CN113837643A - Project task management system and method - Google Patents

Project task management system and method Download PDF

Info

Publication number
CN113837643A
CN113837643A CN202111160248.0A CN202111160248A CN113837643A CN 113837643 A CN113837643 A CN 113837643A CN 202111160248 A CN202111160248 A CN 202111160248A CN 113837643 A CN113837643 A CN 113837643A
Authority
CN
China
Prior art keywords
task
processed
project
supplier
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111160248.0A
Other languages
Chinese (zh)
Other versions
CN113837643B (en
Inventor
汪海燕
黄彦岭
李亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Curtain Cave (Chongqing) Technology Co.,Ltd.
Original Assignee
Shanghai Doujia Network Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Doujia Network Technology Co ltd filed Critical Shanghai Doujia Network Technology Co ltd
Priority to CN202111160248.0A priority Critical patent/CN113837643B/en
Publication of CN113837643A publication Critical patent/CN113837643A/en
Application granted granted Critical
Publication of CN113837643B publication Critical patent/CN113837643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The project task management system and method of the invention: the method comprises the following steps that a supplier distributor decomposes a project task to be processed sent by a demander into a plurality of sub-project tasks, when the sub-project task is a single task to be processed, a single task standard library is inquired based on the task name of the single task to be processed, the single task to be processed is inquired and submitted to corresponding supplier workers, when the sub-project task is the sub-project task to be processed, the sub-project task is issued to a supplier receiver, and the supplier receiver decomposes the sub-project task to be processed; the supplier staff confirms whether to take over, and starts to process the task when confirming the taking over; the supplier staff hands the completed single task to be processed before the deadline of the single task to obtain the corresponding work value of the single task; obtaining the evaluation grade given by the demander for the completion condition of the single task to be processed; and calculating and displaying the work completion integral of the single task to be processed, namely the single task work value of the single task to be processed and the integral coefficient of the single task to be processed and the evaluation grade of the single task to be processed.

Description

Project task management system and method
Technical Field
The invention relates to the technical field of task management APP, in particular to a project task management system and method.
Background
At present, when a supplier receives a task of a project to be processed of a demander, the supplier establishes the project, decomposes the project into a plurality of sub-project tasks, and distributes the plurality of sub-project tasks to corresponding workers or working groups, each worker or working group completes the corresponding sub-project task, and the task management process of the project to be processed is subjectively circulation-oriented, and does not have an automatic and intelligent project task management system. Moreover, when the work tasks of various workers are managed in the prior art, an objective management system for the completion condition of the work tasks is not available, and only the subjective impression of the superior leaders of the workers on the completion of the work tasks of the workers is provided, so that the evaluation condition of the completion condition of one work task is given, and performance assessment is performed based on the evaluation condition.
Disclosure of Invention
Aiming at the problems and the defects in the prior art, the invention provides a novel project task management system and a novel project task management method.
The invention solves the technical problems through the following technical scheme:
the invention provides a project task management system which is characterized by comprising a single task standard library, a project task acquisition module, a project task decomposition module, a single task query module, a single task submitting module, a prompt module, a single task confirmation module, a single task submitting module, a single task evaluation acquisition module, an integral calculation module and an integral display module;
the single-task standard library stores corresponding relations of single-task names, single-task standards and single-task working values;
the project task acquisition module is used for a supplier distributor to acquire a project task to be processed sent by a demander, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline;
the project task decomposition module is used for a supplier distributor to decompose a project task to be processed into a plurality of sub-project tasks, a single task query module is called when the sub-project task is a single task to be processed, the single task query module is issued to a supplier receiver when the sub-project task is a sub-project task to be processed, the supplier receiver is used as a new supplier distributor to re-call the project task decomposition module by taking the sub-project task to be processed as a project task to be processed, and the sub-project task to be processed is a task which needs to be completed by at least two persons;
the single task query module is used for querying a single task standard library based on the task name of a single task to be processed, calling the single task submitting module when the task name exists in the query, and calling the prompting module if the task name does not exist;
the single task submitting module is used for a supplier distributor to submit the single task to be processed to corresponding supplier staff, wherein the single task to be processed comprises a single task name, a single task standard, a single task working value and a single task deadline;
the prompt module is used for prompting that the single task to be processed is not inquired in the task standard library;
the single task confirmation module is used for the staff of the supplier to confirm whether to take over the single task to be processed, sending information for confirming taking over to the distributor of the supplier when confirming taking over, and sending reason information for not taking over to the distributor of the supplier when confirming not taking over;
the single task submitting module is used for the supplier staff to submit the completed single task to be processed before the corresponding single task deadline and obtain the corresponding single task working value;
the single task evaluation acquisition module is used for acquiring the evaluation grade given by a demander for the completion condition of the single task to be processed;
the integral calculation module is used for calculating the work completion integral of the single task to be processed, namely the single task work value of the single task to be processed, namely the integral coefficient, and the evaluation grade of the single task to be processed;
and the integral display module is used for displaying the work completion integral obtained by the supplier worker completing the single task to be processed.
Preferably, the project task management system further comprises a single task evaluation module, wherein the single task evaluation module is used for a supplier distributor to evaluate the single task profit value of the single task to be processed;
the integral calculation module is used for calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
Preferably, the project task management system further comprises a project task item setting module, wherein the project task item setting module is used for setting items for the project tasks to be processed;
the project task decomposition module is used for a supplier distributor to decompose the project task to be processed into a plurality of sub-project tasks.
Preferably, the single task confirmation module is used for the supplier staff to confirm whether to take over the single task to be processed, when the take over is confirmed, the information for confirming the take over is sent to the supplier distributor and the task submitting module is started, when the take over is confirmed, the reason for not taking over is sent to the supplier distributor and the task submitting module is not started and the task submitting module is started, and the task submitting module is used for the supplier distributor to submit the single task to be processed to other supplier staff.
Preferably, the project task management system further comprises a delay module, wherein the delay module is used for a worker of a supplier to send a delay instruction and receive information about whether the supply worker agrees with the delay instruction, and when the received information is the information agreeing with the delay, the information agreeing with the delay and the delay deadline are sent to the single task submitting module, and when the received information is the information not agreeing with the delay, the information not agreeing with the delay is sent to the single task submitting module;
the single task submitting module is used for judging the submitting time of the single task to be processed, obtaining a corresponding single task working value before the submitting time is a single task deadline or before the submission time agrees to delay and the submitting time is the delay deadline, and obtaining a task working value which is the scaling coefficient corresponding to the single task to be processed when the submitting time is the single task deadline and the submission time disagrees with the delay, wherein the scaling coefficient is less than 1.
The invention also provides a project task management method, which is characterized by comprising the following steps:
s1, the distributor of the supplier obtains the task of the project to be processed from the demander, the task of the project to be processed includes the name of the task of the project, the description of the task of the project and the deadline of the task of the project;
s2, the supplier distributor decomposes the project task to be processed into a plurality of sub-project tasks, and enters step S3 when the sub-project tasks are single to-be-processed tasks, and enters step S4 when the sub-project tasks are sub-project tasks to be processed;
s3, inquiring a single task standard library based on the task name of the single task to be processed, calling S5 when the task name exists in the inquiry, otherwise, entering S6, wherein the single task standard library stores the corresponding relation of the single task name, the single task standard and the single task working value;
s4, the sub-to-be-processed project task is issued to a supplier receiver, the supplier receiver is used as a new supplier distributor to re-execute the step S2 by taking the sub-to-be-processed project task as a to-be-processed project task, and the sub-to-be-processed project task is a task which needs to be completed by at least two persons;
s5, the supplier distributor submits the single to-be-processed task to corresponding supplier staff, wherein the single to-be-processed task comprises a single task name, a single task standard, a single task working value and a single task deadline;
s6, prompting that the single task to be processed is not inquired in the task standard library;
s7, the supplier staff confirms whether to take over the single-standby task, and when confirming to take over, the step S8 is carried out, and when confirming not to take over, the step S9 is carried out;
s8, sending the information for confirming the catcher to the distributor of the supplier, and going to step S10;
s9, sending reason information of no-taking to the distributor of the supplier;
s10, the supplier staff hands over the completed single task to be processed before the corresponding single task deadline, and obtains the corresponding single task working value;
s11, obtaining the evaluation grade given by the demander for the completion condition of the single task to be processed;
s12, calculating a work completion integral of the single to-be-processed task, i.e., a single task work value of the single to-be-processed task, i.e., an integral coefficient, i.e., an evaluation level of the single to-be-processed task;
and S13, displaying the work completion integral obtained by the supplier staff completing the single-standby task.
Preferably, step S12 is preceded by the following steps: the supplier distributor evaluates the single task profit value of the single task to be processed;
and S12, calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
Preferably, the following steps are included between steps S1 and S2: setting up project tasks to be processed;
in step S2, the supplier assignor breaks up the standing pending project task into a plurality of sub-project tasks.
Preferably, in step S8, a message confirming the catcher is issued to the supplier assignor and the task is initiated, and in step S9, a reason for not having the catcher is issued to the supplier assignor and the task submission is not initiated and the supplier assignor submits the single pending task to other supplier staff.
Preferably, the following steps are included between steps S8 and S10: the method comprises the following steps that a supplier worker sends a delay instruction, receives information about whether the delay instruction is approved or not, sends information about whether delay is approved or not and a delay deadline when the received information is the information about whether delay is approved, and sends information about whether delay is not approved or not when the received information is the information about not agreeing with delay;
in step S10, the submission time of the single to-be-processed task is determined, the corresponding work value of the single task is obtained before the submission time is the deadline of the single task or before the submission time agrees to the delay and the deadline of the delay, and the work value of the task obtained after the submission time is the deadline of the single task and does not agree to the delay is the work value of the single to-be-processed task, and the scale coefficient is smaller than 1.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
the supplier of the invention decomposes the received project task to be processed of the demander into a plurality of sub-project tasks, and further decomposes the sub-project tasks which need to be completed by a plurality of persons, so as to decompose the project task to be processed into a single task to be processed, based on the single task to be processed, the completion condition of each worker for completing each work task can be objectively calculated, the evaluation of the demander of each work task on the completion condition of the work task of the worker can be known, the profit value brought by each work task can be known, and therefore, the work completion integral of each worker for completing each work task can be calculated, and the work completion integral is adopted for performing performance evaluation during the subsequent performance evaluation of the worker, which is beneficial to realizing the fairness of the performance evaluation of the worker, and can fully mobilize the enthusiasm of the worker.
Drawings
FIG. 1 is a block diagram of a project task management system according to a preferred embodiment of the present invention.
FIG. 2 is a flowchart of a project task management method according to a preferred embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1, the present embodiment provides a project task management system, which includes a project task obtaining module 1, a project task standing module 2, a project task decomposing module 3, a single task querying module 4, a single task standard library 5, a single task submitting module 6, a prompting module 7, a single task confirming module 8, a postponing module 9, a single task submitting module 10, a single task evaluation obtaining module 11, a single task evaluating module 12, a point calculating module 13, a point displaying module 14, and a single task configuring module 15.
The single task standard library 5 stores the corresponding relation among the single task name, the single task standard and the single task working value.
The project task obtaining module 1 is used for a supplier distributor to obtain a project task to be processed sent by a demander, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline.
The project task item setting module 2 is used for setting items for the project tasks to be processed.
The project task decomposition module 3 is used for a supplier distributor to decompose an established project task to be processed into a plurality of sub-project tasks, the single task query module 4 is called when the sub-project tasks are single task to be processed, the sub-project tasks are issued to the supplier receiver when the sub-project tasks are sub-project tasks to be processed, the supplier receiver is used as a new supplier distributor to re-call the project task decomposition module 3 by using the sub-project tasks to be processed as a project task to be processed, and the sub-project tasks to be processed are tasks which are completed by at least two persons.
The single task query module 4 is used for querying the single task standard library 5 based on the task name of the single task to be processed, and calling the single task submitting module 6 when the task name exists, or calling the prompt module 7.
The single task submitting module 6 is used for the supplier distributor to submit the single task to be processed to the corresponding supplier staff, wherein the single task to be processed comprises a single task name, a single task standard, a single task working value and a single task deadline.
The prompt module 7 is used for prompting that the single to-be-processed task is not inquired in the task standard library, and after receiving the prompt information, the supplier manager configures the single task standard and the single task working value of the single to-be-processed task by using the single task configuration module, and stores the configured corresponding relation of the single task name, the single task standard and the single task working value of the single to-be-processed task into the single task standard library 5.
The single task confirmation module 8 is used for the supplier staff to confirm whether to take over the single task to be processed, when the take over is confirmed, the information for confirming the take over is sent to the supplier distributor and the task submitting module 10 is started, when the take over is confirmed, the reason information for not taking over is sent to the supplier distributor and the task submitting module 10 is not started and the task submitting module 6 is started, and the task submitting module 6 is used for the supplier distributor to submit the single task to be processed to other supplier staff.
The delay module 9 is used for the staff of the supplier to send out a delay instruction, receive the information of whether the delay instruction is agreed or not, send the information of agreeing to delay and the delay deadline to the single task submitting module 10 when the received information is the information of agreeing to delay, and send the information of disagreeing with delay to the single task submitting module 10 when the received information is the information of disagreeing with delay.
The single-task submitting module 10 is configured to determine a submitting time of the single to-be-processed task, obtain a corresponding single-task working value before the submitting time is a single-task deadline or before the submitting time agrees to a delay and the delay deadline, obtain a task working value after the submitting time is the single-task deadline and when the submitting time does not agree to the delay, and obtain a task working value that is a task working value corresponding to the single to-be-processed task and is smaller than 1.
The single task evaluation obtaining module 11 is configured to obtain an evaluation level given by a demander for a completion condition of the single task to be processed.
The single-task evaluation module 12 is used for the supplier distributor to evaluate the single-task profit value of the single to-be-processed task.
The integral calculating module 13 is configured to calculate a work completion integral of the single task to be processed (a single task work value of the single task to be processed + an integral coefficient + a single task profit value of the single task to be processed + a profit coefficient) and an evaluation grade of the single task to be processed.
The point display module 14 is used for displaying the work completion point obtained by the supplier worker completing the single task to be processed.
As shown in fig. 2, the present embodiment further provides a project task management method, which includes the following steps:
step 101, a supplier distributor obtains a project task to be processed sent by a demand party, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline.
And 102, setting up items for the project tasks to be processed.
And 103, the supplier distributor decomposes the project task to be processed into a plurality of sub-project tasks, and enters step 104 when the sub-project task is a single task to be processed, and enters step 105 when the sub-project task is a sub-project task to be processed.
And 104, inquiring a single task standard library based on the task name of the single task to be processed, calling 106 when the task name exists in the inquiry, otherwise, entering 107, wherein the single task standard library stores the corresponding relation of the single task name, the single task standard and the single task working value.
And 105, issuing the sub-to-be-processed project task to a supplier receiver, wherein the supplier receiver is used as a new supplier distributor to re-execute the step 103 by taking the sub-to-be-processed project task as a to-be-processed project task, and the sub-to-be-processed project task is a task which needs to be completed by at least two persons.
And 106, the supplier distributor submits the single to-be-processed task to corresponding supplier staff, wherein the single to-be-processed task comprises a single task name, a single task standard, a single task working value and a single task deadline.
And 107, prompting that the single task to be processed is not inquired in the task standard library, configuring the single task standard and the single task working value of the single task to be processed by the supplier, and storing the corresponding relation of the configured single task name, the single task standard and the single task working value of the single task to be processed in the single task standard library.
And step 108, the supplier staff confirms whether to take over the single pending task, and the step 109 is carried out when the supply staff confirms to take over, and the step 110 is carried out when the supply staff confirms not to take over.
Step 109, sending the information for confirming the catcher to the supplier distributor and starting the task, and entering step 112.
And step 110, sending out reason information of no-take to the distributor of the supplier and starting task delivery without starting task submission, wherein the distributor of the supplier delivers the single task to be processed to other workers of the supplier.
And step 111, the supply side staff sends a delay instruction and receives information about whether the supply side staff agrees with the delay instruction, the information about agreeing with the delay and the delay deadline are sent when the received information is the information about agreeing with the delay, and the information about disagreeing with the delay is sent when the received information is the information about disagreeing with the delay.
And 112, the supplier staff submits the completed single task to be processed, the submission time of the single task to be processed is judged, the corresponding single task working value is obtained before the submission time is the deadline of the single task or before the approval delay and the submission time is the deadline of the delay, the task working value obtained after the submission time is the deadline of the single task and the disapproval delay is the task working value corresponding to the single task to be processed, and the proportionality coefficient is less than 1.
And 113, acquiring the evaluation grade given by the demander for the completion condition of the single to-be-processed task.
The supplier distributor evaluates the single job profit value for the single pending job, step 114.
And step 115, calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
And step 116, displaying the work completion integral obtained by the supplier worker completing the single to-be-processed task.
In the scheme, a demander sends a project task to be processed to a supplier, and the supplier acquires the project task to be processed and establishes the project task to be processed. The supplier manager decomposes the project task to be processed into 3 sub-project tasks, wherein the 1 st sub-project task and the 2 nd sub-project task are both single tasks to be processed and can be processed and completed by only one worker, and the 3 rd sub-project task is a sub-project task to be processed.
And (3) sending the 3 rd sub task (the sub to-be-processed project task) to a supplier receiver, after the supplier receiver receives the sub to-be-processed project task, taking the 3 rd sub task as a new supplier manager, taking the sub to-be-processed project task as a to-be-processed project task, and executing the project task decomposition operation again, so that the 3 rd sub task is decomposed into a single to-be-processed task 3, a single to-be-processed task 4 and a single to-be-processed task 5.
And querying a single task standard library based on task names of a single task 1 to be processed, a single task 2 to be processed, a single task 3, a single task 4 and a single task 5 respectively, smoothly entering the next step when querying that the single task name exists, sending a prompt message to prompt a supplier manager when querying that the task name does not exist, configuring the single task standard and the single task working value of the single task by the supplier manager, storing the configured corresponding relation among the single task name, the single task standard and the single task working value of the single task to be processed into the single task standard library, and querying again to obtain the single task name.
The supplier manager respectively submits the single-pending task 1 and the single-pending task 2 to a supplier worker A and a supplier worker B, and the supplier acceptor respectively submits the single-pending task 3, the single-pending task 4 and the single-pending task 5 to a supplier worker C, a supplier worker D and a supplier worker E.
After receiving the single to-be-processed task 1, the supplier worker A confirms whether to take over the single to-be-processed task 1, sends information for confirming taking over to a supplier manager when confirming taking over and starts task submission, wherein a task submission instruction on an interface is lightened by grey, the task submission instruction is started, and the subsequent supplier worker A clicks the task submission instruction to submit a task; and sending reason information of no-take to the supplier manager when no-take is confirmed, starting task submission instead of task submission, and submitting the single-standby task 1 to other supplier staff again by the supplier manager.
After receiving the single to-be-processed task 1, the supplier worker A starts to process the single to-be-processed task 1, and can apply for delay and give a delay reason when the task cannot be completed in time before a specified deadline, and a supplier manager sends information whether to agree with the delay after checking, and gives a delay deadline when agreeing with the delay. When a supplier worker A submits a single task 1 to be processed, the submission time of the single task 1 to be processed is judged, a corresponding single task working value is obtained before the submission time is the task deadline or before the submission time agrees with the delay and before the submission time is the delay deadline, the single task working value obtained after the submission time is the task deadline and when the submission time disagrees with the delay needs to be discounted on the original corresponding single task working value, and the single task working value obtained at the moment is equal to the task working value corresponding to the single task 1.
After the task is submitted, the demander gives an evaluation grade for the completion condition of the single to-be-processed task 1, if the completion condition of the single to-be-processed task 1 is good, the given evaluation grade is 1.2, if the completion condition of the single to-be-processed task 1 is medium, the given evaluation grade is 1.1, if the completion condition of the single to-be-processed task 1 is general, the given evaluation grade is 1.0, and if the completion condition of the single to-be-processed task 1 is poor, the given evaluation grade is 0.9.
Then, the work completion integral of the single job to be processed 1 (the job work value of the single job to be processed 1 + the integral coefficient + the single job profit value of the single job to be processed 1 + the profit coefficient) is calculated as the evaluation grade of the single job to be processed 1, and finally, the work completion integral obtained when the supplier worker a completes the single job to be processed 1 is displayed.
By analogy, the work completion integral obtained when the supplier worker B completes the single to-be-processed task 2, the work completion integral obtained when the supplier worker C completes the single to-be-processed task 3, the work completion integral obtained when the supplier worker D completes the single to-be-processed task 4, and the work completion integral obtained when the supplier worker E completes the single to-be-processed task 5 can be calculated and displayed.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.

Claims (12)

1. A project task management system is characterized by comprising a single task standard library, a project task acquisition module, a project task decomposition module, a single task query module, a single task submitting module, a prompt module, a single task confirmation module, a single task submitting module, a single task evaluation acquisition module, an integral calculation module and an integral display module;
the single-task standard library stores corresponding relations of single-task names, single-task standards and single-task working values;
the project task acquisition module is used for a supplier distributor to acquire a project task to be processed sent by a demander, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline;
the project task decomposition module is used for a supplier distributor to decompose a project task to be processed into a plurality of sub-project tasks, a single task query module is called when the sub-project task is a single task to be processed, the single task query module is issued to a supplier receiver when the sub-project task is a sub-project task to be processed, the supplier receiver is used as a new supplier distributor to re-call the project task decomposition module by taking the sub-project task to be processed as a project task to be processed, and the sub-project task to be processed is a task which needs to be completed by at least two persons;
the single task query module is used for querying a single task standard library based on the task name of a single task to be processed, calling the single task submitting module when the task name exists in the query, and calling the prompting module if the task name does not exist;
the single task submitting module is used for a supplier distributor to submit the single task to be processed to corresponding supplier staff, wherein the single task to be processed comprises a single task name, a single task standard, a single task working value and a single task deadline;
the prompt module is used for prompting that the single task to be processed is not inquired in the task standard library;
the single task confirmation module is used for the staff of the supplier to confirm whether to take over the single task to be processed, sending information for confirming taking over to the distributor of the supplier when confirming taking over, and sending reason information for not taking over to the distributor of the supplier when confirming not taking over;
the single task submitting module is used for the supplier staff to submit the completed single task to be processed before the corresponding single task deadline and obtain the corresponding single task working value;
the single task evaluation acquisition module is used for acquiring the evaluation grade given by a demander for the completion condition of the single task to be processed;
the integral calculation module is used for calculating the work completion integral of the single task to be processed, namely the single task work value of the single task to be processed, namely the integral coefficient, and the evaluation grade of the single task to be processed;
and the integral display module is used for displaying the work completion integral obtained by the supplier worker completing the single task to be processed.
2. The project task management system of claim 1, further comprising a single task assessment module for a supplier distributor to assess a single task profit value for the single pending task;
the integral calculation module is used for calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
3. The project task management system of claim 1, further comprising a project task standing module for standing on a project task to be processed;
the project task decomposition module is used for a supplier distributor to decompose the project task to be processed into a plurality of sub-project tasks.
4. The project task management system of claim 1, wherein the single task confirmation module is configured to allow the supplier staff to confirm whether to take over the single pending task, send information to confirm taking over to the supplier distributor and activate the task submission module when confirming taking over, send reason information to give away taking over to the supplier distributor and activate the task submission module when confirming taking over, and activate the task handing module without activating the task submission module, and the task handing module is configured to allow the supplier distributor to hand over the single pending task to other supplier staff.
5. The project task management system of claim 1, further comprising a delay module, wherein the delay module is configured to provide a delay instruction for a supplier worker, receive information on whether the delay instruction is approved or not, send the information on whether the delay instruction is approved or not and the deadline of the delay to the single task submitting module when the received information is the information on whether the delay is approved, and send the information on whether the delay is not approved to the single task submitting module when the received information is the information on not agreeing the delay;
the single task submitting module is used for judging the submitting time of the single task to be processed, obtaining a corresponding single task working value before the submitting time is a single task deadline or before the submission time agrees to delay and the submitting time is the delay deadline, and obtaining a task working value which is the scaling coefficient corresponding to the single task to be processed when the submitting time is the single task deadline and the submission time disagrees with the delay, wherein the scaling coefficient is less than 1.
6. The project task management system of claim 1, further comprising a single task configuration module, wherein the single task configuration module is configured by a supplier to configure a single task standard and a single task work value of the single task to be processed, and store the configured corresponding relationship among the single task name, the single task standard and the single task work value of the single task to be processed into a single task standard library.
7. A project task management method is characterized by comprising the following steps:
s1, the distributor of the supplier obtains the task of the project to be processed from the demander, the task of the project to be processed includes the name of the task of the project, the description of the task of the project and the deadline of the task of the project;
s2, the supplier distributor decomposes the project task to be processed into a plurality of sub-project tasks, and enters step S3 when the sub-project tasks are single to-be-processed tasks, and enters step S4 when the sub-project tasks are sub-project tasks to be processed;
s3, inquiring a single task standard library based on the task name of the single task to be processed, calling S5 when the task name exists in the inquiry, otherwise, entering S6, wherein the single task standard library stores the corresponding relation of the single task name, the single task standard and the single task working value;
s4, the sub-to-be-processed project task is issued to a supplier receiver, the supplier receiver is used as a new supplier distributor to re-execute the step S2 by taking the sub-to-be-processed project task as a to-be-processed project task, and the sub-to-be-processed project task is a task which needs to be completed by at least two persons;
s5, the supplier distributor submits the single to-be-processed task to corresponding supplier staff, wherein the single to-be-processed task comprises a single task name, a single task standard, a single task working value and a single task deadline;
s6, prompting that the single task to be processed is not inquired in the task standard library;
s7, the supplier staff confirms whether to take over the single-standby task, and when confirming to take over, the step S8 is carried out, and when confirming not to take over, the step S9 is carried out;
s8, sending the information for confirming the catcher to the distributor of the supplier, and going to step S10;
s9, sending reason information of no-taking to the distributor of the supplier;
s10, the supplier staff hands over the completed single task to be processed before the corresponding single task deadline, and obtains the corresponding single task working value;
s11, obtaining the evaluation grade given by the demander for the completion condition of the single task to be processed;
s12, calculating a work completion integral of the single to-be-processed task, i.e., a single task work value of the single to-be-processed task, i.e., an integral coefficient, i.e., an evaluation level of the single to-be-processed task;
and S13, displaying the work completion integral obtained by the supplier staff completing the single-standby task.
8. The project task management method according to claim 7, comprising, before step S12, the steps of: the supplier distributor evaluates the single task profit value of the single task to be processed;
and S12, calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
9. The project task management method of claim 7, comprising, between steps S1 and S2, the steps of: setting up project tasks to be processed;
in step S2, the supplier assignor breaks up the standing pending project task into a plurality of sub-project tasks.
10. The project task management method of claim 7, wherein in step S8, a message confirming the catcher is issued to the supplier distributor and the task is started, and in step S9, a reason for not having the catcher is issued to the supplier distributor and the task submission is not started and the supplier distributor submits the single pending task to other supplier staff.
11. The project task management method of claim 7, comprising, between steps S8 and S10, the steps of: the method comprises the following steps that a supplier worker sends a delay instruction, receives information about whether the delay instruction is approved or not, sends information about whether delay is approved or not and a delay deadline when the received information is the information about whether delay is approved, and sends information about whether delay is not approved or not when the received information is the information about not agreeing with delay;
in step S10, the submission time of the single to-be-processed task is determined, the corresponding work value of the single task is obtained before the submission time is the deadline of the single task or before the submission time agrees to the delay and the deadline of the delay, and the work value of the task obtained after the submission time is the deadline of the single task and does not agree to the delay is the work value of the single to-be-processed task, and the scale coefficient is smaller than 1.
12. The project task management method according to claim 7, wherein the following step is entered after executing step S6: and the supplier configures the task standard and the task working value of the task to be processed and stores the corresponding relation among the configured task name, the task standard and the task working value of the task to be processed into a task standard library.
CN202111160248.0A 2021-09-30 2021-09-30 Project task management system and method Active CN113837643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111160248.0A CN113837643B (en) 2021-09-30 2021-09-30 Project task management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111160248.0A CN113837643B (en) 2021-09-30 2021-09-30 Project task management system and method

Publications (2)

Publication Number Publication Date
CN113837643A true CN113837643A (en) 2021-12-24
CN113837643B CN113837643B (en) 2023-12-29

Family

ID=78968063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111160248.0A Active CN113837643B (en) 2021-09-30 2021-09-30 Project task management system and method

Country Status (1)

Country Link
CN (1) CN113837643B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered
CN109754215A (en) * 2018-12-03 2019-05-14 上海夫卡实业发展有限公司 Technological design work management method, platform and the system quickly delivered
KR102065507B1 (en) * 2018-12-28 2020-01-13 이지연 Realtime construction work management apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered
CN109754215A (en) * 2018-12-03 2019-05-14 上海夫卡实业发展有限公司 Technological design work management method, platform and the system quickly delivered
KR102065507B1 (en) * 2018-12-28 2020-01-13 이지연 Realtime construction work management apparatus

Also Published As

Publication number Publication date
CN113837643B (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN107563843A (en) The inquiry price quoting method and system of auto-parts
Khatib Integrating project risk management and value engineering in tendering processes
US20010025267A1 (en) System and method for facilitating bidding transactions and conducting project management utilizing software metric collection
US20020065702A1 (en) Real-time production tracking and scheduling system
US8843388B1 (en) Method and system for processing an employment application
US20070244800A1 (en) Work allocation system
TWI602132B (en) Multivariate barrel gas fleet distribution system and method
CN111860902A (en) Order processing method, device, equipment and computer readable storage medium
CN111031185A (en) Agent allocation method based on artificial intelligence navigation and related device
CN111563729B (en) Engineering project cost management method, system and storage medium
CN114662888A (en) Job management method, job management apparatus, electronic device, and storage medium
CN113837643A (en) Project task management system and method
CN106384274B (en) A kind of data synchronizing processing method and system of domain name auction
CN113837642A (en) Work task management system and method
CN110738343A (en) platform reservation method, device and storage medium
CN110738391A (en) design project management method and system
CN108268995B (en) Policy issue piece processing method and device, computer equipment and readable storage medium
CN113052612A (en) Authentication mode recommendation method and device, electronic equipment and storage medium
KR20100088428A (en) System for intermediating outsourcing idle facility of industry and method thereof
CN113487161A (en) Engineer skill proficiency evaluation system and method based on working platform
CN110442312A (en) A kind of customer information monitoring method, system and computer readable storage medium
US20050060057A1 (en) System and method for correcting quality problems
US20200279202A1 (en) Construction project management
CN114863586B (en) Test method, device and terminal
JP2002133180A (en) Method and system for making construction budget

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231205

Address after: 401120 No. 1, Floor 1, Building 2, No. 3, Yangliu Road, Middle Section of Mount Huangshan Avenue, Yubei District, Chongqing

Applicant after: Chongqing Yuncai Business Incubator Co.,Ltd.

Address before: 201600 6 6, Si brick road, Si Jing Town, Songjiang District, Shanghai

Applicant before: Shanghai Doujia Network Technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240815

Address after: 401120 No. 102, Floor 1, Building 2, No. 3, Yangliu Road, Middle Mount Huangshan Avenue, Dazhulin Street, Yubei District, Chongqing

Patentee after: Water Curtain Cave (Chongqing) Technology Co.,Ltd.

Country or region after: China

Address before: 401120 No. 1, Floor 1, Building 2, No. 3, Yangliu Road, Middle Section of Mount Huangshan Avenue, Yubei District, Chongqing

Patentee before: Chongqing Yuncai Business Incubator Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right