CN114032935A - A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate - Google Patents
A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate Download PDFInfo
- Publication number
- CN114032935A CN114032935A CN202111286221.6A CN202111286221A CN114032935A CN 114032935 A CN114032935 A CN 114032935A CN 202111286221 A CN202111286221 A CN 202111286221A CN 114032935 A CN114032935 A CN 114032935A
- Authority
- CN
- China
- Prior art keywords
- trestle
- drainage
- foundation pit
- retaining wall
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 45
- 238000001556 precipitation Methods 0.000 claims abstract description 13
- 238000004062 sedimentation Methods 0.000 claims description 5
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/16—Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/14—Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Health & Medical Sciences (AREA)
- Sewage (AREA)
Abstract
The invention relates to a foundation pit buried drainage system with a trestle plate, which utilizes a water retaining wall arranged at the edge of a foundation pit as a water transporting pivot, so that the water retaining wall not only plays a role in edge protection, but also plays a role in internal drainage; three branch pipes are buried in the trestle plate in a concealed mode and serve as drainage pipes in the trestle plate, one end of the drainage pipe in the trestle plate is connected with the pipe orifice of a precipitation well in the trestle, the other end of the drainage pipe in the foundation pit retaining wall is led out from the outer side of the trestle plate and connected with the drainage pipe in the foundation pit retaining wall, and the drainage pipe in the foundation pit retaining wall is also connected with the drainage pipe of the precipitation well outside the trestle; and the tail end of the foundation pit retaining wall is provided with a water collecting tank. The invention carries out hidden protection on the exposed drainage pipeline in the prior foundation pit engineering, does not need to worry about the damage of the pipeline caused by factors such as foundation pit excavation or mechanical walking on a trestle, and the like, simultaneously, the drainage system has stable drainage, a few exposed pipelines are easy to replace and maintain, and does not need to worry about the unsmooth water outlet when the foundation pit emergently descends and drains water.
Description
Technical Field
The invention relates to a set of buried drainage system, in particular to a set of drainage layout suitable for a foundation pit with a trestle bridge plate during excavation construction.
Background
In general foundation ditch engineering, consider that the surrounding environment can restrict the foundation ditch and face the limit working face, the design can arrange the landing stage board as the construction way directly over the foundation ditch, and the landing stage board design is in the same one side of foundation ditch usually, and the foundation ditch excavation and the support installation of being convenient for will fall drainage pipeline and other pipelines and arrange the opposite side at no landing stage simultaneously to reduce the construction influence that the pipeline brought. When a group pit construction or buildings around the foundation pit is met, because the construction access can not be set at the position of the edge of the foundation pit, the trestle plates can only be set at two sides of the foundation pit, so that the drainage pipeline under the trestle can only be turned over the trestle plates, the pipeline is all suspended and exposed, and because the drainage ditch is not arranged at the position of the edge of the foundation pit, the drainage pipeline needs to be laid at the edge and is communicated with the sedimentation tank all the time. This results in long exposed period and wide exposed range of the pipeline, and the pipeline is very easy to be damaged in the excavation process of the foundation pit. In consideration of the arrangement of pain points on the exposed pipeline in the prior art, a buried drainage system for the foundation pit with the trestle bridge plate needs to be designed, so that the pipeline is effectively protected in the whole foundation pit construction process, and the foundation pit dewatering is ensured to be smoothly carried out.
Disclosure of Invention
The invention provides a buried drainage system for a limited space foundation pit with a bridge deck, which can reasonably arrange drainage pipelines during foundation pit construction, realize safe and efficient drainage, is not influenced by cross construction of project branches, and is suitable for the limited space foundation pit with the bridge deck.
In order to achieve the purpose, the technical scheme of the invention is as follows: a foundation pit buried drainage system for a stacked bridge plate utilizes a water retaining wall arranged at the edge of a foundation pit as a water transporting pivot, so that the water retaining wall not only plays a role in edge enclosure, but also achieves an internal drainage function; three branch pipes are buried in the trestle plate in a concealed mode and serve as drainage pipes in the trestle plate, one end of the drainage pipe in the trestle plate is connected with the pipe orifice of a precipitation well in the trestle, the other end of the drainage pipe in the foundation pit retaining wall is led out from the outer side of the trestle plate and connected with the drainage pipe in the foundation pit retaining wall, and the drainage pipe in the foundation pit retaining wall is also connected with the drainage pipe of the precipitation well outside the trestle; and the tail end of the foundation pit retaining wall is provided with a water collecting tank.
Furthermore, two drain pipes are buried in the foundation pit retaining wall.
Furthermore, a three-way interface is reserved for the drain pipe in the foundation pit retaining wall at intervals of about 20 meters and serves as a water inlet, and the drain pipe in the trestle plate and the drainage pipe of the dewatering well outside the trestle are connected to the three-way interface.
Further, the pre-buried nodular well lid of precipitation well mouth of pipe in the landing stage makes things convenient for the later stage to overhaul.
Further, the water collecting tank is connected with the on-site sedimentation tank through a drainage ditch.
The invention has the beneficial effects that:
the invention carries out hidden protection on the exposed drainage pipeline in the prior foundation pit engineering, does not need to worry about the damage of the pipeline caused by factors such as foundation pit excavation or mechanical walking on a trestle, and the like, simultaneously, the drainage system has stable drainage, a few exposed pipelines are easy to replace and maintain, and does not need to worry about the unsmooth water outlet when the foundation pit emergently descends and drains water. The system also reasonably develops the use space of the water retaining wall, achieves the functions of enclosure and drainage, is convenient to operate, is attractive and tidy, and is suitable for most foundation pits with bridge decks to operate.
Drawings
FIG. 1 is a schematic view of a buried drainage system of the present invention
FIG. 2 is a detailed cross-sectional view of a buried drain system of the present invention
FIG. 3 is a schematic view of a pre-buried nodular well cover and a drainage pipe of a dewatering well in a bridge plate;
FIG. 4 is a schematic view of a pre-buried drain pipe and a tee joint in the retaining wall;
FIG. 5 is a schematic view of a three-way joint for communicating a pre-buried drain pipe with a retaining wall;
FIG. 6 is a schematic view of a water outlet collecting tank of the water retaining wall;
in the figure: 1. the landing well casing in the landing stage, 2, landing stage outer landing well casing, 3, the three-way water inlet is reserved with the breakwater to the drainage pipe of landing stage and is linked to each other, 4, the catch basin, 5 landing stage boards, 6, nodular well lid, 7, drain pipe, 8, breakwater, 9, branch pipe, 10, landing stage board reinforcing bar, 11, tee bend interface, 12, escape canal.
With the present embodiment
The invention is further described with reference to the following figures and examples.
As shown in fig. 1 to 6, in the foundation pit buried drainage system for trestle plates, the trestle plates serving as the bearing structures cannot be randomly transformed, and the water retaining walls arranged on the adjacent edges of the foundation pit are used as water transporting hinges, so that the water retaining walls not only play a role in adjacent edge enclosure, but also play a role in internal drainage.
Aiming at the drainage of the precipitation well positioned below the trestle plate, one end of three branch pipes 9 (used for water, electricity and gas) which are buried in the trestle plate 5 in advance is selected to be connected with the 1 port of the precipitation well pipe in the trestle, one end of the branch pipes is led out from the outer side of the trestle plate 5, and the 1 port of the precipitation well pipe in the trestle is sealed by the nodular well cover 6, so that later-stage maintenance is facilitated. 2 drain pipes 7 are buried in the foundation pit retaining wall in a concealed mode, a three-way interface serving as a water inlet is reserved for the drain pipes 7 every 20 m or so, the drain pipes led out of a trestle and the drainage pipes of dewatering wells outside the range of the trestle are connected to the three-way interface 11, and finally a water outlet is arranged at the tail end of the foundation pit retaining wall 8 and connected with a field four-stage sedimentation tank.
The specific implementation process comprises the following steps:
(1) when the trestle is constructed, the drain pipe in the precipitation well is led out in advance at the reinforcement stage, the three branch pipes 9 (electricity, gas and water) are connected and embedded, and the nodular well cover 6 is embedded in the 1 port of the precipitation well pipe in the trestle, so that later-stage maintenance is facilitated, as shown in figure 3.
(2) After the trestle is poured, 2 drain pipes 7 are pre-buried in the foundation pit water retaining wall 8 in a steel bar binding stage, an upward three-way connector 11 is arranged every 20 m, and the drain pipes 7 are paid attention to proper slope placement to ensure that water at a later stage is discharged smoothly, as shown in fig. 4.
(3) Pouring the concrete of the water retaining wall, repairing and leveling the three-way connector 11, and erecting an air pipe, a cable and a drain pipe for water drainage along the outer side of the water retaining wall 8 to ensure that the operation of vehicle personnel is not influenced.
(4) The drainage pipes led out from the trestle are connected with a three-way joint 11 reserved on the water retaining wall 8, and meanwhile, the drainage pipes of other dewatering wells in the pit are also communicated with the water retaining wall 8, as shown in figure 5.
(5) A small water collecting tank 4 is built at the water outlet of the water retaining wall 8, and water is drained to the four-stage sedimentation tank through a drainage ditch 12. As shown in fig. 6.
(6) And when a water pumping test is carried out, the working condition of the dewatering well is smooth, and the water is smoothly discharged from the water outlet.
Claims (5)
1. The utility model provides a bury formula drainage system for there is foundation ditch of deck bridge board which characterized in that: the water retaining wall arranged on the adjacent edge of the foundation pit is used as a water transporting pivot, so that the water retaining wall not only plays a role in adjacent edge protection, but also achieves an internal drainage effect; three branch pipes are buried in the trestle plate in a concealed mode and serve as drainage pipes in the trestle plate, one end of the drainage pipe in the trestle plate is connected with the pipe orifice of a precipitation well in the trestle, the other end of the drainage pipe in the foundation pit retaining wall is led out from the outer side of the trestle plate and connected with the drainage pipe in the foundation pit retaining wall, and the drainage pipe in the foundation pit retaining wall is also connected with the drainage pipe of the precipitation well outside the trestle; and the tail end of the foundation pit retaining wall is provided with a water collecting tank.
2. The underground drainage system for foundation pits with trestle plates as claimed in claim 1, wherein: two drain pipes are buried in the foundation pit retaining wall.
3. The underground drainage system for foundation pits with trestle plates as claimed in claim 2, wherein: and a three-way interface is reserved in the drain pipe in the foundation pit retaining wall at intervals of about 20 meters and serves as a water inlet, and the drain pipe in the trestle plate and the drain pipe of the dewatering well outside the trestle are connected to the three-way interface.
4. The underground drainage system for foundation pits with trestle plates as claimed in claim 1, wherein: the pre-buried nodular well lid of precipitation well mouth of pipe in the landing stage makes things convenient for the later stage to overhaul.
5. The underground drainage system for foundation pits with trestle plates as claimed in claim 1, wherein: the water collecting tank is connected with the on-site sedimentation tank through a drainage ditch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111286221.6A CN114032935A (en) | 2021-11-02 | 2021-11-02 | A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111286221.6A CN114032935A (en) | 2021-11-02 | 2021-11-02 | A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114032935A true CN114032935A (en) | 2022-02-11 |
Family
ID=80135949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111286221.6A Pending CN114032935A (en) | 2021-11-02 | 2021-11-02 | A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114032935A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324089A (en) * | 2022-08-16 | 2022-11-11 | 王新华 | Deep foundation pit structure with drainage side wall gushes water |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109695247A (en) * | 2019-01-04 | 2019-04-30 | 杭州江润科技有限公司 | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method |
CN109763552A (en) * | 2018-12-27 | 2019-05-17 | 中建三局集团有限公司 | A kind of basis is dark to apply gravity type draining regeneration application system and its construction method |
CN209686426U (en) * | 2019-01-04 | 2019-11-26 | 杭州江润科技有限公司 | Foundation pit faces side bumper drainage system |
CN210066791U (en) * | 2019-05-10 | 2020-02-14 | 湖北中南岩土工程有限公司 | A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation |
CN212896422U (en) * | 2020-10-12 | 2021-04-06 | 中国建筑第四工程局有限公司 | Deep foundation pit water intercepting and draining device |
-
2021
- 2021-11-02 CN CN202111286221.6A patent/CN114032935A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763552A (en) * | 2018-12-27 | 2019-05-17 | 中建三局集团有限公司 | A kind of basis is dark to apply gravity type draining regeneration application system and its construction method |
CN109695247A (en) * | 2019-01-04 | 2019-04-30 | 杭州江润科技有限公司 | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method |
CN209686426U (en) * | 2019-01-04 | 2019-11-26 | 杭州江润科技有限公司 | Foundation pit faces side bumper drainage system |
CN210066791U (en) * | 2019-05-10 | 2020-02-14 | 湖北中南岩土工程有限公司 | A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation |
CN212896422U (en) * | 2020-10-12 | 2021-04-06 | 中国建筑第四工程局有限公司 | Deep foundation pit water intercepting and draining device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324089A (en) * | 2022-08-16 | 2022-11-11 | 王新华 | Deep foundation pit structure with drainage side wall gushes water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN208717954U (en) | A kind of integrated pipe canal applied to city section water power route arrangement | |
CN114032935A (en) | A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate | |
CN207062994U (en) | A kind of Urban Storm Flood joint utilizes system | |
CN109577337A (en) | The construction method of deep foundation ditch of flowing line | |
KR100654632B1 (en) | A water turning method of powerless drain pipe and apparatus thereof | |
US6543968B2 (en) | Submersible canal bypass | |
CN214143998U (en) | Sewage collecting pipe network arrangement structure for households along river | |
CN209194585U (en) | It is a kind of with waterproof, the underground pipe gallery structure of drain function | |
CN113175351A (en) | Intensive waste water pump room arrangement and drainage system of double-hole long tunnel | |
CN208167944U (en) | It crosses sea, cross river section drainage pumping plant | |
CN103866815B (en) | Liquefied natural gas receiving station seawater water intake facilities | |
CN112814026A (en) | Hidden vent structure of assembled utility tunnel | |
CN215165816U (en) | Compact rainwater goes into comprehensive trench system of ditch suitable for pier store yard | |
CN219240617U (en) | Inspection shaft suitable for ground storehouse roof heating power pipeline lays | |
CN204783042U (en) | Tunnel structure that has adverse slope near water | |
CN215371539U (en) | Large buried water supply pipeline inspection drainage device | |
CN212388577U (en) | Miniature precipitation system of one-piece small foundation pit | |
CN218292032U (en) | Utility tunnel co-constructed with basement | |
CN215566096U (en) | Intensive waste water pump room arrangement and drainage system of double-hole long tunnel | |
CN212316962U (en) | Basement drainage device that falls | |
CN216948649U (en) | Multifunctional combined well applicable to water supply system | |
CN206419062U (en) | The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant | |
CN213539062U (en) | Be applied to nuclear power plant construction and synthesize trench structure with water treatment plant semi-open | |
CN214940377U (en) | Same-floor crossed intersection of comprehensive pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220211 |