CN113985125A - Method, device and equipment for calculating electric quantity with few abnormal current climbing - Google Patents
Method, device and equipment for calculating electric quantity with few abnormal current climbing Download PDFInfo
- Publication number
- CN113985125A CN113985125A CN202111625397.XA CN202111625397A CN113985125A CN 113985125 A CN113985125 A CN 113985125A CN 202111625397 A CN202111625397 A CN 202111625397A CN 113985125 A CN113985125 A CN 113985125A
- Authority
- CN
- China
- Prior art keywords
- abnormal
- phase
- current
- data
- utilization data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/066—Arrangements for avoiding or indicating fraudulent use
Abstract
The invention discloses a method, a device and equipment for calculating the electric quantity of a current slope which is abnormally low, wherein the method comprises the following steps: acquiring abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing, and screening out electricity utilization data of a normal phase and electricity utilization data of an abnormal phase from the abnormal electricity utilization data; according to the following formula, the power consumption for calculating the abnormal current climbing is reduced:,Wherein T is the acquisition duration of the abnormal data, I is the acquisition frequency,is as followsPower factors of abnormal phases acquired at each acquisition moment;is as followsThe current of the normal phase acquired at each acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,is as followsThe voltage of the normal phase acquired at each acquisition instant,is the comprehensive multiplying power of the transformer area. According to the method, the small electricity consumption amount caused by abnormal current climbing can be accurately calculated only by using the collected abnormal electricity consumption data, and the workload required for collecting the normal electricity consumption data is reduced.
Description
Technical Field
The invention relates to the field of electric quantity data monitoring and calculation, in particular to a method, a device and equipment for calculating electric quantity with less abnormal current climbing.
Background
At present, the research on electricity stealing prevention mainly focuses on analysis of electricity stealing behavior and how to improve accuracy of an electricity stealing prevention algorithm, and research on a calculation method of small electricity consumption caused by electricity stealing is little. The electricity stealing behavior not only brings huge hidden dangers to the safety and reliability of electricity utilization management, but also causes huge economic loss. At present, the method for calculating the daily average lack of electricity consumption of a three-phase three-wire current climbing electricity stealing user is obtained by calculating the difference value of the daily electricity consumption under the conditions of abnormal electricity consumption and normal electricity consumption. This method requires not only data of abnormal conditions but also data of normal conditions, and therefore it is difficult to calculate a small amount of electricity without data of normal electricity consumption, which hinders the work of supplementing electricity.
Disclosure of Invention
The invention provides a method, a device and equipment for calculating the electric quantity which is less counted when the current climbs abnormally, which are used for at least solving the problem that the electric quantity which is less counted is difficult to calculate when no electricity consumption data under the normal condition exists in the prior art.
According to the embodiment of the first aspect of the invention, a method for calculating the abnormal low-power-count electric quantity of current climbing comprises the following steps:
acquiring abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing, and screening out electricity utilization data of a normal phase and electricity utilization data of an abnormal phase from the abnormal electricity utilization data;
according to the formula 1-2, the electric quantity which is counted when the current is abnormally small in climbing slope is calculated:
wherein T is the acquisition duration of the abnormal data, I is the acquisition frequency,is as followsPower factors of abnormal phases acquired at each acquisition moment;is as followsThe current of the normal phase acquired at each acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,is as followsThe voltage of the normal phase acquired at each acquisition instant,is the comprehensive multiplying power of the transformer area.
According to some embodiments of the invention, the acquiring abnormal electricity utilization data of the three-phase three-wire user with the abnormal current climbing comprises:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
According to some embodiments of the invention, the preset time period is the day when the three-phase three-wire user with current climbing abnormality is the earliest to have abnormality;
the value interval of the preset period is [5min, 30min ].
According to some embodiments of the invention, the abnormal electricity data includes a phase a electricity data and a phase C electricity data;
the screening of the power consumption data of the normal phase and the power consumption data of the abnormal phase from the abnormal power consumption data comprises the following steps:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
According to a second aspect of the present invention, an abnormal power-down calculation apparatus for current climbing is provided, including:
the acquisition unit is used for acquiring abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing;
the judging unit is used for screening out power utilization data of a normal phase and power utilization data of an abnormal phase from the abnormal power utilization data;
a calculation unit for calculating the power consumption of the current due to abnormal climbing according to the formula 1-2:
wherein T is the acquisition duration of the abnormal data, I is the acquisition frequency,is as followsPower factors of abnormal phases acquired at each acquisition moment;is as followsThe current of the normal phase acquired at each acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,is as followsThe voltage of the normal phase acquired at each acquisition instant,is the comprehensive multiplying power of the transformer area.
According to some embodiments of the invention, the acquisition unit is configured to:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
According to some embodiments of the invention, the preset time period is the day when the three-phase three-wire user with current climbing abnormality is the earliest to have abnormality;
the value interval of the preset period is [5min, 30min ].
According to some embodiments of the invention, the abnormal electricity data includes a phase a electricity data and a phase C electricity data;
the determination unit is configured to:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
According to a third aspect of the present invention, there is provided a current climbing abnormality electricity-count amount calculation device, including: a memory, a processor and a computer program stored on the memory and executable on the processor, the computer program, when executed by the processor, implementing the steps of the current climbing anomaly undercharge calculation method according to any one of the embodiments of the first aspect.
According to a fourth aspect of the present invention, there is provided a computer-readable storage medium, on which an information transfer implementation program is stored, where the program, when executed by a processor, implements the steps of the current climbing abnormal power shortage calculation method according to any one of the first aspect.
By adopting the embodiment of the invention, only the collected abnormal electricity utilization data is utilized, and the calculation formula in the technical scheme can accurately calculate the small electricity consumption amount of abnormal current climbing so as to supplement the small electricity consumption amount of abnormal users and reduce the workload of collecting normal electricity utilization data.
The foregoing description is only an overview of the technical solutions of the present invention, and the embodiments of the present invention are described below in order to make the technical means of the present invention more clearly understood and to make the above and other objects, features, and advantages of the present invention more clearly understandable.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. In the drawings:
fig. 1 is a schematic flow chart of a method for calculating an abnormal low power consumption during current ramp according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the invention are shown in the drawings, it should be understood that the invention can be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
An embodiment of the first aspect of the present invention provides a method for calculating an abnormal electric quantity of a current climbing, including:
the method comprises the steps of collecting abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing, and screening out electricity utilization data of a normal phase and electricity utilization data of an abnormal phase from the abnormal electricity utilization data.
According to the formula 1-2, the electric quantity which is counted when the current is abnormally small in climbing slope is calculated:
wherein T is the acquisition duration (unit is hour) of abnormal data, I is the acquisition frequency,。power factor of abnormal phase collected for the I-th collection moment;for the current of the normal phase acquired at the i-th acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,for the voltage of the normal phase acquired at the ith acquisition instant,is the comprehensive multiplying power of the transformer area.
By adopting the embodiment of the invention, only the collected abnormal electricity utilization data is utilized, and the calculation formula in the technical scheme can accurately calculate the small electricity consumption amount of abnormal current climbing so as to supplement the small electricity consumption amount of abnormal users and reduce the workload of collecting normal electricity utilization data.
On the basis of the above-described embodiment, various modified embodiments are further proposed, and it is to be noted herein that, in order to make the description brief, only the differences from the above-described embodiment are described in the various modified embodiments.
According to some embodiments of the invention, the manner of collection includes, but is not limited to, data collection by an electrical data collection tool. The collected data includes, but is not limited to, current values of each phase, voltage values of each phase, total electric energy indicating value of active power, total electric energy indicating value of reactive power, and comprehensive multiplying power of transformer area.
According to some embodiments of the invention, the acquiring abnormal electricity utilization data of the three-phase three-wire user with the abnormal current climbing comprises:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
For example, electricity consumption data of a three-phase three-wire user with a climbing abnormality in 24 hours is collected, and data collection is performed at a frequency of once every 15 minutes, that is, T =24h and I = 96.
The period and the time length of data acquisition can be adjusted according to actual conditions.
According to some embodiments of the invention, the preset time period is the day when the three-phase three-wire user with the current climbing abnormality is the earliest to have the abnormality.
The value interval of the preset period is [5min, 30min ]. For example, the data acquisition period is set to 15min, so that 96 groups of power utilization data with abnormal current climbing are obtained.
According to some embodiments of the invention, the abnormal electricity data includes a phase electricity data and a phase C electricity data.
The screening of the power consumption data of the normal phase and the power consumption data of the abnormal phase from the abnormal power consumption data comprises the following steps:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
According to some embodiments of the invention, the power factor data may be acquired directly.
According to some embodiments of the invention, the power factor data may be acquired indirectly. For example, the active power P of abnormal electricity utilization can be acquired through collectionActive powerAnd reactive power QReactive powerThen, the power factor f is calculated according to the following formula:
in another example, the active power P of one phase of abnormal electricity utilization is acquired through collectionActive powerCurrent I, voltage U, then calculating the power factor f according to the following formula:
according to some embodiments of the invention, the electricity utilization data of 24 hours on the day of the current climbing abnormality of the three-phase three-wire user is collected, wherein the abnormality occurs at the earliest time, and the collection period is 15 minutes, so that 96 groups of abnormal electricity utilization data are obtained. For a three-phase three-wire user, the data of the phase B is 0, only the phase A and the phase C have values, and the method is obtained according to the law of energy conservation:
wherein the content of the first and second substances,as a result of the total active power,is the active power of the phase A,and is C-phase active power.
For a three-phase three-wire user, under the condition of current climbing abnormity, the method comprises the following steps of:
wherein the content of the first and second substances,as a result of the total active power,the active power corresponding to the normal phase when the user has abnormal current climbing,the active power corresponding to the abnormal phase when the user has abnormal current climbing.
Due to the existence of an equationWherein, P is the active power of a certain phase, I is the current of the corresponding phase, U is the voltage of the corresponding phase, and f is the power factor of the corresponding phase.
Thus, equation 4 can be approximated by equation 5 as follows:
wherein the content of the first and second substances,the current of the normal phase at the ith acquisition moment on the abnormal day;the voltage of the normal phase at the ith acquisition moment on the abnormal day;the power factor of the ith acquisition moment on the day of normal phase anomaly;the current of the abnormal phase at the ith acquisition moment on the day of abnormality;is abnormal phase atVoltage at the ith acquisition moment on the abnormal day;is the power factor of the anomalous phase at the ith acquisition time on the day of the anomaly.
when the user is normal, that is, when there is no abnormality in the current climbing, the normal phase is still recorded as the normal phase so as to be coincident with the mark in the abnormal stateAnd the abnormal phase is recorded asAt this time existAndand the power factor of each phase under normal and abnormal conditions is unchanged, so the calculation formula of the total active power under normal conditions is as follows:
therefore, the difference between the total active power in the normal case and the abnormal case is as follows:
since the interval between every two time points is 15 minutes, namely 1/4 hours, the difference between the normal power consumption and the abnormal power consumption is as follows without considering the comprehensive multiplying power:
because the electric energy number of the special transformer user is obtained after dividing by the comprehensive multiplying power, the daily-average power-less formula for the abnormal and accurate three-phase three-wire current climbing is as follows:
According to a second aspect of the present invention, an abnormal power-down calculation apparatus for current climbing is provided, including:
and the acquisition unit is used for acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing. The manner of collection includes, but is not limited to, data collection by an electrical data collection tool. The collected data includes, but is not limited to, current values of each phase, voltage values of each phase, total electric energy indicating value of active power, and station area comprehensive multiplying power.
And the judging unit is used for screening out the electricity utilization data of the normal phase and the electricity utilization data of the abnormal phase from the abnormal electricity utilization data.
A calculation unit for calculating the power consumption of the current due to abnormal climbing according to the formula 1-2:
wherein T is the number of anomaliesAccording to the collection duration (unit is hour), I is collection frequency,power factor of abnormal phase collected for the ith collection moment;for the current of the normal phase acquired at the i-th acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,for the voltage of the normal phase acquired at the ith acquisition instant,is the comprehensive multiplying power of the transformer area.
By adopting the embodiment of the invention, only the collected abnormal electricity utilization data is utilized, and the calculation formula in the technical scheme can accurately calculate the small electricity consumption amount of abnormal current climbing so as to supplement the small electricity consumption amount of abnormal users and reduce the workload of collecting normal electricity utilization data.
According to some embodiments of the invention, the acquisition unit is configured to:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
For example, electricity consumption data of a three-phase three-wire user having a climbing abnormality for 24 hours is collected, and data collection is performed at a frequency of once every 15 minutes. The period and the time length of data acquisition can be adjusted according to actual conditions.
According to some embodiments of the invention, the preset time period is the day when the three-phase three-wire user with the current climbing abnormality is the earliest to have the abnormality.
The value interval of the preset period is [5min, 30min ]. For example, the data acquisition period is set to 15min, so that 96 groups of power utilization data with abnormal current climbing are obtained.
According to some embodiments of the invention, the abnormal electricity data includes a phase a electricity data and a phase C electricity data;
the determination unit is configured to:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
Referring to fig. 1, a detailed description is given of a current climbing abnormality electricity-low-count calculation apparatus adapted to perform electricity-low-count calculation based on a current climbing abnormality electricity-low-count calculation method, in a specific embodiment. It is to be understood that the following description is illustrative only and is not intended to be in any way limiting. All similar structures and similar variations thereof adopted by the invention are intended to fall within the scope of the invention.
The acquisition unit of the current climbing abnormity less electricity calculation device acquires electricity utilization data of 24 hours on the day when a three-phase three-wire user with climbing abnormity appears abnormity earliest, and data acquisition is carried out according to the frequency of once every 15 minutes, so that 96 groups of abnormal electricity utilization data are obtained. The determination unit determines which of the A, C phases is the normal electricity utilization phase and which is the abnormal electricity utilization phase, based on the collected electricity utilization data. The calculation unit calculates the power consumption of the current slope climbing abnormity low-power meter according to the collected power consumption data based on a formula 1-2:
wherein T is the acquisition duration (unit is hour) of abnormal data, I is the acquisition frequency,power factor of abnormal phase collected for the ith collection moment;for the current of the normal phase acquired at the i-th acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,for the voltage of the normal phase acquired at the ith acquisition instant,is the comprehensive multiplying power of the transformer area.
Since T =24 hours, I =96, equation 1 can also be expressed as:
by adopting the embodiment of the invention, only the collected abnormal electricity utilization data is utilized, and the calculation formula in the technical scheme can accurately calculate the small electricity consumption amount of abnormal current climbing so as to supplement the small electricity consumption amount of abnormal users and reduce the workload of collecting normal electricity utilization data.
It should be noted that the above-mentioned embodiments are merely preferred embodiments of the present invention, and the present invention is not limited thereto, and those skilled in the art can make various modifications and changes, and various embodiments can be freely combined. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
According to a third aspect of the present invention, there is provided a current climbing abnormality electricity-count amount calculation device, including: a memory, a processor and a computer program stored on the memory and executable on the processor, the computer program, when executed by the processor, implementing the steps of the current climbing anomaly undercharge calculation method according to any one of the embodiments of the first aspect.
According to a fourth aspect of the present invention, there is provided a computer-readable storage medium, on which an information transfer implementation program is stored, where the program, when executed by a processor, implements the steps of the current climbing abnormal power shortage calculation method according to any one of the first aspect.
It should be noted that the computer-readable storage medium in this embodiment includes, but is not limited to: ROM, RAM, magnetic or optical disks, and the like. The processor can be a mobile phone, a computer, a server, an air conditioner or a network device and the like.
It should be noted that well-known methods, structures and techniques have not been shown in detail in the description of the specification in order not to obscure the understanding of this description.
Claims (10)
1. A method for calculating the electric quantity of the current with less abnormal climbing is characterized by comprising the following steps:
acquiring abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing, and screening out electricity utilization data of a normal phase and electricity utilization data of an abnormal phase from the abnormal electricity utilization data;
according to the formula 1-2, the electric quantity which is counted when the current is abnormally small in climbing slope is calculated:
wherein T is the acquisition duration of the abnormal data, I is the acquisition frequency,is as followsPower factors of abnormal phases acquired at each acquisition moment;is as followsThe current of the normal phase acquired at each acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,is as followsThe voltage of the normal phase acquired at each acquisition instant,is the comprehensive multiplying power of the transformer area.
2. The method of claim 1, wherein the collecting abnormal electricity consumption data of the three-phase three-wire user with the current climbing abnormality comprises:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
3. The method of claim 2, wherein the preset time period is the day on which the three-phase three-wire user with the current climbing abnormality occurs at the earliest;
the value interval of the preset period is [5min, 30min ].
4. The method of claim 1, wherein the abnormal electricity usage data includes phase a electricity usage data and phase C electricity usage data;
the screening of the power consumption data of the normal phase and the power consumption data of the abnormal phase from the abnormal power consumption data comprises the following steps:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
5. The utility model provides a current climbing unusual few meter electric quantity accounting device which characterized in that includes:
the acquisition unit is used for acquiring abnormal electricity utilization data of a three-phase three-wire user with abnormal current climbing;
the judging unit is used for screening out power utilization data of a normal phase and power utilization data of an abnormal phase from the abnormal power utilization data;
a calculation unit for calculating the power consumption of the current due to abnormal climbing according to the formula 1-2:
wherein T is the acquisition duration of the abnormal data, I is the acquisition frequency,is as followsPower factors of abnormal phases acquired at each acquisition moment;is as followsThe current of the normal phase acquired at each acquisition instant,for the current of the abnormal phase acquired at the ith acquisition time,is as followsThe voltage of the normal phase acquired at each acquisition instant,is the comprehensive multiplying power of the transformer area.
6. The apparatus of claim 5, wherein the acquisition unit is to:
and in a preset time period, acquiring abnormal electricity utilization data of the three-phase three-wire user with abnormal current climbing according to a preset period so as to calculate the average small electricity consumption of the abnormal current climbing in the preset time period.
7. The apparatus of claim 6, wherein the preset time period is the day on which the three-phase three-wire user with the current climbing abnormality occurs at the earliest;
the value interval of the preset period is [5min, 30min ].
8. The apparatus of claim 6, wherein the abnormal electricity data comprises phase A electricity data and phase C electricity data;
the determination unit is configured to:
and observing the curve trend of the current in the A-phase electricity utilization data and the curve trend of the current in the C-phase electricity utilization data to identify which item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of a normal phase, and the other item of the A-phase electricity utilization data and the C-phase electricity utilization data is electricity utilization data of an abnormal phase.
9. An electric quantity calculating device with abnormal low electricity count in current climbing, comprising: memory, processor and computer program stored on the memory and executable on the processor, the computer program, when executed by the processor, implementing the steps of the current ramp anomaly undercharge calculation method according to any one of claims 1 to 4.
10. A computer-readable storage medium, on which an implementation program for information transfer is stored, the program, when executed by a processor, implementing the steps of the current climbing abnormal low power calculation method according to any one of claims 1 to 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111625397.XA CN113985125B (en) | 2021-12-29 | 2021-12-29 | Method, device and equipment for calculating electric quantity with few abnormal current climbing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111625397.XA CN113985125B (en) | 2021-12-29 | 2021-12-29 | Method, device and equipment for calculating electric quantity with few abnormal current climbing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113985125A true CN113985125A (en) | 2022-01-28 |
CN113985125B CN113985125B (en) | 2022-03-22 |
Family
ID=79734727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111625397.XA Active CN113985125B (en) | 2021-12-29 | 2021-12-29 | Method, device and equipment for calculating electric quantity with few abnormal current climbing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113985125B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109543877A (en) * | 2018-10-18 | 2019-03-29 | 深圳供电局有限公司 | The device of multi-user's stealing leakage meter discriminating method under a kind of same feeder line |
WO2019182172A1 (en) * | 2018-03-21 | 2019-09-26 | 누리플렉스 홀딩스 아이엔씨 | Automatic meter reading system, meter reading terminal, and electricity theft detection method using same |
CN110646664A (en) * | 2019-09-18 | 2020-01-03 | 珠海格力电器股份有限公司 | Method and device for monitoring power consumption of multi-split system and multi-split system |
CN112184477A (en) * | 2020-08-25 | 2021-01-05 | 国网浙江省电力有限公司 | Clustering and PQUI recognition algorithm-based electric quantity supplementing method |
CN113408658A (en) * | 2021-07-14 | 2021-09-17 | 国网吉林省电力有限公司营销服务中心 | Automatic electricity stealing identification method based on data mining technology |
-
2021
- 2021-12-29 CN CN202111625397.XA patent/CN113985125B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019182172A1 (en) * | 2018-03-21 | 2019-09-26 | 누리플렉스 홀딩스 아이엔씨 | Automatic meter reading system, meter reading terminal, and electricity theft detection method using same |
CN109543877A (en) * | 2018-10-18 | 2019-03-29 | 深圳供电局有限公司 | The device of multi-user's stealing leakage meter discriminating method under a kind of same feeder line |
CN110646664A (en) * | 2019-09-18 | 2020-01-03 | 珠海格力电器股份有限公司 | Method and device for monitoring power consumption of multi-split system and multi-split system |
CN112184477A (en) * | 2020-08-25 | 2021-01-05 | 国网浙江省电力有限公司 | Clustering and PQUI recognition algorithm-based electric quantity supplementing method |
CN113408658A (en) * | 2021-07-14 | 2021-09-17 | 国网吉林省电力有限公司营销服务中心 | Automatic electricity stealing identification method based on data mining technology |
Non-Patent Citations (2)
Title |
---|
杜章华 等: "基于生产经营状态识别的低误报率窃电检测二次筛查方法", 《电力系统自动化》 * |
潘明明 等: "基于智能电能表数据的台区识别与窃电检测方法研究", 《智慧电力》 * |
Also Published As
Publication number | Publication date |
---|---|
CN113985125B (en) | 2022-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101714234B (en) | Grid line loss monitoring and analyzing system | |
CN110412347B (en) | Electricity stealing behavior identification method and device based on non-invasive load monitoring | |
CN107271764A (en) | A kind of electrical appliance power consumption method for detecting abnormality and device | |
CN107247201A (en) | Electric oven non-intruding discrimination method based on power and time response | |
CN102033185A (en) | Method for judging wrong wiring of electric energy meter based on apparent power estimation | |
JP6032486B2 (en) | Power management system and power management method | |
CN108363017A (en) | A kind of retired lithium battery stabilization capability value scaling method of long-time storage | |
CN111652761B (en) | Multi-source feature fusion electricity stealing behavior detection method based on evidence theory | |
CN110047013B (en) | Anti-private-transformer user intermittent electricity stealing method | |
CN113985125B (en) | Method, device and equipment for calculating electric quantity with few abnormal current climbing | |
CN113034305A (en) | Non-invasive load monitoring event classification method and storage medium | |
CN106405224B (en) | Energy-saving diagnosis method and system based on mass electric energy data | |
CN113484596A (en) | Power quality monitoring method, device and equipment and readable storage medium | |
US20210231723A1 (en) | Fault current calculation during transformer saturation using the waveform unsaturated region | |
CN112946393A (en) | Electric energy quality monitoring and analyzing system | |
CN107860969A (en) | Wind generating set electric energy information acquisition device, system and method | |
CN113986910B (en) | Method and device for estimating electric quantity of current slope climbing abnormity in small amount | |
CN112505613B (en) | Method and system for estimating fault loss electric quantity of high-voltage supply and high-voltage metering full-voltage loss metering | |
CN106018931B (en) | Rate of qualified voltage monitoring method and system | |
CN108512214A (en) | A kind of line loss calculation method of the power circuit based on load coefficient | |
CN213986757U (en) | Non-rechargeable battery residual capacity estimation system and electronic equipment | |
CN113985126B (en) | Method and device for calculating low electricity metering quantity due to under-voltage abnormality | |
CN106771490A (en) | A kind of OPGW terminal monitorings system | |
CN113985314B (en) | Method and device for calculating electric quantity with few wrong wiring abnormalities | |
CN109541308A (en) | Harmonic analysis method based on distributed plesiochronous power grid measuring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |