CN113839466A - Dispatching network interaction method for reporting and processing alternating current line fault - Google Patents

Dispatching network interaction method for reporting and processing alternating current line fault Download PDF

Info

Publication number
CN113839466A
CN113839466A CN202111145111.8A CN202111145111A CN113839466A CN 113839466 A CN113839466 A CN 113839466A CN 202111145111 A CN202111145111 A CN 202111145111A CN 113839466 A CN113839466 A CN 113839466A
Authority
CN
China
Prior art keywords
fault
line
information
scheduling
dispatching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111145111.8A
Other languages
Chinese (zh)
Other versions
CN113839466B (en
Inventor
许士锦
范展滔
杨元威
张坤
吕耀棠
邱生敏
孙雁斌
单政博
陈兴望
张艺镨
李志中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN202111145111.8A priority Critical patent/CN113839466B/en
Publication of CN113839466A publication Critical patent/CN113839466A/en
Application granted granted Critical
Publication of CN113839466B publication Critical patent/CN113839466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a dispatching network interaction method for reporting and processing alternating current line faults, which belongs to the technical field of power engineering and comprises the following steps: a station terminal fills a fault general record table, after a line alternating current fault occurs, a station terminal operation attendant fills the fault general record table according to field monitoring system information, and the record table supports selection of line name, fault time, fault phase and reclosing condition fault general information; the invention optimizes the alternating current line fault reporting interaction mechanism, divides the process into five links of filling fault general record table at the factory station end, merging the fault record table at the dispatching end, filling detailed information such as protection action condition at the factory station end and the like, and the dispatching end automatically informs the line patrol unit according to the protection information and reports the line patrol result at the line patrol unit, thereby improving the efficiency of collecting the fault information by the dispatcher during the fault period and providing technical support for the dispatcher to better process the fault.

Description

Dispatching network interaction method for reporting and processing alternating current line fault
Technical Field
The invention relates to the technical field of power engineering, in particular to a dispatching network interaction method for reporting and processing alternating current line faults.
Background
The accident handling is an important task for the dispatcher to work on duty, after the AC line has a fault, the operators on duty on both sides report relevant information such as protection actions after the fault to the dispatcher through the telephone, and the dispatcher determines whether to carry out forced delivery or further overhaul and other handling on the fault line according to the collected information.
The conventional ac line fault reporting and processing mechanism has the following disadvantages:
1) the traditional communication line fault information collection adopts a communication mode of a telephone, telephone queuing and 'vehicle jam' are easy to form along with the enlargement of the scale of a power grid, and the timeliness and the accident handling progress of dispatcher information collection can be influenced when the communication line fault occurs;
when the dispatcher collects the protection action information, the method that a factory station port head reports and the dispatcher records the information manually and then records the information in an OMS system dispatching log module is adopted; meanwhile, before informing a line patrol unit, a dispatcher needs to manually browse a line maintenance unit table, and manually match the time consumption and the efficiency of the corresponding line maintenance unit of a fault point according to fault positioning information reported by plant stations on two sides, so that the dispatching network interaction method for reporting and processing the alternating current line fault is provided.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a scheduling network interaction method for reporting and processing alternating current line faults, which overcomes the defects of the prior art and aims to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: a dispatching network interaction method for alternating current line fault reporting and processing comprises the following steps:
s1, a station terminal fills a fault general record table, after a line communication fault occurs, a station terminal runs an attendant to fill the fault general record table according to the information of a field monitoring system, the record table supports selection of line names, fault time, fault phase and reclosing condition accident general information, a scheduling command network interaction system automatically generates event names according to the information, and the attendant clicks a storage button to automatically send the fault general to a scheduling terminal;
and S2, merging the fault record table by the dispatching end, and merging the fault profiles on the two sides by clicking a merging button by the dispatcher after the dispatching end receives the fault information on the two sides of the line.
And S3, the station side fills in detailed information such as protection action conditions, the station side operation attendant can continue to fill in fault detailed information such as protection action conditions, wave recording distance measurement, whether abnormality exists or not in primary and secondary equipment inspection and the like under the fault record general information after the on-site protection information is collected, and a storage button is clicked to automatically update the fault detailed information to a dispatching end fault record view page.
S4, the scheduling end automatically informs the line patrol units according to the protection information, clicks a line patrol unit generating button on a scheduling record view page, the system automatically calculates corresponding maintenance units according to the protection distance measurement information filled in by the plant station, and the line patrol column below the scheduling record view automatically generates the corresponding line patrol units.
And S5, the line patrol units report line patrol results, the line maintenance unit clicks a sign-in button to sign in for line patrol notifications issued by the scheduling terminal, and after all the line patrol units sign in, the scheduling terminal schedules and records view flow to the link in the line patrol. And after the maintenance unit signs, the maintenance unit sends a person to a field inspection line, and after the line inspection is finished, the line inspection situation is filled in the system and is sent to the dispatching end.
As a preferred embodiment of the present invention, in step S2, the merging needs to satisfy the following condition: reporting records of plant stations on two sides are required; the field contents of the line name, the fault time, the fault phase, the reclosing condition and the like are the same, if the conditions do not meet the system automatic display error reporting prompt, after the combination is successful, the fault profiles on the two sides are combined into one, the combined fault profile is displayed in a scheduling record view, when the communication terminal and the plant station network interaction system have faults, a scheduling end can be additionally provided with the scheduling record view, and can click a synchronous OMS button to automatically synchronize the fault profiles in an OMS system scheduling log module.
As a preferred technical solution of the present invention, in step S3, the scheduling end may click the synchronization OMS button to automatically synchronize the updated detailed fault information in the OMS system scheduling log module.
As a preferred embodiment of the present invention, in step S4, after the dispatcher confirms that the sending unit is correct by manually inputting the patrol unit in the notification patrol column, the dispatcher clicks the notification patrol button to send the patrol notification to the line maintenance unit corresponding to the fault location point.
As a preferred technical solution of the present invention, in step S5, the scheduling end may click the synchronization OMS button to automatically synchronize the inspection result in the OMS system scheduling log module, and after completing the fault recording, the scheduling recording view is transferred to the archiving link.
The invention has the beneficial effects that:
the invention relies on a dispatching network interaction system, optimizes the alternating current line fault reporting interaction mechanism, and divides the process into five links of filling a fault general record table at a plant station end, merging the fault record table at a dispatching end, filling detailed information such as protection action conditions at the plant station end and the like, and automatically informing a line patrol unit and reporting a line patrol result by the dispatching end according to the protection information, thereby improving the efficiency of collecting the fault information by a dispatcher during the fault period and providing technical support for better handling the fault by the dispatcher.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, a scheduling network interaction method for ac line fault reporting and handling includes the following method steps:
s1, a station terminal fills a fault general record table, after a line communication fault occurs, a station terminal runs an attendant to fill the fault general record table according to the information of a field monitoring system, the record table supports selection of line names, fault time, fault phase and reclosing condition accident general information, a scheduling command network interaction system automatically generates event names according to the information, and the attendant clicks a storage button to automatically send the fault general to a scheduling terminal;
and S2, merging the fault record table by the dispatching end, and merging the fault profiles on the two sides by clicking a merging button by the dispatcher after the dispatching end receives the fault information on the two sides of the line. Merging needs to meet the conditions: reporting records of plant stations on two sides are required; the field contents of the line name, the fault time, the fault phase, the reclosing condition and the like are the same, if the conditions do not meet the system automatic display error reporting prompt, after the combination is successful, the fault profiles on the two sides are combined into one, the combined fault profile is displayed in a scheduling record view, when the communication terminal and the plant station network interaction system have faults, a scheduling end can be additionally provided with the scheduling record view, and can click a synchronous OMS button to automatically synchronize the fault profiles in an OMS system scheduling log module.
And S3, the station side fills in detailed information such as protection action conditions, the station side operation attendant can continue to fill in fault detailed information such as protection action conditions, wave recording distance measurement, whether abnormality exists or not in primary and secondary equipment inspection and the like under the fault record general information after the on-site protection information is collected, and a storage button is clicked to automatically update the fault detailed information to a dispatching end fault record view page. And the scheduling end can click a synchronous OMS button to automatically synchronize the updated fault detailed information in a scheduling log module of the OMS system.
S4, the scheduling end automatically informs the line patrol units according to the protection information, clicks a line patrol unit generating button on a scheduling record view page, the system automatically calculates corresponding maintenance units according to the protection distance measurement information filled in by the plant station, and the line patrol column below the scheduling record view automatically generates the corresponding line patrol units. The method supports manual input of a line patrol unit in a notification line patrol column, and a dispatcher clicks a notification line patrol button to send a line patrol notification to a line maintenance unit corresponding to a fault distance measuring point after confirming that a sending unit is correct.
And S5, the line patrol units report line patrol results, the line maintenance unit clicks a sign-in button to sign in for line patrol notifications issued by the scheduling terminal, and after all the line patrol units sign in, the scheduling terminal schedules and records view flow to the link in the line patrol. And after the maintenance unit signs, the maintenance unit sends a person to a field inspection line, and after the line inspection is finished, the line inspection situation is filled in the system and is sent to the dispatching end. And the scheduling end can click a synchronous OMS button to automatically synchronize the line patrol result in an OMS system scheduling log module, and after fault recording is completed, the scheduling record view is transferred to a filing link.
The working principle is as follows: the invention relies on a dispatching network interaction system, optimizes the alternating current line fault reporting interaction mechanism, and divides the process into five links of filling a fault general record table at a plant station end, merging the fault record table at a dispatching end, filling detailed information such as protection action conditions at the plant station end and the like, and automatically informing a line patrol unit and reporting a line patrol result by the dispatching end according to the protection information, thereby improving the efficiency of collecting the fault information by a dispatcher during the fault period and providing technical support for better handling the fault by the dispatcher.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. A dispatching network interaction method for reporting and processing alternating current line fault is characterized by comprising the following steps:
s1, a station terminal fills a fault general record table, after a line communication fault occurs, a station terminal runs an attendant to fill the fault general record table according to the information of a field monitoring system, the record table supports selection of line names, fault time, fault phase and reclosing condition accident general information, a scheduling command network interaction system automatically generates event names according to the information, and the attendant clicks a storage button to automatically send the fault general to a scheduling terminal;
and S2, merging the fault record table by the dispatching end, and merging the fault profiles on the two sides by clicking a merging button by the dispatcher after the dispatching end receives the fault information on the two sides of the line.
And S3, the station side fills in detailed information such as protection action conditions, the station side operation attendant can continue to fill in fault detailed information such as protection action conditions, wave recording distance measurement, whether abnormality exists or not in primary and secondary equipment inspection and the like under the fault record general information after the on-site protection information is collected, and a storage button is clicked to automatically update the fault detailed information to a dispatching end fault record view page.
S4, the scheduling end automatically informs the line patrol units according to the protection information, clicks a line patrol unit generating button on a scheduling record view page, the system automatically calculates corresponding maintenance units according to the protection distance measurement information filled in by the plant station, and the line patrol column below the scheduling record view automatically generates the corresponding line patrol units.
And S5, the line patrol units report line patrol results, the line maintenance unit clicks a sign-in button to sign in for line patrol notifications issued by the scheduling terminal, and after all the line patrol units sign in, the scheduling terminal schedules and records view flow to the link in the line patrol. And after the maintenance unit signs, the maintenance unit sends a person to a field inspection line, and after the line inspection is finished, the line inspection situation is filled in the system and is sent to the dispatching end.
2. The method of claim 1, wherein in step S2, the merging requirement is that: reporting records of plant stations on two sides are required; the field contents of the line name, the fault time, the fault phase, the reclosing condition and the like are the same, if the conditions do not meet the system automatic display error reporting prompt, after the combination is successful, the fault profiles on the two sides are combined into one, the combined fault profile is displayed in a scheduling record view, when the communication terminal and the plant station network interaction system have faults, a scheduling end can be additionally provided with the scheduling record view, and can click a synchronous OMS button to automatically synchronize the fault profiles in an OMS system scheduling log module.
3. The interaction method of dispatching network for ac line fault reporting and processing as claimed in claim 1, wherein in step S3, the dispatching end can click the synchronization OMS button to automatically synchronize the updated fault details in the OMS system dispatch log module.
4. The method as claimed in claim 1, wherein in step S4, the manual input of the patrol unit is supported by the notification patrol column, and the dispatcher clicks the notification patrol button to send the patrol notification to the corresponding line maintenance unit corresponding to the fault location point after confirming that the sending unit is correct.
5. The interaction method of the dispatching network for ac line fault reporting and processing according to claim 4, wherein in step S5, the dispatching end can click the synchronous OMS button to automatically synchronize the line patrol result in the OMS system dispatching log module, and after the fault recording is completed, the dispatching record view is circulated to the filing link.
CN202111145111.8A 2021-09-28 2021-09-28 Scheduling network interaction method for alternating current line fault reporting and processing Active CN113839466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111145111.8A CN113839466B (en) 2021-09-28 2021-09-28 Scheduling network interaction method for alternating current line fault reporting and processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111145111.8A CN113839466B (en) 2021-09-28 2021-09-28 Scheduling network interaction method for alternating current line fault reporting and processing

Publications (2)

Publication Number Publication Date
CN113839466A true CN113839466A (en) 2021-12-24
CN113839466B CN113839466B (en) 2023-09-01

Family

ID=78967147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111145111.8A Active CN113839466B (en) 2021-09-28 2021-09-28 Scheduling network interaction method for alternating current line fault reporting and processing

Country Status (1)

Country Link
CN (1) CN113839466B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065215A (en) * 2012-12-19 2013-04-24 云南电力调度控制中心 Power grid dispatching method
CN110400040A (en) * 2019-06-06 2019-11-01 中国南方电网有限责任公司 A kind of quick transmission system of management and running information based on mobile Internet
WO2019233047A1 (en) * 2018-06-07 2019-12-12 国电南瑞科技股份有限公司 Power grid dispatching-based operation and maintenance method
CN110956357A (en) * 2019-10-10 2020-04-03 国网浙江省电力有限公司宁波供电公司 Intelligent regulation and control networked interaction system applied to power company

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065215A (en) * 2012-12-19 2013-04-24 云南电力调度控制中心 Power grid dispatching method
WO2019233047A1 (en) * 2018-06-07 2019-12-12 国电南瑞科技股份有限公司 Power grid dispatching-based operation and maintenance method
CN110400040A (en) * 2019-06-06 2019-11-01 中国南方电网有限责任公司 A kind of quick transmission system of management and running information based on mobile Internet
CN110956357A (en) * 2019-10-10 2020-04-03 国网浙江省电力有限公司宁波供电公司 Intelligent regulation and control networked interaction system applied to power company

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
单政博等: "基于数据融合的数字化电网调度指挥和管控平台", 《机械与电子》 *
林志贤;: "基于多系统交互的电力调度应急信息自动统计报送模式", 大众用电, no. 04 *
郑炜楠;李腾飞;何蓝图;: "基于跳闸自动研判的故障信息智能填报统计系统", 大众用电, no. 09 *

Also Published As

Publication number Publication date
CN113839466B (en) 2023-09-01

Similar Documents

Publication Publication Date Title
CN110782370B (en) Comprehensive operation and maintenance management platform for power dispatching data network
CN105785201B (en) A kind of power distribution network fault analysis method and study and judge system
CN111985659A (en) Power line repair service method based on Internet
CN109472476B (en) Power failure identification analysis method and system
CN103683511A (en) Method and system for processing fault of integrated monitoring platform based on power distribution network
CN111582550A (en) Power station fault first-aid repair quick response system based on GIS
CN111667076A (en) Tracking method for processing power failure fault
CN109389524B (en) Integrated operation and maintenance cooperative management method based on power grid data, storage device and terminal
CN108564344A (en) A kind of DC converter station fault data automatic acquiring method and device
CN105354681A (en) Method for automatically studying, judging and correcting acquisition file of marketing acquisition interface data
CN111522997A (en) Plan compiling and alarm pushing system and method based on model and file service
CN113839466A (en) Dispatching network interaction method for reporting and processing alternating current line fault
CN112800077A (en) Monitoring method and device for electronic transfer list
CN110350663B (en) Low-voltage household meter power failure fault warning device and method based on edge calculation
CN101847865A (en) Electric network relay protection and fault analysis system
CN201298172Y (en) Data synchronization fault diagnosis device for centralized control station
CN116054403A (en) Power grid dispatching measurement and monitoring method based on national network big data platform
CN112636947B (en) Data network shutdown point table information checking management method
Qi et al. Construction and implementation of power grid dispatching interactive system based on Internet
CN112446619A (en) Power distribution network emergency repair processing method and device
CN108303956B (en) Automatic on-duty centralized monitoring system for power grid dispatching
CN110852606A (en) Production early report data object analysis method based on regulation cloud
CN112085339A (en) SOA (service oriented architecture) -based master and standby system real-time data checking device and method
CN116611639A (en) Distribution network rush repair control method
CN114565359A (en) Standardized fault record automatic generation instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant