CN113737822A CN202110967253.6A CN202110967253A CN113737822A CN 113737822 A CN113737822 A CN 113737822A CN 202110967253 A CN202110967253 A CN 202110967253A CN 113737822 A CN113737822 A CN 113737822A
Authority
CN
China
Prior art keywords
plate
water filtering
guard plate
handing
filtering layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110967253.6A
Other languages
Chinese (zh)
Other versions
CN113737822B (en
Inventor
王一帆
张志海
鲍黎明
赵海莲
陈先平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202110967253.6A priority Critical patent/CN113737822B/en
Publication of CN113737822A publication Critical patent/CN113737822A/en
Application granted granted Critical
Publication of CN113737822B publication Critical patent/CN113737822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to the field of slope support construction, in particular to an assembled guard plate suitable for a weathered rock area and a construction method thereof. By using the assembled guard plate structure, the difficulties of loose rock soil and difficult excavation in the weathered rock area are well overcome, and the construction period of enclosure construction is greatly shortened; the guard plates are prefabricated into standard parts, and are directly assembled on site, and the construction period is further shortened by applying an assembly type construction concept, the standard guard plates are uniform in size, and are transversely and longitudinally arranged in order during assembly construction, so that the attractiveness of an enclosure area is improved; the guard plate material is waste garbage and a new water filtering material, so that underground water in inter-pile rocks can be filtered and drained while the environment is protected, the cost is saved, and inter-pile rock-soil rocks are blocked; through set up the gasket between connecting piece and handing-over board, to the destruction of handing-over board and provide effectual anchor when having reduced the connecting piece and having consolidated, make the holistic enclosure effect of backplate reliable and stable.

Description

Assembled guard plate suitable for weathered rock area and construction method thereof
Technical Field
The invention relates to the field of slope support construction, in particular to an assembled guard plate suitable for a weathered rock area and a construction method thereof.
Background
In traditional side slope support work progress, the shotcrete support is comparatively used extensively, sets up the reinforcing bar net piece in putting the sloping region, fixes through soil nail or stock, combines anchor and shotcrete for consolidate the foundation ditch side slope, on the fender pile perpendicular, is applicable equally, has obtained more and more applications in international foundation ditch engineering field.
However, when the traditional spray anchoring is carried out on the vertical surface of the support pile taking the weathered rock stratum as the main geology, soil nails and the like are not easy to anchor, the expansion bolts and the transverse reinforcing ribs are only suitable for fixing the reinforcing mesh, the construction procedures are multiple, the spraying difficulty is high, the requirement on excavation technology is high, the effect after spraying is poor, the use limitation is large, and the enclosure effect cannot be fully exerted under the geological conditions of the weathered rock area.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the assembled guard plate suitable for the weathered rock area and the construction method thereof can be used for performing assembled construction enclosure in the area with the weathered rock as the main geological condition, and has the advantages of stable and reliable enclosure effect, short construction period, low cost, attractiveness and practicability.
In order to solve the technical problems, the invention adopts the technical scheme that:
the utility model provides an assembled backplate suitable for morals and manners district sets up on the surface of the fender pile 21 of anchor weathering rock stratum 20, contains I1 and II 2 backplate of the crisscross overlap joint assembly of multiunit, its characterized in that: the protective plate I1 comprises a water filtering layer I3 arranged on the outer side and a water filtering layer I4 arranged on the inner side, the water filtering layer I4 is longitudinally flush with the water filtering layer I3 and is longer than the water filtering layer I3 in the transverse direction, the part of the water filtering layer I4, which exceeds the left side and the right side of the water filtering layer I3 in the transverse direction, is called an interface plate I5, and a connecting hole I6 is formed in the interface plate I5;
the protective plate II 2 comprises a water filtering layer II 8 arranged on the outer side and a water filtering layer II 9 arranged on the inner side, the water filtering layer II 8 is longitudinally flush with the water filtering layer II 9 and transversely longer than the water filtering layer II 9, the part of the water filtering layer II 8 transversely exceeding the left side and the right side of the water filtering layer II 9 is called an interface plate II 10, and a connecting hole II 11 is formed in the interface plate II 10;
backplate I1 and backplate II 2 are as an organic whole through handing-over board I5, II 10 overlap joints of handing-over board are at I5 surfaces of handing-over board, and the lapped handing-over board I5 of looks and handing-over board II 10 assemble in fender pile 21's surface through connecting piece 13.
Furthermore, the guard plate I1 and the guard plate II 2 are both prefabricated standard parts.
Furthermore, the outer surface of the water filtering layer I3 is provided with a handle I7, and the outer surface of the water filtering layer II 8 is provided with a handle II 12.
Further, connecting hole I6, the same and center alignment of connecting hole II 11 size that looks lapped handing over plate I5 and handing over plate II 10 correspond, connecting piece 13 and connecting hole I6 and II 11 looks adaptations of connecting hole, inside connecting piece 13 passed in proper order behind handing over plate II 10 and the handing over plate I5 anchor into fender pile 21.
Further, the outer diameter of the upper end of the connecting piece 13 is larger than the inner diameters of the connecting hole I6 and the connecting hole II 11, a gasket 14 is arranged between the upper end of the connecting piece 13 and the cross connecting plate II 10, and the depth of the connecting piece 13 anchored into the supporting pile 21 is not lower than 5 cm.
Furthermore, the water filtering layer I3 and the water filtering layer II 8 are made of high-density composite materials formed by pressing after polyethylene and activated carbon are mixed, and the water filtering layer I4 and the water filtering layer II 9 are made of organic high-molecular low-density materials made of domestic garbage recovery.
A construction method of an assembled type guard plate suitable for a weathered rock area is characterized by comprising the following steps:
s1, excavating a foundation pit, and displaying a shape of a support pile, specifically, treating the weathered rock stratum 20 by using an excavator and a breaking hammer in a matching manner, so that a surface layer of the weathered rock stratum is flush with the outer side line of the support pile 21;
s2, assembling the guard plate I1 and the guard plate II 2, specifically, assembling a group of 2-4 people, transversely assembling the guard plate I1 and the guard plate II 2 in a staggered manner along the lower bottom surface of the crown beam 22 at the top end of the support pile 21, overlapping the adjacent cross connection plates I5 and II 10 corresponding to the guard plate I1 and the guard plate II 2 together to align the centers of the connecting holes I6 and II 11 corresponding to the overlapped cross connection plates I5 and II 10, and then enabling the connecting piece 13 to penetrate through the corresponding connecting holes II 11 and I6 and be anchored into the support pile 21;
s3, after a group of guard plates I1 and II 2 are assembled, sequentially assembling a next group of guard plates I1 and II 2 along the transverse direction until the total length of a row of transverse guard plates I1 and II 2 can cover the transverse length of a corresponding enclosure area;
s4, after a row of transverse guard plates I1 and II 2 are assembled, sequentially assembling a next row of guard plates I1 and II 2 along the longitudinal direction until the assembled guard plates I1 and II 2 can cover the whole enclosure area in the transverse direction and the longitudinal direction;
and S5, filling concrete in gaps between the assembled protecting plates I1 and II 2 and the weathered rock layer 20 for plugging.
Furthermore, the sizes of the guard plate I1 and the guard plate II 2 are designed according to the area of a containment area, the guard plate I1 and the guard plate II 2 are both manufactured into standard parts in advance in a factory and are directly assembled on site.
Further, in step S2: the outer side of the connecting hole II 11 is provided with a gasket 14, the connecting piece 13 penetrates through the gasket 14 firstly and then penetrates through the connecting hole II 11 and the connecting hole I6, and the anchoring depth of the connecting piece 13 into the supporting pile 21 is not less than 5 cm.
Further, in step S4: and the next row of guard plates I1 and II 2 are arranged close to the previous row of guard plates I1 and II 2, and the gap between the two adjacent rows of guard plates I1 and II 2 is filled with a waterproof adhesive 23 for plugging.
Compared with the prior art, the invention has the following main advantages:
1. by using the assembled guard plate structure, the traditional steel bar net piece enclosure is replaced, the steps of steel bar binding, water drain hole construction, concrete spraying and the like are omitted, the difficulties of loose rock soil and difficult excavation in a weathered rock area are well overcome, and the construction period of the enclosure construction is greatly shortened;
2. the guard plates are prefabricated into standard parts, and are directly assembled on site, and the construction period is further shortened by applying an assembly type construction concept, the standard guard plates are uniform in size, and are transversely and longitudinally arranged in order during assembly construction, so that the attractiveness of an enclosure area is improved;
3. the drainage layer of the guard plate is made of an organic polymer low-density material prepared by recycling household garbage, the drainage layer is made of a high-density composite material formed by mixing and pressing polyethylene and activated carbon, underground water in rock between piles can be filtered and drained while the environment is protected, the cost is saved, broken stone rock soil between piles is blocked, compared with a traditional drainage hole, the drainage area is large, drainage is sufficient, and the influence of rock stratum water pressure on support can be reduced;
4. through set up the gasket between connecting piece and handing-over board, the lifting surface area of multiplicable connecting piece and handing-over board to reduce the destruction to the handing-over board when the connecting piece is consolidated and provide effectual anchor, make the holistic enclosure effect of backplate reliable and stable.
Drawings
FIG. 1 is a schematic view of a panel I of the present invention;
FIG. 2 is a schematic view of a shield II according to the present invention;
FIG. 3 is a schematic view of a connector of the present invention;
FIG. 4 is a schematic view of the overall assembly of the present invention;
FIG. 5 is an integrally assembled side view of the present invention;
FIG. 6 is a flow chart of the construction method of the present invention.
In the figure: 1. a guard plate I; 2. a guard plate II; 3. filtering a water layer I; 4. a filtering soil layer I; 5. an interface board I; 6. a connecting hole I; 7. a grip I; 8. a water filtering layer II; 9. a filtering soil layer II; 10. an interface board II; 11. a connecting hole II; 12. a grip II; 13. a connecting member; 14. a gasket; 20. weathered rock; 21. supporting piles; 22. a crown beam; 23. and (4) water-stopping glue.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to fig. 1 to 6 and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
It should be noted that, according to the implementation requirement, each step/component described in the present application can be divided into more steps/components, and two or more steps/components or partial operations of the steps/components can be combined into new steps/components to achieve the purpose of the present invention.
The invention provides an assembled guard plate suitable for a weathered rock area, which is arranged on the outer surface of a support pile 21 anchored into a weathered rock layer 20 and comprises a plurality of groups of guard plates I1 and guard plates II 2 which are assembled in a staggered overlapping mode.
As shown in figure 1, backplate I1 contains the drainage layer I3 that sets up in the outside and sets up the filtering soil layer I4 in the inboard, filtering soil layer I4 is ascending with drainage layer I3 parallel and level on the longitudinal, is good at drainage layer I3 on horizontal, the part that I4 on the transverse surpasss I3 left and right sides of drainage layer is called the handing over board I5, connecting hole I6 has been seted up on handing over board I5, specifically can be the bolt hole.
As shown in fig. 2, backplate II 2 contains the drainage layer II 8 that sets up in the outside and sets up the filter soil layer II 9 in the inboard, II 8 longitudinal and II 9 parallel and level in the filter soil layer of drainage layer, be longer than filter soil layer II 9 on horizontal, II 8 parts that exceed II 9 left and right sides in the filter soil layer on horizontal of drainage layer are called the handing over board II 10, handing over board II 10 is last to have seted up connecting hole II 11, specifically can be the bolt hole.
The filter soil layer I4 and the filter soil layer II 9 are made of organic polymer low-density materials made of domestic garbage recovery, can filter partial soil and gravels in weathered rocks in a first step, are firm in structure, can bear the lateral force of the weathered rocks, and are first barriers for resisting rock stratums; the water filtering layer I3 and the water filtering layer II 8 are made of high-density composite materials formed by mixing and pressing polyethylene and activated carbon according to the mass ratio of 8-15: 1, can play a role in filtering water storage and slow release, water can directly flow out along the outer surface of the guard plate after rock soil in the water filtering layer is filtered and water is secondarily filtered through the water filtering layer, and compared with a traditional water drainage hole, the water drainage hole is large in discharge area and sufficient in drainage, and the influence of water pressure on support is reduced.
Meanwhile, the guard plate material is waste garbage and a new filter material, makes certain contribution to environmental protection, waste utilization and cost saving, is a recyclable material, can be reasonably selected by a user according to the self condition in the use process, and can be used as a permanent support material or subjected to secondary processing after disassembly for reutilization, so that the cost is further saved.
Further, backplate I1 and backplate II 2 are as an organic whole through handing-over board I5, II 10 overlap joint assemblings of handing-over board, II 10 overlap joints of handing-over board are at I5 surface of handing-over board, and lapped handing-over board I5 and II 10 of handing-over board assemble in fender pile 21's surface through connecting piece 13 mutually, specifically can be expansion bolts connection.
Wherein, connecting hole I6, the same and the center of connecting hole II 11 size that looks lapped handing over plate I5 and handing over plate II 10 correspond align, connecting piece 13 and connecting hole I6 and II 11 looks adaptations of connecting hole, connecting piece 13 passes handing over plate II 10 and handing over plate I5 back anchor in proper order and props up inside pile 21.
As shown in fig. 3, the outer diameter of the upper end of the connecting piece 13 is larger than the inner diameters of the connecting hole i 6 and the connecting hole ii 11, a gasket 14 is arranged between the upper end of the connecting piece 13 and the cross connecting plate ii 10, and the anchoring depth of the connecting piece 13 into the interior of the support pile 21 is not less than 5 cm.
Through set up the gasket between connecting piece and handing-over board, the lifting surface area of multiplicable connecting piece and handing-over board to reduce the destruction to the handing-over board when the connecting piece is consolidated and provide effectual anchor, make the holistic enclosure effect of backplate reliable and stable.
Furthermore, the guard plate I1 and the guard plate II 2 are both standard parts prefabricated in a factory.
Furthermore, the outer surface of the water filtering layer I3 is provided with a handle I7, and the outer surface of the water filtering layer II 8 is provided with a handle II 12.
The guard plates are prefabricated into standard parts, the standard parts are directly assembled on site, the assembly type construction concept is applied, the construction period is further shortened, the standard guard plates are uniform in size, the guard plates are transversely and longitudinally arranged in order during assembly construction, and the attractiveness of the enclosure area is improved.
Based on the same inventive concept, the embodiment of the application also provides a construction method of the assembled guard plate suitable for the weathered rock area, and as shown in fig. 4 to 6, the construction method comprises the following steps:
s1, excavating a foundation pit, displaying a shape of a support pile, and specifically, processing the weathered rock stratum 20 by using the cooperation of an excavator and a breaking hammer to enable the surface layer of the weathered rock stratum to be flush with the outer side line of the support pile 21.
S2, assembling the guard plate I1 and the guard plate II 2, specifically, one set of 2-4 persons, transversely assembling the guard plate I1 and the guard plate II 2 in a staggered mode along the lower bottom surface of the crown beam 22 at the top end of the support pile 21, lapping the adjacent guard plate I1 and the adjacent cross connection plate I5 and the cross connection plate II 10 corresponding to the guard plate II 2 together, aligning centers of the connecting holes I6 and the connecting holes II 11 corresponding to the lapped cross connection plate I5 and the cross connection plate II 10, and then enabling the connecting piece 13 to penetrate through the corresponding connecting holes II 11 and the corresponding connecting holes I6 and be anchored into the support pile 21.
The size of the guard plate I1 and the size of the guard plate II 2 are designed according to the area of a containment area, the guard plate I1 and the guard plate II 2 are both manufactured into standard parts in advance in a factory and are directly assembled on site.
Furthermore, a gasket 14 is arranged on the outer side of the connecting hole II 11, the connecting piece 13 penetrates through the gasket 14 firstly and then penetrates through the connecting hole II 11 and the connecting hole I6, and the depth of the connecting piece 13 anchored into the supporting pile 21 is not less than 5 cm.
S3, after a group of guard plates I1 and II 2 are assembled, sequentially assembling a next group of guard plates I1 and II 2 along the transverse direction until the total length of a row of transverse guard plates I1 and II 2 can cover the transverse length of the corresponding enclosure area.
S4, after the transverse row of the guard plates I1 and the transverse row of the guard plates II 2 are assembled, sequentially assembling the next row of the guard plates I1 and the next row of the guard plates II 2 along the longitudinal direction, specifically two rows or three rows, until the assembled guard plates I1 and the assembled guard plates II 2 can cover the whole enclosure area in the transverse direction and the longitudinal direction.
Wherein, I1 and II 2 next-door neighbour's the I1 and II 2 arrangements of backplate of one row last of backplate next-row backplate, and the clearance between two adjacent rows of backplate I1 and backplate II 2 is filled and is stopped water and glue 23 and carry out the shutoff.
And S5, filling concrete in gaps between the assembled protecting plates I1 and II 2 and the weathered rock layer 20 for plugging.
Furthermore, after the foundation pit engineering is finished, the guard plate can become a permanent supporting structure or be dismantled according to the situation, and the dismantled plate can be subjected to secondary processing and reused.
By adopting the assembled guard plate and the construction method thereof, a new material guard plate and the support pile are perfectly combined, so that the slope support enters a new material and technical era, a process of spray anchor support is cancelled in a weathered rock stratum region with better geology, the steps of binding of reinforcing mesh sheets, drilling rock strata, arranging drain holes, spraying concrete and the like are reduced, the support and drainage effects of spray anchor are achieved, and the beneficial effects of waste utilization and material recycling are realized.
It will be understood by those skilled in the art that the foregoing is only a preferred embodiment of the present invention, and is not intended to limit the invention, and that any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. The utility model provides an assembled backplate suitable for morals and manners district sets up on the surface of anchor in fender pile (21) of morals and manners stratum (20), contains I (1) of backplate and II (2) of backplate of the crisscross overlap joint assembly of multiunit, its characterized in that: the protective plate I (1) comprises a water filtering layer I (3) arranged on the outer side and a water filtering layer I (4) arranged on the inner side, the water filtering layer I (4) is longitudinally flush with the water filtering layer I (3) and transversely longer than the water filtering layer I (3), the part of the water filtering layer I (4) transversely exceeding the left side and the right side of the water filtering layer I (3) is called an intersection plate I (5), and a connecting hole I (6) is formed in the intersection plate I (5);
the guard plate II (2) comprises a water filtering layer II (8) arranged on the outer side and a filtering soil layer II (9) arranged on the inner side, the water filtering layer II (8) is longitudinally flush with the filtering soil layer II (9) and transversely longer than the filtering soil layer II (9), the part of the water filtering layer II (8) transversely exceeding the left side and the right side of the filtering soil layer II (9) is called an interconnecting plate II (10), and a connecting hole II (11) is formed in the interconnecting plate II (10);
backplate I (1) and backplate II (2) are as an organic whole through handing-over board I (5), handing-over board II (10) overlap joint assembly, handing-over board II (10) overlap joint is in handing-over board I (5) surface, and lapped handing-over board I (5) and handing-over board II (10) assemble in the surface of fender pile (21) through connecting piece (13) mutually.
2. The fabricated panel adapted for use in a weathered rock zone of claim 1, wherein: the guard plate I (1) and the guard plate II (2) are both prefabricated standard parts.
3. The fabricated panel adapted for use in a weathered rock zone of claim 1, wherein: the outer surface of the water filtering layer I (3) is provided with a handle I (7), and the outer surface of the water filtering layer II (8) is provided with a handle II (12).
4. The fabricated panel adapted for use in a weathered rock zone of claim 1, wherein: connecting hole I (6), the same and center of connecting hole II (11) size that looks lapped handing-over plate I (5) and handing-over plate II (10) correspond align, connecting piece (13) and connecting hole I (6) and connecting hole II (11) looks adaptation, inside anchor income fender pile (21) after connecting piece (13) pass handing-over plate II (10) and handing-over plate I (5) in proper order.
5. The fabricated panel suitable for weathered rock zones of claim 1 or 4, wherein: the outer diameter of the upper end of the connecting piece (13) is larger than the inner diameter of the connecting hole I (6) and the connecting hole II (11), a gasket (14) is arranged between the upper end of the connecting piece (13) and the cross connecting plate II (10), and the depth of the connecting piece (13) anchored into the interior of the supporting pile (21) is not lower than 5 cm.
6. The fabricated panel adapted for use in a weathered rock zone of claim 1, wherein: the water filtering layer I (3) and the water filtering layer II (8) are made of high-density composite materials formed by mixing and pressing polyethylene and activated carbon, and the water filtering layer I (4) and the water filtering layer II (9) are made of organic high-molecular low-density materials made of recycled household garbage.
7. A construction method of an assembled type guard plate suitable for a weathered rock area is characterized by comprising the following steps:
s1, excavating a foundation pit, and displaying a shape of a support pile, specifically, processing a weathered rock stratum (20) by matching an excavator and a breaking hammer to enable a surface layer of the weathered rock stratum to be flush with the outer side line of the support pile (21);
s2, assembling the guard plate I (1) and the guard plate II (2), specifically, assembling a group of 2-4 persons, starting to transversely assemble the guard plate I (1) and the guard plate II (2) in a staggered manner along the lower bottom surface of a crown beam (22) at the top end of a support pile (21), overlapping the adjacent guard plate I (1) and the guard plate II (2) with the cross connection plate I (5) and the cross connection plate II (10) which correspond to each other, aligning centers of the connecting holes I (6) and the connecting holes II (11) which correspond to the cross connection plate I (5) and the cross connection plate II (10) which are overlapped with each other, and then enabling the connecting piece (13) to penetrate through the corresponding connecting holes II (11) and the connecting holes I (6) and be anchored into the support pile (21);
s3, after a group of guard plates I (1) and II (2) are assembled, sequentially assembling a next group of guard plates I (1) and II (2) along the transverse direction until the total length of a row of the guard plates I (1) and II (2) can cover the transverse length of a corresponding enclosure area;
s4, after a row of transverse guard plates I (1) and II (2) are assembled, sequentially assembling the next row of guard plates I (1) and II (2) along the longitudinal direction until the assembled guard plates I (1) and II (2) can cover the whole enclosure area in the transverse direction and the longitudinal direction;
and S5, filling concrete in gaps between the assembled protecting plate I (1) and II (2) and the weathered rock layer (20) for plugging.
8. The method for constructing the fabricated panel for weathered rock areas according to claim 7, wherein the method comprises the following steps: the size of the guard plate I (1) and the size of the guard plate II (2) are designed according to the area of a containment area, the guard plate I (1) and the guard plate II (2) are both manufactured into standard parts in advance in a factory and are directly assembled on site.
9. The fabricated panel construction method suitable for weathered rock areas according to claim 7, wherein in step S2: the outer side of the connecting hole II (11) is provided with a gasket (14), the connecting piece (13) penetrates through the gasket (14) firstly and then penetrates through the connecting hole II (11) and the connecting hole I (6), and the depth of the connecting piece (13) anchored into the supporting pile (21) is not less than 5 cm.
10. The fabricated panel construction method suitable for weathered rock areas according to claim 7, wherein in step S4: the next row of protective plates I (1) and II (2) are arranged next to the previous row of protective plates I (1) and II (2), and gaps between the two adjacent rows of protective plates I (1) and II (2) are filled with water stop glue (23) for plugging.
CN202110967253.6A 2021-08-23 2021-08-23 Assembled guard plate suitable for weathered rock area and construction method thereof Active CN113737822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110967253.6A CN113737822B (en) 2021-08-23 2021-08-23 Assembled guard plate suitable for weathered rock area and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110967253.6A CN113737822B (en) 2021-08-23 2021-08-23 Assembled guard plate suitable for weathered rock area and construction method thereof

Publications (2)

Publication Number Publication Date
CN113737822A true CN113737822A (en) 2021-12-03
CN113737822B CN113737822B (en) 2022-12-16

Family

ID=78732244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110967253.6A Active CN113737822B (en) 2021-08-23 2021-08-23 Assembled guard plate suitable for weathered rock area and construction method thereof

Country Status (1)

Country Link
CN (1) CN113737822B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914944A (en) * 2018-07-27 2018-11-30 中国冶集团有限公司 Shoal high water level pipeline Support of Foundation Pit Excavation precipitation system and construction method
CN211312538U (en) * 2019-11-28 2020-08-21 四川鸥鹏建筑工程公司 Novel deep foundation pit supporting structure
CN211447013U (en) * 2019-11-27 2020-09-08 中冶建工集团有限公司 Barricade mounting structure with assembled drainage layer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914944A (en) * 2018-07-27 2018-11-30 中国冶集团有限公司 Shoal high water level pipeline Support of Foundation Pit Excavation precipitation system and construction method
CN211447013U (en) * 2019-11-27 2020-09-08 中冶建工集团有限公司 Barricade mounting structure with assembled drainage layer
CN211312538U (en) * 2019-11-28 2020-08-21 四川鸥鹏建筑工程公司 Novel deep foundation pit supporting structure

Also Published As

Publication number Publication date
CN113737822B (en) 2022-12-16

Similar Documents

Publication Publication Date Title
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN111101540B (en) Construction method for passing existing electric power tunnel on open cut tunnel
CN105672323A (en) Compound soil nail wall supporting structure system with steel pipe piles and construction method of compound soil nail wall supporting structure system
CN110777819A (en) High and steep mine mountain reconstruction ecological restoration method
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
KR102342234B1 (en) Retaining wall block and retaining wall construction method using the same
Tan et al. Practical solutions for concurrent excavation of neighboring mega basements closely surrounded by utility tunnels in Shanghai Hongqiao CBD
CN109972632B (en) Construction method of recyclable soil nail assembled flexible surface wall
KR101380782B1 (en) Eco-composite type steel temporary construction and construction method thereof
US11821316B1 (en) System and construction method of single-layer lining tunnel structure based on mine-tunnelling method
CN111305220A (en) Concrete support and structural top plate combined building system based on permanent and temporary combination and construction method thereof
CN113737822B (en) Assembled guard plate suitable for weathered rock area and construction method thereof
KR101149362B1 (en) Retaining wall with prestressed concrete tie and method for constructing the same
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN202673305U (en) Construction structure for use in tunnel arch changing construction
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN212477759U (en) Slope protection surface layer
CN213571956U (en) Combined construction method pile supporting structure
CN202148530U (en) Curtain water stop slope wall
CN212001126U (en) Concrete support and structure top plate combined building system based on permanent-temporary combination
CN103306291A (en) Technology for support and protection of wide-angle steep slope by cable-stayed concrete piles
CN220080027U (en) Structure is handled to crossing node of interim stand of foundation ditch and bottom plate
CN209854714U (en) Recyclable soil nail assembled flexible surface wall
CN113931228B (en) Material platform construction method for basement construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant