CN113962622A - Door and window production management system - Google Patents
Door and window production management system Download PDFInfo
- Publication number
- CN113962622A CN113962622A CN202111085036.0A CN202111085036A CN113962622A CN 113962622 A CN113962622 A CN 113962622A CN 202111085036 A CN202111085036 A CN 202111085036A CN 113962622 A CN113962622 A CN 113962622A
- Authority
- CN
- China
- Prior art keywords
- construction
- information
- terminal
- production
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 115
- 238000010276 construction Methods 0.000 claims abstract description 122
- 238000009434 installation Methods 0.000 claims abstract description 71
- 238000007726 management method Methods 0.000 claims description 30
- 239000000463 material Substances 0.000 claims description 11
- 238000011900 installation process Methods 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 7
- 238000004891 communication Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000011521 glass Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000010354 integration Effects 0.000 claims description 2
- 230000008569 process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a door and window production management system, comprising: the server terminal comprises an information receiving module, an information sending module, a processing chip and a storage module, wherein the information receiving module is used for receiving various kinds of information, and the processing chip is used for integrating various kinds of information and sending the information in the form of electric signals or wireless signals through the information sending module; the construction terminal is used for feeding back progress information and survey information of a construction site to the server terminal; the client terminal is used for acquiring progress information of a construction site; firstly, a constructor surveys on site, generates a unique opening number for an opening, integrates corresponding surveying information with the opening number and sends the integrated information to a server terminal, the server terminal generates corresponding construction information according to the surveying information, and the constructor acquires the construction information through the construction terminal and constructs according to the construction information. Compared with the prior art, the door and window production management system provided by the invention can realize personalized production and installation, is convenient to manage production and ensures the construction period.
Description
Technical Field
The invention relates to the technical field of door and window production management, in particular to a door and window production management system.
Background
The field of application of the production management system during door and window production has the trend of door and window fine product along with the enhancement of the individuation of market demands, so that the door and window has good service performance and good environment beautifying effect.
However, with the increase of order personalization, a certain impact is caused to the traditional production management, and because no special production management method and special system are provided, the production management is messy, so that on one hand, the personalization of production installation is difficult to ensure, and on the other hand, the construction period is delayed due to frequent rework.
Therefore, it is necessary to provide a door and window production management system capable of realizing personalized production and installation, facilitating the management of production and ensuring the construction period to solve the above technical problems.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a door and window production management system which can realize personalized production and installation, is convenient for managing production and ensures the construction period.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a door and window production management system comprising:
the server terminal comprises an information receiving module, an information sending module, a processing chip and a storage module, wherein the information receiving module is used for receiving various types of information, and the processing chip is used for integrating various types of information and sending the information in the form of electric signals or wireless signals through the information sending module;
the construction terminal is in wireless connection with the server terminal and is used for feeding back progress information and survey information of a construction site to the server terminal;
the client terminal is in wireless connection with the server terminal and is used for acquiring progress information of a construction site;
utilize door and window production management system carries out the in-process of door and window production installation to single entrance to a cave, at first surveyed by the constructor scene, for the entrance to a cave generates only entrance to a cave number and with corresponding survey information with after the entrance to a cave number integration send to the server terminal, the server terminal basis survey information and generate corresponding construction information, the constructor passes through the construction terminal acquires construction information, and press construction information construction.
Preferably, the construction information includes a frame material, a frame structure, an installation procedure, and a predicted construction period.
Preferably, the construction information is dynamically regulated, when a constructor conducts first construction according to the construction information, the cave entrance is surveyed again, a reconnaissance result is sent to the server terminal through the construction terminal, and the server terminal conducts fine adjustment on the construction information according to the reconnaissance result.
Preferably, the construction method comprises the following concrete steps:
step S10, purchasing frame materials, wherein the server terminal firstly sends the construction information to the construction terminal, and a construction party orders to purchase corresponding frame materials and feeds back purchase information to the server terminal;
step S20, in the first production, the server terminal sends production signals to the construction terminal in unit time after receiving the purchase information, and the construction terminal produces according to the installation procedure of the construction information after receiving the production signals;
step S30, first installation, wherein after the production of the first workpiece in the installation process is finished, the server terminal sends an installation signal to the construction terminal, after the construction terminal receives the installation signal, the first workpiece which is finished in production is installed, the cave entrance is surveyed again to obtain a reconnaissance result, and the reconnaissance result is sent to the server terminal;
step S40, carrying out second production, wherein the server terminal sends a production signal to the construction terminal after receiving the reconnaissance result and carrying out fine adjustment on the production size of the next workpiece according to the reconnaissance result, and the construction terminal carries out production of the next workpiece according to the production signal after the fine adjustment after receiving the production signal;
step S50, installation for the Nth time, wherein after the production of the former workpiece in the installation procedure is finished, the server terminal sends an installation signal to the construction terminal again, the construction terminal installs the workpiece, surveys the hole again to obtain a reconnaissance result related to the latter procedure, and sends the reconnaissance result to the server terminal;
step S60, the Nth production, the server terminal sends a production signal to the construction terminal after receiving the reconnaissance result and finely adjusting the production of the next workpiece according to the reconnaissance result, and the construction terminal produces the next workpiece according to the finely adjusted production signal after receiving the production signal;
and S70, repeating the steps S50 and S60 until the installation is completed.
Preferably, the unit time is 1 to 3 days.
Preferably, the installation process comprises outer frame installation, glass fixing installation, inner sash installation, seam plugging, steel auxiliary frame installation, railing installation, shutter installation and canopy installation.
Preferably, the client terminal and the construction terminal are mobile phones, PC computers, tablet computers or watches with communication functions.
In summary, compared with the prior art, the door and window production management system provided by the invention has the advantages that the construction terminal and the client terminal which are in communication connection with the server terminal are arranged, so that a client can obtain the latest progress of door and window installation through the client terminal, a construction party can obtain an installation procedure through the construction terminal, the continuity of door and window production is ensured, meanwhile, the intervention of the client terminal strengthens the tightness of the client and the production installation, the installation and the production are monitored by the client, and the personalized production and installation are realized to the greatest extent; through setting up the server terminal in proper order in turn to the construction terminal sends production signal and installation signal for installation and production go on in step, and the installation process of usable preceding step is finely tuned as the feedback of follow-up production, the production of each work piece, can effectively avoid the mismatch of size and the waste of raw and other materials, has further promoted the continuity and the reliability of door and window installation production.
Drawings
Fig. 1 is a block diagram illustrating a door and window production management system according to the present invention;
fig. 2 is a work flow block diagram of the door and window production management system provided by the invention.
In the figure, 100, a door and window production management system; 10. a server terminal; 11. an information receiving module; 12. an information sending module; 13. processing the chip; 14. a storage module; 20. a construction terminal; 30. and a client terminal.
Detailed Description
The invention is described in detail below with reference to the figures and examples. The following experimental examples and examples are intended to further illustrate but not limit the invention.
Referring to fig. 1 and fig. 2 in combination, the present invention provides a door and window production management system 100, where the door and window production management system 100 includes a server terminal 10, a construction terminal 20, and a client terminal 30. Wherein, the construction terminal 20 and the client terminal 30 are wirelessly connected with the server terminal 10, respectively.
The server terminal 10 includes an information receiving module 11, an information sending module 12, a processing chip 13 and a storage module 14. The information receiving module is configured to receive various types of information, and the processing chip 13 is configured to integrate various types of information and transmit the integrated information through the information transmitting module in the form of an electrical signal or a wireless signal.
The construction terminal 20 is configured to feed back the progress information and survey information of the construction site to the server terminal 10.
The client terminal 30 is used for acquiring progress information of a construction site.
In the process of using the door and window production management system 100 to produce and install doors and windows for a single hole, firstly, a construction party surveys on site, generates a unique hole number for the hole, integrates corresponding survey information with the hole number and then sends the survey information to the server terminal 10.
And generating a unique opening number for the opening by using the construction terminal 20, namely inputting the opening into the door and window production management system 100 through the construction terminal 20. It should be noted that, in the actual use process of the door and window production management system 100, the opening numbers may be generated for a plurality of openings at the same time, and the corresponding survey information is recorded and stored in the storage module 14, and this embodiment is described by taking the door and window production installation of one opening as an example.
The server terminal 10 generates corresponding construction information according to the survey information, and a construction party acquires the construction information through the construction terminal 20 and constructs according to the construction information. The construction information is information automatically generated by the processing chip 13 according to the information of the length, width, thickness ratio, orientation, and the like of the hole in the survey information, and of course, the customer can also change the construction information through the customer terminal 30 to perform personalized adjustment on the construction information.
Preferably, in the present embodiment, the construction information includes a frame material, a frame structure, an installation process, and a predicted construction period.
Preferably, the construction information is dynamically regulated. Namely, after the constructor performs the first construction according to the construction information, the constructor performs reconnaissance on the opening, and sends a reconnaissance result to the server terminal 10 through the construction terminal 20, and the server terminal 10 performs fine adjustment on the construction information according to the reconnaissance result.
So set up for in the production installation, the entrance to a cave size after the installation at every turn is the production size of the next work piece of waiting to install, can guarantee the suitability of installation in furthest, has guaranteed door and window structure's stability when being convenient for install.
Specifically, the construction method comprises the following concrete steps:
step S10, purchasing frame-shaped materials, the server terminal 10 first sends the construction information to the construction terminal 20, the construction party orders to purchase the corresponding frame-shaped materials, and feeds back the purchase information to the server terminal 10;
step S20, in the first production, after receiving the purchase information, the server terminal 10 sends a production signal to the construction terminal 20 in a unit time, and after receiving the production signal, the construction terminal 20 performs production according to the installation procedure of the construction information;
step S30, first installation, after the production of the first workpiece in the installation process is finished, the server terminal 10 sends an installation signal to the construction terminal 20, after the construction terminal 20 receives the installation signal, the first workpiece which is produced is installed, the cave opening is surveyed again to obtain the result of surveying again, and the result of surveying again is sent to the server terminal 10;
step S40, performing second production, in which the server terminal 10, after receiving the reconnaissance result, performs fine adjustment on the production size of the next workpiece according to the reconnaissance result, and then sends a production signal to the construction terminal 20, and after receiving the production signal, the construction terminal 20 performs production of the next workpiece according to the fine-adjusted production signal;
step S50, installing for the Nth time, wherein after the production of the previous workpiece in the installation process is finished, the server terminal 10 sends an installation signal to the construction terminal 20 again, the construction terminal 20 installs the workpiece, surveys the hole again to obtain a reconnaissance result related to the next process, and sends the reconnaissance result to the server terminal 10;
step S60, performing nth production, in which the server terminal 10, after receiving the reconnaissance result, finely adjusts production of a next workpiece according to the reconnaissance result, and then sends a production signal to the construction terminal 20, and the construction terminal 20, after receiving the production signal, performs production of the next workpiece according to the finely adjusted production signal;
and S70, repeating the steps S50 and S60 until the installation is completed.
Preferably, the unit time is 1 to 3 days. In the present embodiment, the unit time is 2 days. And simultaneously, the installation process is set as outer frame installation, glass fixing installation, inner sash installation, crack plugging, steel auxiliary frame installation, railing installation, shutter installation and canopy installation.
The client terminal 30 and the construction terminal 20 may be a mobile phone, a PC computer, a tablet computer, or a watch having a communication function.
Compared with the prior art, the door and window production management system provided by the invention has the advantages that the construction terminal and the client terminal which are in communication connection with the server terminal are arranged, so that a client can obtain the latest progress of door and window installation through the client terminal, a construction party can obtain an installation procedure through the construction terminal, the continuity of door and window production is ensured, meanwhile, the intervention of the client terminal strengthens the tightness of the client and production installation, the installation and production are monitored by the client, and the personalized production and installation are realized to the maximum extent; through setting up the server terminal in proper order in turn to the construction terminal sends production signal and installation signal for installation and production go on in step, and the installation process of usable preceding step is finely tuned as the feedback of follow-up production, the production of each work piece, can effectively avoid the mismatch of size and the waste of raw and other materials, has further promoted the continuity and the reliability of door and window installation production.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that several improvements and modifications without departing from the principle of the present invention will occur to those skilled in the art, and such improvements and modifications should also be construed as within the scope of the present invention.
Claims (7)
1. A door and window production management system, comprising:
the server terminal comprises an information receiving module, an information sending module, a processing chip and a storage module, wherein the information receiving module is used for receiving various types of information, and the processing chip is used for integrating various types of information and sending the information in the form of electric signals or wireless signals through the information sending module;
the construction terminal is in wireless connection with the server terminal and is used for feeding back progress information and survey information of a construction site to the server terminal;
the client terminal is in wireless connection with the server terminal and is used for acquiring progress information of a construction site;
utilize door and window production management system carries out the in-process of door and window production installation to single entrance to a cave, at first surveyed by the constructor scene, for the entrance to a cave generates only entrance to a cave number and with corresponding survey information with after the entrance to a cave number integration send to the server terminal, the server terminal basis survey information and generate corresponding construction information, the constructor passes through the construction terminal acquires construction information, and press construction information construction.
2. The door and window production management system of claim 1, wherein the construction information includes frame material, frame structure, installation procedure, and estimated construction period.
3. The door and window production management system according to claim 2, wherein the construction information is dynamically controlled, when a constructor performs first construction according to the construction information, the opening is surveyed again, a reconnaissance result is sent to the server terminal through the construction terminal, and the server terminal performs fine adjustment on the construction information according to the reconnaissance result.
4. The door and window production management system according to claim 3, wherein the construction of the construction side comprises the following specific steps:
step S10, purchasing frame materials, wherein the server terminal firstly sends the construction information to the construction terminal, and a construction party orders to purchase corresponding frame materials and feeds back purchase information to the server terminal;
step S20, in the first production, the server terminal sends production signals to the construction terminal in unit time after receiving the purchase information, and the construction terminal produces according to the installation procedure of the construction information after receiving the production signals;
step S30, first installation, wherein after the production of the first workpiece in the installation process is finished, the server terminal sends an installation signal to the construction terminal, after the construction terminal receives the installation signal, the first workpiece which is finished in production is installed, the cave entrance is surveyed again to obtain a reconnaissance result, and the reconnaissance result is sent to the server terminal;
step S40, carrying out second production, wherein the server terminal sends a production signal to the construction terminal after receiving the reconnaissance result and carrying out fine adjustment on the production size of the next workpiece according to the reconnaissance result, and the construction terminal carries out production of the next workpiece according to the production signal after the fine adjustment after receiving the production signal;
step S50, installation for the Nth time, wherein after the production of the former workpiece in the installation procedure is finished, the server terminal sends an installation signal to the construction terminal again, the construction terminal installs the workpiece, surveys the hole again to obtain a reconnaissance result related to the latter procedure, and sends the reconnaissance result to the server terminal;
step S60, the Nth production, the server terminal sends a production signal to the construction terminal after receiving the reconnaissance result and finely adjusting the production of the next workpiece according to the reconnaissance result, and the construction terminal produces the next workpiece according to the finely adjusted production signal after receiving the production signal;
and S70, repeating the steps S50 and S60 until the installation is completed.
5. The door and window production management system according to claim 4, wherein the unit time is 1 to 3 days.
6. The door and window production management system according to claim 4, wherein the installation process comprises outer frame installation, glass fixing installation, inner sash installation, seam plugging, steel auxiliary frame installation, railing installation, shutter installation and canopy installation.
7. The door and window production management method according to claim 4, wherein the client terminal and the construction terminal are a mobile phone, a PC, a tablet computer or a watch with a communication function.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111085036.0A CN113962622A (en) | 2021-09-16 | 2021-09-16 | Door and window production management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111085036.0A CN113962622A (en) | 2021-09-16 | 2021-09-16 | Door and window production management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113962622A true CN113962622A (en) | 2022-01-21 |
Family
ID=79461757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111085036.0A Pending CN113962622A (en) | 2021-09-16 | 2021-09-16 | Door and window production management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113962622A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104346667A (en) * | 2013-07-31 | 2015-02-11 | 无锡新格尔软件有限公司 | Door and window management system |
WO2016134535A1 (en) * | 2015-02-28 | 2016-09-01 | 罗春晖 | Construction process control method |
CN106203776A (en) * | 2016-06-24 | 2016-12-07 | 青岛亿商天下网络科技有限公司 | A kind of door and window production management system and method |
CN107085758A (en) * | 2017-01-19 | 2017-08-22 | 北京恒华伟业科技股份有限公司 | A kind of project management method, apparatus and system |
CN109034550A (en) * | 2018-07-03 | 2018-12-18 | 广州供电局有限公司 | Project survey and construction field monitoring method, system and computer equipment |
CN110334447A (en) * | 2019-07-05 | 2019-10-15 | 济南大学 | A kind of ORIENTED DOOR AND WINDOW DESIGN and process planning integrated approach, system, server and readable storage medium storing program for executing |
-
2021
- 2021-09-16 CN CN202111085036.0A patent/CN113962622A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104346667A (en) * | 2013-07-31 | 2015-02-11 | 无锡新格尔软件有限公司 | Door and window management system |
WO2016134535A1 (en) * | 2015-02-28 | 2016-09-01 | 罗春晖 | Construction process control method |
CN106203776A (en) * | 2016-06-24 | 2016-12-07 | 青岛亿商天下网络科技有限公司 | A kind of door and window production management system and method |
CN107085758A (en) * | 2017-01-19 | 2017-08-22 | 北京恒华伟业科技股份有限公司 | A kind of project management method, apparatus and system |
CN109034550A (en) * | 2018-07-03 | 2018-12-18 | 广州供电局有限公司 | Project survey and construction field monitoring method, system and computer equipment |
CN110334447A (en) * | 2019-07-05 | 2019-10-15 | 济南大学 | A kind of ORIENTED DOOR AND WINDOW DESIGN and process planning integrated approach, system, server and readable storage medium storing program for executing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101528266B1 (en) | Portable terminal and method for offering application thereof | |
CN104506702A (en) | Volume adjusting method | |
KR102035832B1 (en) | Method and apparatus for electronic labor contract and labor management | |
CN104281065A (en) | Network control charging method and system | |
CN103942044A (en) | Remote assistance method and system in application of mobile terminal | |
AU2003276103A1 (en) | Method and system for controlling resources via a mobile terminal, related network and computer program product therefor | |
DE102010014914A1 (en) | Portable Wi-Fi digital video camcorder and system with this | |
EP1589402A2 (en) | Power control apparatus, electronic apparatus, and portable communications terminal | |
CN113962622A (en) | Door and window production management system | |
KR20070000921A (en) | Simultaneousness interpretation system using wireless communication terminal equipment | |
CN105656894A (en) | Main control intelligent terminal, controlled intelligent terminal and monitoring method | |
CN105589575A (en) | Input method invoking method and device | |
US20070198840A1 (en) | System and method for digitally certifying and checking data of a project | |
DE19547809A1 (en) | Mobile telephone device with facsimile and short message facility function | |
CN113962623A (en) | Door and window production management method and system | |
CN112269916A (en) | Demand matching method and device based on recruitment and server | |
CN103118354B (en) | A kind of terminal automatic detecting and the method and system of automatically downloading | |
CN105100378A (en) | Method and device for processing mobile terminal communication records | |
KR102116514B1 (en) | Method and apparatus for managing version of applications | |
CN103826163A (en) | Wireless automatic updating system and method | |
US20240146765A1 (en) | Private cloud infrastructure stitching process and orchestration | |
CN104021005A (en) | Information processing method and device | |
CN113656787B (en) | Service providing device, terminal, authentication device, resource access method and system | |
CN102736937A (en) | Method for acquiring and providing information of application program, terminal and network server | |
CN108076302A (en) | A kind of implementation method of network-type visitor's phone system based on immediate communication platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: He Haiying Inventor after: Lei Yuhe Inventor after: Song Tingbing Inventor after: Li Hengzhi Inventor after: Yuan Xu Inventor before: Song Tingbing Inventor before: Li Hengzhi Inventor before: Yuan Xu Inventor before: He Haiying Inventor before: Lei Yuhe |