CN113925713A CN202111237680.5A CN202111237680A CN113925713A CN 113925713 A CN113925713 A CN 113925713A CN 202111237680 A CN202111237680 A CN 202111237680A CN 113925713 A CN113925713 A CN 113925713A
Authority
CN
China
Prior art keywords
sleeve
mounting plate
fixedly connected
stretcher
spiral spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111237680.5A
Other languages
Chinese (zh)
Inventor
贺雪松
徐剑峰
王虎
钱佳伟
黄健华
树森
张振伟
邢朋朋
熊韬
鞠鎏佳
王殿超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN202111237680.5A priority Critical patent/CN113925713A/en
Publication of CN113925713A publication Critical patent/CN113925713A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G7/00Beds specially adapted for nursing; Devices for lifting patients or disabled persons
    • A61G7/10Devices for lifting patients or disabled persons, e.g. special adaptations of hoists thereto
    • A61G7/1025Lateral movement of patients, e.g. horizontal transfer
    • A61G7/1034Rollers, rails or other means
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G7/00Beds specially adapted for nursing; Devices for lifting patients or disabled persons
    • A61G7/10Devices for lifting patients or disabled persons, e.g. special adaptations of hoists thereto
    • A61G7/104Devices carried or supported by
    • A61G7/1042Rail systems
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G7/00Beds specially adapted for nursing; Devices for lifting patients or disabled persons
    • A61G7/10Devices for lifting patients or disabled persons, e.g. special adaptations of hoists thereto
    • A61G7/1049Attachment, suspending or supporting means for patients
    • A61G7/1057Supported platforms, frames or sheets for patient in lying position
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G7/00Beds specially adapted for nursing; Devices for lifting patients or disabled persons
    • A61G7/10Devices for lifting patients or disabled persons, e.g. special adaptations of hoists thereto
    • A61G7/1073Parts, details or accessories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Abstract

The invention aims to solve the problem of conveying emergency patients, and discloses an emergency accessible channel structure capable of quickly conveying a stretcher, which comprises a suspended ceiling, wherein a connecting plate is arranged above the suspended ceiling, a third mounting plate, a second mounting plate and a first mounting plate are sequentially arranged below the connecting plate from left to right, first screws are symmetrically arranged between the first mounting plate and the connecting plate, second screws are symmetrically arranged between the second mounting plate and the connecting plate, third screws are symmetrically arranged between the third mounting plate and the connecting plate, a second sleeve is fixedly arranged on the lower surface of the first mounting plate, a first spiral spring is fixedly connected with the lower end of the second sleeve, a first sliding rod is sleeved inside the first spiral spring, and a first sleeve is fixedly connected with the lower end of the first spiral spring. The invention also discloses an emergency barrier-free channel construction process capable of quickly conveying the stretcher. The stretcher conveying device is an accessible channel for conveying the stretcher, so that the stretcher is conveniently and quickly conveyed into an emergency room, and precious time is won for emergency treatment.

Description

Emergency accessible channel construction process and structure capable of rapidly conveying stretcher
Technical Field
The invention relates to the field of emergency treatment, in particular to an emergency treatment barrier-free channel construction process and structure capable of quickly conveying a stretcher.
Background
In hospitals, emergency treatment can occur, namely, patients are conveyed to the hospitals and then conveyed to emergency rooms through stretchers in the hospitals, but the patients or family members in the hospitals can block the emergency rooms in the process, and although the stretcher is pushed for shouting, the patients are also transferred in a time-wasting manner, the time for conveying the patients cannot be greatly shortened, the optimal treatment time can be missed, and the emergency treatment is dangerous, so that an emergency treatment barrier-free channel structure capable of quickly conveying the stretchers is required to be designed to solve the conveying problem of the emergency treatment patients.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a construction process and a structure of an emergency barrier-free channel capable of quickly conveying a stretcher.
The invention is realized by the following technical scheme:
an emergency barrier-free channel construction process capable of quickly conveying a stretcher comprises the following steps:
1) mounting a connecting plate on the roof, and sequentially mounting a third mounting plate, a second mounting plate and a first mounting plate from left to right below the connecting plate;
2) a hydraulic cylinder is installed on the second installation plate, a sixth sleeve is installed on the lower side of the hydraulic cylinder, a third spiral spring is fixedly connected to the lower end of the sixth sleeve, a third sliding rod is sleeved inside the third spiral spring, and a fifth sleeve is fixedly connected to the lower end of the third spiral spring;
3) a second sleeve is fixedly arranged on the lower surface of the first mounting plate, a first spiral spring is fixedly connected to the lower end of the second sleeve, a first sliding rod is sleeved inside the first spiral spring, and a first sleeve is fixedly connected to the lower end of the first spiral spring;
4) a third sleeve is fixedly arranged on the lower surface of the third mounting plate, a second spiral spring is fixedly connected to the lower end of the third sleeve, a second sliding rod is sleeved inside the second spiral spring, and a fourth sleeve is fixedly connected to the lower end of the second spiral spring;
5) installing a guide rail below the first sleeve, the fourth sleeve and the fifth sleeve;
6) and installing the sleeve frame on the guide rail.
An emergency call accessible channel structure capable of rapidly conveying stretcher, comprising a suspended ceiling, wherein a connecting plate is arranged above the suspended ceiling, a third mounting plate, a second mounting plate and a first mounting plate are sequentially arranged below the connecting plate from left to right, first screw rods are symmetrically arranged between the first mounting plate and the connecting plate, second screw rods are symmetrically arranged between the second mounting plate and the connecting plate, third screw rods are symmetrically arranged between the third mounting plate and the connecting plate, a second sleeve is fixedly arranged on the lower surface of the first mounting plate, a first spiral spring is fixedly connected with the lower end of the second sleeve, a first slide bar is sleeved inside the first spiral spring, a first sleeve is fixedly connected with the lower end of the first spiral spring, a hydraulic cylinder is fixedly arranged in the middle of the second mounting plate, a sixth sleeve is arranged on the lower side of the hydraulic cylinder, and a third spiral spring is fixedly connected with the lower end of the sixth sleeve, the utility model discloses a warning lamp, including first spiral spring, first slide bar, second spiral spring, second slide bar, deflector plate, warning lamp, the inside cover of third spiral spring has the third slide bar, third spiral spring lower extreme fixedly connected with fifth sleeve pipe, fixed surface installs the third sleeve pipe under the third mounting panel, third sleeve pipe lower extreme fixedly connected with second spiral spring, the inside cover of second spiral spring has the second slide bar, second spiral spring lower extreme fixedly connected with fourth sleeve pipe, first sleeve pipe, fourth sleeve pipe and fifth sleeve pipe lower extreme fixed mounting have the guide rail, the guide rail overcoat has the deflector, evenly be equipped with the guide pulley between deflector and the guide rail, fixed surface installs the montant under the deflector, montant lower extreme fixed mounting has a cover frame, fastening screw is installed to the symmetry on the cover frame, warning lamp is installed to montant surface bilateral symmetry.
Preferably, the guide rail is of a T-shaped structure.
Preferably, the first sliding rod is in sliding fit with the first sleeve and the second sleeve, the second sliding rod is in sliding fit with the third sleeve and the fourth sleeve, and the third sliding rod is in sliding fit with the fifth sleeve and the sixth sleeve.
Preferably, a piston rod of the hydraulic cylinder is fixedly connected with the sixth sleeve.
Preferably, the guide plate is of a clip-shaped structure, and the guide plate is sleeved outside the guide rail.
Preferably, the cover frame is a rectangular frame.
Preferably, the guide wheel slides on the upper surface of the guide rail edge.
Preferably, the hanging top is provided with a groove for sliding the first sliding rod, the second sliding rod and the third sliding rod.
Compared with the prior art, the invention has the beneficial effects that:
the stretcher conveying device can guide by using the guide rail through the guide rail, so that the guide rail directly guides the stretcher into an emergency room, a stretcher conveying channel is formed, the blockage of stretcher conveying is prevented, the conveying is more stable through the guide wheel on the guide plate, the rapid conveying of a patient is conveniently completed, the warning can be performed through the warning lamp, pedestrians in a hospital are reminded, the lifting control can be performed through the control of the hydraulic cylinder, the stretcher is further conveniently lifted, the barrier-free conveying is conveniently performed, and the patient can be pulled downwards to observe the patient through the arrangement of the spiral springs when an emergency occurs on the stretcher. The stretcher conveying device is an accessible channel for conveying the stretcher, so that the stretcher is conveniently and quickly conveyed into an emergency room, and precious time is won for emergency treatment.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of the guide plate of the present invention in cooperation with a guide rail.
Fig. 3 is a side view of the bezel of the present invention.
Description of reference numerals: 1. guide rail, 2, first sleeve pipe, 3, first slide bar, 4, first coil spring, 5, second sleeve pipe, 6, suspended ceiling, 7, first mounting plate, 8, first screw rod, 9, connecting plate, 10, second mounting plate, 11, second screw rod, 12, hydraulic cylinder, 13, third screw rod, 14, third mounting plate, 15, third sleeve pipe, 16, second coil spring, 17, second slide bar, 18, fourth sleeve pipe, 19, guide plate, 20, guide wheel, 21, vertical bar, 22, sleeve frame, 23, fastening screw, 24, warning light, 25, fifth sleeve pipe, 26, third slide bar, 27, third coil spring, 28, sixth sleeve pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, "above" or "below" a first feature means that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact with each other via another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The following disclosure provides many different embodiments or examples for implementing different features of the invention. To simplify the disclosure of the present invention, the components and arrangements of specific examples are described below. Of course, they are merely examples and are not intended to limit the present invention. Furthermore, the present invention may repeat reference numerals and/or letters in the various examples, such repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
Referring to fig. 1-3, the present invention provides a technical solution:
an emergency barrier-free channel construction process capable of quickly conveying a stretcher comprises the following steps:
1) mounting a connecting plate 9 on the roof, and sequentially mounting a third mounting plate 14, a second mounting plate 10 and a first mounting plate 7 from left to right below the connecting plate 9;
2) a hydraulic cylinder 12 is installed on the second installation plate 10, a sixth sleeve 28 is installed on the lower side of the hydraulic cylinder 12, a third spiral spring 27 is fixedly connected to the lower end of the sixth sleeve 28, a third slide bar 26 is sleeved inside the third spiral spring 27, and a fifth sleeve 25 is fixedly connected to the lower end of the third spiral spring 27;
3) a second sleeve 5 is fixedly installed on the lower surface of the first installation plate 7, a first spiral spring 4 is fixedly connected to the lower end of the second sleeve 5, a first slide rod 3 is sleeved inside the first spiral spring 4, and a first sleeve 2 is fixedly connected to the lower end of the first spiral spring 4;
4) a third sleeve 15 is fixedly mounted on the lower surface of the third mounting plate 14, a second spiral spring 16 is fixedly connected to the lower end of the third sleeve 15, a second slide rod 17 is sleeved inside the second spiral spring 16, and a fourth sleeve 18 is fixedly connected to the lower end of the second spiral spring 16;
5) mounting the guide rail 1 below the first casing 2, the fourth casing 18 and the fifth casing 25;
6) the sleeve frame 22 is mounted on the guide rail 1.
The utility model provides a can transport emergency call accessible channel structure of stretcher fast, includes furred ceiling 6, furred ceiling 6 top is equipped with connecting plate 9, connecting plate 9 below is equipped with third mounting panel 14, second mounting panel 10 and first mounting panel 7 from a left side right side in proper order, first screw rod 8 is equipped with to the symmetry between first mounting panel 7 and the connecting plate 9, second screw rod 11 is equipped with to the symmetry between second mounting panel 10 and the connecting plate 9, third screw rod 13 is equipped with to the symmetry between third mounting panel 14 and the connecting plate 9, fixed surface installs second sleeve pipe 5 under the first mounting panel 7, second sleeve pipe 5 lower extreme fixedly connected with first coil spring 4, first coil spring 4 endotheca has first slide bar 3, 4 lower extreme fixedly connected with first sleeve pipe 2 of first coil spring, 10 middle part fixed mounting of second mounting panel has pneumatic cylinder 12, a sixth sleeve 28 is installed on the lower side of the hydraulic cylinder 12, a third spiral spring 27 is fixedly connected to the lower end of the sixth sleeve 28, a third sliding rod 26 is sleeved inside the third spiral spring 27, a fifth sleeve 25 is fixedly connected to the lower end of the third spiral spring 27, a third sleeve 15 is fixedly installed on the lower end of the third mounting plate 14, a second spiral spring 16 is fixedly connected to the lower end of the third sleeve 15, a second sliding rod 17 is sleeved inside the second spiral spring 16, a fourth sleeve 18 is fixedly connected to the lower end of the second spiral spring 16, a guide rail 1 is fixedly installed at the lower end of each of the first sleeve 2, the fourth sleeve 18 and the fifth sleeve 25, a guide plate 19 is sleeved outside the guide rail 1, guide wheels 20 are uniformly installed between the guide plate 19 and the guide rail 1, a vertical rod 21 is fixedly installed on the lower end of the guide plate 19, a sleeve frame 22 is fixedly installed at the lower end of the vertical rod 21, fastening screws 23 are symmetrically installed on the sleeve frame 22, and warning lamps 24 are symmetrically installed on two sides of the surface of the vertical rod 21.
The guide rail 1 is of a T-shaped structure.
The first slide bar 3 is in sliding engagement with the first sleeve 2 and the second sleeve 5, the second slide bar 17 is in sliding engagement with the third sleeve 15 and the fourth sleeve 18, and the third slide bar 26 is in sliding engagement with the fifth sleeve 25 and the sixth sleeve 28.
The piston rod of the hydraulic cylinder 12 is fixedly connected to the sixth sleeve 28.
The guide plate 19 is of a clip-shaped structure, and the guide plate 19 is sleeved outside the guide rail 1.
The frame 22 is a rectangular frame.
The guide wheel 20 slides along the upper surface of the guide rail 1.
And grooves for sliding the first sliding rod 3, the second sliding rod 17 and the third sliding rod 26 are formed in the suspended ceiling 6.
The method comprises the following operation steps: firstly, the connecting plate 9 on the upper part of the suspended ceiling 6 is fixed on the roof, then the hydraulic cylinder 12 is controlled, the lifting of the guide rail 1 can be controlled, the guide rail 1 is positioned at a high place at ordinary times, when emergency patients are in the position of coming, the hydraulic cylinder 12 is controlled, the guide rail 1 is lowered, then a stretcher is quickly inserted into the sleeve frame 22 and is fastened through the fastening screw 23, a doctor transfers the patients to the stretcher, then the stretcher is supported to push, meanwhile, the hydraulic cylinder 12 can be controlled, the height of the stretcher is controlled, barrier-free movement is carried out during movement, if the patients are uncomfortable during movement, the stretcher only needs to be pulled downwards, the stretcher can be pulled down through the sliding of the first slide bar 3, the second slide bar 17 and the third slide bar 26, the stretcher can be observed, and therefore, the conveying time can be greatly reduced during conveying, can be sent to the emergency room directly.
The present embodiment is only for explaining the present invention, and not for limiting the present invention, and those skilled in the art can make modifications without inventive contribution to the present embodiment as needed after reading the present specification, but all of which are protected by patent law within the scope of the claims of the present invention.

Claims (9)

1. An emergency barrier-free channel construction process capable of quickly conveying a stretcher is characterized by comprising the following steps:
1) mounting a connecting plate (9) on a roof, and sequentially mounting a third mounting plate (14), a second mounting plate (10) and a first mounting plate (7) from left to right below the connecting plate (9);
2) a hydraulic cylinder (12) is mounted on the second mounting plate (10), a sixth sleeve (28) is mounted on the lower side of the hydraulic cylinder (12), a third spiral spring (27) is fixedly connected to the lower end of the sixth sleeve (28), a third sliding rod (26) is sleeved inside the third spiral spring (27), and a fifth sleeve (25) is fixedly connected to the lower end of the third spiral spring (27);
3) a second sleeve (5) is fixedly mounted on the lower surface of the first mounting plate (7), a first spiral spring (4) is fixedly connected to the lower end of the second sleeve (5), a first sliding rod (3) is sleeved inside the first spiral spring (4), and a first sleeve (2) is fixedly connected to the lower end of the first spiral spring (4);
4) a third sleeve (15) is fixedly mounted on the lower surface of the third mounting plate (14), a second spiral spring (16) is fixedly connected to the lower end of the third sleeve (15), a second sliding rod (17) is sleeved inside the second spiral spring (16), and a fourth sleeve (18) is fixedly connected to the lower end of the second spiral spring (16);
5) installing a guide rail (1) below the first sleeve (2), the fourth sleeve (18) and the fifth sleeve (25);
6) the sleeve frame (22) is arranged on the guide rail (1).
2. The utility model provides a but emergency call accessible channel structure of rapid transit stretcher, includes furred ceiling (6), its characterized in that: the suspended ceiling is characterized in that a connecting plate (9) is arranged above the suspended ceiling (6), a third mounting plate (14), a second mounting plate (10) and a first mounting plate (7) are sequentially arranged from left to right below the connecting plate (9), first screws (8) are symmetrically arranged between the first mounting plate (7) and the connecting plate (9), second screws (11) are symmetrically arranged between the second mounting plate (10) and the connecting plate (9), third screws (13) are symmetrically arranged between the third mounting plate (14) and the connecting plate (9), a second sleeve (5) is fixedly arranged on the lower surface of the first mounting plate (7), a first spiral spring (4) is fixedly connected to the lower end of the second sleeve (5), a first sliding rod (3) is sleeved inside the first spiral spring (4), and a first sleeve (2) is fixedly connected to the lower end of the first spiral spring (4), second mounting panel (10) middle part fixed mounting has pneumatic cylinder (12), pneumatic cylinder (12) downside is equipped with sixth sleeve pipe (28), sixth sleeve pipe (28) lower extreme fixedly connected with third coil spring (27), the inside cover of third coil spring (27) has third slide bar (26), third coil spring (27) lower extreme fixedly connected with fifth sleeve pipe (25), fixed surface installs third sleeve pipe (15) under third mounting panel (14), third sleeve pipe (15) lower extreme fixedly connected with second coil spring (16), the inside cover of second coil spring (16) has second slide bar (17), second coil spring (16) lower extreme fixedly connected with fourth sleeve pipe (18), first sleeve pipe (2), fourth sleeve pipe (18) and fifth sleeve pipe (25) lower extreme are solid
Guide rail (1) are equipped with in the ann, guide rail (1) overcoat has deflector (19), evenly be equipped with between deflector (19) and guide rail (1) guide pulley (20), fixed surface installs montant (21) under deflector (19), montant (21) lower extreme fixed mounting has cover frame (22), fastening screw (23) are installed to the symmetry on cover frame (22), warning light (24) are installed to montant (21) surface bilateral symmetry.
3. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: the guide rail (1) is of a T-shaped structure.
4. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: the first slide bar (3) is in sliding fit with the first sleeve (2) and the second sleeve (5), the second slide bar (17) is in sliding fit with the third sleeve (15) and the fourth sleeve (18), and the third slide bar (26) is in sliding fit with the fifth sleeve (25) and the sixth sleeve (28).
5. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: and a piston rod of the hydraulic cylinder (12) is fixedly connected with a sixth sleeve (28).
6. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: the guide plate (19) is of a clip-shaped structure, and the guide plate (19) is sleeved outside the guide rail (1).
7. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: the sleeve frame (22) is a rectangular frame body.
8. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: the guide wheel (20) slides along the upper surface of the edge of the guide rail (1).
9. The emergency clear passage structure of claim 2, wherein said stretcher is capable of being rapidly transported, and comprises: and grooves for sliding the first sliding rod (3), the second sliding rod (17) and the third sliding rod (26) are formed in the suspended ceiling (6).
CN202111237680.5A 2021-10-25 2021-10-25 Emergency accessible channel construction process and structure capable of rapidly conveying stretcher Pending CN113925713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111237680.5A CN113925713A (en) 2021-10-25 2021-10-25 Emergency accessible channel construction process and structure capable of rapidly conveying stretcher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111237680.5A CN113925713A (en) 2021-10-25 2021-10-25 Emergency accessible channel construction process and structure capable of rapidly conveying stretcher

Publications (1)

Publication Number Publication Date
CN113925713A true CN113925713A (en) 2022-01-14

Family

ID=79283980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111237680.5A Pending CN113925713A (en) 2021-10-25 2021-10-25 Emergency accessible channel construction process and structure capable of rapidly conveying stretcher

Country Status (1)

Country Link
CN (1) CN113925713A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103860372A (en) * 2014-02-27 2014-06-18 苏州瑞华医院有限公司 Medical hydrotherapy system with sky rail transfer device
CN106193413A (en) * 2016-08-22 2016-12-07 成都市第四建筑工程公司 One hides day rail system and a construction method
CN206675665U (en) * 2016-12-21 2017-11-28 美德远健(北京)医疗系统科技有限公司 The bi-motor biobelt lifting device of sky rail patient's transfer system
CN206809421U (en) * 2017-01-20 2017-12-29 广州市佰好惠医疗科技有限公司 A kind of day rail shifting machine
CN208808922U (en) * 2018-04-04 2019-05-03 美德远健领动(北京)医疗器械有限公司 A kind of track of sky rail patient transfer system
CN110368230A (en) * 2019-07-22 2019-10-25 安徽职业技术学院 A kind of sky rail shifting machine
CN213217118U (en) * 2020-05-31 2021-05-18 三峡大学附属仁和医院 Special patient of CT equipment crosses a bed auxiliary device
CN213553450U (en) * 2020-04-08 2021-06-29 美德远健领动(北京)医疗器械有限公司 Track system
CN213883961U (en) * 2020-09-21 2021-08-06 华中科技大学同济医学院附属协和医院 Suspension transfer device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103860372A (en) * 2014-02-27 2014-06-18 苏州瑞华医院有限公司 Medical hydrotherapy system with sky rail transfer device
CN106193413A (en) * 2016-08-22 2016-12-07 成都市第四建筑工程公司 One hides day rail system and a construction method
CN206675665U (en) * 2016-12-21 2017-11-28 美德远健(北京)医疗系统科技有限公司 The bi-motor biobelt lifting device of sky rail patient's transfer system
CN206809421U (en) * 2017-01-20 2017-12-29 广州市佰好惠医疗科技有限公司 A kind of day rail shifting machine
CN208808922U (en) * 2018-04-04 2019-05-03 美德远健领动(北京)医疗器械有限公司 A kind of track of sky rail patient transfer system
CN110368230A (en) * 2019-07-22 2019-10-25 安徽职业技术学院 A kind of sky rail shifting machine
CN213553450U (en) * 2020-04-08 2021-06-29 美德远健领动(北京)医疗器械有限公司 Track system
CN213217118U (en) * 2020-05-31 2021-05-18 三峡大学附属仁和医院 Special patient of CT equipment crosses a bed auxiliary device
CN213883961U (en) * 2020-09-21 2021-08-06 华中科技大学同济医学院附属协和医院 Suspension transfer device

Similar Documents

Publication Publication Date Title
WO2016163681A2 (en) Medical bed having easy to remove bedpan
CN206166181U (en) Manual lift table
CN113925713A (en) Emergency accessible channel construction process and structure capable of rapidly conveying stretcher
CN106958761A (en) A kind of portable floor lamp mounting bracket
CN210228552U (en) Medical belt capable of being separated from fixing frame and using respirator
CN210595056U (en) Two-stage transmission lifting structure based on wheel set
CN205313557U (en) Stomach cancer chromosome detects auxiliary assembly
CN216359531U (en) Diaphragm valve internal leakage improves and uses clamping device
CN205968017U (en) Shedding mechanism of diaphragm solenoid valve kludge
CN210872662U (en) Baby box lifting system and baby culture device
CN210594786U (en) Elevator with fire rescue function
CN210300014U (en) Outpatient service preliminary examination nursing examination table
CN209237185U (en) A kind of suspension type TDP mind lamp
CN218808975U (en) Plate carrying device
CN215498597U (en) Air compressor motor fastening connection mechanism
CN211326221U (en) Integrated forming ambulance inner decoration
CN215230533U (en) Ultraviolet illumination disinfection kitchen
CN209137164U (en) A kind of hospital bed leg support device
CN213467770U (en) Simple photocatalytic degradation reaction device
CN204971629U (en) Novel combination formula ICU tower crane
CN210384227U (en) Novel transport bed
CN214019133U (en) Reaction training equipment for preventing senile dementia
CN217787108U (en) Animal epidemic disease rapid detection all-in-one machine
CN213641830U (en) Operating table device for translational patient
CN109847082A (en) The hidden full embedding type shutter door of high vacuum autoclave with pulsing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220114

RJ01 Rejection of invention patent application after publication