CN114039839A
CN114039839A CN202111320151.1A CN202111320151A CN114039839A CN 114039839 A CN114039839 A CN 114039839A CN 202111320151 A CN202111320151 A CN 202111320151A CN 114039839 A CN114039839 A CN 114039839A
Authority
CN
China
Prior art keywords
communication
protocol
recovery time
preset
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111320151.1A
Other languages
Chinese (zh)
Other versions
CN114039839B (en
Inventor
程洋
陈锦洪
彭志荣
冯志华
杨玺
张欣
赵爽
冯嘉烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202111320151.1A priority Critical patent/CN114039839B/en
Publication of CN114039839A publication Critical patent/CN114039839A/en
Application granted granted Critical
Publication of CN114039839B publication Critical patent/CN114039839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/14Session management
    • H04L67/141Setup of application sessions
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/08Protocols for interworking; Protocol conversion
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/16Implementation or adaptation of Internet protocol [IP], of transmission control protocol [TCP] or of user datagram protocol [UDP]
    • H04L69/163In-band adaptation of TCP data exchange; In-band control procedures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L2212/00Encapsulation of packets

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a power communication fault repairing method and a device, which are applied to a safety communication control center, wherein the safety communication control center is in communication connection with a communication emergency repair center, and the method comprises the following steps: when power communication interruption is monitored, acquiring fault data of at least one load node; performing global optimization based on the fault data, and determining communication recovery time corresponding to each load node; sending each communication recovery time to a communication emergency repair center; the communication emergency repair center is used for generating communication emergency repair schemes based on communication recovery time, so that the communication emergency repair schemes corresponding to load nodes are generated more efficiently based on the communication recovery time, repair efficiency is improved, and sustainable use of power communication is guaranteed.

Description

Power communication fault repairing method and device
Technical Field
The invention relates to the technical field of communication safety, in particular to a method and a device for repairing a power communication fault.
Background
The power communication network is developed to ensure safe and stable operation of the power system. The relay protection and safety and stability control system and the dispatching automation system of the power system are called three main pillars of safe and stable operation of the power system by people, are the foundation of power grid dispatching automation, network operation marketization and management modernization, are important means for ensuring safe, stable and economic operation of a power grid, are important infrastructure of the power system, and have strict requirements on the reliability of communication.
The existing power communication network may be seriously influenced by ground buildings or weather due to the environmental influence, so that the existing power communication network is damaged. At this moment, in order to ensure the reliability of power communication, the electric power communication network needs to be rescued through power communication emergency repair, but the emergency repair efficiency is low due to the fact that the prior art scheme lacks effective information safety protection measures.
Disclosure of Invention
The invention provides a method and a device for repairing a power communication fault, which solve the technical problem of low repair efficiency caused by the lack of effective information safety protection measures in the conventional power communication network repair process.
The invention provides a power communication fault repairing method which is applied to a safety communication control center, wherein the safety communication control center is in communication connection with a communication emergency repair center, and the method comprises the following steps:
when power communication interruption is monitored, acquiring fault data of at least one load node;
performing global optimization based on the fault data, and determining communication recovery time corresponding to each load node;
sending each communication recovery time to the communication emergency repair center; and the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
Optionally, before the step of acquiring fault data of at least one load node when the power communication interruption is monitored, the method further comprises:
establishing TCP connection with a preset network communication system;
receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and if the power communication state data is not received within a preset monitoring time period, judging that the power communication is interrupted.
Optionally, the network communication system is further configured to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from the load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and carrying out secondary encapsulation on the primary encapsulated data based on an SAA protocol and then sending the primary encapsulated data to the secure communication control center.
Optionally, the target protocol library includes a protocol description, a protocol library identifier, a device type, and configuration parameter information.
Optionally, the fault data includes a load class and an active power average value corresponding to the load node, and the step of performing global optimization based on the fault data and determining communication recovery time corresponding to each of the load nodes includes:
substituting each load grade and the active power average value into a preset global optimization formula;
solving the global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure BDA0003344895120000021
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
The invention also provides a power communication fault repairing device, which is applied to a safety communication control center, wherein the safety communication control center is in communication connection with a communication emergency repair center, and the device comprises:
the fault data acquisition module is used for acquiring fault data of at least one load node when the power communication interruption is monitored;
the recovery time determining module is used for carrying out global optimization based on the fault data and determining communication recovery time corresponding to each load node;
the recovery time sending module is used for sending each communication recovery time to the communication emergency repair center; and the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
Optionally, the apparatus further comprises:
the connection establishing module is used for establishing TCP connection with a preset network communication system;
the power communication state data receiving module is used for receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and the power communication interruption judging module is used for judging that the power communication is interrupted if the power communication state data is not received in a preset monitoring time period.
Optionally, the network communication system is further configured to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from the load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and carrying out secondary encapsulation on the primary encapsulated data based on an SAA protocol and then sending the primary encapsulated data to the secure communication control center.
Optionally, the target protocol library includes a protocol description, a protocol library identifier, a device type, and configuration parameter information.
Optionally, the fault data includes a load level and an active power average value corresponding to the load node, and the recovery time determining module is specifically configured to:
substituting each load grade and the active power average value into a preset global optimization formula;
solving the global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure BDA0003344895120000041
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
According to the technical scheme, the invention has the following advantages:
the method comprises the steps that power communication state data of each load node are obtained in real time through a network communication system and forwarded to a communication safety control center, when the power communication state data are not received in a monitoring time period, power communication interruption is judged, at the moment, the communication safety control center can collect fault data from sensors of each load node through the network communication system, global optimization is carried out based on the fault data, and communication recovery time corresponding to each load node is determined; sending each communication recovery time to the communication emergency repair center; and the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time. Therefore, the technical problem that the existing electric power communication network rush-repair process is lack of effective information safety protection measures to cause low rush-repair efficiency is solved, and based on the length of communication recovery time, a communication emergency rush-repair scheme corresponding to each load node is generated more efficiently, so that the rush-repair efficiency is improved, and the sustainable use of electric power communication is guaranteed.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a flowchart illustrating steps of a power communication fault repairing method according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating a final output curve of a test comparison provided by an embodiment of the present invention;
fig. 3 is a block diagram of a power communication fault repairing apparatus according to an embodiment of the present invention.
Detailed Description
The embodiment of the invention provides a method and a device for repairing a power communication fault, which are used for solving the technical problem of low repair efficiency caused by the lack of effective information safety protection measures in the conventional power communication network repair process.
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a flowchart illustrating steps of a power communication fault repairing method according to an embodiment of the present invention.
The invention provides a power communication fault repairing method which is applied to a safety communication control center, wherein the safety communication control center is in communication connection with a communication emergency repair center, and the method comprises the following steps:
step 101, when power communication interruption is monitored, acquiring fault data of at least one load node;
in the embodiment of the invention, the safety communication control center monitors the power communication state of each load node through the data of the load node forwarded by the network communication system, and if the power communication interruption of the load node is monitored, the safety communication control center acquires the fault data of at least one load node through the network communication system and provides a data basis for the subsequent power communication fault repairing sequence of the load node.
It should be noted that the network communication system according to the embodiment of the present invention is referred to as a 5G network communication system.
Optionally, before step 101, the method further comprises the following sub-steps:
establishing TCP connection with a preset network communication system;
receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and if the power communication state data is not received within the preset monitoring time period, judging that the power communication is interrupted.
In one example of the present invention, before the secure communication control center performs power communication state monitoring of the load node, a TCP connection may be established with a preset network communication system by configuring virtual IP addresses of the secure communication control center and the network communication system. After the TCP connection is established, the network communication system receives a protocol communication request sent by the safety communication control center based on a connected protocol stack, and wakes up a plurality of sensors connected with the network communication system to collect power communication state data of the load nodes.
And after the network communication system receives the electric power communication state data corresponding to each load node, forwarding the electric power communication state data to the safety communication control center through the 5G communication network in a preset monitoring time period. And if the safety communication control center does not receive the power communication state data in the monitoring time period, judging that the power communication is interrupted at the moment.
It should be noted that the protocol communication request may further include acquiring the attribute and current state information of each load node, and waking up the network communication system and a plurality of sensors connected thereto for data communication.
TCP refers to Transmission Control Protocol (TCP), a connection-oriented, reliable transport layer communication Protocol based on byte streams, which is intended to adapt to layered Protocol hierarchies that support multi-network applications. Reliable communication services are provided by means of TCP between pairs of processes in host computers connected to different but interconnected computer communication networks, capable of operating over a variety of communication systems that are hardwired to packet-switched or circuit-switched networks.
In another example of the present invention, the network communication system is further configured to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and performing secondary encapsulation on the primary encapsulated data based on the SAA protocol and then sending the primary encapsulated data to a secure communication control center.
In this embodiment, after receiving the protocol communication request, the network communication system may search the target protocol library in the dynamic protocol library based on the protocol library identifier carried by the network communication system, and load the target protocol library in a general communication channel or other types of communication channels built in the network communication system. It should be noted that, a plurality of 5G communication protocols, such as 3GPP, LTE, CCSA, MEC, SAA, etc., are stored in the dynamic protocol library, and each communication protocol has a corresponding protocol library identifier.
After a target protocol library is loaded in a communication channel, unique identifiers of all sensors are distributed for communication signals, and the channel is initialized, so that subsequent data interactive transmission is realized. When the electric quantity communication fault of the load node is judged, fault data collected from the load node by a plurality of sensors is received through a network communication system, protocol conversion can be firstly carried out on the fault data for realizing subsequent high-speed data transmission, the fault data are converted into standard format data transmitted on a protocol adaptation layer of a 5G communication network, in order to guarantee the safety of data transmission, the fault data after protocol conversion can be packaged based on an MEC protocol to obtain primary packaging data, and the primary packaging data are subjected to secondary packaging based on an SAA protocol and then are sent to a safety communication control center.
Further, the target protocol library includes protocol description, protocol library identification, device type and configuration parameter information.
In another example of the present invention, after the secure communication control center receives the secondary encapsulated data, the secondary encapsulated data may be analyzed based on the SAA protocol, and then the secondary encapsulated data is analyzed by using the MEC protocol to obtain the fault data, thereby ensuring the security of the communication process.
102, performing global optimization based on fault data, and determining communication recovery time corresponding to each load node;
in the embodiment of the invention, after the safety communication control center receives the fault data, due to the influences of the fault states, the load grades and the like of different load nodes, in order to ensure that the power communication can be recovered as soon as possible, global optimization can be carried out according to the fault data so as to determine the communication recovery time corresponding to each load node respectively, and a data basis is provided for a subsequent communication emergency repair center to generate a communication emergency repair scheme.
Optionally, the fault data includes a load level and an active power average corresponding to the load node, and step 102 may include the following sub-steps:
substituting each load grade and the average value of the active power into a preset global optimization formula;
solving a global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure BDA0003344895120000081
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
In an example of the present invention, parameters such as a load level and an active power average value corresponding to each load node may be substituted into a preset global optimization formula, and the global optimization formula is solved with the objective of minimizing the communication recovery time of each load node, so as to obtain the communication recovery time corresponding to each load node.
103, sending each communication recovery time to a communication emergency repair center; the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
In the embodiment of the invention, after receiving the communication recovery time corresponding to each load node, the communication emergency repair center can sequence the time from small to large according to the recovery time, and can acquire the fault type of the load node sent by the safety communication control center at the same time when receiving the communication recovery time, so as to generate the corresponding communication emergency repair scheme for the load node corresponding to each communication recovery time.
In the embodiment of the invention, the power communication state data of each load node is acquired in real time through a network communication system and is forwarded to a communication safety control center, when the power communication state data is not received in a monitoring time period, the power communication is judged to be interrupted, at the moment, the communication safety control center can acquire fault data from a sensor of each load node through the network communication system, perform global optimization based on the fault data and determine the communication recovery time corresponding to each load node; sending each communication recovery time to a communication emergency repair center; the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time. Therefore, the technical problem that the existing electric power communication network rush-repair process is lack of effective information safety protection measures to cause low rush-repair efficiency is solved, and based on the length of communication recovery time, a communication emergency rush-repair scheme corresponding to each load node is generated more efficiently, so that the rush-repair efficiency is improved, and the sustainable use of electric power communication is guaranteed.
In another example of the invention, a traditional GA method and the method of the invention are selected to carry out comparison test, and the test results are compared by means of scientific demonstration to verify the real effect of the method of the invention.
When the traditional GA method is used for solving the problems, respective solving results are compared, and the parameters of three algorithms participating in comparison are as follows:
(1) the method (global optimization algorithm) of the invention: initial temperature t 0-1030, final temperature tmin-10-30, Lk-1, α -0.9 (1312 iterations);
(2) traditional methods GA methods (genetic algorithms): the population quantity is 20, the gene crossing probability is 70%, the gene variation probability is 10%, and the iterative computation is 300 times.
The basic principle of the two algorithms is random search, so that when the iteration times are not infinite, the final optimization result fluctuates, in order to show the respective actual performance, after a plurality of independent repeated tests are carried out, the research idea of analyzing data by using a statistical method is adopted, 500 independent repeated optimization calculations are carried out by using the two algorithms respectively, and compared indexes comprise 5 items of program average running time, final optimization objective function mean value, optimization rate, 1/10000 optimized solution rate and 5/10000 optimized solution rate, wherein the optimization rate refers to the probability of searching the actual optimal solution of the optimization problem by the algorithm, and represents the capability of searching the optimal solution by the algorithm; 1/10000(5/10000) the optimal solution rate indicates the probability that the algorithm finds the optimal solution before 1/10000(5/10000) the optimization problem, the higher the value, the stronger the stability of the algorithm.
Referring to fig. 2, a schematic diagram of a final result output curve of experimental comparison is shown, in which a solid line is a curve output by the present invention, and a dotted line is a curve output by a conventional method, according to the schematic diagram of fig. 2, it can be intuitively seen that the solid line and the dotted line gradually increase in distance with time, the dotted line always shows an unstable fluctuation trend and always increases lower than the safety of the solid line, although the solid line slightly fluctuates, the solid line basically tends to be stable and is always kept at a rising position of the dotted line, thereby illustrating that the efficiency of the method of the present invention is far greater than that of the conventional method, and verifying the true effect of the method of the present invention.
Referring to fig. 3, fig. 3 is a block diagram of a power communication fault repairing apparatus according to an embodiment of the present invention.
The invention also provides a power communication fault repairing device, which is applied to a safety communication control center, wherein the safety communication control center is in communication connection with a communication emergency repair center, and the device comprises:
a fault data acquisition module 301, configured to acquire fault data of at least one load node when it is monitored that power communication is interrupted;
a recovery time determining module 302, configured to perform global optimization based on the fault data, and determine communication recovery times corresponding to the load nodes, respectively;
a recovery time sending module 303, configured to send each communication recovery time to a communication emergency repair center; the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
Optionally, the apparatus further comprises:
the connection establishing module is used for establishing TCP connection with a preset network communication system;
the power communication state data receiving module is used for receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and the power communication interruption judging module is used for judging that the power communication is interrupted if the power communication state data is not received in the preset monitoring time period.
Optionally, the network communication system is further adapted to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and performing secondary encapsulation on the primary encapsulated data based on the SAA protocol and then sending the primary encapsulated data to a secure communication control center.
Optionally, the target protocol library includes a protocol description, a protocol library identification, a device type, and configuration parameter information.
Optionally, the fault data includes a load level and an active power average value corresponding to the load node, and the recovery time determining module 302 is specifically configured to:
substituting each load grade and the average value of the active power into a preset global optimization formula;
solving a global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure BDA0003344895120000111
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
It can be clearly understood by those skilled in the art that, for convenience and brevity of description, the specific working processes of the above-described apparatuses and modules may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the embodiments provided in the present invention, it should be understood that the disclosed apparatus and method may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the units is only one logical division, and other divisions may be realized in practice, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. The electric power communication fault repairing method is applied to a safety communication control center which is in communication connection with a communication emergency repair center, and comprises the following steps:
when power communication interruption is monitored, acquiring fault data of at least one load node;
performing global optimization based on the fault data, and determining communication recovery time corresponding to each load node;
sending each communication recovery time to the communication emergency repair center; and the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
2. The method of claim 1, wherein prior to the step of obtaining fault data for at least one load node when an interruption in power communication is monitored, the method further comprises:
establishing TCP connection with a preset network communication system;
receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and if the power communication state data is not received within a preset monitoring time period, judging that the power communication is interrupted.
3. The method of claim 2, wherein the network communication system is further configured to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from the load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and carrying out secondary encapsulation on the primary encapsulated data based on an SAA protocol and then sending the primary encapsulated data to the secure communication control center.
4. The method of claim 2, wherein the target protocol library comprises protocol specifications, protocol library identification, device type, and configuration parameter information.
5. The method according to claim 1, wherein the fault data includes a load class and an active power average value corresponding to the load node, and the step of performing global optimization based on the fault data to determine a communication recovery time corresponding to each of the load nodes comprises:
substituting each load grade and the active power average value into a preset global optimization formula;
solving the global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure FDA0003344895110000021
Figure FDA0003344895110000022
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
6. The utility model provides a power communication trouble prosthetic devices, its characterized in that is applied to the safety communication control center, the safety communication control center is with communication emergency repair center communication connection, the device includes:
the fault data acquisition module is used for acquiring fault data of at least one load node when the power communication interruption is monitored;
the recovery time determining module is used for carrying out global optimization based on the fault data and determining communication recovery time corresponding to each load node;
the recovery time sending module is used for sending each communication recovery time to the communication emergency repair center; and the communication emergency repair center is used for generating a communication emergency repair scheme based on each communication recovery time.
7. The apparatus of claim 6, further comprising:
the connection establishing module is used for establishing TCP connection with a preset network communication system;
the power communication state data receiving module is used for receiving power communication state data returned by the network communication system in response to the sent protocol communication request;
and the power communication interruption judging module is used for judging that the power communication is interrupted if the power communication state data is not received in a preset monitoring time period.
8. The apparatus of claim 7, wherein the network communication system is further configured to,
responding to the protocol communication request, searching a target protocol library in a preset dynamic protocol library by adopting a protocol library identifier carried by the protocol communication request, and loading the target protocol library in a preset communication channel;
when fault data collected from the load nodes by a plurality of preset sensors are received, carrying out protocol conversion on the fault data;
encapsulating the fault data after protocol conversion based on an MEC protocol to obtain primary encapsulated data;
and carrying out secondary encapsulation on the primary encapsulated data based on an SAA protocol and then sending the primary encapsulated data to the secure communication control center.
9. The apparatus of claim 7, wherein the target protocol library comprises protocol specifications, protocol library identification, device type, and configuration parameter information.
10. The apparatus according to claim 6, wherein the fault data includes a load level and an active power average value corresponding to the load node, and the recovery time determining module is specifically configured to:
substituting each load grade and the active power average value into a preset global optimization formula;
solving the global optimization formula by adopting a preset optimization path time matrix with the aim of minimizing the communication recovery time corresponding to each load node to obtain the communication recovery time corresponding to each load node;
the global optimization formula is as follows:
Figure FDA0003344895110000031
Figure FDA0003344895110000032
wherein f is the communication recovery time, ωiIs the load class, tiFor the communication recovery time, P, corresponding to the ith said load nodeiIs the average value of the active power corresponding to the ith load node, tpir is the ending time, tir is the starting time, N is the total number of the load nodes, F (t)maxIs the maximum value of the system function;
the optimal path time matrix is as follows:
Rreal(t)=R*inc(t);
wherein R isreal(t) is the optimal path time matrix, inc (t) is a preset optimal path increasing coefficient, and R is a preset positive integer.
CN202111320151.1A 2021-11-09 2021-11-09 Electric power communication fault repairing method and device Active CN114039839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111320151.1A CN114039839B (en) 2021-11-09 2021-11-09 Electric power communication fault repairing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111320151.1A CN114039839B (en) 2021-11-09 2021-11-09 Electric power communication fault repairing method and device

Publications (2)

Publication Number Publication Date
CN114039839A true CN114039839A (en) 2022-02-11
CN114039839B CN114039839B (en) 2024-01-23

Family

ID=80143648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111320151.1A Active CN114039839B (en) 2021-11-09 2021-11-09 Electric power communication fault repairing method and device

Country Status (1)

Country Link
CN (1) CN114039839B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018160874A (en) * 2017-03-24 2018-10-11 国立研究開発法人情報通信研究機構 Optical communication emergency restoration method and apparatus
CN108923428A (en) * 2018-08-27 2018-11-30 东北大学 A kind of power distribution network Dynamic- Recovery system and method based on Apoptosis algorithm
CN112242701A (en) * 2020-11-03 2021-01-19 上海电力大学 Distribution method and system based on multi-fault first-aid repair task of power distribution network
CN113011670A (en) * 2021-03-30 2021-06-22 国网河北省电力有限公司电力科学研究院 Power distribution network fault emergency repair dispatching-fault recovery coordination method and device
CN113256058A (en) * 2021-04-06 2021-08-13 国网山东省电力公司东平县供电公司 Electric power emergency management system for handling emergency

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018160874A (en) * 2017-03-24 2018-10-11 国立研究開発法人情報通信研究機構 Optical communication emergency restoration method and apparatus
CN108923428A (en) * 2018-08-27 2018-11-30 东北大学 A kind of power distribution network Dynamic- Recovery system and method based on Apoptosis algorithm
CN112242701A (en) * 2020-11-03 2021-01-19 上海电力大学 Distribution method and system based on multi-fault first-aid repair task of power distribution network
CN113011670A (en) * 2021-03-30 2021-06-22 国网河北省电力有限公司电力科学研究院 Power distribution network fault emergency repair dispatching-fault recovery coordination method and device
CN113256058A (en) * 2021-04-06 2021-08-13 国网山东省电力公司东平县供电公司 Electric power emergency management system for handling emergency

Also Published As

Publication number Publication date
CN114039839B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
Huang et al. Characterization of cascading failures in interdependent cyber-physical systems
TWI612415B (en) System and management method of server and computer-readable storage medium
US20130031164A1 (en) Method for transfer of control between devices in a substation system and a device thereof
CN110752966B (en) Network protocol security test method and device, electronic equipment and storage medium
CN112769897A (en) Synchronization method and device for edge calculation message, electronic equipment and storage medium
CN108650111B (en) Information security electric power semi-physical simulation platform building method and system
CN111340456A (en) Edge cloud collaborative data processing method, device and equipment based on Internet of things
US20160277547A1 (en) Packet monitoring device and packet monitoring method for communication packet
CN113009212B (en) System and method for intelligently monitoring state of lightning arrester of power distribution network based on Internet of things
CN113364624A (en) Mixed cloud flow acquisition method and system based on edge computing
CN113675947A (en) Power transmission side equipment state monitoring method of power transmission gateway and power transmission gateway
CN112702219B (en) Internet of things network monitoring method, device, equipment and storage medium
CN113691408B (en) Power data communication network simulation method, device and computer equipment
CN117076937B (en) Node training method and device of distributed system and distributed system
CN113037542B (en) Cloud network topology construction method based on software defined network
CN111769987B (en) Network information security testing system and method based on big data management model
CN114039839A (en) Power communication fault repairing method and device
CN110381050B (en) Multi-protocol conversion and verification method and device for data packet
CN114243914B (en) Power monitoring system
Lee et al. mIoTwins: design and evaluation of mIoT framework for private edge networks
CN102215206A (en) Method and device for identifying network protocol based on NPTA technology
CN115174435A (en) Comprehensive evaluation method for performance of power communication transmission network
CN114401147A (en) New energy power station communication message comparison method and system based on abstract algorithm
CN113626405A (en) HDFS network data transmission optimization method, system, terminal and storage medium
Honeth et al. Distributed topology inference for electric power grids

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant