the back surface of the sliding block is connected with a bearing in a clamping mode, and a screw rod is sleeved in the bearing.
As a further scheme of the invention: the slider sliding connection is in the spout, the spout is seted up at the lower surface of box body inner wall.
As a further scheme of the invention: the back fixedly connected with two pushing hands of box body, the outer wall of lead screw passes through the nut joint at the back of box body, the nut joint is on the box body, the one end fixedly connected with at the lead screw back changes the handle, the lower surface of roof and the last fixed surface of flattening board are connected.
A landscape garden construction project installation construction method comprises the following steps:
s1, mounting a seat support frame: the seat support frame is fixed on the bottom plate by placing the seat support frame on the bottom plate and using bolts through six mounting blocks.
S2, erection of the installation construction device: it is inboard with the box body propulsion seat support frame through two pushing hands, when the box body was put into the seat support frame inboard completely, rotatable commentaries on classics made it drive the lead screw rotatory, the lead screw rotatory in-process through with the nut between mutually supporting, make it drive slider and two pulley movements through the bearing, make it support the hang plate after the pulley moves one end distance forward, make the layer board drive connecting plate and a plurality of baffle rebound and pass in two through-holes through the connecting rod.
S3, laying a seat plate: after a plurality of baffles passed two through-holes, because the distance between two adjacent baffles equals, place the seat board between two baffles in proper order, because place at seat board unaligned at will, accessible pushing hands push-and-pull box body makes the back laminating of flattening board and a plurality of seat boards, makes a plurality of seat boards be in on the same water flat line.
S4, positioning of the seat plate: open out gluey mechanism behind the position of a plurality of seat boards of adjustment, make glue mechanism in glue four stock guide pipe flows to two guiding gutters of glue accessible, make the gomphosis part between seat board and the seat support frame reinforce, secondly the height of the adjustable roof of two hydraulic stems makes roof downstream and with a plurality of seat board in close contact with, with the seat board compaction, level and smooth to a plurality of seat boards.
S5, unloading and mounting the construction device: treat that seat board and seat support frame pass through glue and consolidate the back, make roof rebound and break away from the seat board through adjusting two hydraulic stems, it is rotatory secondly to reverse the in-process that makes its rotation to drive the lead screw, the rotatory in-process of lead screw drives slider and two pulleys through the bearing and moves backward, makes connecting plate and baffle downstream and break away from the through-hole through the spring shrink simultaneously, secondly through two pushing hands take the box body out can.
(III) advantageous effects
Compared with the prior art, the invention has the beneficial effects that:
1. in the invention, the screw rod is driven to rotate by rotating the rotating handle, the screw rod is matched with the nut in the rotating process to drive the sliding block and the two pulleys to move through the bearing, the inclined plate is supported after the pulley moves forwards for a certain distance, the supporting plate drives the connecting plate and the plurality of clapboards to move upwards through the connecting rod and pass through the two through holes, because the distance between the two adjacent clapboards is equal, the seat plates are sequentially placed between the two clapboards, the glue in the glue outlet mechanism can flow into the two guide channels through the four guide pipes, the embedded part between the seat plates and the seat supporting frame is reinforced, the two hydraulic rods can adjust the height of the top plate, the top plate moves downwards and is in close contact with the plurality of seat plates, the seat plates are compacted, and the plurality of seat plates are placed at equal intervals and are installed and fixed simultaneously, avoid a plurality of seat boards dislocation condition to appear, when lightening work burden, realize high-efficient, accurate purpose of assembling the seat.
2. According to the installation structure, due to the fact that the leveling plate is randomly placed on the seat plate and is not aligned, the box body can be pushed and pulled through the push handle, the leveling plate is attached to the back faces of the seat plates, the seat plates are located on the same horizontal line, the installation accuracy of the seat plates is further improved, through the mutual matching between the support plate and the springs, the sliding block and the two pulleys are driven by the bearing to move backwards in the rotation process of the screw rod, and meanwhile the connecting plate and the partition plate move downwards and are separated from the through hole through the contraction of the springs, so that the downward unloading work of the installation construction device is facilitated, and efficient installation of the seat is facilitated.
3. According to the invention, by arranging the guide grooves, the top plate, the hydraulic rods, the sliding blocks and the pulleys, glue can flow into the two guide grooves through the four guide pipes, so that the embedded part between the seat plate and the seat support frame is reinforced, then the height of the top plate can be adjusted by the two hydraulic rods, the top plate can move downwards and can be in close contact with the plurality of seat plates, the seat plates are compacted, the stability of the installation of the seat plates is improved, the friction between the inclined plates and the pulleys is reduced by the arrangement of the pulleys, the height of the partition plates is convenient to adjust, the pulleys cannot deviate in the moving process due to the arrangement of the sliding blocks, and the stability of the adjustment of the partition plates is improved.
Drawings
FIG. 1 is a schematic flow diagram of the present invention;
FIG. 2 is a schematic perspective view of the present invention;
FIG. 3 is a schematic perspective view of a top plate according to the present invention;
FIG. 4 is a schematic perspective view of a seat support frame according to the present invention;
FIG. 5 is a schematic three-dimensional structure of the case according to the present invention;
FIG. 6 is a schematic perspective view of a pallet according to the present invention;
in the figure: 1. a seat support frame; 2. a box body; 3. a base plate; 4. mounting blocks; 5. a hydraulic lever; 6. a top plate; 7. a discharge assembly; 71. a glue discharging mechanism; 72. a material guide pipe; 8. a diversion trench; 9. a through hole; 10. arranging the components; 101. a connecting plate; 102. a partition plate; 11. a support assembly; 111. a connecting rod; 112. a spring; 12. a support plate; 13. an inclined plate; 14. a sliding assembly; 141. a pulley; 142. a slider; 143. a bearing; 15. a screw rod; 16. a nut; 17. turning a handle; 18. a pushing handle; 19. a chute; 20. a screed plate.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in fig. 1 to 6, the present invention provides a technical solution: the utility model provides a landscape architecture construction project installation construction method, including the installation construction device, the installation construction device includes seat support frame 1, seat support frame 1 inboard is provided with box body 2, the lower surface of box body 2 and the upper surface overlap joint of bottom plate 3, the upper surface of bottom plate 3 and the lower surface overlap joint of six installation pieces 4, the one side that corresponds three installation piece 4 mutual close to respectively with the left and right sides face fixed connection of seat support frame 1, the rear of bottom plate 3 upper surface and the bottom fixed connection of two hydraulic stems 5, the top of two hydraulic stems 5 all is connected with the lower fixed surface of roof 6, through setting up hydraulic stem 5, the height of roof 6 can be adjusted to two hydraulic stems 5, make roof 6 remove downwards and with a plurality of seat board in close contact with, with the seat board compaction, improve the stability to the seat board installation.
The upper surface of the top plate 6 is provided with a material discharging component 7, the material discharging component 7 is clamped on the top plate 6, the upper surface of the seat supporting frame 1 is provided with a through hole 9, the upper surface of the seat supporting frame 1 is provided with three diversion trenches 8, through setting up the guiding gutter 8, glue accessible four passage pipes 72 flow to in two guiding gutters 8, make the gomphosis part between seat board and the seat support frame 1 reinforce, be provided with same range subassembly 10 in two through-holes 9, the bottom of range subassembly 10 and the top fixed connection of four supporting component 11, the equal sliding connection of four supporting component 11 is at the top of box body 2, the bottom of four supporting component 11 all is connected with the last fixed surface of layer board 12, the lower surface of layer board 12 and the last fixed surface of hang plate 13 are connected, the lower surface of hang plate 13 and the top overlap joint of sliding component 14, the back of sliding component 14 is provided with lead screw 15.
Specifically, as shown in fig. 1, 4 and 6, the discharging assembly 7 includes a glue discharging mechanism 71, the glue discharging mechanism 71 is disposed on the upper surface of the top plate 6, the left and right sides of the glue discharging mechanism 71 are both communicated with the material guiding pipes 72, the four material guiding pipes 72 all penetrate through the top plate 6, and the four material guiding pipes 72 are respectively located at four corners of the lower surface of the top plate 6, the arranging assembly 10 includes a connecting plate 101, the upper surface of the connecting plate 101 is provided with a plurality of partition plates 102, the distance between two adjacent partition plates 102 is equal by disposing the partition plates 102, the seat plates are sequentially disposed between the two partition plates 102, the seat plates are disposed at equal intervals, the plurality of partition plates 102 are disposed at equal intervals, the lower surface of the connecting plate 101 is fixedly connected with the top ends of the four supporting assemblies 11, the supporting assemblies 11 include connecting rods 111, the top ends of the connecting rods 111 are fixedly connected with the lower surface of the connecting plate 101, the bottom ends of the connecting rods 111 are fixedly connected with the upper surfaces of the supporting plates 12, the outer surface of the connecting rod 111 is sleeved with a spring 112, the top end of the spring 112 is fixedly connected with the lower surface of the connecting plate 101, and the bottom end of the spring 112 is fixedly connected with the upper surface of the box body 2.
Specifically, as shown in fig. 1, 2 and 6, the sliding assembly 14 includes a sliding block 142, an upper surface of the sliding block 142 is fixedly connected to bottom ends of two pulleys 141, friction between the inclined plate 13 and the pulleys 141 is reduced by the arrangement of the pulleys 141, so as to facilitate height adjustment of the partition plate 102, top ends of the two pulleys 141 are overlapped with a lower surface of the inclined plate 13, a back surface of the sliding block 142 is clamped with a bearing 143, a lead screw 15 is sleeved in the bearing 143, the sliding block 142 is slidably connected in the sliding groove 19, due to the arrangement of the sliding block 142, the position of the sliding block 141 is not shifted in the moving process, so as to improve the stability of adjustment of the partition plate 102, the sliding groove 19 is formed in a lower surface of an inner wall of the box body 2, the back surface of the box body 2 is fixedly connected with two pushing handles 18, an outer wall of the lead screw 15 is clamped to the back surface of the box body 2 through a nut 16, the nut 16 is clamped on the box body 2, one end of the back surface of the lead screw 15 is fixedly connected with a rotating handle 17, the lower surface of the top plate 6 is fixedly connected to the upper surface of the screed 20.
A landscape garden construction project installation construction method comprises the following steps:
s1, installing the seat support frame 1: the seat support frame 1 is fixed to the floor panel 3 by placing it on the floor panel 3 and using bolts through the six mounting blocks 4.
S2, erection of the installation construction device: the box body 2 is pushed into the inner side of the seat support frame 1 through the two push hands 18, when the box body 2 is completely placed into the inner side of the seat support frame 1, the rotating handle 17 can be rotated to drive the screw rod 15 to rotate, the screw rod 15 is matched with the nut 16 in the rotating process, the screw rod drives the sliding block 142 and the two pulleys 141 to move through the bearing 143, the inclined plate 13 is supported after the pulleys 141 move forwards for a distance, and the supporting plate 12 drives the connecting plate 101 and the plurality of partition plates 102 to move upwards through the connecting rod 111 and penetrate through the two through holes 9.
S3, laying a seat plate: after the plurality of partition plates 102 pass through the two through holes 9, the seat plates are sequentially arranged between the two partition plates 102 because the distance between the two adjacent partition plates 102 is equal, and the leveling plates 20 are attached to the back surfaces of the plurality of seat plates by pushing and pulling the box body 2 through the push handles 18 because the seat plates are randomly arranged and are not aligned, so that the plurality of seat plates are positioned on the same horizontal line.
S4, positioning of the seat plate: after the positions of a plurality of seat plates are adjusted, the glue outlet mechanism 71 is opened, glue in the glue outlet mechanism 71 can flow into two guide chutes 8 through four guide pipes 72, so that the embedded part between the seat plates and the seat support frame 1 can be reinforced, and then the height of the top plate 6 can be adjusted by two hydraulic rods 5, so that the top plate 6 moves downwards and is in close contact with the seat plates, the seat plates are compacted, and the seat plates are leveled.
S5, unloading and mounting the construction device: after the seat plate and the seat support frame 1 are reinforced by glue, the top plate 6 is moved upwards and separated from the seat plate by adjusting the two hydraulic rods 5, then the screw rod 15 is driven to rotate by the reverse rotation handle 17 in the rotation process, the slide block 142 and the two pulleys 141 are driven to move backwards by the bearing 143 in the rotation process of the screw rod 15, meanwhile, the connecting plate 101 and the partition plate 102 are driven to move downwards and separated from the through hole 9 by the contraction of the spring 112, and then the box body 2 is pulled out by the two push hands 18.
In conclusion, the following results are obtained:
the rotating handle 17 is rotated to drive the screw rod 15 to rotate, the screw rod 15 is matched with the nut 16 in the rotating process, the screw rod drives the sliding block 142 and the two pulleys 141 to move through the bearing 143, the inclined plate 13 is supported after the pulleys 141 move forwards for a certain distance, the supporting plate 12 drives the connecting plate 101 and the plurality of partition plates 102 to move upwards through the connecting rod 111 and pass through the two through holes 9, the seat plates are sequentially placed between the two partition plates 102 because the distance between the two adjacent partition plates 102 is equal, glue in the glue outlet mechanism 71 can flow into the two guide grooves 8 through the four guide pipes 72, the embedded part between the seat plates and the seat supporting frame 1 is reinforced, the height of the top plate 6 can be adjusted by the two hydraulic rods 5, the top plate 6 moves downwards and is in close contact with the plurality of seat plates, the seat plates are compacted, and the plurality of seat plates are placed at equal intervals and are installed and fixed simultaneously, avoid a plurality of seat boards dislocation condition to appear, when lightening work burden, realize high-efficient, accurate purpose of assembling the seat.
Through the setting of flattening board 20, because place at the seat board unalignment at will, accessible pushing hands 18 push-and-pull box body 2, make the laminating of flattening board 20 and the back of a plurality of seat boards, make a plurality of seat boards be in on the same water flat line, further improve the precision of seat board installation, through mutually supporting between layer board 12 and the spring 112, lead screw 15 rotatory in-process drives slider 142 and two pulleys 141 rearward movement through bearing 143, contract simultaneously through the spring 112 and make connecting plate 101 and baffle 102 downstream and break away from through-hole 9, so that the work of unloading under installation construction equipment, be favorable to the high-efficient installation to the seat.
Through setting up guiding gutter 8, roof 6, hydraulic stem 5, slider 142 and pulley 141, glue accessible four passage 72 flow to two guiding gutters 8 in, the gomphosis part that makes between seat board and the seat support frame 1 can be consolidated, secondly the height of the adjustable roof 6 of two hydraulic stems 5, make roof 6 downstream and with a plurality of seat board in close contact with, with the seat board compaction, improve the stability to the seat board installation, through pulley 141's setting, reduce the friction between hang plate 13 and the pulley 141, be convenient for adjust the height of baffle 102, slider 142's setting makes pulley 141 can not the skew position at the in-process that removes, improve the stability of adjusting baffle 102.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (8)

1. The landscape garden building project installation construction method is characterized in that an installation construction device is adopted, the installation construction device comprises a seat support frame (1), a box body (2) is arranged on the inner side of the seat support frame (1), the lower surface of the box body (2) is in lap joint with the upper surface of a bottom plate (3), the upper surface of the bottom plate (3) is in lap joint with the lower surfaces of six installation blocks (4), the surfaces, close to each other, of the corresponding three installation blocks (4) are fixedly connected with the left side surface and the right side surface of the seat support frame (1), the rear part of the upper surface of the bottom plate (3) is fixedly connected with the bottom ends of two hydraulic rods (5), and the top ends of the two hydraulic rods (5) are fixedly connected with the lower surface of a top plate (6);
the upper surface of the top plate (6) is provided with a material discharging component (7), the material discharging component (7) is clamped on the top plate (6), the upper surface of the seat support frame (1) is provided with through holes (9), the upper surface of the seat support frame (1) is provided with three diversion trenches (8), the two through holes (9) are internally provided with the same arrangement component (10), the bottom ends of the arrangement components (10) are fixedly connected with the top ends of the four support components (11), the four support components (11) are all connected with the top of the box body (2) in a sliding way, the bottom ends of the four support components (11) are all fixedly connected with the upper surface of the supporting plate (12), the lower surface of the supporting plate (12) is fixedly connected with the upper surface of the inclined plate (13), the lower surface of the inclined plate (13) is overlapped with the top end of the sliding assembly (14), and a screw rod (15) is arranged on the back surface of the sliding assembly (14).
2. The landscape architecture construction project installation and construction method according to claim 1, characterized in that: the discharging assembly (7) comprises a glue discharging mechanism (71), the glue discharging mechanism (71) is arranged on the upper surface of the top plate (6), the left side and the right side of the glue discharging mechanism (71) are communicated with material guide pipes (72), the four material guide pipes (72) penetrate through the top plate (6), and the four material guide pipes (72) are respectively located at four corners of the lower surface of the top plate (6).
3. The landscape architecture construction project installation and construction method according to claim 1, characterized in that: the arrangement component (10) comprises a connecting plate (101), a plurality of partition plates (102) are arranged on the upper surface of the connecting plate (101), the partition plates (102) are arranged equidistantly, and the lower surface of the connecting plate (101) is fixedly connected with the top ends of the four supporting components (11).
4. The landscape architecture construction project installation and construction method according to claim 3, characterized in that: the supporting component (11) comprises a connecting rod (111), the top end of the connecting rod (111) is fixedly connected with the lower surface of the connecting plate (101), the bottom end of the connecting rod (111) is fixedly connected with the upper surface of the supporting plate (12), the outer surface of the connecting rod (111) is sleeved with a spring (112), the top end of the spring (112) is fixedly connected with the lower surface of the connecting plate (101), and the bottom end of the spring (112) is fixedly connected with the upper surface of the box body (2).
5. The landscape architecture construction project installation and construction method according to claim 1, characterized in that: the sliding assembly (14) comprises a sliding block (142), the upper surface of the sliding block (142) is fixedly connected with the bottom ends of the two pulleys (141), the top ends of the two pulleys (141) are respectively overlapped with the lower surface of the inclined plate (13), a bearing (143) is clamped on the back surface of the sliding block (142), and a screw rod (15) is sleeved in the bearing (143).
6. The landscape architecture construction project installation and construction method according to claim 5, characterized in that: the slider (142) is connected in the chute (19) in a sliding way, and the chute (19) is arranged on the lower surface of the inner wall of the box body (2).
7. The landscape architecture construction project installation and construction method according to claim 5, characterized in that: the utility model discloses a multi-functional box, including box body (2), two pushing hands (18) of back fixedly connected with of box body (2), the outer wall of lead screw (15) passes through nut (16) joint at the back of box body (2), nut (16) joint is on box body (2), the one end fixedly connected with at the lead screw (15) back changes handle (17), the lower surface of roof (6) and the last fixed surface of flattening board (20) are connected.
8. The landscape architecture construction project installation and construction method according to claim 1, which comprises the following steps:
s1, installing the seat support frame (1): the seat support frame (1) is placed on the bottom plate (3) and is fixed on the bottom plate (3) through six mounting blocks (4) by using bolts;
s2, erection of the installation construction device: the box body (2) is pushed into the inner side of the seat support frame (1) through the two push handles (18), when the box body (2) is completely placed into the inner side of the seat support frame (1), the rotating handle (17) can be rotated to drive the screw rod (15) to rotate, the screw rod (15) is matched with the nut (16) in the rotating process, the screw rod drives the sliding block (142) and the two pulleys (141) to move through the bearing (143), and the inclined plate (13) is supported after the pulleys (141) move forwards for a distance, so that the supporting plate (12) drives the connecting plate (101) and the partition plates (102) to move upwards through the connecting rod (111) and penetrate through the two through holes (9);
s3, laying a seat plate: after the plurality of partition plates (102) penetrate through the two through holes (9), because the distance between two adjacent partition plates (102) is equal, the seat plates are sequentially placed between the two partition plates (102), and because the seat plates are randomly placed in a non-aligned state, the box body (2) can be pushed and pulled through the push handle (18), so that the leveling plate (20) is attached to the back surfaces of the plurality of seat plates, and the plurality of seat plates are positioned on the same horizontal line;
s4, positioning of the seat plate: after the positions of the seat plates are adjusted, the glue outlet mechanism (71) is opened, glue in the glue outlet mechanism (71) can flow into the two guide grooves (8) through the four material guide pipes (72), so that the embedded part between the seat plates and the seat support frame (1) is reinforced, and then the height of the top plate (6) can be adjusted by the two hydraulic rods (5), so that the top plate (6) moves downwards and is in close contact with the seat plates, the seat plates are compacted, and the seat plates are leveled;
s5, unloading and mounting the construction device: after the seat plate and the seat support frame (1) are reinforced by glue, the top plate (6) moves upwards and is separated from the seat plate by adjusting the two hydraulic rods (5), then the reversing handle (17) drives the screw rod (15) to rotate in the rotating process, the screw rod (15) drives the sliding block (142) and the two pulleys (141) to move backwards through the bearing (143) in the rotating process, meanwhile, the connecting plate (101) and the partition plate (102) move downwards and are separated from the through hole (9) through the contraction of the spring (112), and then the box body (2) is pulled out through the two pushing hands (18).
CN202111353643.0A 2021-11-16 2021-11-16 Mounting construction method for landscape architecture construction engineering Active CN114102502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111353643.0A CN114102502B (en) 2021-11-16 2021-11-16 Mounting construction method for landscape architecture construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111353643.0A CN114102502B (en) 2021-11-16 2021-11-16 Mounting construction method for landscape architecture construction engineering

Publications (2)

Publication Number Publication Date
CN114102502A true CN114102502A (en) 2022-03-01
CN114102502B CN114102502B (en) 2023-11-21

Family

ID=80395657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111353643.0A Active CN114102502B (en) 2021-11-16 2021-11-16 Mounting construction method for landscape architecture construction engineering

Country Status (1)

Country Link
CN (1) CN114102502B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB695774A (en) * 1952-05-16 1953-08-19 Percival Bernard Lewis Improvements in or relating to seating structures
WO2002052991A1 (en) * 2000-12-29 2002-07-11 Vladimir Indic Assembly of balls as an element of deck-chair, chair, back of a chair and arm-rest, and the process of assembling thereof
JP2006322282A (en) * 2005-05-20 2006-11-30 Ibiken Kk Paving method
JP2010088787A (en) * 2008-10-10 2010-04-22 Kotobuki Corp Independent seat type bench
US20140091609A1 (en) * 2012-09-28 2014-04-03 Flexsteel Industries, Inc. Seating unit with improved structure
CN210204031U (en) * 2019-07-27 2020-03-31 北京怀胜城市建设开发有限公司 Garden chair
CN111493575A (en) * 2020-04-22 2020-08-07 张金峰 Landscape garden construction project installation construction method
CN112263103A (en) * 2020-10-27 2021-01-26 李碰 Park chair assembling equipment capable of automatically arranging boards at equal intervals
CN212802727U (en) * 2020-04-02 2021-03-26 张爱乐 Landscape corridor frame structure based on garden design
CN112696056A (en) * 2020-12-17 2021-04-23 武汉市园林建筑规划设计研究院有限公司 Garden pavilion construction method
CN213096996U (en) * 2020-08-11 2021-05-04 杜晓月 Seat is used in gardens

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB695774A (en) * 1952-05-16 1953-08-19 Percival Bernard Lewis Improvements in or relating to seating structures
WO2002052991A1 (en) * 2000-12-29 2002-07-11 Vladimir Indic Assembly of balls as an element of deck-chair, chair, back of a chair and arm-rest, and the process of assembling thereof
JP2006322282A (en) * 2005-05-20 2006-11-30 Ibiken Kk Paving method
JP2010088787A (en) * 2008-10-10 2010-04-22 Kotobuki Corp Independent seat type bench
US20140091609A1 (en) * 2012-09-28 2014-04-03 Flexsteel Industries, Inc. Seating unit with improved structure
CN210204031U (en) * 2019-07-27 2020-03-31 北京怀胜城市建设开发有限公司 Garden chair
CN212802727U (en) * 2020-04-02 2021-03-26 张爱乐 Landscape corridor frame structure based on garden design
CN111493575A (en) * 2020-04-22 2020-08-07 张金峰 Landscape garden construction project installation construction method
CN213096996U (en) * 2020-08-11 2021-05-04 杜晓月 Seat is used in gardens
CN112263103A (en) * 2020-10-27 2021-01-26 李碰 Park chair assembling equipment capable of automatically arranging boards at equal intervals
CN112696056A (en) * 2020-12-17 2021-04-23 武汉市园林建筑规划设计研究院有限公司 Garden pavilion construction method

Also Published As

Publication number Publication date
CN114102502B (en) 2023-11-21

Similar Documents

Publication Publication Date Title
CN114102502A (en) Landscape garden construction project installation construction method
CN104396629A (en) Movable steel frame greenhouse and construction method thereof
CN110130587A (en) Double helix adjustable multifunctional split heads and floor dimensional control methods based on split heads
CN103109699A (en) Efficient heat preservation greenhouse and manufacturing method
CN110173091B (en) Bin-parting construction method for concrete terrace
EP2826925A2 (en) Building complex
CN203985281U (en) Removable reinforced cement greenhouse booth
CN207130578U (en) A kind of stacked structure of pitching laydown machine
CN2923827Y (en) Concrete U-shape canal cast-in-situ vibration extending machine
CN113331045B (en) Green building in gardens
KR102291683B1 (en) Construction method of flowerbed boundary using boundary plate
CN211873976U (en) Landscape corridor frame
CN210917994U (en) Find sloping ditch formula drainage system
CN109306719B (en) Module assembled roof rainwater collection device and utilization system thereof
CN202850175U (en) Integral type water ditch side moldboard
CN113585021B (en) Municipal engineering construction pavement paving device and paving method thereof
CN207828728U (en) A kind of assembled ecological block
CN207176417U (en) A kind of garden greening brick
CN207211533U (en) A kind of photovoltaic tiles of installation easy to disassemble
CN103643781A (en) Keel connector for indoor wall and floor decoration
CN214656792U (en) Novel water conservancy construction slope protection structure
CN221103991U (en) Ecological landscape afforests seeder
CN112449814B (en) Modularization submerged plant seedling planting system
CN216405350U (en) Water conservancy ditch rubbish cleaning device
CN216689355U (en) Foundation that building engineering construction was used impels level device fast

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant