Disclosure of Invention
Aiming at the problems and the defects in the prior art, the invention provides a novel project task management system and a novel project task management method.
The invention solves the technical problems through the following technical scheme:
the invention provides a project task management system which is characterized by comprising a single task standard library, a project task acquisition module, a project task decomposition module, a single task query module, a single task submitting module, a prompt module, a single task confirmation module, a single task submitting module, a single task evaluation acquisition module, an integral calculation module and an integral display module;
the single-task standard library stores corresponding relations of single-task names, single-task standards and single-task working values;
the project task acquisition module is used for a supplier distributor to acquire a project task to be processed sent by a demander, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline;
the project task decomposition module is used for a supplier distributor to decompose a project task to be processed into a plurality of sub-project tasks, a single task query module is called when the sub-project task is a single task to be processed, the single task query module is issued to a supplier receiver when the sub-project task is a sub-project task to be processed, the supplier receiver is used as a new supplier distributor to re-call the project task decomposition module by taking the sub-project task to be processed as a project task to be processed, and the sub-project task to be processed is a task which needs to be completed by at least two persons;
the single task query module is used for querying a single task standard library based on the task name of a single task to be processed, calling the single task submitting module when the task name exists in the query, and calling the prompting module if the task name does not exist;
the single task submitting module is used for a supplier distributor to submit the single task to be processed to corresponding supplier staff, wherein the single task to be processed comprises a single task name, a single task standard, a single task working value and a single task deadline;
the prompt module is used for prompting that the single task to be processed is not inquired in the task standard library;
the single task confirmation module is used for the staff of the supplier to confirm whether to take over the single task to be processed, sending information for confirming taking over to the distributor of the supplier when confirming taking over, and sending reason information for not taking over to the distributor of the supplier when confirming not taking over;
the single task submitting module is used for the supplier staff to submit the completed single task to be processed before the corresponding single task deadline and obtain the corresponding single task working value;
the single task evaluation acquisition module is used for acquiring the evaluation grade given by a demander for the completion condition of the single task to be processed;
the integral calculation module is used for calculating the work completion integral of the single task to be processed, namely the single task work value of the single task to be processed, namely the integral coefficient, and the evaluation grade of the single task to be processed;
and the integral display module is used for displaying the work completion integral obtained by the supplier worker completing the single task to be processed.
Preferably, the project task management system further comprises a single task evaluation module, wherein the single task evaluation module is used for a supplier distributor to evaluate the single task profit value of the single task to be processed;
the integral calculation module is used for calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
Preferably, the project task management system further comprises a project task item setting module, wherein the project task item setting module is used for setting items for the project tasks to be processed;
the project task decomposition module is used for a supplier distributor to decompose the project task to be processed into a plurality of sub-project tasks.
Preferably, the single task confirmation module is used for the supplier staff to confirm whether to take over the single task to be processed, when the take over is confirmed, the information for confirming the take over is sent to the supplier distributor and the task submitting module is started, when the take over is confirmed, the reason for not taking over is sent to the supplier distributor and the task submitting module is not started and the task submitting module is started, and the task submitting module is used for the supplier distributor to submit the single task to be processed to other supplier staff.
Preferably, the project task management system further comprises a delay module, wherein the delay module is used for a worker of a supplier to send a delay instruction and receive information about whether the supply worker agrees with the delay instruction, and when the received information is the information agreeing with the delay, the information agreeing with the delay and the delay deadline are sent to the single task submitting module, and when the received information is the information not agreeing with the delay, the information not agreeing with the delay is sent to the single task submitting module;
the single task submitting module is used for judging the submitting time of the single task to be processed, obtaining a corresponding single task working value before the submitting time is a single task deadline or before the submission time agrees to delay and the submitting time is the delay deadline, and obtaining a task working value which is the scaling coefficient corresponding to the single task to be processed when the submitting time is the single task deadline and the submission time disagrees with the delay, wherein the scaling coefficient is less than 1.
The invention also provides a project task management method, which is characterized by comprising the following steps:
s1, the distributor of the supplier obtains the task of the project to be processed from the demander, the task of the project to be processed includes the name of the task of the project, the description of the task of the project and the deadline of the task of the project;
s2, the supplier distributor decomposes the project task to be processed into a plurality of sub-project tasks, and enters step S3 when the sub-project tasks are single to-be-processed tasks, and enters step S4 when the sub-project tasks are sub-project tasks to be processed;
s3, inquiring a single task standard library based on the task name of the single task to be processed, calling S5 when the task name exists in the inquiry, otherwise, entering S6, wherein the single task standard library stores the corresponding relation of the single task name, the single task standard and the single task working value;
s4, the sub-to-be-processed project task is issued to a supplier receiver, the supplier receiver is used as a new supplier distributor to re-execute the step S2 by taking the sub-to-be-processed project task as a to-be-processed project task, and the sub-to-be-processed project task is a task which needs to be completed by at least two persons;
s5, the supplier distributor submits the single to-be-processed task to corresponding supplier staff, wherein the single to-be-processed task comprises a single task name, a single task standard, a single task working value and a single task deadline;
s6, prompting that the single task to be processed is not inquired in the task standard library;
s7, the supplier staff confirms whether to take over the single-standby task, and when confirming to take over, the step S8 is carried out, and when confirming not to take over, the step S9 is carried out;
s8, sending the information for confirming the catcher to the distributor of the supplier, and going to step S10;
s9, sending reason information of no-taking to the distributor of the supplier;
s10, the supplier staff hands over the completed single task to be processed before the corresponding single task deadline, and obtains the corresponding single task working value;
s11, obtaining the evaluation grade given by the demander for the completion condition of the single task to be processed;
s12, calculating a work completion integral of the single to-be-processed task, i.e., a single task work value of the single to-be-processed task, i.e., an integral coefficient, i.e., an evaluation level of the single to-be-processed task;
and S13, displaying the work completion integral obtained by the supplier staff completing the single-standby task.
Preferably, step S12 is preceded by the following steps: the supplier distributor evaluates the single task profit value of the single task to be processed;
and S12, calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
Preferably, the following steps are included between steps S1 and S2: setting up project tasks to be processed;
in step S2, the supplier assignor breaks up the standing pending project task into a plurality of sub-project tasks.
Preferably, in step S8, a message confirming the catcher is issued to the supplier assignor and the task is initiated, and in step S9, a reason for not having the catcher is issued to the supplier assignor and the task submission is not initiated and the supplier assignor submits the single pending task to other supplier staff.
Preferably, the following steps are included between steps S8 and S10: the method comprises the following steps that a supplier worker sends a delay instruction, receives information about whether the delay instruction is approved or not, sends information about whether delay is approved or not and a delay deadline when the received information is the information about whether delay is approved, and sends information about whether delay is not approved or not when the received information is the information about not agreeing with delay;
in step S10, the submission time of the single to-be-processed task is determined, the corresponding work value of the single task is obtained before the submission time is the deadline of the single task or before the submission time agrees to the delay and the deadline of the delay, and the work value of the task obtained after the submission time is the deadline of the single task and does not agree to the delay is the work value of the single to-be-processed task, and the scale coefficient is smaller than 1.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
the supplier of the invention decomposes the received project task to be processed of the demander into a plurality of sub-project tasks, and further decomposes the sub-project tasks which need to be completed by a plurality of persons, so as to decompose the project task to be processed into a single task to be processed, based on the single task to be processed, the completion condition of each worker for completing each work task can be objectively calculated, the evaluation of the demander of each work task on the completion condition of the work task of the worker can be known, the profit value brought by each work task can be known, and therefore, the work completion integral of each worker for completing each work task can be calculated, and the work completion integral is adopted for performing performance evaluation during the subsequent performance evaluation of the worker, which is beneficial to realizing the fairness of the performance evaluation of the worker, and can fully mobilize the enthusiasm of the worker.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1, the present embodiment provides a project task management system, which includes a project task obtaining module 1, a project task standing module 2, a project task decomposing module 3, a single task querying module 4, a single task standard library 5, a single task submitting module 6, a prompting module 7, a single task confirming module 8, a postponing module 9, a single task submitting module 10, a single task evaluation obtaining module 11, a single task evaluating module 12, a point calculating module 13, a point displaying module 14, and a single task configuring module 15.
The single task standard library 5 stores the corresponding relation among the single task name, the single task standard and the single task working value.
The project task obtaining module 1 is used for a supplier distributor to obtain a project task to be processed sent by a demander, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline.
The project task item setting module 2 is used for setting items for the project tasks to be processed.
The project task decomposition module 3 is used for a supplier distributor to decompose an established project task to be processed into a plurality of sub-project tasks, the single task query module 4 is called when the sub-project tasks are single task to be processed, the sub-project tasks are issued to the supplier receiver when the sub-project tasks are sub-project tasks to be processed, the supplier receiver is used as a new supplier distributor to re-call the project task decomposition module 3 by using the sub-project tasks to be processed as a project task to be processed, and the sub-project tasks to be processed are tasks which are completed by at least two persons.
The single task query module 4 is used for querying the single task standard library 5 based on the task name of the single task to be processed, and calling the single task submitting module 6 when the task name exists, or calling the prompt module 7.
The single task submitting module 6 is used for the supplier distributor to submit the single task to be processed to the corresponding supplier staff, wherein the single task to be processed comprises a single task name, a single task standard, a single task working value and a single task deadline.
The prompt module 7 is used for prompting that the single to-be-processed task is not inquired in the task standard library, and after receiving the prompt information, the supplier manager configures the single task standard and the single task working value of the single to-be-processed task by using the single task configuration module, and stores the configured corresponding relation of the single task name, the single task standard and the single task working value of the single to-be-processed task into the single task standard library 5.
The single task confirmation module 8 is used for the supplier staff to confirm whether to take over the single task to be processed, when the take over is confirmed, the information for confirming the take over is sent to the supplier distributor and the task submitting module 10 is started, when the take over is confirmed, the reason information for not taking over is sent to the supplier distributor and the task submitting module 10 is not started and the task submitting module 6 is started, and the task submitting module 6 is used for the supplier distributor to submit the single task to be processed to other supplier staff.
The delay module 9 is used for the staff of the supplier to send out a delay instruction, receive the information of whether the delay instruction is agreed or not, send the information of agreeing to delay and the delay deadline to the single task submitting module 10 when the received information is the information of agreeing to delay, and send the information of disagreeing with delay to the single task submitting module 10 when the received information is the information of disagreeing with delay.
The single-task submitting module 10 is configured to determine a submitting time of the single to-be-processed task, obtain a corresponding single-task working value before the submitting time is a single-task deadline or before the submitting time agrees to a delay and the delay deadline, obtain a task working value after the submitting time is the single-task deadline and when the submitting time does not agree to the delay, and obtain a task working value that is a task working value corresponding to the single to-be-processed task and is smaller than 1.
The single task evaluation obtaining module 11 is configured to obtain an evaluation level given by a demander for a completion condition of the single task to be processed.
The single-task evaluation module 12 is used for the supplier distributor to evaluate the single-task profit value of the single to-be-processed task.
The integral calculating module 13 is configured to calculate a work completion integral of the single task to be processed (a single task work value of the single task to be processed + an integral coefficient + a single task profit value of the single task to be processed + a profit coefficient) and an evaluation grade of the single task to be processed.
The point display module 14 is used for displaying the work completion point obtained by the supplier worker completing the single task to be processed.
As shown in fig. 2, the present embodiment further provides a project task management method, which includes the following steps:
step 101, a supplier distributor obtains a project task to be processed sent by a demand party, wherein the project task to be processed comprises a project task name, a project task description and a project task deadline.
And 102, setting up items for the project tasks to be processed.
And 103, the supplier distributor decomposes the project task to be processed into a plurality of sub-project tasks, and enters step 104 when the sub-project task is a single task to be processed, and enters step 105 when the sub-project task is a sub-project task to be processed.
And 104, inquiring a single task standard library based on the task name of the single task to be processed, calling 106 when the task name exists in the inquiry, otherwise, entering 107, wherein the single task standard library stores the corresponding relation of the single task name, the single task standard and the single task working value.
And 105, issuing the sub-to-be-processed project task to a supplier receiver, wherein the supplier receiver is used as a new supplier distributor to re-execute the step 103 by taking the sub-to-be-processed project task as a to-be-processed project task, and the sub-to-be-processed project task is a task which needs to be completed by at least two persons.
And 106, the supplier distributor submits the single to-be-processed task to corresponding supplier staff, wherein the single to-be-processed task comprises a single task name, a single task standard, a single task working value and a single task deadline.
And 107, prompting that the single task to be processed is not inquired in the task standard library, configuring the single task standard and the single task working value of the single task to be processed by the supplier, and storing the corresponding relation of the configured single task name, the single task standard and the single task working value of the single task to be processed in the single task standard library.
And step 108, the supplier staff confirms whether to take over the single pending task, and the step 109 is carried out when the supply staff confirms to take over, and the step 110 is carried out when the supply staff confirms not to take over.
Step 109, sending the information for confirming the catcher to the supplier distributor and starting the task, and entering step 112.
And step 110, sending out reason information of no-take to the distributor of the supplier and starting task delivery without starting task submission, wherein the distributor of the supplier delivers the single task to be processed to other workers of the supplier.
And step 111, the supply side staff sends a delay instruction and receives information about whether the supply side staff agrees with the delay instruction, the information about agreeing with the delay and the delay deadline are sent when the received information is the information about agreeing with the delay, and the information about disagreeing with the delay is sent when the received information is the information about disagreeing with the delay.
And 112, the supplier staff submits the completed single task to be processed, the submission time of the single task to be processed is judged, the corresponding single task working value is obtained before the submission time is the deadline of the single task or before the approval delay and the submission time is the deadline of the delay, the task working value obtained after the submission time is the deadline of the single task and the disapproval delay is the task working value corresponding to the single task to be processed, and the proportionality coefficient is less than 1.
And 113, acquiring the evaluation grade given by the demander for the completion condition of the single to-be-processed task.
The supplier distributor evaluates the single job profit value for the single pending job, step 114.
And step 115, calculating the work completion integral of the single task to be processed (the single task work value of the single task to be processed and the integral coefficient and the single task profit value of the single task to be processed and the profit coefficient) and the evaluation grade of the single task to be processed.
And step 116, displaying the work completion integral obtained by the supplier worker completing the single to-be-processed task.
In the scheme, a demander sends a project task to be processed to a supplier, and the supplier acquires the project task to be processed and establishes the project task to be processed. The supplier manager decomposes the project task to be processed into 3 sub-project tasks, wherein the 1 st sub-project task and the 2 nd sub-project task are both single tasks to be processed and can be processed and completed by only one worker, and the 3 rd sub-project task is a sub-project task to be processed.
And (3) sending the 3 rd sub task (the sub to-be-processed project task) to a supplier receiver, after the supplier receiver receives the sub to-be-processed project task, taking the 3 rd sub task as a new supplier manager, taking the sub to-be-processed project task as a to-be-processed project task, and executing the project task decomposition operation again, so that the 3 rd sub task is decomposed into a single to-be-processed task 3, a single to-be-processed task 4 and a single to-be-processed task 5.
And querying a single task standard library based on task names of a single task 1 to be processed, a single task 2 to be processed, a single task 3, a single task 4 and a single task 5 respectively, smoothly entering the next step when querying that the single task name exists, sending a prompt message to prompt a supplier manager when querying that the task name does not exist, configuring the single task standard and the single task working value of the single task by the supplier manager, storing the configured corresponding relation among the single task name, the single task standard and the single task working value of the single task to be processed into the single task standard library, and querying again to obtain the single task name.
The supplier manager respectively submits the single-pending task 1 and the single-pending task 2 to a supplier worker A and a supplier worker B, and the supplier acceptor respectively submits the single-pending task 3, the single-pending task 4 and the single-pending task 5 to a supplier worker C, a supplier worker D and a supplier worker E.
After receiving the single to-be-processed task 1, the supplier worker A confirms whether to take over the single to-be-processed task 1, sends information for confirming taking over to a supplier manager when confirming taking over and starts task submission, wherein a task submission instruction on an interface is lightened by grey, the task submission instruction is started, and the subsequent supplier worker A clicks the task submission instruction to submit a task; and sending reason information of no-take to the supplier manager when no-take is confirmed, starting task submission instead of task submission, and submitting the single-standby task 1 to other supplier staff again by the supplier manager.
After receiving the single to-be-processed task 1, the supplier worker A starts to process the single to-be-processed task 1, and can apply for delay and give a delay reason when the task cannot be completed in time before a specified deadline, and a supplier manager sends information whether to agree with the delay after checking, and gives a delay deadline when agreeing with the delay. When a supplier worker A submits a single task 1 to be processed, the submission time of the single task 1 to be processed is judged, a corresponding single task working value is obtained before the submission time is the task deadline or before the submission time agrees with the delay and before the submission time is the delay deadline, the single task working value obtained after the submission time is the task deadline and when the submission time disagrees with the delay needs to be discounted on the original corresponding single task working value, and the single task working value obtained at the moment is equal to the task working value corresponding to the single task 1.
After the task is submitted, the demander gives an evaluation grade for the completion condition of the single to-be-processed task 1, if the completion condition of the single to-be-processed task 1 is good, the given evaluation grade is 1.2, if the completion condition of the single to-be-processed task 1 is medium, the given evaluation grade is 1.1, if the completion condition of the single to-be-processed task 1 is general, the given evaluation grade is 1.0, and if the completion condition of the single to-be-processed task 1 is poor, the given evaluation grade is 0.9.
Then, the work completion integral of the single job to be processed 1 (the job work value of the single job to be processed 1 + the integral coefficient + the single job profit value of the single job to be processed 1 + the profit coefficient) is calculated as the evaluation grade of the single job to be processed 1, and finally, the work completion integral obtained when the supplier worker a completes the single job to be processed 1 is displayed.
By analogy, the work completion integral obtained when the supplier worker B completes the single to-be-processed task 2, the work completion integral obtained when the supplier worker C completes the single to-be-processed task 3, the work completion integral obtained when the supplier worker D completes the single to-be-processed task 4, and the work completion integral obtained when the supplier worker E completes the single to-be-processed task 5 can be calculated and displayed.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.