CN113833167A - Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof - Google Patents

Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof Download PDF

Info

Publication number
CN113833167A
CN113833167A CN202111287205.9A CN202111287205A CN113833167A CN 113833167 A CN113833167 A CN 113833167A CN 202111287205 A CN202111287205 A CN 202111287205A CN 113833167 A CN113833167 A CN 113833167A
Authority
CN
China
Prior art keywords
wall
pipeline
sleeve
annular rib
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111287205.9A
Other languages
Chinese (zh)
Inventor
刘少亮
郝翠彩
张玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Academy Of Architectural Sciences Co ltd
Original Assignee
Hebei Academy Of Architectural Sciences Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Academy Of Architectural Sciences Co ltd filed Critical Hebei Academy Of Architectural Sciences Co ltd
Priority to CN202111287205.9A priority Critical patent/CN113833167A/en
Publication of CN113833167A publication Critical patent/CN113833167A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/22Installations of cables or lines through walls, floors or ceilings, e.g. into buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Acoustics & Sound (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

The invention relates to a pipeline wall-penetrating device for integrating a heat-insulating structure and a manufacturing and construction process thereof, wherein the pipeline wall-penetrating device for integrating the heat-insulating structure comprises a main pipeline, a first annular rib is arranged at the front end of the main pipeline, a sleeve is sleeved at the front end of the main pipeline, the front end of the sleeve is connected with the first annular rib, a second annular rib is arranged on the outer wall of the main pipeline, the position of the second annular rib corresponds to the rear end of the sleeve, a movable buckle cover for sealing the rear end port of the sleeve is arranged between the second annular rib and the rear end of the sleeve, and detachable blocking covers are respectively arranged at the front end and the rear end of the main pipeline. The invention has good air tightness, no thermal bridge, convenient construction and low cost, does not need on-site secondary treatment, can effectively solve the problems of leakage of a protective layer, unqualified air tightness, high secondary construction difficulty, high construction cost and the like caused by the fact that a hole needs to be formed in the construction of the ultra-low energy consumption building heat-insulation integrated structure of the traditional embedded pipe, and has obvious economic benefit and social benefit.

Description

Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof
Technical Field
The invention relates to a pipeline wall penetrating device, in particular to a pipeline wall penetrating device for integrating a heat insulation structure and a manufacturing and construction process thereof.
Background
The application and popularization of the ultra-low energy consumption building are important measures for realizing carbon peak reaching and carbon neutralization of the building. The method is very important for implementing the integrated technology of the heat-insulating structure of the building with ultra-low energy consumption at present. However, the traditional construction process and device are difficult to meet the requirements of integration of the ultra-low energy consumption building heat insulation mechanism on high air tightness, no heat bridge, good heat insulation and energy saving characteristics.
In traditional outer wall entrance to a cave seted up the in-process, outer wall concrete major structure need set up sleeve pipe (or reserve hole) and wear to locate the through-hole with the pipeline, fill insulation material between pipeline and sleeve pipe (or reserve hole), paste waterproof vapour barrier membrane/waterproof ventilative membrane in outer wall major structure inside and outside afterwards, seal the space between pipeline and the through-hole, follow-up paste the heat preservation in the outer wall outside, pipeline position heat preservation should cut and avoid, carry out the veneer construction of plastering in the heat preservation outside at last. Based on the traditional wall pipe construction method and device, the wall pipe and the sleeve are two separated devices, and the construction process is not consistent; in order to ensure the air tightness, the periphery of the pipeline still needs to be sealed by a waterproof steam-insulating film/a waterproof steam-permeable film at the indoor and outdoor sides of the main structure.
The heat preservation structure integrated structure generally comprises a reinforced concrete main body structure, a heat preservation layer and a concrete protection layer 3, and the system requires that the reinforced concrete main body structure at the indoor side, the heat preservation layer in the middle and the concrete protection layer at the outermost side are constructed simultaneously. If the traditional sleeve device and the construction process are adopted, after the construction of the outer wall is finished, the pipeline openings of the heat-insulating layer and the protective layer need to be dug for the second time, the waterproof tightness between the pipeline and the protective layer is damaged, and the problems of cracking and water seepage are easily caused. The heat preservation between sleeve and pipeline can only be filled in one side, and the compactness can not be ensured. The waterproof and breathable film on the outer surface of the outdoor reinforced concrete main body structure cannot be adhered, and the air tightness measure cannot be realized. It can be seen that the application of the traditional sleeve device and the construction process in the building insulation structure integrated system can cause the problems of high engineering construction difficulty, unrealizable design index, incapability of guaranteeing construction effect and the like.
Disclosure of Invention
The invention aims to provide a pipeline wall-penetrating device for heat insulation structure integration and a manufacturing and construction process thereof, and aims to solve the problems that the traditional sleeve device and the construction process are applied to a building heat insulation structure integration system to cause high engineering construction difficulty and incapability of guaranteeing compactness.
The invention is realized by the following steps: the utility model provides a pipeline wall-penetrating device for insulation construction integration, includes the main line the front end of main line is provided with first ring rib the sleeve pipe has been cup jointed to the front portion of main line, sheathed tube front end with first ring rib is connected be provided with second ring rib on the outer wall of main line, the position of second ring rib with sheathed tube rear end corresponds the second ring rib with be provided with between the sheathed tube rear end and be used for sealing the portable buckle closure of sleeve pipe rear end mouth forms the packing space between main line, first ring rib, sleeve pipe, second ring rib and the portable buckle closure, the packing space is used for filling insulation material the front and back both ends of main line pipe are provided with removable shutoff lid respectively.
Furthermore, the diameters of the first annular rib and the outer ring of the movable buckle cover are larger than the diameter of the outer wall of the sleeve, a third annular rib is arranged on the outer wall of the sleeve, and an end annular rib is arranged on the outer wall of the rear end of the main pipeline.
Furthermore, annular grooves are respectively formed in the part, exceeding the outer wall of the sleeve, of the rear end face of the first annular rib, the part, exceeding the outer wall of the sleeve, of the front end face of the movable buckle cover, the front end face of the end annular rib and the two end faces of the third annular rib.
Furthermore, a plurality of inner ring ribs are arranged in the filling space, the outer rings of the inner ring ribs are connected with the sleeve, the inner rings of the inner ring ribs are connected with the main pipeline, the filling space is divided into a plurality of sections of cavities by the inner ring ribs, and ring rib through holes are formed in the inner ring ribs.
Furthermore, the front end of the main pipeline is an expanding pipe with a diameter slightly larger than that of other parts.
Furthermore, the movable buckle cover is annular, an annular boss part is arranged on the front side surface of the movable buckle cover, an annular clamping groove is arranged on the outer ring of the boss part, an inclined surface is arranged on the outer edge of the front end surface of the boss part, and the inner ring of the movable buckle cover is a trapezoidal surface; the outer ring of the second annular rib is a trapezoidal surface, and an annular clamping protrusion is arranged on the inner wall of the rear end of the sleeve.
The invention also discloses a manufacturing process of the pipeline wall penetrating device, which comprises the following steps:
a. the method comprises the steps of manufacturing a main pipeline, enabling the length of the main pipeline to be the same as the designed total thickness of an outer wall structure, arranging a first annular rib and a second annular rib on the outer wall of the main pipeline, enabling the first annular rib to be located at the front end of the main pipeline, enabling the distance between the first annular rib and the second annular rib to be equal to the thickness of a reinforced concrete wall body of an outer wall, enabling the front end of the main pipeline to be in a closed form, forming a plugging cover of the front end, manufacturing an annular cutting line along the edge of the inner wall of the main pipeline on the plugging cover of the front end, forming a detachable plugging cover of the front end, and installing a detachable plugging cover at the rear end of the main pipeline.
b. And manufacturing a sleeve, wherein the length of the sleeve is equal to the thickness of the reinforced concrete wall of the outer wall, the diameter of the sleeve is larger than the outer diameter of the main pipeline and is smaller than the maximum diameter of the first annular rib, and the outer wall of the sleeve is provided with a third annular rib.
c. And manufacturing a movable buckle cover to enable the movable buckle cover to be annular, wherein the diameter of the inner ring of the movable buckle cover is consistent with that of the outer ring of the second annular rib, and the front end face of the movable buckle cover can be detachably arranged at the rear end of the sleeve.
d. And sleeving the sleeve on the front part of the main pipeline, so that the front end of the sleeve is contacted with the rear end surface of the first annular rib, and the contact surface is fixedly connected in a sealing manner.
e. And filling a filling space formed between the sleeve and the main pipeline with a heat insulation material.
f. And sleeving the movable buckle cover on the main pipeline and buckling and installing the movable buckle cover between the rear end of the sleeve and the second annular rib.
Furthermore, a plurality of inner annular ribs are arranged on the outer wall of the main pipeline between the first annular rib and the second annular rib, the inner annular ribs divide the filling space between the main pipeline and the sleeve into a plurality of cavities, and annular rib through holes are formed in the inner annular ribs; when the heat insulation material is filled, firstly, the foaming type heat insulation material is injected into the cavity at the front end through the annular rib through hole, and then the heat insulation material with the combustion grade of A grade is filled in the cavity at the rearmost end.
Furthermore, an annular boss part is arranged on the front side surface of the movable buckle cover, an annular clamping groove is arranged on the outer ring of the boss part, an inclined surface is arranged on the outer edge of the front end surface of the boss part, and the inner ring of the movable buckle cover is a trapezoidal surface; the outer ring of the second annular rib is a trapezoidal surface, and an annular clamping protrusion is arranged on the inner wall of the rear end of the sleeve.
The invention also discloses a construction process of the pipeline wall penetrating device for integrating the heat insulation structure, which comprises the following steps:
a. and binding steel bars on the reinforced concrete wall body part of the outer wall, and fixing the pipeline wall penetrating device for integrating the heat insulation structure on the steel bars of the main structure.
b. The heat preservation layer and the connecting component are fixedly installed on the outer side of the steel bar, the rear portion of a main pipeline of the pipeline wall penetrating device integrated with the heat preservation structure penetrates through the heat preservation layer, the inner side face of the heat preservation layer is in contact with the outer end face of the movable buckle cover, and the thickness of the heat preservation layer is smaller than the distance between the movable buckle cover and the rear end of the main pipeline.
c. Formworks are erected on two sides of the outer wall, the formworks on the two sides are respectively contacted with two ends of the main pipeline, and a gap is formed between the outer side formwork and the heat insulation layer.
d. And pouring concrete in the gaps between the heat preservation layer and the formworks on the two sides, and removing the formworks after the concrete is solidified to form the heat preservation integrated wall body with the pipeline wall penetrating device for integrating the heat preservation structure.
e. When carrying out indoor pipeline installation, demolish the removable blanking cover of front end earlier, with the pipeline of indoor pipeline and the pipeline wall bushing device's that is used for insulation construction integration front end socket joint connection.
f. The detachable plugging cover at the rear end is kept in an original state, and when the outdoor pipeline is to be installed, the detachable plugging cover at the rear end is detached again.
The pipeline wall penetrating device for the integration of the heat insulation structure is suitable for the integration of the heat insulation structure and the outer wall structure. The casing forms the integral type structure through first ring rib and thread pipe, can guarantee the leakproofness of device itself, and only need once install when the construction can, reduce the construction process step. The sleeve part is used for being installed in the reinforced concrete wall body, and heat insulation materials are filled in the filling space between the sleeve and the main pipeline so as to insulate the front end part of the main pipeline and ensure the heat insulation of the pipeline wall penetrating device. The rear end of the sleeve is plugged through a movable buckle cover, so that the filling of heat-insulating materials and the formation of a heat-insulating structure are facilitated. The structure of the first annular rib, the third annular rib, the movable buckle cover and the end annular rib is beneficial to fixing the pipeline wall penetrating device on an outer wall structure, the annular groove on the pipeline wall penetrating device can be in close contact with concrete to form a tight sealing surface, and the use of a waterproof vapor-proof film or a waterproof breathable film is reduced.
The manufacturing process of the pipeline wall penetrating device is used for manufacturing the pipeline wall penetrating device for the integration of the heat insulation structure, and the integrated pipeline wall penetrating device is formed through a special manufacturing and assembling process, so that the construction of the heat insulation integrated outer wall structure is facilitated.
According to the construction process of the pipeline wall penetrating device for the integration of the heat insulation structure, the pipeline wall penetrating device for the integration of the heat insulation structure is a prefabricated integrated structure and is adaptive to the size of a heat insulation integrated outer wall, the pipeline wall penetrating device can be directly and fixedly arranged on a steel bar of a reinforced concrete wall body integrally according to a designed threading position during construction, then the heat insulation layer is arranged at the designed position, a main pipeline penetrates through the heat insulation layer, a formwork is erected, then concrete pouring can be carried out, an inner reinforced concrete wall body and an outer self-compacting concrete layer are formed, and the heat insulation layer is wrapped in the outer wall structure, so that the outer wall structure is integrally formed. And the heat preservation between sleeve pipe and the thread pipe is accomplished in the pipeline wall penetrating device manufacturing process, does not need the later stage to carry out the construction alone, has reduced the construction step, and need not destroy the wall body, has avoided the influence of secondary excavation to outer wall structure leakproofness.
The invention has good air tightness, no thermal bridge, convenient construction and low cost, does not need on-site secondary treatment, can effectively solve the problems of leakage of a protective layer, unqualified air tightness, high secondary construction difficulty, high construction cost and the like caused by the fact that a hole needs to be formed in the construction of the ultra-low energy consumption building heat-insulation integrated structure of the traditional embedded pipe, and has obvious economic benefit and social benefit.
Drawings
Figure 1 is a schematic view of the installation of the invention.
Figure 2 is a perspective view of the invention with the cannula cut away.
In the figure: 1. a main pipeline; 2. a sleeve; 3. a movable buckle cover; 4. a first annular rib; 5. a second annular rib; 6. an inner annular rib; 7. Filling the space; 8. a third annular rib; 9. an end annular rib; 10. the plugging cover can be disassembled; 11. expanding the diameter of the pipe; 12. a thermal insulation material; 13. an annular groove; 14. clamping the bulges; 15. a circular cutting line; 16. a ring rib through hole; 17. a reinforced concrete wall; 18. a heat-insulating layer; 19. a self-compacting concrete layer; 3-1, a boss portion; 3-2, a clamping groove; 3-3, inclined plane.
Detailed Description
As shown in fig. 1 and 2, the pipeline wall-penetrating device for integration of a heat insulation structure of the invention comprises a main pipeline 1, wherein a first annular rib 4 is arranged on the outer wall of the front end of the main pipeline 1, a sleeve 2 is sleeved at the front end part of the main pipeline 1, and the front end of the sleeve 2 is hermetically connected with the rear side surface of the first annular rib 4. The outer wall of the main pipeline 1 is provided with a second annular rib 5, the position of the second annular rib 5 corresponds to the rear end of the sleeve 2, a movable buckle cover 3 is arranged between the second annular rib 5 and the rear end of the sleeve 2, and the movable buckle cover 3 is buckled at the rear ends of the second annular rib 5 and the sleeve 2 to seal the rear end opening of the sleeve 2.
A filling space 7 is formed among the main pipeline 1, the first annular rib 4, the sleeve 2, the second annular rib 5 and the movable buckle cover 3, and the filling space 7 is used for filling heat insulation materials 12. After the thermal insulation material 12 is filled, the filling space 7 is sealed by the movable buckle cover 3.
The front end and the rear end of the main line pipe are respectively provided with a detachable plugging cover 10. For not being connected completely between removable blocking lid 10 and the main pipeline 1, can adopt the form of cutting out annular cutting line 15, make removable blocking lid 10 can conveniently pull down from main pipeline 1 tip, also can adopt local bonding or local welded mode, make the outer lane of removable blocking lid 10 intermittent with be connected main pipeline 1, or adopt other any can conveniently follow main pipeline 1 tip with removable blocking lid 10 and pull down and do not destroy the connected mode of main pipeline 1.
The diameters of the outer rings of the first annular rib 4 and the movable buckle cover 3 are larger than the diameter of the outer wall of the sleeve 2, a third annular rib 8 is arranged on the outer wall of the sleeve 2, and an end annular rib 9 is arranged on the outer wall of the rear end of the main pipeline 1. The first annular rib 4 and the movable buckle cover 3 are embedded on two side faces of the reinforced concrete wall body 17 during construction of the outer wall, the third annular rib 8 is completely embedded in the reinforced concrete wall body 17, the end annular rib 9 is embedded on the outer side face of the self-compacting concrete layer 19, the first annular rib 4, the movable buckle cover 3 and the third annular rib 8 can be used for stably fixing the pipeline wall penetrating device integrated with the heat insulation structure on the reinforced concrete wall body 17 to form a sealing face, the end annular rib 9 is used for stably fixing the pipeline wall penetrating device integrated with the heat insulation structure on the self-compacting concrete layer 19 to form the sealing face, and the connecting strength and the connecting sealing performance of the pipeline wall penetrating device and the outer wall structure are improved.
The part of the rear end face of the first annular rib 4, which exceeds the outer wall of the sleeve 2, the part of the front end face of the movable buckle cover 3, which exceeds the outer wall of the sleeve 2, the front end face of the end annular rib 9 and two end faces of the third annular rib 8 are respectively provided with an annular groove 13. The annular groove 13 can form an irregular contact surface with concrete, and the sealing performance of the contact surface with the concrete is further improved through the formed concave-convex structure.
A plurality of inner ring ribs 6 are arranged in the filling space 7, the outer ring of each inner ring rib 6 is connected with the corresponding sleeve 2, the inner ring of each inner ring rib 6 is connected with the corresponding main pipeline 1, each inner ring rib 6 is used for supporting the corresponding outer sleeve 2 to prevent the corresponding outer sleeve 2 from deforming or moving, the filling space 7 is divided into a plurality of sections of cavities by the inner ring ribs 6, different heat insulation materials 12 can be filled in the different cavities, and in order to fill the heat insulation materials 12 in the cavities located at the front ends, the inner ring ribs 6 are provided with ring rib through holes 16. Can be in the cavity of rearmost end filling burning grade be the insulation material 12 of A level, generally can select for use the rock wool, the rock wool can directly be placed in the cavity of outermost end as the flocculus, then seals the back port through movable buckle closure 3. And it is difficult to fill the thermal insulation material 12 except for the rearmost cavity, and an injection tool may be used to inject a foaming type thermal insulation material 12, such as a foaming polyurethane material, into the cavity through the annular rib through hole 16.
The front end of the main pipeline 1 is an expanding pipe 11 with a diameter slightly larger than other parts, and the expanding pipe 11 can be inserted into an indoor pipeline in use, so that the main pipeline 1 and the indoor pipeline are in sealed connection.
The movable buckle cover 3 is annular, an annular boss part 3-1 is arranged on the front side face of the movable buckle cover 3, an annular clamping groove 3-2 is arranged on the outer ring of the boss part 3-1, an inclined plane 3-3 is arranged on the outer edge of the front end face of the boss part 3-1, and the inner ring of the movable buckle cover 3 is a trapezoidal surface. The outer ring of the second annular rib 5 is a trapezoidal surface, and the inner wall of the rear end of the sleeve 2 is provided with an annular clamping bulge 14. When the movable buckle cover 3 is installed, the movable buckle cover 3 is pressed towards the front end, the clamping protrusion 14 slides into the clamping groove 3-2 along the inclined surface 3-3 to realize clamping, and the trapezoidal surface of the inner ring of the movable buckle cover 3 is tightly contacted with the trapezoidal surface of the outer ring of the second annular rib 5 to form sealing.
A pipeline wall device that is used for insulation construction integration is applicable to insulation construction integration outer wall structure. The casing 2 forms the integral type structure through first ring rib 4 and thread pipe, can guarantee the leakproofness of device itself, and only need once install when the construction can, reduce the construction process step.
The sleeve 2 is partially used for being installed in a reinforced concrete wall 17, and the heat insulation material 12 is filled in the filling space 7 between the sleeve 2 and the main pipeline 1 so as to insulate the front end part of the main pipeline and ensure the heat insulation of the pipeline wall penetrating device.
The rear end of the sleeve 2 is blocked by a movable buckle cover 3, so that the filling of the heat insulation material 12 and the formation of a heat insulation structure are facilitated. The structures of the first annular rib 4, the third annular rib 8, the movable buckle cover 3 and the end annular rib 9 are beneficial to fixing the pipeline wall penetrating device on an outer wall structure, and the annular groove 13 on the pipeline wall penetrating device can be tightly contacted with concrete to form a tight sealing surface, so that the use of a waterproof vapor-proof film or a waterproof breathable film is reduced.
The manufacturing process of the pipeline wall-penetrating device comprises the following steps.
a. The method comprises the steps of manufacturing a main pipeline 1, enabling the length of the main pipeline 1 to be the same as the design total thickness of an outer wall structure, arranging a first annular rib 4 and a second annular rib 5 on the outer wall of the main pipeline 1, enabling the first annular rib 4 to be located at the front end of the main pipeline 1, enabling the distance between the first annular rib 4 and the second annular rib 5 to be equal to the thickness of a reinforced concrete wall 17 of the outer wall, enabling the front end of the main pipeline 1 to be in a closed form, forming a sealing cover of the front end, manufacturing an annular cutting line 15 on the sealing cover of the front end along the edge of the inner wall of the main pipeline 1, forming a detachable sealing cover 10 of the front end, and installing the detachable sealing cover 10 at the rear end of the main pipeline 1.
b. The sleeve 2 is manufactured, the length of the sleeve 2 is equal to the thickness of a reinforced concrete wall 17 of an outer wall, the diameter of the sleeve 2 is larger than the outer diameter of the main pipeline 1 and smaller than the maximum diameter of the first annular rib 4, and the outer wall of the sleeve 2 is provided with a third annular rib 8.
c. And manufacturing the movable buckle cover 3 to enable the movable buckle cover 3 to be annular, wherein the diameter of the inner ring of the movable buckle cover 3 is consistent with that of the outer ring of the second annular rib 5, and the front end face of the movable buckle cover 3 can be detachably arranged at the rear end of the sleeve 2.
d. The sleeve 2 is sleeved at the front end of the main pipeline 1, so that the front end of the sleeve 2 is contacted with the rear end face of the first annular rib 4, and the contact face is fixedly connected in a sealing manner.
e. The filling space 7 formed between the jacket 2 and the main line 1 is filled with a thermal insulation material 12.
f. The movable buckle cover 3 is sleeved on the main pipeline 1 and is buckled and installed between the rear end of the sleeve 2 and the second annular rib 5.
Wherein the first annular rib 4, the second annular rib 5, the end annular rib 9 and the inner annular rib 6 are integrally formed with the main pipeline 1, the removable closure cap 10 at the front end is also integrally formed with the main pipeline 1, and the sleeve 2 and the third annular rib 8 are integrally formed.
The outer wall of the main pipeline 1 between the first annular rib 4 and the second annular rib 5 is provided with a plurality of inner annular ribs 6, the inner annular ribs 6 divide a filling space 7 between the main pipeline 1 and the sleeve 2 into a plurality of cavities, and annular rib through holes 16 are formed in the inner annular ribs 6. The inner ring rib 6 has at least one, and the inner ring rib 6 can support the sleeve 2, prevents the deformation and the displacement of sleeve 2, simultaneously, divides the filling space 7 into two at least cavitys through the inner ring rib 6, and the cavity that is close to the front end is used for filling ordinary insulation material 12, and the cavity that is close to the rear end is used for filling insulation material 12 that has high burning grade to realize pipeline wall penetrating device's fire behavior.
When the thermal insulation material 12 is filled, a tool is used to inject the foaming thermal insulation material 12 into the cavity at the front end through the annular rib through hole 16, and then the thermal insulation material 12 with the combustion grade of A grade is filled into the cavity at the rearmost end. The foaming type heat insulation material 12 can be made of foaming polyurethane material, and the heat insulation material 12 with the combustion grade of A grade can be made of rock wool.
An annular boss part 3-1 is arranged on the front side surface of the movable buckle cover 3, an annular clamping groove 3-2 is arranged on the outer ring of the boss part 3-1, an inclined surface 3-3 is arranged on the outer edge of the front end surface of the boss part 3-1, and the inner ring of the movable buckle cover 3 is a trapezoidal surface; the outer ring of the second annular rib 5 is a trapezoidal surface, and the inner wall of the rear end of the sleeve 2 is provided with an annular clamping bulge 14.
The main pipeline 1, the sleeve 2 and the movable buckle cover 3 are three parts of the pipeline wall-penetrating device for integrating the heat insulation structure, can be manufactured independently, can be manufactured by casting molding, injection molding and other processes, and are generally made of polymers, plastics and the like. The obtained main line pipe is connected with the sleeve 2 in a bonding or fusion mode, the movable buckle cover 3 is connected in a clamping mode, and the pipeline wall penetrating device can be quickly and conveniently assembled.
The manufacturing process of the pipeline wall penetrating device is used for manufacturing the pipeline wall penetrating device for the integration of the heat insulation structure, and the integrated pipeline wall penetrating device is formed through a special manufacturing and assembling process, so that the construction of the heat insulation integrated outer wall structure is facilitated.
The construction process of the pipeline wall penetrating device for integrating the heat insulation structure comprises the following steps.
a. And (4) binding steel bars on the reinforced concrete wall body 17 part of the outer wall, and fixing the pipeline wall penetrating device for integrating the heat insulation structure on the steel bars of the main structure.
b. The heat preservation layer 18 and the connecting member are fixedly installed on the outer side of the steel bar, the rear portion of the main pipeline 1 of the pipeline wall penetrating device integrated with the heat preservation structure penetrates through the heat preservation layer 18, the inner side face of the heat preservation layer 18 is in contact with the outer end face of the movable buckle cover 3, and the thickness of the heat preservation layer 18 is smaller than the distance between the movable buckle cover 3 and the rear end of the main pipeline 1.
c. Formworks are erected on two sides of the outer wall, the formworks on the two sides are respectively contacted with two ends of the main pipeline 1, and a gap is formed between the outer side formwork and the outer wall heat-insulating layer 18.
d. And pouring concrete in the gap between the heat preservation layer 18 and the formworks at the two sides, and removing the formworks after the concrete is solidified to form the heat preservation integrated wall body with the pipeline wall penetrating device for integrating the heat preservation structure.
e. When the indoor pipeline is installed, the detachable plugging cover 10 at the front end is firstly detached, and the indoor pipeline and the front end of the pipeline wall penetrating device integrated with the heat preservation structure are connected in an inserting mode.
f. The detachable plugging cover 10 at the rear end remains the same, and when the outdoor pipeline is installed, the detachable plugging cover 10 at the rear end is detached.
The integrated outer wall of the heat insulation structure requires that the reinforced concrete wall 17 and the self-compacting concrete layer 19 on the outer side are poured simultaneously, the position of the through-wall pipe cannot be reserved, only later-stage hole opening installation is performed, the outer wall joint is damaged, meanwhile, the airtightness between the sleeve 2 and the wall body is difficult to guarantee, the contact surface of the reinforced concrete wall 17 and the heat insulation layer 18 is located inside the wall body, and the construction of a waterproof membrane is difficult to perform.
The construction process of the invention adopts the pipeline wall penetrating device for the integration of the heat insulation structure, the device is a prefabricated integrated structure and is adaptive to the size of the heat insulation integrated outer wall, when in construction, the pipeline wall penetrating device can be directly and fixedly arranged on the steel bars of the reinforced concrete wall 17 according to the designed threading position, then the heat insulation layer 18 is arranged at the designed position, the main pipeline 1 penetrates through the heat insulation layer 18, the pouring of concrete can be carried out after the formwork is erected, the reinforced concrete wall 17 at the inner side and the self-compacting concrete layer 19 at the outer side are formed, and the heat insulation layer 18 is coated in the outer wall structure, so that the outer wall structure is integrally formed. Meanwhile, the concrete poured by the reinforced concrete wall 17 is also tightly contacted with the outer surface of the sleeve 2 to form a sealing surface. And the heat preservation between sleeve pipe 2 and the thread pipe is accomplished in pipeline wall penetrating device manufacture process, does not need the later stage to be under construction alone, and pipeline wall penetrating device also does not need the installation of later stage trompil, and owing to need not construct waterproof ventilated membrane and waterproof vapour barrier membrane, has reduced the construction step and the construction degree of difficulty, and need not destroy the wall body, has avoided the influence of secondary excavation to outer wall structure seal.
The invention has good air tightness, no thermal bridge, convenient construction and low cost, does not need on-site secondary treatment, can effectively solve the problems of leakage of a protective layer, unqualified air tightness, high secondary construction difficulty, high construction cost and the like caused by the fact that a hole needs to be formed in the construction of the ultra-low energy consumption building heat-insulation integrated structure of the traditional embedded pipe, and has obvious economic benefit and social benefit.

Claims (10)

1. The utility model provides a pipeline wall-penetrating device for insulation construction integration, its characterized in that, includes the main line the front end of main line is provided with first ring rib the front portion of main line has cup jointed the sleeve pipe, the sheathed tube front end with first ring rib is connected be provided with second ring rib on the outer wall of main line, the position of second ring rib with the sheathed tube rear end corresponds be provided with between second ring rib and the sheathed tube rear end and be used for sealing the portable buckle closure of sleeve pipe rear end mouth, main line, first ring rib, sleeve pipe, second ring rib and portable buckle closure form the packing space between the cover, the packing space is used for filling insulation material, both ends are provided with removable shutoff lid respectively around the main line pipe.
2. The pipeline wall-penetrating device for the integration of the heat preservation structure as recited in claim 1, wherein the diameters of the first annular rib and the outer ring of the movable buckle cover are larger than the diameter of the outer wall of the sleeve, a third annular rib is arranged on the outer wall of the sleeve, and an end annular rib is arranged on the outer wall of the rear end of the main pipeline.
3. The pipe-line wall-penetrating device for insulation structure integration according to claim 2, wherein annular grooves are respectively provided on a portion of the rear end face of the first annular rib that exceeds the outer wall of the casing, a portion of the front end face of the movable buckle cover that exceeds the outer wall of the casing, the front end faces of the end annular ribs, and both end faces of the third annular rib.
4. The pipeline wall-penetrating device for the integration of the heat preservation structure as recited in claim 1, wherein a plurality of inner annular ribs are arranged in the filling space, outer rings of the inner annular ribs are connected with the casing, inner rings of the inner annular ribs are connected with the main pipeline, the inner annular ribs divide the filling space into a plurality of sections of cavities, and annular rib through holes are arranged on the inner annular ribs.
5. The pipeline wall-penetrating device for the integration of the heat preservation structure as recited in claim 1, wherein the front end of the main pipeline is an expanded diameter pipe having a diameter slightly larger than that of other parts.
6. The pipeline wall-penetrating device for the integration of the heat preservation structure as recited in claim 1, wherein the movable cover is circular, an annular boss part is provided on a front side surface of the movable cover, an annular clamping groove is provided on an outer ring of the boss part, an inclined surface is provided on an outer edge of a front end surface of the boss part, and an inner ring of the movable cover is a trapezoidal surface; the outer ring of the second annular rib is a trapezoidal surface, and an annular clamping protrusion is arranged on the inner wall of the rear end of the sleeve.
7. A manufacturing process of a pipeline wall-penetrating device is characterized by comprising the following steps:
a. manufacturing a main pipeline, enabling the length of the main pipeline to be the same as the designed total thickness of an outer wall structure, arranging a first annular rib and a second annular rib on the outer wall of the main pipeline, enabling the first annular rib to be located at the front end of the main pipeline, enabling the distance between the first annular rib and the second annular rib to be equal to the thickness of a reinforced concrete wall body of the outer wall, enabling the front end of the main pipeline to be in a closed form, forming a front-end blocking cover, manufacturing an annular cutting line on the front-end blocking cover along the edge of the inner wall of the main pipeline, forming a front-end detachable blocking cover, and installing a detachable blocking cover at the rear end of the main pipeline;
b. manufacturing a sleeve, wherein the length of the sleeve is equal to the thickness of a reinforced concrete wall of the outer wall, the diameter of the sleeve is larger than the outer diameter of the main pipeline and smaller than the maximum diameter of the first annular rib, and the outer wall of the sleeve is provided with a third annular rib;
c. manufacturing a movable buckle cover, wherein the movable buckle cover is annular, the diameter of an inner ring of the movable buckle cover is consistent with that of an outer ring of the second annular rib, and the front end face of the movable buckle cover can be detachably arranged at the rear end of the sleeve;
d. sleeving the sleeve on the front part of the main pipeline, so that the front end of the sleeve is contacted with the rear end face of the first annular rib, and the contact face is fixedly connected in a sealing manner;
e. filling a filling space formed between the sleeve and the main pipeline with a heat insulation material;
f. and sleeving the movable buckle cover on the main pipeline and buckling and installing the movable buckle cover between the rear end of the sleeve and the second annular rib.
8. The manufacturing method of the pipeline wall-penetrating device for the integration of the heat preservation structure as claimed in claim 7, wherein a plurality of inner annular ribs are arranged on the outer wall of the main pipeline between the first annular rib and the second annular rib, the inner annular ribs divide the filling space between the main pipeline and the sleeve into a plurality of cavities, and annular rib through holes are formed in the inner annular ribs; when the heat insulation material is filled, firstly, the foaming type heat insulation material is injected into the cavity at the front end through the annular rib through hole, and then the heat insulation material with the combustion grade of A grade is filled in the cavity at the rearmost end.
9. The method for manufacturing a pipeline wall-penetrating device for integration of a heat preservation structure as recited in claim 7, wherein an annular boss portion is provided on a front side surface of the movable cover, an annular clamping groove is provided on an outer ring of the boss portion, an inclined surface is provided on an outer edge of a front end surface of the boss portion, and an inner ring of the movable cover is a trapezoidal surface; the outer ring of the second annular rib is a trapezoidal surface, and an annular clamping protrusion is arranged on the inner wall of the rear end of the sleeve.
10. A construction process for a pipeline wall penetrating device integrated with a heat insulation structure is characterized by comprising the following steps:
a. binding steel bars on a reinforced concrete wall body part of an outer wall, and fixing the pipeline wall penetrating device for the integration of the heat insulation structure, which is defined in any one of claims 1-6, on the steel bars of the main body structure;
b. the heat preservation layer and the connecting component are fixedly arranged on the outer side of the steel bar, the rear part of a main pipeline of the pipeline wall penetrating device for integrating the heat preservation structure penetrates through the heat preservation layer, the inner side surface of the heat preservation layer is contacted with the outer end surface of the movable buckle cover, and the thickness of the heat preservation layer is smaller than the distance between the movable buckle cover and the rear end of the main pipeline;
c. supporting formworks on two sides of the outer wall, enabling the formworks on the two sides to be respectively contacted with two ends of the main pipeline, and forming a gap between the outer side formwork and the heat insulation layer;
d. pouring concrete in gaps between the heat preservation layer and the formworks on the two sides, and removing the formworks after the concrete is solidified to form a heat preservation integrated wall body with a pipeline wall penetrating device for integrating the heat preservation structure;
e. when the indoor pipeline is installed, the detachable plugging cover at the front end is firstly detached, and the indoor pipeline is connected with the front end of the pipeline wall-penetrating device for integrating the heat insulation structure in an inserting manner;
f. the detachable plugging cover at the rear end is kept in an original state, and when the outdoor pipeline is to be installed, the detachable plugging cover at the rear end is detached again.
CN202111287205.9A 2021-11-02 2021-11-02 Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof Pending CN113833167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111287205.9A CN113833167A (en) 2021-11-02 2021-11-02 Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111287205.9A CN113833167A (en) 2021-11-02 2021-11-02 Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof

Publications (1)

Publication Number Publication Date
CN113833167A true CN113833167A (en) 2021-12-24

Family

ID=78966853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111287205.9A Pending CN113833167A (en) 2021-11-02 2021-11-02 Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof

Country Status (1)

Country Link
CN (1) CN113833167A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI798109B (en) * 2022-06-14 2023-04-01 鼎興開發貿易股份有限公司 Pre-embedded components in the wall for pipe penetration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI798109B (en) * 2022-06-14 2023-04-01 鼎興開發貿易股份有限公司 Pre-embedded components in the wall for pipe penetration

Similar Documents

Publication Publication Date Title
CN106149764A (en) A kind of precast assembly pipe gallery bell and spigot waterproof construction
CN108166993B (en) A kind of portable slip casting casing bit and application method suitable for grouting behind shaft or drift lining
CN113833167A (en) Pipeline wall penetrating device for integration of heat insulation structure and manufacturing and construction process thereof
CN206246920U (en) A kind of rapid pipeline repairing device
CN216195751U (en) Heat-bridge-free sleeve for integrated external envelope structure of heat-insulating structure
KR20110122279A (en) Solf-assembly power district inosculation device for underground power transmit and supply
CN104964121B (en) A kind of sleeve water leakage plugging method
CN216839585U (en) Sealing structure at joint of new concrete and old concrete
CN213980033U (en) Shear force wall screw rod hole block structure
CN211118039U (en) Wall pipe assembly
CN114006329A (en) Cable variable-diameter sealing piece water-blocking flange
CN108729562B (en) Waterproof plugging device
CN211006643U (en) Bored concrete pile for water conservancy construction with watertight fittings
CN211342004U (en) Hole reinforcing and leakage preventing construction structure for side wall of old water pool
KR200452242Y1 (en) Arrangement line connection device of manhole line
JP4143794B2 (en) Filling method of filling material
CN210800267U (en) Prefabricated modular water-blocking flange
KR200459984Y1 (en) Pipe Connector for Manhole
CN110593629A (en) Construction method and structure for reinforcing and preventing leakage of old pool side wall through hole opening
CN209876166U (en) Basement outer wall rear calandria waterproof construction
CN218378318U (en) Pipeline convenient to maintenance
KR101609811B1 (en) Eco-friendly irrigation canal
CN214947166U (en) Underground drainage pipe flexible joint for recycling production of construction waste
CN202308994U (en) Plastic cable pipe
CN217519386U (en) Wall-penetrating pipeline heat-insulating sleeve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination