CN113789802B - Clay waterproof curtain wall - Google Patents

Clay waterproof curtain wall Download PDF

Info

Publication number
CN113789802B
CN113789802B CN202110915778.5A CN202110915778A CN113789802B CN 113789802 B CN113789802 B CN 113789802B CN 202110915778 A CN202110915778 A CN 202110915778A CN 113789802 B CN113789802 B CN 113789802B
Authority
CN
China
Prior art keywords
curtain wall
rod
steel plate
arc
connecting steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110915778.5A
Other languages
Chinese (zh)
Other versions
CN113789802A (en
Inventor
罗荣
汪彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN LONGCHENG CONSTRUCTION GROUP CO LTD
Original Assignee
FUJIAN LONGCHENG CONSTRUCTION GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN LONGCHENG CONSTRUCTION GROUP CO LTD filed Critical FUJIAN LONGCHENG CONSTRUCTION GROUP CO LTD
Priority to CN202110915778.5A priority Critical patent/CN113789802B/en
Publication of CN113789802A publication Critical patent/CN113789802A/en
Application granted granted Critical
Publication of CN113789802B publication Critical patent/CN113789802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • E02D19/185Joints between sheets constituting the sealing aprons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • E02D2200/146Springs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0037Clays
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

A clay waterproof curtain wall comprises: curtain walls; the first connecting steel plate is arranged on the curtain wall; the first arc-shaped plate is rotatably arranged on the first connecting steel plate; the first extension rod is fixedly connected to one side of the first arc-shaped plate; the first arc-shaped groove is arranged on one side of the first arc-shaped plate opposite to the first stretching rod and matched with the first stretching rod; one end of the first elastic part is connected with the first extension rod, and the other end of the first elastic part is connected with the first arc-shaped plate; a first air bag provided on the first connection steel plate; the first plug connector is arranged on the first steel plate in a telescopic mode; the first inserting hole is formed in the first arc-shaped plate; and the first air path is used for connecting the plug connector with the first air bag.

Description

Clay waterproof curtain wall
Technical Field
The invention relates to the technical field of waterproof curtain walls, in particular to a clay waterproof curtain wall.
Background
During construction of a foundation pit, a first construction procedure is to construct a water-stop curtain wall around the foundation pit and prevent or reduce underground water on the side wall and the bottom of the foundation pit from flowing into the foundation pit.
In order to prevent the waterproof curtain wall from being damaged by excessive pressure of silt on the side wall of the foundation pit, an anchor rope is usually arranged on the waterproof curtain wall and a steel plate is fixed on the waterproof curtain wall. Curtain walls are used in open air environments after installation.
The inventors found, in the long-term practice, that the following technical problems exist in the related art:
the curtain can drop because of vibrations if meet strong wind weather after long-time use, and then leads to the curtain to drop or the curtain shifts, and then causes the harm for constructor life safety.
Disclosure of Invention
The invention aims to provide a clay waterproof curtain wall to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a clay waterproof curtain wall, wherein, includes:
curtain walls;
a first connection steel plate installed on the curtain wall;
the first arc-shaped plate is rotatably arranged on the first connecting steel plate;
the first extension rod is fixedly connected to one side of the first arc-shaped plate;
the first arc-shaped groove is arranged on one side of the first arc-shaped plate opposite to the first stretching rod and matched with the first stretching rod;
one end of the first elastic part is connected with the first extension rod, and the other end of the first elastic part is connected with the first arc-shaped plate;
a first airbag disposed on the first connection steel plate;
the first plug connector is arranged on the first steel plate in a telescopic mode;
the first inserting hole is formed in the first arc-shaped plate;
the first air path is used for connecting the plug connector and the first air bag;
when the first connecting steel plates are connected together, the first arc-shaped plate rotates to enable the first extension rods on two sides to be respectively inserted into the first arc-shaped grooves on the other side, the first plug connector is inserted into the first connecting hole, and when the first extension rods vibrate, the first air bag is pressed to enable the first plug connector to be tightly inserted into the first connecting hole.
This embodiment soil waterproof curtain wall, wherein, include:
the first fixing rod is arranged on the first stretching rod and is positioned on one side, away from the steel plate, of the first stretching rod;
and the second fixing rod is arranged on the first steel plate, and the first elastic piece is connected with the first fixing rod and the second fixing rod.
This embodiment soil waterproof curtain wall, wherein, include:
the first limiting rod is arranged on the first steel plate, is positioned between the first fixing rod and the second fixing rod and is used for limiting the first fixing rod.
The soil waterproof curtain wall of this embodiment, wherein, include:
the stock is connected with target wall, and passes curtain wall with first connecting steel plate is used for supporting curtain wall.
The soil waterproof curtain wall of this embodiment, wherein, include:
the anchor rod penetrates through the first fixing block, and the first fixing block is in contact with the first connecting steel plate;
one end of the first lead screw is abutted against the first fixed block;
the nut is arranged on the first lead screw;
the second fixing block is arranged on the anchor rod, the first lead screw penetrates through the first fixing block through threads, and the nut is arranged between the second fixing block and the first fixing block;
and the first limiting block is arranged on the first anchor rod and is positioned on one side of the second fixing block, which deviates from the first connecting steel plate, and is used for limiting the second fixing block.
The soil waterproof curtain wall of this embodiment, wherein, include:
the rubber pad sets up the steel sheet with between the curtain wall, just the stock passes the rubber pad is used for right the steel sheet with the curtain wall carries out the shock attenuation.
The soil waterproof curtain wall of this embodiment, wherein, include:
and a sliding groove provided on the first connection steel plate for sliding the first connection steel plate.
The soil waterproof curtain wall of this embodiment, wherein, include:
and the one-way valve is arranged on the first air bag and used for allowing the outside air to enter the first air bag from the one-way valve.
The soil waterproof curtain wall of this embodiment, wherein, include:
and the switch valve is arranged on the first air bag and used for deflating the first air bag.
Compared with the prior art, the invention has the beneficial effects that:
when this embodiment is implemented, be connected together curtain wall through first connecting steel sheet, when two first connecting steel sheets are connected together, first arc rotates, make first stretching rod insert in the first arc wall, realize the installation of two first connecting steel sheets, after the installation, first plug connector inserts in the first spliced eye, during the curtain vibrations, drive first stretching rod vibrations, compress first gasbag, make first plug connector stretch into more in, consolidate the connection of first connecting steel sheet, and then carry out more firm fixed to the curtain, avoid the curtain to drop.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is an enlarged rear sectional view taken at B in FIG. 2;
FIG. 4 is a side elevational view of an embodiment of the coupling device of the present invention;
FIG. 5 is a rear view of a first boom embodiment of the present invention;
FIG. 6 is a cross-sectional view of a first connector according to an embodiment of the present invention at a first connection steel plate;
FIG. 7 is a structural view of a cable bolt according to an embodiment of the present invention;
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like are used in the orientations and positional relationships indicated in the drawings, which are merely for convenience of description and simplicity of description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or to implicitly indicate the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 7, the present invention provides a clay waterproof curtain wall technical solution:
a clay waterproof curtain wall 101 comprises:
a curtain wall 101;
a first connecting steel plate 102, the first connecting steel plate 102 being installed on the curtain wall 101;
a first arc-shaped plate 103, the first arc-shaped plate 103 being rotatably provided on the first connecting steel plate 102;
a first extension rod 104 fixedly connected to one side of the first arc plate 103;
a first arc-shaped slot 105, which is arranged on the first arc-shaped plate 103 opposite to the first stretching rod 104 and is matched with the first stretching rod 104;
a first elastic member 106, one end of the first elastic member 106 is connected to the first extension rod 104, and the other end is connected to the first arc plate 103;
a first air bladder 107 provided on the first connecting steel plate 102;
a first connector 108 telescopically mounted on the first steel plate;
a first insertion hole 109 provided on the first arc plate 103;
a first air passage 110 connecting the plug and the first air bag 107;
when the two first connecting steel plates 102 are connected together, the first arc-shaped plate 103 rotates to enable the first extending rods 104 on the two sides to be respectively inserted into the first arc-shaped grooves 105 on the other side, the first plug connector 108 is inserted into the first connecting hole, and when the first extending rods 104 vibrate, the first air bag 107 is pressed to enable the first plug connector 108 to be tightly inserted into the first connecting hole.
When this embodiment is implemented, be connected together curtain wall through first connecting steel sheet 102, when two first connecting steel sheets 102 are connected together, first arc 103 rotates, make first pole 104 insert in first arc 105, realize the installation of two first connecting steel sheets 102, after the installation, first plug connector 108 inserts in first spliced eye 109, during the curtain vibrations, drive first pole 104 vibrations, compress first air bag 107, make first plug connector 108 stretch into more in 109, consolidate the connection of first connecting steel sheet, and then carry out more firm fixed to the curtain, avoid the curtain to drop.
In some embodiments, the method comprises:
the first fixing rod 111 is arranged on the first stretching rod 104 and is positioned on one side, away from the steel plate, of the first stretching rod 104;
and a second fixing rod 112 disposed on the first steel plate, wherein the first elastic member 106 connects the first fixing rod 111 and the second fixing rod 112.
The first fixing rod 111 and the second fixing rod 112 are connected by a first elastic member 106, the first extending rod can be combined with the first arc-shaped groove 105 more tightly by the first elastic member 106, the first fixing rod 111 and the second fixing rod 112 can be connected by a first elastic member, and the first elastic member can be an elastic member such as a telescopic spring, which is prior art and will not be described in detail herein.
In some embodiments, the method comprises:
the first limiting rod 113 is disposed on the first steel plate, located between the first fixing rod 111 and the second fixing rod 112, and used for limiting the first fixing rod 111.
The first limiting rod 113 is arranged to prevent the first extension rod 104 from rotating towards the second fixing rod 112 due to the action of the first elastic element 106, so that the two first connecting steel plates 102 are difficult to install during installation.
In some embodiments, the method comprises:
and an anchor rod 114 connected to the target wall and penetrating through the curtain wall 101 and the first connection steel plate 102 for supporting the curtain wall 101.
The anchor rod mounts the curtain wall 11 and the first connection steel plate 102 to a desired wall, and the target wall refers to a wall to which the curtain wall is to be mounted.
In some embodiments, the method comprises:
a first fixing block 115, through which the anchor rod 114 passes, and the first fixing block 115 is in contact with the first connection steel plate 102;
a first screw rod 116, one end of which is abutted against the first fixing block 115;
a nut 117 provided on the first lead screw;
the second fixing block 118 is arranged on the anchor rod 114, the first lead screw penetrates through the first fixing block 115 through threads, and the nut 117 is arranged between the second fixing block 118 and the first fixing block 115;
and the first limiting block 119 is arranged on the first anchor rod 114 and positioned on one side of the second fixing block 118, which is far away from the first connecting steel plate 102, and is used for limiting the second fixing block 118.
The anchor rod 114 is connected with a target wall body, and is abutted to a steel plate through a first fixing block, the first lead screw 116 is abutted to the first fixing block, a nut is screwed on the first lead screw 116, the second fixing block 118 is abutted to the nut, a limiting block limits the second fixing block, the first fixing block 115 is abutted through the first lead screw 116, and the effect of fixing the first fixing block 115 and the first connecting steel plate 102 is achieved.
In some embodiments, the method comprises:
rubber pad 120 is disposed between the steel plate and the curtain wall 101, and anchor rod 114 passes through rubber pad 120 for damping the steel plate and curtain wall 101.
By adopting the technical scheme, because the anchoring rod 114 needs to be drilled on the curtain wall 101 after the curtain wall 101 is built, water is easy to seep from the anchoring rod 114 after the anchoring rod 114 is built, and the rubber pad 120 can well prevent the water from seeping from the anchoring rod 114.
In some embodiments, the method comprises:
and a sliding groove provided on the first connecting steel plate 102 for sliding the first connecting steel plate 102.
Through adopting above-mentioned technical scheme, make things convenient for the workman when assembling first connection steel sheet 102, make things convenient for the equipment still with the workman when promoting first connection steel sheet 102 in opposite directions, the spout has also played the track of injecing the promotion, prevent that the workman when promoting first connection steel sheet 102, first connection steel sheet 102 takes place to sideslip and damages workman's problem.
In some embodiments, the method comprises:
and a check valve 121 disposed on the first air cell for allowing external air to enter the first air cell from the check valve.
After the air bag is inflated to the first air path, external air can enter the first air bag, and the air bag is inflated.
In some embodiments, the method comprises:
and a switch valve 122 disposed on the first air bag for deflating the first air bag.
The switch valve 122 is used for deflating the air bag, can loosen the first plug connector and the first plug hole, and facilitates the detachment of the first connecting steel plate when the first connecting steel plate is detached.
In some embodiments, the first connector 108 is inserted into the mounting hole 125 of the first connecting steel plate, and the bottom of the first connector is connected to the bottom of the mounting hole 125 through a spring 124, the first air channel 110 is connected to the bottom of the mounting hole 125, and a sealing gasket 123 is disposed around the first connector 108 for sealing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a clay stagnant water curtain wall which characterized in that includes:
curtain walls;
a first connection steel plate installed on the curtain wall;
the first arc-shaped plate is rotatably arranged on the first connecting steel plate;
the first extension rod is fixedly connected to one side of the first arc-shaped plate;
the first arc-shaped groove is arranged on one side of the first arc-shaped plate opposite to the first stretching rod and matched with the first stretching rod;
one end of the first elastic part is connected with the first extension rod, and the other end of the first elastic part is connected with the first arc-shaped plate;
a first airbag disposed on the first connection steel plate;
the first plug connector is arranged on the first connecting steel plate in a telescopic mode;
the first inserting hole is formed in the first arc-shaped plate;
the first air path is used for connecting the plug connector and the first air bag;
when the two first connecting steel plates are connected together, the first arc-shaped plate rotates to enable the first extending rods on two sides to be respectively inserted into the first arc-shaped grooves on the other side, the first plug connectors are inserted into the first inserting holes, and when the first extending rods vibrate, the first air bags are pressed to enable the first plug connectors to be tightly inserted into the first inserting holes.
2. The clay waterproof curtain wall according to claim 1, comprising:
the first fixing rod is arranged on the first stretching rod and is positioned on one side, away from the steel plate, of the first stretching rod;
and the second fixing rod is arranged on the first connecting steel plate, and the first elastic piece is connected with the first fixing rod and the second fixing rod.
3. The clay waterproof curtain wall according to claim 1, comprising:
and the first limiting rod is arranged on the first connecting steel plate, is positioned between the first fixing rod and the second fixing rod and is used for limiting the first fixing rod.
4. The clay waterproof curtain wall according to claim 1, comprising:
the anchor rod is connected with the target wall body and penetrates through the curtain wall body and the first connecting steel plate to support the curtain wall body.
5. The clay waterproof curtain wall as claimed in claim 4, comprising:
the anchor rod penetrates through the first fixing block, and the first fixing block is in contact with the first connecting steel plate;
one end of the first screw rod is abutted against the first fixed block;
the nut is arranged on the first screw rod;
the second fixed block is arranged on the anchor rod, the first screw rod penetrates through the first fixed block through threads, and the nut is arranged between the second fixed block and the first fixed block;
and the first limiting block is arranged on the anchor rod and positioned on one side of the second fixing block, which is deviated from the first connecting steel plate, and is used for limiting the second fixing block.
6. The clay waterproof curtain wall according to claim 1, comprising:
the rubber pad sets up the steel sheet with between the curtain wall, and the stock passes the rubber pad is used for right the steel sheet with the curtain wall carries out the shock attenuation.
7. The clay waterproof curtain wall according to claim 1, comprising:
and a sliding groove provided on the first connection steel plate for sliding the first connection steel plate.
8. The clay waterproof curtain wall according to claim 1, comprising:
and the one-way valve is arranged on the first air bag and used for allowing the outside air to enter the first air bag from the one-way valve.
9. The clay waterproof curtain wall according to claim 1, comprising:
and the switch valve is arranged on the first air bag and used for deflating the first air bag.
CN202110915778.5A 2021-08-10 2021-08-10 Clay waterproof curtain wall Active CN113789802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110915778.5A CN113789802B (en) 2021-08-10 2021-08-10 Clay waterproof curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110915778.5A CN113789802B (en) 2021-08-10 2021-08-10 Clay waterproof curtain wall

Publications (2)

Publication Number Publication Date
CN113789802A CN113789802A (en) 2021-12-14
CN113789802B true CN113789802B (en) 2022-12-23

Family

ID=78875866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110915778.5A Active CN113789802B (en) 2021-08-10 2021-08-10 Clay waterproof curtain wall

Country Status (1)

Country Link
CN (1) CN113789802B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HU222363B1 (en) * 1999-02-10 2003-06-28 Sándor Barkász Process for building of continuous, impermeable slot-wall, which enlarge permeability road
CN102296620B (en) * 2011-06-14 2013-12-04 黄朝阳 Curtain water-stop slope wall and construction method thereof
CN104074197B (en) * 2014-03-20 2016-05-04 温州大学 The construction method of large diameter thin wall cylinder stake compound anchor rod-type foundation pit enclosure structure
CN209741861U (en) * 2019-03-22 2019-12-06 扬州工业职业技术学院 Civil engineering foundation ditch prevention of seepage water side direction water proof curtain underground continuous wall
CN210315575U (en) * 2019-06-04 2020-04-14 河南大学 Stagnant water envelope of soft soil foundation building foundation ditch
CN211596810U (en) * 2020-01-07 2020-09-29 惠州亿安建筑工程有限公司 Foundation ditch stagnant water curtain reinforcement structure

Also Published As

Publication number Publication date
CN113789802A (en) 2021-12-14

Similar Documents

Publication Publication Date Title
CN113789802B (en) Clay waterproof curtain wall
CN214657864U (en) Building wall deformation joint construction device
CN110984245B (en) Basement anti-floating anchor rod and construction method thereof
CN220417063U (en) Monitor for oil gas leakage
CN214843515U (en) Monitoring devices for hydraulic engineering
CN209924218U (en) Curtain wall with watertight structure
CN213692463U (en) Deep inclinometer wiring protection box
CN216194454U (en) Seepage-proofing water-stopping device for hydraulic engineering
CN215934402U (en) Tower crane illumination headlight cable conductor uninstallation mount
CN215594057U (en) A underground structure for protecting subway tunnel structure
CN213867890U (en) Foundation ditch escape canal
CN110552325B (en) Be used for channel cofferdam equipment prevention of seepage stagnant water structure
CN219886884U (en) Slide-resistant pile structure for supporting rock-soil slope
CN219080277U (en) Prestressed sheet pile device capable of being installed rapidly
CN212000960U (en) Corridor wall structure seam seepage drainage device
CN219470983U (en) Water conservancy construction cofferdam equipment
CN219932466U (en) Submersible water changing equipment with good sealing performance
CN211208173U (en) Dry-type transformer with noise reduction effect
CN208753935U (en) A kind of waterproof cable armored cassette
CN217712491U (en) Confined aquifer drilling leaking stoppage slip casting structure
CN220105033U (en) Water permeable detection device for coal mining
CN211395771U (en) Expansion joint and outer formula waterstop clearance leak protection thick liquid steel sheet that pastes
CN212452457U (en) Water-stop sheet for hydraulic engineering
CN211645787U (en) Novel rail silent joint
CN113585632B (en) Sleeve grouting frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221118

Address after: 363000 22-23 / F, Longcheng building, No.42, Ziwei Road, Shima Town, Longhai City, Zhangzhou City, Fujian Province

Applicant after: FUJIAN LONGCHENG CONSTRUCTION GROUP Co.,Ltd.

Address before: 210000 503, building 6, Daqiao South Road community, south side of community 21, Xinmin Road, Gulou District, Nanjing, Jiangsu Province

Applicant before: Luo Rong

GR01 Patent grant
GR01 Patent grant