CN113988677A - Integrated city planning decision support system based on smart city planning - Google Patents

Integrated city planning decision support system based on smart city planning Download PDF

Info

Publication number
CN113988677A
CN113988677A CN202111294126.0A CN202111294126A CN113988677A CN 113988677 A CN113988677 A CN 113988677A CN 202111294126 A CN202111294126 A CN 202111294126A CN 113988677 A CN113988677 A CN 113988677A
Authority
CN
China
Prior art keywords
planning
city
urban
module
degree
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111294126.0A
Other languages
Chinese (zh)
Inventor
王一
姜雪
满宴辰
杨金钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianzhu University
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN202111294126.0A priority Critical patent/CN113988677A/en
Publication of CN113988677A publication Critical patent/CN113988677A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Geometry (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computer Hardware Design (AREA)
  • General Business, Economics & Management (AREA)
  • Evolutionary Computation (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Mathematical Optimization (AREA)
  • Databases & Information Systems (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Operations Research (AREA)
  • Pure & Applied Mathematics (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Remote Sensing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention belongs to the technical field of urban planning, and discloses an integrated urban planning decision support system based on smart urban planning, which comprises the following components: the system comprises a data acquisition module, a data verification module, a file management module, a data editing module, a city three-dimensional model construction module, a planning target determination module, a city resource determination module, a planning analysis module, a reference map generation module, a verification module, an evaluation module, a result output module, a data management module and a data query module; the invention makes full use of advanced technology, combines the actual demand of the urban planning department for urban planning, carries out urban planning decision, carries out comprehensive evaluation on the urban planning decision from multiple angles of planning target completion, urban resource consumption, urban intellectualization and convenience, can ensure the reliability of the decision, and provides a powerful tool for the management of urban geographic space objects in the urban planning and designing process by urban planning administrative departments and design units.

Description

Integrated city planning decision support system based on smart city planning
Technical Field
The invention belongs to the technical field of urban planning, and particularly relates to an integrated urban planning decision support system based on smart urban planning.
Background
With the acceleration of the urbanization process, the traditional city planning and management means can not adapt to the rapid development of cities, and the digital cities and the virtual cities are replaced, so that a brand-new concept and regulation means for city planning construction and management and working life is undoubtedly provided for people. The traditional city planning is carried out in a two-dimensional space, the problems of environment harmony and the like are difficult to be scientifically judged, and the expression form of the traditional city planning result is mainly a picture.
Through the above analysis, the problems and defects of the prior art are as follows:
(1) the management efficiency of the traditional city planning decision system on the aspects of data integration, decision support and the like is to be matched with the urbanization development speed urgently.
(2) The traditional city planning decision excessively depends on two-dimensional space results, and the problem of scientifically judging the environment harmony of the city space is solved by lacking the verification and support of a three-dimensional space.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides an integrated city planning decision support system based on smart city planning.
The invention is realized in this way, a decision support system for urban planning based on the integration of smart city planning, which comprises:
the data acquisition module is used for acquiring planning design drawings of cities, urban aerial photographs, satellite cloud charts and related information of various buildings and plans in the cities;
the data verification module is used for verifying the collected city planning map and various related information based on the city aerial photograph map and the satellite cloud map;
the file management module comprises a map editing unit and a scene editing unit and is used for editing the map document based on the data verification result;
the data editing module comprises a document browsing unit, a map management unit and a three-dimensional editing unit; the map display system is used for editing the MapGIS general graph and managing document browsing and map;
the city three-dimensional model building module is used for building a city three-dimensional model based on the verified or modified image and other information;
the planning target determining module is used for acquiring the planning demand of the city and converting the planning demand into a planning achievable target;
the urban resource determining module is used for determining available land, water and other available resources of the current city based on the collected related data;
the planning analysis module is used for determining a plurality of city planning schemes based on planning targets and the determined available resources of the city;
the reference map generation module is used for converting the determined multiple city planning schemes into multiple city planning reference maps and constructing corresponding three-dimensional models;
the checking module is used for sequentially inputting the plurality of city planning reference pictures and the corresponding three-dimensional models into a pre-constructed city three-dimensional model and judging whether the city planning reference pictures and the corresponding three-dimensional models are feasible or not;
the evaluation module is used for evaluating the verified planning scheme based on the completion degree of the planning target, the consumption degree of urban resources, the urban intellectualization degree and the convenience degree as evaluation targets;
the result output module is used for outputting each planning scheme, the planning scheme reference picture and the evaluation result corresponding to the planning scheme;
the data management module comprises a document management unit, a data source management unit, a thematic map management unit and a database; the method is used for map document directory management, thematic map management and data source management.
Further, the document browsing unit includes: for processing the map window.
Further, the building module of the urban three-dimensional model based on the verified or modified image and other information comprises:
obtaining verified city planning data, a city aerial photograph and a satellite cloud picture;
analyzing and processing the verified city planning data to obtain original space data of a city and construct a basic model of the city;
acquiring various building information of a city, and constructing a model of each building based on the appearance and corresponding size of each building;
adding the various building models to the constructed city basic model; adding the constructed underground pipeline model to the city foundation model;
and performing three-dimensional rendering on the city foundation model added with the building model and the underground pipeline model to obtain a corresponding city three-dimensional model.
Further, the underground pipeline model construction method comprises the following steps:
acquiring the type of an urban underground pipeline model, and acquiring modeling parameters required for establishing the urban underground pipeline model from urban underground pipeline data;
establishing a pipeline node tree structure relationship based on the type of the urban underground pipeline model and modeling parameters; establishing an underground pipeline joint and a pipeline three-dimensional element model; simultaneously creating an urban underground three-dimensional scene;
and automatically constructing a three-dimensional underground pipeline model according to the positions of the underground pipeline structure and the nodes in the modeling parameters.
Further, the types of the underground pipeline model include: pipeline model and inspection shaft model.
Further, the evaluation module evaluates the verified planning scheme based on the completion degree of the planning target, the consumption degree of urban resources, the urban intellectualization degree and the convenience degree as evaluation targets, and comprises the following steps:
determining importance degrees of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree to urban planning, and determining respective scores of the corresponding planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree based on the importance degrees;
calculating weights of planning target completion, urban resource consumption, urban intellectualization and convenience degrees in the planning target completion, the urban resource consumption, the urban intellectualization and the convenience degrees of the urban planning scheme;
and calculating the total score of the urban planning scheme according to the obtained scores of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree and the weights of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree, wherein the total score is the evaluation result of the planning scheme.
Further, the integrated city planning decision support system based on smart city planning further includes:
the data query module comprises an attribute query unit and a space query unit; for providing a spatial query and attribute query interface.
Another object of the present invention is to provide an information data processing terminal, wherein the information data processing terminal is configured to implement the integrated city planning decision support system based on smart city planning.
It is another object of the present invention to provide a computer program product stored on a computer readable medium, comprising a computer readable program for providing a user input interface for applying the integrated city planning decision support system based on smart city planning when executed on an electronic device.
It is another object of the present invention to provide a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to apply the integrated city planning decision support system based on smart city planning.
By combining all the technical schemes, the invention has the advantages and positive effects that: the invention makes full use of advanced technologies such as GIS, virtual simulation, database and the like, combines the actual requirements of the urban planning department on urban planning, carries out urban planning decision, carries out comprehensive evaluation on the urban planning decision from multiple angles of planning target completion, urban resource consumption, urban intellectualization and convenience, can ensure the reliability of the decision, and provides a powerful tool for the management of urban geographic space objects in the urban planning and designing process of urban planning administrative departments and design units.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings needed to be used in the embodiments of the present application will be briefly described below, and it is obvious that the drawings described below are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained from the drawings without creative efforts.
Fig. 1 is a schematic diagram of a decision support system for integrated city planning based on smart city planning according to an embodiment of the present invention;
in the figure: 1. a data acquisition module; 2. a data verification module; 3. a file management module; 4. a data editing module; 5. a city three-dimensional model building module; 6. a planning target determination module; 7. a city resource determination module; 8. a planning analysis module; 9. a reference map generation module; 10. a checking module; 11. an evaluation module; 12. a result output module; 13. a data management module; 14. and a data query module.
FIG. 2 is a schematic structural diagram of a data management module according to an embodiment of the present invention;
in the figure: 15. a document management unit; 16. a data source management unit; 17. a thematic map management unit; 19. A database.
Fig. 3 is a flowchart of a method for constructing a three-dimensional city model by a three-dimensional city model construction module according to an embodiment of the present invention based on verified or modified images and other information.
Fig. 4 is a flowchart of a method for constructing an underground pipeline model according to an embodiment of the present invention.
Fig. 5 is a flowchart of a method for evaluating a verified planning scheme by the evaluation module according to the embodiment of the present invention, based on the completion degree of the planning target, the consumption degree of the urban resources, the urban intellectualization degree, and the convenience degree as evaluation targets.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Aiming at the problems in the prior art, the invention provides an integrated city planning decision support system based on smart city planning, and the invention is described in detail below with reference to the accompanying drawings.
As shown in fig. 1, the integrated city planning decision support system based on smart city planning provided in the embodiment of the present invention includes:
the data acquisition module 1 is used for acquiring planning and design drawings of cities, urban aerial photographs, satellite cloud charts and relevant information of various buildings in the cities;
the data verification module 2 is used for verifying the collected city planning map and various related information based on the city aerial photograph map and the satellite cloud map;
the file management module 3 comprises a map editing unit and a scene editing unit and is used for editing and processing the map document based on the data verification result;
the data editing module 4 comprises a document browsing unit, a map management unit and a three-dimensional editing unit; the map display system is used for editing the MapGIS general graph and managing document browsing and map;
the city three-dimensional model building module 5 is used for building a city three-dimensional model based on the verified or modified image and other information;
the planning target determining module 6 is used for acquiring the planning demand of the city and converting the planning demand into a planning achievable target;
the urban resource determining module 7 is used for determining available land, water and other available resources of the current city based on the collected related data;
the planning analysis module 8 is used for determining a plurality of city planning schemes based on planning targets and the determined available resources of the city;
a reference map generation module 9, configured to convert the determined multiple city planning schemes into multiple city planning reference maps, and construct corresponding three-dimensional models;
the checking module 10 is used for sequentially inputting the multiple city planning reference pictures and the corresponding three-dimensional models into a pre-constructed city three-dimensional model and judging whether the city planning reference pictures and the corresponding three-dimensional models are feasible or not;
the evaluation module 11 is used for evaluating a verified planning scheme based on the completion degree of a planning target, the consumption degree of urban resources, the urban intellectualization degree and the convenience degree as evaluation targets;
a result output module 12, configured to output each planning scheme, a planning scheme reference map, and an evaluation result corresponding to the planning scheme;
a data management module 13 including a document management unit 15, a data source management unit 16, a thematic map management unit 17, and a database 18; the map data management system is used for map document directory management, thematic map management and data source management;
the data query module 14 comprises an attribute query unit and a space query unit; for providing a spatial query and attribute query interface.
The document browsing unit provided by the embodiment of the invention comprises: for processing the map window.
As shown in fig. 3, the building module of a three-dimensional city model according to the embodiment of the present invention, based on the verified or modified image and other information, includes:
s101, obtaining verified city planning data, a city aerial photograph and a satellite cloud picture;
s102, analyzing and processing the verified city planning data, acquiring original spatial data of a city and constructing a basic model of the city;
s103, acquiring various building information of the city, and constructing a model of each building based on the appearance and corresponding size of each building;
s104, adding the building models to the constructed city basic model; adding the constructed underground pipeline model to the city foundation model;
and S105, performing three-dimensional rendering on the city foundation model added with the building model and the underground pipeline model to obtain a corresponding city three-dimensional model.
As shown in fig. 4, the method for constructing an underground pipeline model according to the embodiment of the present invention includes:
s201, acquiring the type of an urban underground pipeline model, and acquiring modeling parameters required for building the urban underground pipeline model from urban underground pipeline data;
s202, establishing a pipeline node tree structure relation based on the type of the urban underground pipeline model and modeling parameters; establishing an underground pipeline joint and a pipeline three-dimensional element model; simultaneously creating an urban underground three-dimensional scene;
and S203, automatically constructing a three-dimensional underground pipeline model according to the underground pipeline structure and the positions of the nodes in the modeling parameters.
The types of the underground pipeline model provided by the embodiment of the invention comprise: pipeline model and inspection shaft model.
As shown in fig. 5, the evaluation module provided in the embodiment of the present invention evaluates a verified planning scheme based on the completion degree of the planning target, the consumption degree of the urban resources, the urban intellectualization degree, and the convenience degree as evaluation targets, including:
s301, determining importance degrees of a planning target completion degree, an urban resource consumption degree, urban intellectualization and convenience degree to urban planning, and determining respective scores of the corresponding planning target completion degree, the urban resource consumption degree, the urban intellectualization and the convenience degree based on the importance degrees;
s302, calculating weights of the planning target completion degree, the urban resource consumption degree, the planning target completion degree in the urban intelligentization and facilitation degrees, the urban resource consumption degree, the urban intelligentization and facilitation degrees of the urban planning scheme;
and S303, calculating the total score of the urban planning scheme according to the obtained scores of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree and the weights of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree, wherein the total score is the evaluation result of the planning scheme.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention, and the scope of the present invention is not limited thereto, and any modification, equivalent replacement, and improvement made by those skilled in the art within the technical scope of the present invention disclosed herein, which is within the spirit and principle of the present invention, should be covered by the present invention.

Claims (10)

1. An integrated city planning decision support system based on smart city planning, the integrated city planning decision support system based on smart city planning comprising:
the data acquisition module is used for acquiring planning design drawings of cities, urban aerial photographs, satellite cloud charts and related information of various buildings and plans in the cities;
the data verification module is used for verifying the collected city planning map and various related information based on the city aerial photograph map and the satellite cloud map;
the file management module comprises a map editing unit and a scene editing unit and is used for editing the map document based on the data verification result;
the data editing module comprises a document browsing unit, a map management unit and a three-dimensional editing unit; the map display system is used for editing the MapGIS general graph and managing document browsing and map;
the city three-dimensional model building module is used for building a city three-dimensional model based on the verified or modified image and other information;
the planning target determining module is used for acquiring the planning demand of the city and converting the planning demand into a planning achievable target;
the urban resource determining module is used for determining available land, water and other available resources of the current city based on the collected related data;
the planning analysis module is used for determining a plurality of city planning schemes based on planning targets and the determined available resources of the city;
the reference map generation module is used for converting the determined multiple city planning schemes into multiple city planning reference maps and constructing corresponding three-dimensional models;
the checking module is used for sequentially inputting the plurality of city planning reference pictures and the corresponding three-dimensional models into a pre-constructed city three-dimensional model and judging whether the city planning reference pictures and the corresponding three-dimensional models are feasible or not;
the evaluation module is used for evaluating the verified planning scheme based on the completion degree of the planning target, the consumption degree of urban resources, the urban intellectualization degree and the convenience degree as evaluation targets;
the result output module is used for outputting each planning scheme, the planning scheme reference picture and the evaluation result corresponding to the planning scheme;
the data management module comprises a document management unit, a data source management unit, a thematic map management unit and a database; the method is used for map document directory management, thematic map management and data source management.
2. The integrated city planning decision support system based on smart city planning of claim 1, wherein the document browsing unit comprises: for processing the map window.
3. The integrated city planning decision support system based on smart city planning of claim 1, wherein the city three-dimensional model building module building a city three-dimensional model based on the verified or modified images and other information comprises:
obtaining verified city planning data, a city aerial photograph and a satellite cloud picture;
analyzing and processing the verified city planning data to obtain original space data of a city and construct a basic model of the city;
acquiring various building information of a city, and constructing a model of each building based on the appearance and corresponding size of each building;
adding the various building models to the constructed city basic model; adding the constructed underground pipeline model to the city foundation model;
and performing three-dimensional rendering on the city foundation model added with the building model and the underground pipeline model to obtain a corresponding city three-dimensional model.
4. The integrated city planning decision support system based on smart city planning of claim 3, wherein the underground pipeline model construction method comprises:
acquiring the type of an urban underground pipeline model, and acquiring modeling parameters required for establishing the urban underground pipeline model from urban underground pipeline data;
establishing a pipeline node tree structure relationship based on the type of the urban underground pipeline model and modeling parameters; establishing an underground pipeline joint and a pipeline three-dimensional element model; simultaneously creating an urban underground three-dimensional scene;
and automatically constructing a three-dimensional underground pipeline model according to the positions of the underground pipeline structure and the nodes in the modeling parameters.
5. The integrated city planning decision support system based on smart city planning of claim 4, wherein the types of the underground pipeline model include: pipeline model and inspection shaft model.
6. The integrated city planning decision support system based on smart city planning of claim 1, wherein the evaluation module evaluates the verified planning scenario based on the completion degree of the planning objective, the consumption degree of the city resources, the city intelligence and the convenience degree as evaluation objectives comprises:
determining importance degrees of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree to urban planning, and determining respective scores of the corresponding planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree based on the importance degrees;
calculating weights of planning target completion, urban resource consumption, urban intellectualization and convenience degrees in the planning target completion, the urban resource consumption, the urban intellectualization and the convenience degrees of the urban planning scheme;
and calculating the total score of the urban planning scheme according to the obtained scores of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree and the weights of the planning target completion degree, the urban resource consumption degree, the urban intellectualization degree and the convenience degree, wherein the total score is the evaluation result of the planning scheme.
7. The integrated city planning decision support system based on smart city planning of claim 1, wherein the integrated city planning decision support system based on smart city planning further comprises:
the data query module comprises an attribute query unit and a space query unit; for providing a spatial query and attribute query interface.
8. An information data processing terminal, characterized in that the information data processing terminal is used for implementing the integrated city planning decision support system based on smart city planning as claimed in any one of claims 1-7.
9. A computer program product stored on a computer readable medium, comprising a computer readable program for providing a user input interface for applying the integrated city planning decision support system based on smart city planning as claimed in any one of claims 1 to 7 when executed on an electronic device.
10. A computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to apply the integrated city planning decision support system based on smart city planning as claimed in any one of claims 1 to 7.
CN202111294126.0A 2021-11-03 2021-11-03 Integrated city planning decision support system based on smart city planning Pending CN113988677A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111294126.0A CN113988677A (en) 2021-11-03 2021-11-03 Integrated city planning decision support system based on smart city planning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111294126.0A CN113988677A (en) 2021-11-03 2021-11-03 Integrated city planning decision support system based on smart city planning

Publications (1)

Publication Number Publication Date
CN113988677A true CN113988677A (en) 2022-01-28

Family

ID=79746144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111294126.0A Pending CN113988677A (en) 2021-11-03 2021-11-03 Integrated city planning decision support system based on smart city planning

Country Status (1)

Country Link
CN (1) CN113988677A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115796449A (en) * 2022-11-23 2023-03-14 重庆大学 Smart city portal building method and system, electronic equipment and medium
CN116597680A (en) * 2023-03-28 2023-08-15 北京知藏云道科技有限公司 Line feasibility prediction system based on data analysis

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115796449A (en) * 2022-11-23 2023-03-14 重庆大学 Smart city portal building method and system, electronic equipment and medium
CN115796449B (en) * 2022-11-23 2023-12-05 重庆大学 Smart city portal building method, smart city portal building system, electronic equipment and smart city portal building medium
CN116597680A (en) * 2023-03-28 2023-08-15 北京知藏云道科技有限公司 Line feasibility prediction system based on data analysis

Similar Documents

Publication Publication Date Title
Biljecki et al. An improved LOD specification for 3D building models
Behzadan et al. Visualization of construction graphics in outdoor augmented reality
Khalil et al. Categorisation of building data in the digital documentation of heritage buildings
KR101546703B1 (en) System for processing massive bim data of building
KR101546705B1 (en) Method for visualizing building-inside bim data by bim data process terminal
Biljecki et al. Does a finer level of detail of a 3D city model bring an improvement for estimating shadows?
CN112784002B (en) Virtual scene generation method, device, equipment and storage medium
CN113988677A (en) Integrated city planning decision support system based on smart city planning
Toschi et al. Geospatial data processing for 3D city model generation, management and visualization
Yang et al. Complementarity of historic building information modelling and geographic information systems
Zhou et al. OutDet: an algorithm for extracting the outer surfaces of building information models for integration with geographic information systems
Padsala et al. Conceptualizing, Managing and Developing: A Web Based 3D City Information Model for Urban Energy Demand Simulation.
Khayyal et al. Creation and spatial analysis of 3D city modeling based on GIS data
Kostrikov et al. Urbogeosystemic Approach to Agglomeration Study within the Urban Remote Sensing Frameworks
Harrie et al. 3D city models for supporting simulations in city densifications
CN117351162A (en) Live-action three-dimensional planning design method based on digital twin
Schaller et al. Geodesign apps and 3D modelling with CityEngine for the city of tomorrow
Buyukdemircioglu et al. Development of a smart city concept in virtual reality environment
CN117313371A (en) Comprehensive display method based on digital twin model
Shariatpour et al. Urban 3D Modeling as a Precursor of City Information Modeling and Digital Twin for Smart City Era: A Case Study of the Narmak Neighborhood of Tehran City, Iran
CN116912817A (en) Three-dimensional scene model splitting method and device, electronic equipment and storage medium
Rubinowicz Application of Available Digital Resources for City Visualisation and Urban Analysis
Liu et al. An IoT-based intelligent geological disaster application using open-source software framework
Leng et al. A data integration and simplification framework for improving site planning and building design
Dezen-Kempter et al. Challenges of District Information Modeling (DIM) Applied for Heritage Preservation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination