CN113803079A - Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure - Google Patents

Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure Download PDF

Info

Publication number
CN113803079A
CN113803079A CN202111109286.3A CN202111109286A CN113803079A CN 113803079 A CN113803079 A CN 113803079A CN 202111109286 A CN202111109286 A CN 202111109286A CN 113803079 A CN113803079 A CN 113803079A
Authority
CN
China
Prior art keywords
mud film
pressure
cabin
opening operation
bentonite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111109286.3A
Other languages
Chinese (zh)
Inventor
历朋林
白坤
杜昌言
吴玉礼
徐慧旺
李海振
陆野
宾锡午
娄瑞
杨青林
田兆平
董冰
薛永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Shield Engineering Co Ltd
Original Assignee
China Railway 14th Bureau Group Shield Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Shield Engineering Co Ltd filed Critical China Railway 14th Bureau Group Shield Engineering Co Ltd
Priority to CN202111109286.3A priority Critical patent/CN113803079A/en
Publication of CN113803079A publication Critical patent/CN113803079A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/0678Adding additives, e.g. chemical compositions, to the slurry or the cuttings
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/001Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing unburned clay
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00034Physico-chemical characteristics of the mixtures
    • C04B2111/00146Sprayable or pumpable mixtures
    • C04B2111/00155Sprayable, i.e. concrete-like, materials able to be shaped by spraying instead of by casting, e.g. gunite
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00724Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Dispersion Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to the technical field of urban underground engineering construction, in particular to a method for maintaining a tunnel face mud film during pressurized cabin opening operation of a large-diameter mud shield, which comprises the following steps: after opening the cabin under pressure, spraying high-viscosity bentonite at the cracks of the palm mud film by using a high-pressure spray gun, so that the high-viscosity bentonite permeates into the cracks, filling and sealing the cracks, and spraying for at least one time; the high-viscosity bentonite is prepared from a grouting agent, bentonite and water according to a ratio of 1: 15-20: 35-40. The invention can greatly improve the maintenance efficiency of the tunnel face mud film when the muddy water balance shield is pressed to open the cabin, and meanwhile, the repeated pressurization and decompression are not needed during the cabin opening operation, thereby reducing the health risk brought to operators due to the pressure change.

Description

Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure
Technical Field
The invention relates to the technical field of urban underground engineering construction, in particular to a method for maintaining a tunnel face mud film during pressurized cabin opening operation of a large-diameter mud shield.
Background
When the shield machine tunnels in a complicated and variable stratum, abnormal abrasion and other conditions of a cutter often occur, and the cutter needs to be checked and replaced by opening the cabin. In recent years, with the development of shield manufacturing technology, a shield machine develops towards the direction of large diameter and large burial depth, a large-diameter normal-pressure cutter head is developed, and when a cutter is abnormally worn, the cutter is only required to be replaced in the normal-pressure environment of a cutter head spoke arm, so that the construction efficiency is improved. Although the problem of under-pressure cabin opening tool changing is solved by the normal-pressure cutter head, the shield machine can also face the problems of damage of a stone crusher, mud cake formation of the cutter head, failure of sealing of a main drive and the like, and at the moment, the shield machine still needs to enter the cabin for inspection in time and process fault phenomena. However, shield cabin opening operation under high water pressure, high permeability and complex geological conditions has high difficulty and risk, and improper treatment often causes adverse effects such as excavation face collapse and groundwater breakdown, so the stability of the tunnel face mud film is the key to success or failure of cabin opening. The under-pressure cabin opening is a method for forming a closed mud film on an excavation surface by using mud, balancing the corresponding water and soil pressure by using air pressure, and opening the cabin under the air pressure support (CN 104121023A: a device and a method for testing the air closing value of the mud film on the excavation surface when the mud shield is under pressure to open the cabin). At present, pressurization and decompression processes are needed for cabin opening under pressure, a large amount of time is consumed, and frequent pressurization and decompression have certain influence on the bodies of cabin entering personnel. Therefore, how to continuously maintain the stability of the tunnel face mud film and avoid the situations of cracks, perforation and the like of the mud film under the action of pressure under the condition of long time of opening the chamber under pressure, a stable and safe working environment is provided for the personnel entering the chamber, and the problem of constant attention in the shield industry is formed. At present, in the process of cabin opening operation, the pressure of an excavation cabin is gradually reduced and pressure can not be maintained, so that the mud film is possibly cracked, personnel need to evacuate, and the excavation cabin is grouted again to form a new mud film. On the basis, researchers develop a new mode (CN 111042825A: a method for repairing the deterioration and ventilation of the mud film on the excavation surface when the earth pressure balance shield is opened under pressure), namely, slurry is uniformly coated on the cracks of the mud film through a brush, the pressure of the excavation chamber is increased, the slurry is maintained for a period of time to permeate into the cracks, a new mud film is formed through repeated operation, and then the pressure is reduced to enter the advancing chamber for construction. Compared with the traditional method, the method has the advantages that although the efficiency is improved, repeated pressurization and depressurization are needed, the cabin entering personnel adopt a hairbrush mode to smear, the acting area is small, and the operation efficiency is low.
Disclosure of Invention
Aiming at the technical problems that the maintenance efficiency of the mud film on the tunnel face of the large shield is low, the pressure chamber needs to be repeatedly pressurized and decompressed and the like in the prior art, the invention provides the tunnel face mud film maintenance method during the pressurized cabin opening operation of the large-diameter mud shield, which greatly improves the maintenance efficiency of the mud film on the tunnel face when the large mud balance shield is pressurized and opened, and simultaneously, the repeated pressurization and decompression are not needed during the cabin opening operation, thereby reducing the health risk brought to operators due to the pressure change.
The invention provides a tunnel face mud film maintenance method during large-diameter slurry shield under-pressure cabin opening operation, which comprises the following steps: after opening the cabin under pressure, spraying high-viscosity bentonite at the cracks of the palm mud film by using a high-pressure spray gun, so that the high-viscosity bentonite permeates into the cracks, filling and sealing the cracks, and spraying for at least one time;
the high-viscosity bentonite is prepared from a grouting agent, montmorillonite and water according to the weight ratio of 1: 15-20: 35-40. The grouting agent is a conventional grouting agent used in the prior art and is prepared by refining a high-performance plasticizer, a surfactant, a calcium-silicon micro-expansion agent, a hydration heat inhibitor, a migration type rust inhibitor, nanoscale mineral calcium-silicon iron powder and a stabilizer or refining and compounding low-alkali low-heat portland cement and the like.
Furthermore, before the cabin is opened under pressure, the cabin entering pressure is determined through theoretical calculation and a pressure maintaining and reducing test, and the cabin entering pressure under pressure is reduced as much as possible under the condition that the good quality of a mud film is ensured so as to prolong the cabin entering working time.
Further, the viscosity of the prepared high-viscosity bentonite is 40-60 s, and the viscosity is the Markov funnel viscosity.
Further, adjusting the jet flow according to the size and the position of the crack of the mud film on the tunnel face; the crack is large, and the jet flow is increased; the crack is smaller, the jet flow is reduced, the standard that the high-viscosity bentonite completely sticks the crack is taken as the standard, the purpose is to jet the slurry with the spraying amount suitable for the size of the crack, and the crack is more fully filled.
Furthermore, the sprayed high-viscosity bentonite is in a spray shape, so that the spraying is more uniform.
Furthermore, during cabin opening operation, pressure fluctuation of the palm mud film and the air pressure cabin is observed, and if cracks or pressure fluctuation occurs, high-viscosity bentonite is sprayed again until the cracks or the pressure stability cannot be observed by naked eyes.
Furthermore, after crack spraying is finished, if the air pressure of the air pressure cabin is unstable, high-viscosity bentonite is sprayed on the palm face mud film comprehensively until the pressure of the air pressure cabin is stable, and adverse effects caused by mud film cracks which cannot be observed by naked eyes are reduced.
Further, high-pressure spray gun is hand-held type, adopts pneumatic type pressure control, and the atmospheric pressure control scope is: 11-12 bar.
Furthermore, the density of the high-viscosity bentonite is 0.2-0.4 g/cm lower than that of the hatch-opening slurry3On the one hand, the effect is that the density is small to ensure that better spraying effect can be formed in the maintenance process of the sludge filmThe high-viscosity bentonite is convenient to uniformly distribute and penetrate into cracks of a mud film; on the other hand, when the high-viscosity bentonite fills cracks on the palm surface, further water absorption occurs, and the liquid expands in the presence of water, thereby effectively filling the cracks.
As a preferred technical scheme:
the invention relates to a tunnel face mud film maintenance method during large-diameter slurry shield under-pressure cabin opening operation, which specifically comprises the following steps:
(1) before opening the cabin under pressure, confirming the required cabin entering pressure according to calculation and test;
(2) mixing a grouting agent for opening the cabin, montmorillonite and water to prepare high-viscosity bentonite, and placing the prepared high-viscosity bentonite in a high-pressure spray gun;
(3) after people enter the cabin, judging the size and the position of a mud film crack by observing the surface condition of the mud film on the palm surface, adjusting corresponding operating parameters, spraying high-viscosity bentonite by adopting a high-pressure spray gun crack, and taking the condition that the crack is completely stuck by the high-viscosity bentonite as a standard;
(4) in the cabin opening process, observing the surface condition of the tunnel face, and if a new crack appears, repeatedly spraying high-viscosity bentonite, and dynamically maintaining the tunnel face mud film;
(5) after the spraying operation is finished, if the tunnel face mud film has no cracks and/or pressure fluctuation of the air pressure cabin, the tunnel face mud film does not need to be subjected to other operations; if the tunnel face mud film cracks and/or the pressure of the air pressure cabin fluctuates, high-viscosity bentonite is sprayed on the tunnel face mud film comprehensively.
The principle of the invention is as follows: according to the invention, the high-viscosity bentonite is adopted to fill the cracks of the mud film, and the montmorillonite in the high-viscosity bentonite can enable the high-viscosity bentonite to expand after penetrating into the cracks so as to fill the cracks; the grouting agent can enable the prepared slurry to have higher strength and elastic modulus, no shrinkage after expansion and bonding force after being hardened, and enable the slurry in the crack to be full and compact; the purpose of water in the raw materials is to ensure that the high-viscosity bentonite keeps certain fluidity and is convenient for spraying by a spray gun; the high-viscosity bentonite prepared by the raw materials has the best performance; meanwhile, the invention adopts the high-pressure spray gun to fill cracks appearing on the tunnel face mud film, has high efficiency and convenient operation, and is suitable for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield.
The invention has the beneficial effects that:
the method for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield adopts high-viscosity bentonite prepared by mixing a grouting agent, bentonite and water in proportion as mud film maintenance slurry, has the characteristics of high viscosity, light weight and easiness in puffing, and is easy to form uniform spraying; the high-pressure spray gun is used for filling cracks appearing on the face mud film, the wetness of the face is kept, the air tightness and the stability of the mud film can be effectively guaranteed, the high-pressure spray gun device is simple and convenient to operate, the spraying area is large, the spraying time is short, meanwhile, the air pressure chamber is not required to be repeatedly pressurized, the health risk of constructors is reduced, and the rapid dynamic maintenance of the large-diameter face mud film can be realized.
After the crack of the palm surface mud film is treated, the additional treatment is not needed, and the method is convenient and efficient.
Detailed Description
In order to make those skilled in the art better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
The invention relates to a tunnel face mud film maintenance method during cabin opening operation of a large-diameter slurry shield under pressure, which specifically comprises the following steps:
(1) before opening the cabin under pressure, theoretical calculation and a pressure maintaining and reducing test are carried out to ensure that the pressure of the cabin entering under pressure is reduced as much as possible under the condition of ensuring better mud film quality so as to prolong the working time of the cabin entering;
(2) taking out the grouting agent and swellingMixing and stirring soil and water to prepare mud film maintenance mud, wherein the mass ratio of the mud pressing agent to the bentonite to the water is 1:18:38, mixing is carried out, the viscosity of the mud of the bentonite mixture is kept at 50s, and the density of the high-viscosity bentonite is 0.3g/cm lower than that of the open cabin mud3
(3) When entering the cabin, the working personnel carry the high-viscosity bentonite and the high-pressure spray gun. Observing the size and position of the cracks of the palm surface mud film, and spraying high-viscosity bentonite. And if the crack is large, adjusting the spraying flow rate and increasing the spraying flow rate. Adjust high-pressure spray gun atmospheric pressure size simultaneously, high-pressure spray gun is the hand-held type, adopts pneumatic type pressure control, and the atmospheric pressure control scope is: 11-12bar, the sprayed high-viscosity bentonite is in a spray shape and is convenient to be uniformly distributed. And after the spraying work is finished, checking the pressure fluctuation condition of the air pressure bin, if the air pressure is unstable, and if cracks which cannot be observed by naked eyes exist on the surface of the mud film, comprehensively spraying high-viscosity bentonite mud on the palm surface mud film until the pressure fluctuation of the air pressure bin is stable.
(4) And in the cabin opening operation process, observing the pressure fluctuation condition of the tunnel face mud film and the air pressure cabin, and if cracks and/or unstable pressure occur, spraying the high-viscosity bentonite again to realize dynamic maintenance of the tunnel face mud film.
(5) After the palm surface mud film is sprayed with the high-viscosity bentonite, if no crack and/or unstable pressure occurs, the mud film does not need to be additionally treated.
Example 2
The invention relates to a tunnel face mud film maintenance method during cabin opening operation of a large-diameter slurry shield under pressure, which specifically comprises the following steps:
(1) before opening the cabin under pressure, theoretical calculation and a pressure maintaining and reducing test are carried out to ensure that the pressure of the cabin entering under pressure is reduced as much as possible under the condition of ensuring better mud film quality so as to prolong the working time of the cabin entering;
(2) mixing and stirring a grouting agent, bentonite and water to prepare mud film maintenance slurry, wherein the mass ratio of the grouting agent to the bentonite to the water is 1:15:40, the viscosity of the bentonite mixture slurry is kept for 40s, and the density of the high-viscosity bentonite is 0.2g/cm lower than that of the open-cabin slurry3
(3) When entering the cabin, the working personnel carry the high-viscosity bentonite and the high-pressure spray gun. Observing the size and position of the cracks of the palm surface mud film, and spraying high-viscosity bentonite. And if the crack is large, adjusting the spraying flow rate and increasing the spraying flow rate. Adjust high-pressure spray gun atmospheric pressure size simultaneously, high-pressure spray gun is the hand-held type, adopts pneumatic type pressure control, and the atmospheric pressure control scope is: 11-12bar, the sprayed high-viscosity bentonite is in a spray shape and is convenient to be uniformly distributed. And after the spraying work is finished, checking the pressure fluctuation condition of the air pressure bin, if the air pressure is unstable, and if cracks which cannot be observed by naked eyes exist on the surface of the mud film, comprehensively spraying high-viscosity bentonite mud on the palm surface mud film until the pressure fluctuation of the air pressure bin is stable.
(4) And in the cabin opening operation process, observing the pressure fluctuation condition of the tunnel face mud film and the air pressure cabin, and if cracks and/or unstable pressure occur, spraying the high-viscosity bentonite again to realize dynamic maintenance of the tunnel face mud film.
(5) After the palm surface mud film is sprayed with the high-viscosity bentonite, if no crack and/or unstable pressure occurs, the mud film does not need to be additionally treated.
Example 3
The invention relates to a tunnel face mud film maintenance method during cabin opening operation of a large-diameter slurry shield under pressure, which specifically comprises the following steps:
(1) before opening the cabin under pressure, theoretical calculation and a pressure maintaining and reducing test are carried out to ensure that the pressure of the cabin entering under pressure is reduced as much as possible under the condition of ensuring better mud film quality so as to prolong the working time of the cabin entering;
(2) mixing and stirring a grouting agent, bentonite and water to prepare mud film maintenance slurry, wherein the mass ratio of the grouting agent to the bentonite to the water is 1:20:35, the viscosity of the bentonite mixture slurry is kept for 60s, and the density of the high-viscosity bentonite is 0.4g/cm lower than that of the open-cabin slurry3
(3) When entering the cabin, the working personnel carry the high-viscosity bentonite and the high-pressure spray gun. Observing the size and position of the cracks of the palm surface mud film, and spraying high-viscosity bentonite. And if the crack is large, adjusting the spraying flow rate and increasing the spraying flow rate. Adjust high-pressure spray gun atmospheric pressure size simultaneously, high-pressure spray gun is the hand-held type, adopts pneumatic type pressure control, and the atmospheric pressure control scope is: 11-12bar, the sprayed high-viscosity bentonite is in a spray shape and is convenient to be uniformly distributed. And after the spraying work is finished, checking the pressure fluctuation condition of the air pressure bin, if the air pressure is unstable, and if cracks which cannot be observed by naked eyes exist on the surface of the mud film, comprehensively spraying high-viscosity bentonite mud on the palm surface mud film until the pressure fluctuation of the air pressure bin is stable.
(4) And in the cabin opening operation process, observing the pressure fluctuation condition of the tunnel face mud film and the air pressure cabin, and if cracks and/or unstable pressure occur, spraying the high-viscosity bentonite again to realize dynamic maintenance of the tunnel face mud film.
(5) After the palm surface mud film is sprayed with the high-viscosity bentonite, if no crack and/or unstable pressure occurs, the mud film does not need to be additionally treated.
The invention adopts high-viscosity bentonite prepared by mixing the mud-pressing agent, the bentonite and the water according to a proportion as mud film maintenance mud, has the characteristics of high viscosity, light weight and easy expansion, and is easy to form uniform spraying; the high-pressure spray gun is used for filling cracks appearing on the face mud film, the wetness of the face is kept, the air tightness and the stability of the mud film can be effectively guaranteed, the high-pressure spray gun device is simple and convenient to operate, the spraying area is large, the large-diameter face mud film can be quickly and dynamically maintained, meanwhile, the air pressure chamber does not need to be repeatedly pressurized, and the health risk of construction personnel is reduced.
If the mud film on the tunnel face is cracked and dried on the surface in a certain standard section of the tunnel project of the yellow river in the south of China, the method of the embodiment 1 of the invention can control the maintenance period within 2 hours, and the maintenance period of the conventional mud film repairing method (repeatedly pressurizing and depressurizing and smearing the mud film in a brush mode by cabin entering personnel) is usually 1-2 days at present, so that the construction efficiency is greatly improved.
Although the present invention has been described in detail by way of preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made on the embodiments of the present invention by those skilled in the art without departing from the spirit and scope of the present invention, and these modifications or substitutions are within the scope of the present invention/any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention.

Claims (10)

1. A method for maintaining a face mud film during pressurized cabin opening operation of a large-diameter slurry shield is characterized in that after the cabin is opened under pressure, high-viscosity bentonite is sprayed to cracks of the face mud film by a high-pressure spray gun, so that the high-viscosity bentonite permeates into the cracks, the cracks are filled and sealed, and the spraying frequency is at least one time;
the high-viscosity bentonite is prepared from a grouting agent, montmorillonite and water according to the weight ratio of 1: 15-20: 35-40.
2. The method for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield according to claim 1, wherein before the pressurized cabin opening operation, the cabin entering pressure is determined through theoretical calculation and a pressure maintaining and reducing test.
3. The method for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield as claimed in claim 1, wherein the viscosity of the prepared high-viscosity bentonite is 40-60 s.
4. The method for maintaining the mud film on the working face of the large-diameter slurry shield during the pressurized cabin opening operation of the large-diameter slurry shield according to claim 1, wherein the spraying flow is adjusted according to the size and the position of the crack of the mud film on the working face, and the standard that the crack is completely stuck by the high-viscosity bentonite is adopted.
5. The method for maintaining the mud film on the tunnel face during the pressurized cabin opening operation of the large-diameter slurry shield as claimed in claim 1, wherein the sprayed high-viscosity bentonite is in a spray form.
6. The method for maintaining the face mud film of the large-diameter slurry shield during the pressurized cabin opening operation according to claim 1, wherein during the cabin opening operation, the pressure fluctuation of the face mud film and the pressure cabin is observed, and if the crack or the pressure fluctuation occurs, the high-viscosity bentonite is sprayed again until the crack is not observed or the pressure is stable.
7. The method for maintaining the face mud film of the large-diameter slurry shield during the pressurized cabin opening operation according to claim 1, wherein after the crack spraying is completed, if the air pressure of the air pressure cabin is unstable, the face mud film is sprayed with high-viscosity bentonite on the whole until the pressure of the air pressure cabin is stable.
8. The method for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield according to claim 1, wherein the high-pressure spray gun is handheld, pneumatic pressure control is adopted, and the air pressure control range is as follows: 11-12 bar.
9. The method for maintaining the mud film on the tunnel face during the pressurized cabin opening operation of the large-diameter slurry shield as claimed in claim 1, wherein the density of the high-viscosity bentonite is 0.2-0.4 g/cm lower than that of the cabin opening slurry3
10. The method for maintaining the tunnel face mud film during the pressurized cabin opening operation of the large-diameter slurry shield according to any one of claims 1 to 9, which is characterized by comprising the following steps:
(1) before opening the cabin under pressure, confirming the required cabin entering pressure according to calculation and test;
(2) mixing a grouting agent for opening the cabin, montmorillonite and water to prepare high-viscosity bentonite, and placing the prepared high-viscosity bentonite in a high-pressure spray gun;
(3) after people enter the cabin, judging the size and the position of a mud film crack by observing the surface condition of the mud film on the palm surface, adjusting corresponding operating parameters, and performing spraying high-viscosity bentonite crack filling treatment by adopting a high-pressure spray gun crack, wherein the standard that the crack is completely stuck by the high-viscosity bentonite is adopted;
(4) in the cabin opening process, observing the surface condition of the tunnel face, and if a new crack appears, repeatedly spraying high-viscosity bentonite, and dynamically maintaining the tunnel face mud film;
(5) after the spraying operation is finished, if the tunnel face mud film has no cracks and/or pressure fluctuation of the air pressure cabin, the tunnel face mud film does not need to be subjected to other operations; if the tunnel face mud film cracks and/or the pressure of the air pressure cabin fluctuates, high-viscosity bentonite is sprayed on the tunnel face mud film comprehensively.
CN202111109286.3A 2021-09-22 2021-09-22 Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure Pending CN113803079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111109286.3A CN113803079A (en) 2021-09-22 2021-09-22 Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111109286.3A CN113803079A (en) 2021-09-22 2021-09-22 Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure

Publications (1)

Publication Number Publication Date
CN113803079A true CN113803079A (en) 2021-12-17

Family

ID=78896291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111109286.3A Pending CN113803079A (en) 2021-09-22 2021-09-22 Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure

Country Status (1)

Country Link
CN (1) CN113803079A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5512096A (en) * 1993-10-20 1996-04-30 Wyo-Ben, Inc. Flexible grouting composition
JP2000193796A (en) * 1998-12-25 2000-07-14 Kajima Corp Method for back-filling and manufacture of block used for the method
JP2001073355A (en) * 1999-09-07 2001-03-21 Shimoda Gijutsu Kenkyusho:Kk Injection method for grout regarding cement and bentonite as main material
CN104005769A (en) * 2014-03-25 2014-08-27 中铁十六局集团地铁工程有限公司 Waterless sandy cobble stratum shield cabin-opening tool changing method
CN107021660A (en) * 2017-05-17 2017-08-08 句容康泰膨润土有限公司 A kind of gunite concrete additive
CN108101493A (en) * 2018-01-11 2018-06-01 东莞市明洁隧道建设材料有限公司 It is used and firm mud with the highly viscous shield of high-consistency
CN110002802A (en) * 2019-03-20 2019-07-12 内蒙古高远工程科技发展有限公司 A kind of prestress hole path pressure grouting agent and preparation method thereof
CN110359917A (en) * 2019-06-27 2019-10-22 中交一公局第三工程有限公司 Sand-pebble layer large-diameter shield tool changing construction method with pressure
CN111042825A (en) * 2019-12-23 2020-04-21 河海大学 Repairing method for deterioration and ventilation of excavation face mud film during under-pressure cabin opening of earth pressure balance shield

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5512096A (en) * 1993-10-20 1996-04-30 Wyo-Ben, Inc. Flexible grouting composition
JP2000193796A (en) * 1998-12-25 2000-07-14 Kajima Corp Method for back-filling and manufacture of block used for the method
JP2001073355A (en) * 1999-09-07 2001-03-21 Shimoda Gijutsu Kenkyusho:Kk Injection method for grout regarding cement and bentonite as main material
CN104005769A (en) * 2014-03-25 2014-08-27 中铁十六局集团地铁工程有限公司 Waterless sandy cobble stratum shield cabin-opening tool changing method
CN107021660A (en) * 2017-05-17 2017-08-08 句容康泰膨润土有限公司 A kind of gunite concrete additive
CN108101493A (en) * 2018-01-11 2018-06-01 东莞市明洁隧道建设材料有限公司 It is used and firm mud with the highly viscous shield of high-consistency
CN110002802A (en) * 2019-03-20 2019-07-12 内蒙古高远工程科技发展有限公司 A kind of prestress hole path pressure grouting agent and preparation method thereof
CN110359917A (en) * 2019-06-27 2019-10-22 中交一公局第三工程有限公司 Sand-pebble layer large-diameter shield tool changing construction method with pressure
CN111042825A (en) * 2019-12-23 2020-04-21 河海大学 Repairing method for deterioration and ventilation of excavation face mud film during under-pressure cabin opening of earth pressure balance shield

Similar Documents

Publication Publication Date Title
CN104533418B (en) A kind of underground coal mine deep hole static(al) that is used for breaks rock dust
Quebaud et al. Use of chemical foam for improvements in drilling by earth-pressure balanced shields in granular soils
CN110195580B (en) Gas-liquid two-phase combined coal bed permeability increasing method
CN106836214B (en) Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing
Jiang et al. Investigation of rock cutting dust formation and suppression using water jets during mining
CN111305877B (en) Construction method for strong rockburst section tunnel in high-altitude area
CN108444888A (en) A kind of fractured coal and rock osmotic grouting visual test device and its test method
CN110359917A (en) Sand-pebble layer large-diameter shield tool changing construction method with pressure
CN207974823U (en) A kind of grouting pipeline structure of deep hole grouting
CN105257309B (en) In a kind of layer of sand in balancing earth-pressure shielding machine storehouse slip casting tool changing construction method
CN105569665B (en) Balancing earth-pressure shielding machine soil mass consolidation tool changing construction method outside the native storehouse in layer of sand
CN113803079A (en) Method for maintaining tunnel face mud film during cabin opening operation of large-diameter slurry shield under pressure
CN110185035A (en) A kind of pile making method of the MJS engineering method suitable for hardpan
CN105257306B (en) A kind of tool changing construction method of filling in barn reinforced in shield cabin
KR100469525B1 (en) The replacement type pillar-shaped hardening structure formation equipment and the formation method of leading mortar jet
CN112281933A (en) Construction method of high-pressure jet grouting pile test
CN107389398A (en) A kind of adjustable soil sample instrument for carbonizing of confined pressure
CN108101493B (en) Yini mud with high consistency and high viscosity for shield
US1952162A (en) Grouting of ground, soil, or other measures
CN110259465A (en) A kind of method that list shield double mode TBM pre-grouting reinforces fault belt
CN103992780A (en) Additive for hole-sealing material, novel hole-sealing material prepared by utilizing additive and application method of novel hole-sealing material
CN113605899A (en) Tunnel excavation method based on hydraulic impact crushing and static crushing
CN207512696U (en) A kind of roomy crack enclosed construction of rock mass
CN115434720B (en) Construction method for dismantling screw conveyor under pressure
CN117027836A (en) Metamorphic water jet intelligent tunneling method for tunnel hard rock face

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination