CN113938832A - Management and control device for electric power construction site - Google Patents

Management and control device for electric power construction site Download PDF

Info

Publication number
CN113938832A
CN113938832A CN202111199738.1A CN202111199738A CN113938832A CN 113938832 A CN113938832 A CN 113938832A CN 202111199738 A CN202111199738 A CN 202111199738A CN 113938832 A CN113938832 A CN 113938832A
Authority
CN
China
Prior art keywords
management
control device
construction site
electric power
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111199738.1A
Other languages
Chinese (zh)
Inventor
汤晓前
吴远旭
姚少广
王菁
金莉君
徐中南
蒋姝莹
许哲伟
吴泽权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Power Transmission And Transformation Engineering Co ltd Is Jindong Electric Power Branch
Original Assignee
Jinhua Power Transmission And Transformation Engineering Co ltd Is Jindong Electric Power Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Power Transmission And Transformation Engineering Co ltd Is Jindong Electric Power Branch filed Critical Jinhua Power Transmission And Transformation Engineering Co ltd Is Jindong Electric Power Branch
Priority to CN202111199738.1A priority Critical patent/CN113938832A/en
Publication of CN113938832A publication Critical patent/CN113938832A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/021Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B7/00Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00
    • G08B7/06Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00 using electric transmission, e.g. involving audible and visible signalling through the use of sound and light sources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/30Services specially adapted for particular environments, situations or purposes
    • H04W4/33Services specially adapted for particular environments, situations or purposes for indoor environments, e.g. buildings
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/80Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a management and control device for an electric power construction site, which comprises an electronic fence arranged on the construction site and a management and control device arranged at an entrance and an exit of the construction site, wherein the management and control device is connected with the electronic fence and is also in communication connection with a mobile terminal. The invention has reasonable design and simple structure, avoids the arrangement of a large number of equipment parts, not only keeps the safety problem of the original monitoring construction site, but also is more beneficial to reducing the cost investment.

Description

Management and control device for electric power construction site
Technical Field
The invention relates to the technical field of electric power construction management and control, in particular to a management and control device for an electric power construction site.
Background
At present, with the progress of science and technology and the construction based on the national power grid company, hundreds of sites which work simultaneously every day are reached, so the task of site safety management and control is very heavy. Because the working quantity cardinal number is big, safety control personnel can't carry out the safety control to every job site in real time, have the potential safety hazard, consequently can't guarantee electric power job site's safety. And at present, construction sites mostly adopt an outsourcing form, outsourcing companies have negligence and lucky psychology to site work, the execution strength of safe construction protective equipment and actions is relaxed, great potential safety hazards exist, and due to the fact that the number of construction workers is large, irregular behaviors of the safe construction protective equipment and the actions cannot be obtained, punishment evidences are difficult to obtain. To some extent, easily leading to security incidents. Therefore, related electric power construction site control systems and methods also appear in recent years, for example, in the application of the Chinese invention patent with application publication number CN109889791A, video information of a site can be collected through a ball control machine, an unqualified target video can be obtained through analysis and processing of an algorithm program in an analysis server, an irregular behavior of the construction site can be obtained, punishment evidence can be collected, meanwhile, the unqualified target video can be displayed through display equipment, and an alarm module is used for giving an alarm prompt, so that the occurrence of safety events can be further avoided. However, the ball control machine, the individual soldier equipment, the ubiquitous internet of things equipment and the like are required to be distributed, and the equipment is not only one, so that the cost investment is increased, and the popularization and the application are inconvenient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the management and control device for the electric power construction site, which is reasonable in design and simple in structure, avoids arrangement of a large number of equipment parts, not only keeps the safety problem of the original monitoring construction site, but also is more beneficial to reducing the cost input.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
the utility model provides an electric power is management and control device for job site, is including setting up in the fence of job site and setting up the management and control device at the job site access & exit, the management and control device with fence is connected, management and control device is communication connection still has mobile terminal.
Preferably, still include the setting element that is used in personnel in the construction location on one's body, the setting element with the management and control device is linked together, the management and control device with mobile terminal is linked together.
Preferably, the positioning piece adopts GPS mobile phone positioning or two-dimensional code scanning positioning.
Preferably, the electronic fence is a physical electronic fence or a virtual electronic fence or a combination thereof.
Preferably, the management and control device includes the main part, the main part openly is provided with collection information piece, video module and alarm, inside GIS three-dimensional topography map building module, the three-dimensional building module of BIM, central processing unit and the power module of being provided with of main part, power module does GIS three-dimensional topography map building module, the three-dimensional building module of BIM, central processing unit, collection information piece, video module and the alarm provides the electric energy, it is connected with respectively to collect information piece, video module, alarm, the three-dimensional topography map building module of GIS and the three-dimensional building module of BIM central processing unit.
Preferably, the information collecting part comprises a work card swiping table and a fingerprint identifier, the work card swiping table is arranged on the main body front face, the fingerprint identifier comprises a fingerprint touch control plate and a groove, and the fingerprint touch control plate is located in the groove.
Preferably, the video module comprises a display screen, a sound device and a camera, and the display screen, the sound device and the camera are distributed on the front face of the main body.
Preferably, the alarm device is arranged on the front face of the main body instead of being arranged on the side end face of the main body.
Preferably, the alarm adopts an audible and visual alarm or a buzzer.
Preferably, the bottom surface is provided with the base under the main part, the base is round platform shape, and round platform shape the base up end is opened has the mounting groove, the mounting groove is used for the block terminal surface under the main part.
Preferably, the mounting groove is the U-shaped, the U-shaped mounting groove both ends are the arc angle setting, and the arc angle setting the mounting groove with the terminal surface is mutually supported under the main part.
Preferably, the lower end surface of the base is provided with a bottom cover plate, an inner cavity is formed in the base, and a weight stabilizing block is placed in the inner cavity.
Preferably, the weight stabilizing block is an iron absorption block or a stabilizing sand bag.
Preferably, the upper end face of the main body is provided with a hanging ring and a handle.
Compared with the prior art, the invention has the beneficial effects that:
the electronic fence comprises an electronic fence arranged on a construction site and a control device arranged at an entrance and an exit of the construction site, wherein the control device is connected with the electronic fence and is also in communication connection with a mobile terminal.
Drawings
Fig. 1 is a schematic diagram of an embodiment of the present invention.
FIG. 2 is a schematic diagram of a second embodiment of the present invention.
Fig. 3 is a schematic structural diagram of the control device of the present invention.
Fig. 4 is a schematic block diagram of the main body of the present invention.
FIG. 5 is a schematic view of the main body and the base of the present invention.
FIG. 6 is a schematic view of the connection between the main body upper hanging ring and the handle of the present invention.
In the figure: 1, an electronic fence; 2, a management and control device; 3, the mobile terminal; 4, positioning parts; 21, a body; 22, collecting information pieces; 23, a video module; 24, an alarm; 25, a GIS three-dimensional topographic map building module; 26, a BIM three-dimensional building module; 27, a central processing unit; 28, a power supply module; 29, a base; 211, a hoisting ring; 212, a handle; 221, a employee card swiping station; 222, a fingerprint recognizer; 231, a display screen; 232, sound equipment; 233, a camera; 291, a mounting groove; 292, a bottom cover plate; 293, lumen; 294, weight stabilizing block.
Detailed Description
In the description of the present invention, it should be noted that when an element is referred to as being "fixed" or "disposed" to another element, it can be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or be indirectly connected to the other element.
In the description of the present invention, it should be noted that the terms "center", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings or the orientations or positional relationships in which the products of the present invention are conventionally placed when used, and are merely used for convenience of describing and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise. The meaning of "a number" is one or more unless specifically limited otherwise.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the accompanying drawings and examples. It should be understood, however, that the description herein of specific embodiments is only intended to illustrate the invention and not to limit the scope of the invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
The first embodiment is as follows: referring to fig. 1, the management and control device for the electric power construction site comprises an electronic fence 1 arranged on the construction site and a management and control device 2 arranged at an entrance and an exit of the construction site, wherein the management and control device 2 is connected with the electronic fence 1, and the management and control device 2 is further in communication connection with a mobile terminal 3. The original equipment of this kind of combination job site combines fence 1 and fence 1, and the spare part that has so significantly reduced not only has reduced the degree of difficulty and the cost of installation, also can the input of significantly reduced cost, and management and control device 2 can feed back the site conditions to mobile terminal 3 simultaneously, and mobile terminal 3 can realize implementing the control scene.
Example two: on the basis of the first embodiment, as shown in fig. 2, the system further includes a positioning element 4 for positioning the construction personnel, the positioning element 4 is communicated with the control device 2, the control device 2 is communicated with the mobile terminal 3, and a manager of the mobile terminal 3 can monitor the in-place situation of the construction personnel in real time. What says more, what setting element 4 adopted is that GPS cell-phone location or two-dimensional code sweep a yard location, sweep a yard location at mobile terminal 3 through GPS cell-phone location or two-dimensional code, be favorable to supervising constructor's the condition that targets in place, can manage the construction team archives, including personnel's qualification inquiry, record inquiry violating the regulations, add record function violating the regulations to make the administrator can effectively monitor the overall work of each construction job site, know the job site actual conditions.
Further, the electronic fence 1 is a physical electronic fence or a virtual electronic fence or a combination thereof.
After a physical electronic fence mode is implemented, a maintainer takes the electronic fence, deploys the electronic fence to the site according to working requirements, and monitors whether a person crosses the border in real time; if someone is out of range, management and control device 2 will be given to material object fence, management and control device 2 not only reports to the police, the staff of the job site access & exit of being convenient for knows to take measures, management and control device 2 also can be corresponding simultaneously transmits for mobile terminal 3, the owner of the mobile terminal 3 of being convenient for like this can know, the owner of general mobile terminal 3 is the relevant person in charge of job site, thereby can monitor by long-range.
For the physical electronic fence, whether a person crosses the border can be monitored in an infrared correlation and microwave mode. For the virtual electronic fence manner, a positioning base station may be used to deploy the virtual electronic fence or a 3D module may be used to deploy the virtual electronic fence. The virtual electronic fence is invisible on the spot, and the deployment is realized in a remote mode. When the positioning base station is adopted to deploy the virtual electronic fence, whether the personnel cross the border is measured and calculated by utilizing the relative position of the positioning base station and the relative distance between the personnel and the base station according to the requirement of the virtual electronic fence; and adopting the 3D module to deploy the virtual electronic fence, deploying the position and the corresponding boundary of the virtual electronic fence on the graph relative coordinate of the 3D module, identifying the positioning result of the personnel positioning management module on the graph relative coordinate of the 3D module, and judging whether the personnel cross the boundary by comparing the personnel relative position and the virtual electronic fence relative boundary parameter in real time. Secondly management and control device 2 can be given to the electron fence in kind, management and control device 2 not only reports to the police, the staff of the job site access & exit of being convenient for knows to take measures, management and control device 2 also can be corresponding simultaneously transmits for mobile terminal 3, the owner of the mobile terminal 3 of being convenient for can know like this, the owner of general mobile terminal 3 is the relevant person in charge of job site, thereby can monitor by long-range. The physical electronic fence is withdrawn in the field, while the virtual electronic fence is cancelled by the setting.
The electronic fence is deployed and applied on site through any one or combination of more than two of a real object electronic fence deployed through infrared induction, a virtual electronic fence formed through video intelligent analysis and a virtual electronic fence realized through personnel positioning or a 3D module.
Example three: in addition to the first embodiment or the second embodiment, as shown in fig. 3 and 4, the management and control device 2 includes a main body 21, a collected information component 22, a video module 23 and an alarm 24 are disposed on the front surface of the main body 21, the video module 23 is favorable for providing services such as remote video, voice conversation, on-site technical consultation and training, and realizing intellectualization, a GIS three-dimensional topographic map building module 25, a BIM three-dimensional building module 26, a central processor 27 and a power module 28 are disposed inside the main body 21, the power module 28 provides electric energy for the GIS three-dimensional topographic map building module 25, the BIM three-dimensional building module 26, the central processor 27, the collected information component 22, the video module 23, the alarm 24, the GIS three-dimensional topographic map building module 25 and the BIM three-dimensional building module 26, the collected information component 22, the video module 23, the alarm 24, the GIS three-dimensional map building module 25 and the BIM three-dimensional building module 26 are respectively connected with the central processor 27, and the GIS three-dimensional map building module 25 is used for managing the geographic information system and inquiring the surrounding environment, Road navigation and other items, and the BIM three-dimensional building module 25 provides BIM key technology application. It is to be noted that the information collecting member 22 includes a work card reading station 221 and a fingerprint recognizer 222, the work card reading station 221 and the fingerprint recognizer 222 are respectively disposed on the front surface of the main body 21, the fingerprint recognizer 222 includes a fingerprint touch pad and a groove, the fingerprint touch pad is located in the groove, when in use, the finger of one hand is placed on the fingerprint touch pad of the groove, and the employee's card is placed on the employee's card swiping table 221 by the other hand, so that the fingerprint touch pad can identify the fingerprint of the personnel, the employee card swiping platform 221 can identify the employee card of the personnel, thereby verifying whether a person who enters the construction site is a worker through the combination of fingerprint recognition and a work permit, therefore, the personnel can pass through the fingerprint verification and the employee card verification, and can pass through the fingerprint verification and the employee card verification smoothly, and unnecessary entering of non-construction field personnel is reduced. It is also to be noted that the video module 23 includes a display screen 231, a sound 232 and a camera 233, and the display screen 231, the sound 232 and the camera 233 are distributed on the front surface of the main body 1, which is convenient for installation and fabrication. It should be noted that the alarm 24 can also be disposed on the side end face of the main body 21, and has various types and wide choice, and it is further noted that the alarm 26 is a sound and light alarm or a buzzer, which is beneficial for the workers at the entrance and exit of the construction site to know, so as to take measures to avoid the entrance of illegal people and improve the safety of the construction site.
Example four: on the basis of the third embodiment, furthermore, as shown in fig. 5, the bottom surface of the main body 21 is provided with the base 29, the base 29 is in the shape of a circular truncated cone, the upper end surface of the circular truncated cone-shaped base 29 is provided with the mounting groove 291, the mounting groove 291 is used for clamping the bottom end surface of the main body 21, which is beneficial to the detachable mounting of the base 29 and the main body 21, and is convenient for later-stage replacement, further, the mounting groove 291 is in the shape of a U, which is more in line with the shape of the bottom end surface of the main body 21, and because the four corners of the main body 21 are arc corners, corresponding arc corners also exist at the two ends of the mounting groove 291, so that the damage to the two is reduced when the mounting is performed, and the service life of the device is prolonged. It is again to say that the lower terminal surface of base 29 is provided with bottom cover plate 292, base 29 is inside to be opened there is an inner chamber 293, place steady heavy piece 294 in inner chamber 293, this kind is favorable to more stabilizing base 29, be favorable to placing main part 21 more, avoid it to topple over carelessly, and cause the damage of equipment, what steady heavy piece 294 adopted is to inhale iron plate or stabilize the sand bag, inhale iron plate and place at inner chamber 293, especially put on the horizontal plane of iron like this, have sufficient suction capacity, and the preparation of being convenient for, to stabilizing the sand bag and adopting the bag to place fine sand, this kind of source is extensive, the cost of production and manufacture has been reduced. As shown in fig. 6, the upper end surface of the main body 21 is provided with a hanging ring 211 and a handle 212, which is also beneficial to manual holding, convenient to move, convenient to hoist and mount, various in form and wide in choice for people.
Standard parts used in the application document can be purchased from the market, the specific connection mode of each part adopts conventional means such as mature bolts in the prior art, the internal parts of the power supply and the central processing unit adopt conventional models in the prior art, the internal structure of the power supply and the internal parts of the central processing unit belongs to the structure of the prior art, a worker can complete normal operation of the power supply and the central processing unit according to a manual of the prior art, and the circuit connection adopts the conventional connection mode in the prior art, so that specific description is not provided.
It should be noted that, although the above embodiments have been described herein, the invention is not limited thereto. Therefore, based on the innovative concepts of the present invention, the technical solutions of the present invention can be directly or indirectly applied to other related technical fields by making changes and modifications to the embodiments described herein, or by using equivalent structures or equivalent processes performed in the content of the present specification and the attached drawings, which are included in the scope of the present patent.

Claims (10)

1. The utility model provides an electric power is management and control device for job site which characterized in that: including setting up in fence (1) of job site and setting up management and control device (2) at the job site access & exit, management and control device (2) with fence (1) is connected, management and control device (2) still communication connection has mobile terminal (3).
2. The management and control device for the electric power construction site according to claim 1, wherein: still including being used in the construction personnel location on one's body setting element (4), setting element (4) with management and control device (2) are linked together, management and control device (2) with mobile terminal (3) are linked together.
3. The management and control device for the electric power construction site according to claim 2, wherein: the positioning piece (4) adopts GPS mobile phone positioning or two-dimension code scanning positioning.
4. The management and control device for the electric power construction site according to claim 1, wherein: the electronic fence (1) is a physical electronic fence or a virtual electronic fence or a combination thereof.
5. The management and control device for the electric power construction site according to claim 1, wherein: management and control device (2) are including main part (21), main part (21) openly are provided with and collect information piece (22), video module (23) and alarm (24), main part (21) inside is provided with GIS three-dimensional topography map and establishes module (25), BIM three-dimensional establishment module (26), central processing unit (27) and power module (28), power module (28) do GIS three-dimensional topography map establishment module (25), BIM three-dimensional establishment module (26), central processing unit (27), collection information piece (22), video module (23) and alarm (24) provide the electric energy, it is connected with respectively to collect information piece (22), video module (23), alarm (24), GIS three-dimensional topography map establishment module (25) and BIM three-dimensional establishment module (26) central processing unit (27).
6. The management and control device for the electric power construction site according to claim 5, wherein: collect information piece (22) including employee's card swiping platform (221) and fingerprint identification ware (222), employee's card swiping platform (221) with fingerprint identification ware (222) sets up respectively on main part (21) are positive, fingerprint identification ware (222) include fingerprint touch-control board and recess, the fingerprint touch-control board is located in the recess.
7. The management and control device for the electric power construction site according to claim 5, wherein: the video module (23) comprises a display screen (231), a sound box (232) and a camera (233), wherein the display screen (231), the sound box (232) and the camera (233) are distributed on the front face of the main body (1).
8. The management and control device for the electric power construction site according to claim 5, wherein: the alarm device (24) is arranged on the front face of the main body (21) and is replaced by the alarm device (24) arranged on the side end face of the main body (21).
9. The management and control device for the electric power construction site as claimed in claim 5, 6, 7 or 8, wherein: the alarm (26) adopts an audible and visual alarm or a buzzer.
10. The management and control device for the electric power construction site according to claim 5, wherein: the lower bottom surface of the main body (21) is provided with a base (29), the base (29) is in the shape of a circular truncated cone, an installation groove (291) is formed in the upper end surface of the base (29) in the shape of the circular truncated cone, and the installation groove (291) is used for clamping the lower end surface of the main body (21).
CN202111199738.1A 2021-10-14 2021-10-14 Management and control device for electric power construction site Pending CN113938832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111199738.1A CN113938832A (en) 2021-10-14 2021-10-14 Management and control device for electric power construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111199738.1A CN113938832A (en) 2021-10-14 2021-10-14 Management and control device for electric power construction site

Publications (1)

Publication Number Publication Date
CN113938832A true CN113938832A (en) 2022-01-14

Family

ID=79279421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111199738.1A Pending CN113938832A (en) 2021-10-14 2021-10-14 Management and control device for electric power construction site

Country Status (1)

Country Link
CN (1) CN113938832A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109558997A (en) * 2017-09-25 2019-04-02 舟山启明新能源科技有限公司 Electric power construction field personnel positioning and operation safety managing and control system based on LED visible light
WO2020264033A1 (en) * 2019-06-25 2020-12-30 Scientia Potentia Est, LLC. Site supervisor system for construction sites
CN112365201A (en) * 2021-01-12 2021-02-12 江苏巨龙电力工程有限公司 Neural network-based infrastructure construction monitoring and early warning system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109558997A (en) * 2017-09-25 2019-04-02 舟山启明新能源科技有限公司 Electric power construction field personnel positioning and operation safety managing and control system based on LED visible light
WO2020264033A1 (en) * 2019-06-25 2020-12-30 Scientia Potentia Est, LLC. Site supervisor system for construction sites
CN112365201A (en) * 2021-01-12 2021-02-12 江苏巨龙电力工程有限公司 Neural network-based infrastructure construction monitoring and early warning system and method

Similar Documents

Publication Publication Date Title
CN111126838B (en) Intelligent engineering management system
CN109380796B (en) Cloud platform intelligent helmet and security protection management and control system based on cloud platform intelligent helmet
CN107330664A (en) A kind of intelligence based on Internet of Things builds management system
CN109500827A (en) Machine room intelligent crusing robot
CN103523676B (en) Real-time monitoring and pre-warning system for security risks of gantry crane operation of metro shield tunnel and working method of system
CN113706355A (en) Method for building intelligent emergency system of chemical industry park
CN110674957A (en) Intelligent charging management system and method
CN108242125A (en) A kind of multi-functional construction safety monitor
CN101742255A (en) Automatic video monitoring system of electricity field operation
CN207883094U (en) A kind of multi-functional construction safety monitor
CN112565694A (en) On-spot safety monitoring management system of building engineering
CN214475124U (en) Construction operation safety control system
CN105955118A (en) Garbage dumping and recycling system
CN114245294A (en) Personnel safety management and control system for 3D personnel positioning
CN105354909A (en) Intelligent safety inspection monitoring information system
CN113404318A (en) BIM (building information modeling), UWB (ultra wide band) and AR (augmented reality) technology based temporary edge opening construction control method
CN103912024A (en) Cloud well lid and cloud well lid management system
CN112034502A (en) Real-time positioning system for production personnel
CN115526523A (en) Evaluation method for intelligent construction site
CN209927913U (en) Electric energy meter with anti-electricity-stealing function
CN113938832A (en) Management and control device for electric power construction site
CN115169777A (en) Intelligent supervision system for safety operation
CN207503396U (en) A kind of transmission line of electricity protective survey terminal
CN105843137A (en) Integrated monitoring method and system
CN107967663A (en) A kind of region of deploying to ensure effective monitoring and control of illegal activities prevents the unauthorized automatic alarm system and method swarmed into

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination