CN113734983A - Steel case roof beam hoist device for construction - Google Patents

Steel case roof beam hoist device for construction Download PDF

Info

Publication number
CN113734983A
CN113734983A CN202111018838.XA CN202111018838A CN113734983A CN 113734983 A CN113734983 A CN 113734983A CN 202111018838 A CN202111018838 A CN 202111018838A CN 113734983 A CN113734983 A CN 113734983A
Authority
CN
China
Prior art keywords
fixedly connected
fixed
frame
winding wheel
fixed block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111018838.XA
Other languages
Chinese (zh)
Other versions
CN113734983B (en
Inventor
陈兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
CSCEC Strait Construction and Development Co Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd, CSCEC Strait Construction and Development Co Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202111018838.XA priority Critical patent/CN113734983B/en
Publication of CN113734983A publication Critical patent/CN113734983A/en
Application granted granted Critical
Publication of CN113734983B publication Critical patent/CN113734983B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/02Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods

Abstract

The invention provides a steel box girder hoisting device for building construction, which belongs to the technical field of steel box girder hoisting, and comprises: the upper ends of the four supporting legs are fixedly connected with a supporting frame; the translation mechanism is composed of a driving assembly and two groups of sliding assemblies, the translation mechanism is arranged at the upper end of the support frame, each group of sliding assemblies consists of a guide rail, a fixed frame and two first pulleys, the guide rails are fixedly connected to the upper end of the support frame, the two first pulleys are slidably clamped at the upper ends of the guide rails, the fixed frame is fixedly connected to the two ends of the two first pulleys, the two groups of sliding assemblies are respectively arranged at the two parts of the support frame, and a first rotating rod is fixedly connected between the two first pulleys positioned at the front side; the problem of can't guarantee among the prior art that every hoisting point atress is balanced is solved.

Description

Steel case roof beam hoist device for construction
Technical Field
The invention belongs to the technical field of steel box girder hoisting, and particularly relates to a steel box girder hoisting device for building construction.
Background
In recent years, the bridge construction industry in China is developed rapidly, and a large-section hoisting technology of steel box girders is adopted in the construction of some super-large bridges. For the construction of offshore bridges, the construction period at sea should be reduced as much as possible, the risk of offshore construction is reduced, and the economy of the construction scheme is improved. At the present stage, because the dead weight of the marine large-section steel box girder is large, in order to ensure that the steel box girder does not deform during hoisting, a truss type or a pressure bar type hoisting tool is generally adopted to distribute the weight of the steel box girder to a plurality of hoisting points and enable the hoisting points to bear the force only in the vertical direction, so that the hoisting points are prevented from being stressed by horizontal split force during hoisting to extrude and deform the steel box girder bridge deck. The truss type lifting appliance is relatively high in structural rigidity, large in self weight, high in self height, and high in cost due to the fact that a crane ship with a larger lifting height needs to be selected or a steel wire rope with higher strength needs to be adopted to meet the requirement of lifting height. At present, a pressing rod type lifting appliance commonly adopted mostly adopts a form of connection of a pulley set for ensuring the stress requirement of each lifting point, a steel wire rope is easy to separate from a sliding groove under the condition that a steel box girder has longitudinal and transverse slopes, and the steel wire rope needs to be replaced when the gradient changes to influence the construction period.
Due to the length error of the steel wire rope, the problem that the stress balance of each lifting point cannot be guaranteed exists.
Disclosure of Invention
The invention aims to provide a steel box girder hoisting device for building construction, and aims to solve the problem that the stress balance of each hoisting point cannot be ensured in the prior art.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a steel case roof beam hoist device for construction, includes:
the upper ends of the four supporting legs are fixedly connected with supporting frames;
the translation mechanism comprises a driving component and two groups of sliding components, the translation mechanism is arranged at the upper end of the support frame, each group of sliding components consists of a guide rail, a fixed frame and two first pulleys, the guide rail is fixedly connected at the upper end of the support frame, the two first pulleys are in sliding joint with the upper end of the guide rail, the fixed frame is fixedly connected at the two ends of the two first pulleys, the two groups of sliding components are respectively arranged at the two parts of the support frame, a first rotating rod is fixedly connected between the two first pulleys positioned at the front side, the driving component consists of a first motor, a first bevel gear and a second bevel gear, the first motor is fixedly connected at the lower end of a second fixed frame, the first bevel gear is fixedly connected with an output shaft of the first motor, and the second bevel gear is fixedly connected with the circumferential surface of the first rotating rod, the first bevel gear is in meshed connection with the second bevel gear;
the first fixing frame is fixedly connected to the upper ends of the two fixing frames;
the second fixing frame is fixedly connected to the upper ends of the two fixing frames;
the lifting mechanism is connected with the first fixing frame and the second fixing frame so as to lift the steel box to be lifted; and
and the angle adjusting mechanism is connected with the lifting mechanism so as to adjust the angle of the steel box to be hung.
As a preferable aspect of the present invention, the lifting mechanism includes a second motor, a first winding wheel, a first fixed block, a second winding wheel, a third winding wheel, a fixed rope, a winding rope, a fourth winding wheel, and a suspension buckle, the second motor is fixedly connected to an upper end of the first fixed frame, the first winding wheel is fixedly connected to a circumferential surface of an output shaft of the second motor, one end of the winding rope is fixedly sleeved on the circumferential surface of the first winding wheel, the first fixed block and the fourth winding wheel are respectively and fixedly connected to two ends of the second fixed frame, the winding rope is sequentially sleeved on circumferential surfaces of the second winding wheel, the fourth winding wheel, and the third winding wheel, the fixed rope is fixedly connected to a lower end of the first fixed block, and the suspension buckle is fixedly connected to a proximal end of the third winding wheel and the second winding wheel.
As a preferred scheme of the present invention, the angle adjusting mechanism comprises a hoisting assembly and two sets of smoothing assemblies, the hoisting assembly comprises a hoisting ring, a hoisting frame and two cross beams, the hoisting ring is sleeved on the lower end of the suspension buckle, the hoisting frame is fixedly connected to the lower end of the hoisting ring, and the two balancing ropes are respectively sleeved on two inner cavities of the hoisting frame.
As a preferable scheme of the invention, the lower ends of the two balance ropes are sleeved with a cross beam.
As a preferable scheme of the invention, two groups of the smooth components are composed of a third motor, a second fixed block, a threaded rod, a third fixed block, a fourth fixed block, a lifting rope, two second pulleys and two chutes, the two groups of the smooth components are respectively arranged at two sides of the cross beam and are symmetrically distributed, the third motor is fixedly connected with the upper end of the cross beam, the third fixing block is movably clamped on the surface of the cross beam, the fourth fixing block and the second fixing block are both fixedly connected to the upper end of the cross beam, the threaded rod is fixedly connected to an output shaft of the third motor, threaded rod threaded connection is in the one end of fourth fixed block and third fixed block respectively, two the second pulley all rotates to be connected in the lower extreme of third fixed block, two the spout is all dug in the upper end of crossbeam, two the second pulley slides the joint respectively in the inner wall of two spouts.
As a preferable scheme of the present invention, the lower ends of the two third fixing blocks are both fixedly connected with a lifting rope.
As a preferable scheme of the invention, two ends of the two guide rails are fixedly connected with limiting blocks, and the height of each limiting block is higher than that of the two fixing frames.
As a preferable scheme of the invention, triangular supporting blocks are fixedly connected at the joints of the four supporting legs and the supporting frame.
In a preferred embodiment of the present invention, the driving assembly is disposed at a side close to any of the fixed frames.
As a preferable scheme of the invention, the lower ends of the four supporting legs are fixedly connected with a fixed base.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the angle adjusting mechanism consists of a hoisting assembly and two groups of smooth assemblies, the hoisting ring arranged in the hoisting assembly ensures that the angle adjusting mechanism can be randomly adjusted at multiple angles under the hoisting of the hoisting buckle, the two balance ropes are respectively sleeved in the two inner cavities of the hoisting frame, the adjustable angle of the angle adjusting mechanism is further increased, the two groups of smooth assemblies can drive the steel boxes hoisted on the two hoisting ropes to adjust the relative lengths of the two hoisting ropes according to requirements, the gravity of the steel boxes is changed under the influence of gravity, so that the angle of the steel boxes is adjusted to adapt to requirements under different environments, and the inclination angle of the steel boxes can be adjusted without replacing the hoisting ropes with different lengths.
2. According to the invention, the translation mechanism comprises a driving assembly and two sets of sliding assemblies, the driving mechanism uses the second bevel gear and the first bevel gear to change the output direction of the first motor, so that the two sets of sliding assemblies are driven to respectively slide at the upper ends of the two guide rails through the first rotating rod, the first fixing frame and the second fixing frame fixed at the upper ends of the two fixing frames are translated, the lifting mechanism fixedly connected to the upper end of the first fixing frame is displaced, the angle adjusting mechanism hoisted at the lower side of the lifting mechanism is moved, the steel box is moved to different positions and heights, and the applicability of the invention is greatly improved.
3. According to the lifting buckle, the steel box needs to be lifted, the first winding wheel winds the winding rope by starting the second motor, the other end of the winding rope is fixedly connected to one end of the first fixing block by the fixing rope, and the winding rope is respectively sleeved on the circumferential surfaces of the second winding wheel, the fourth winding wheel and the third winding wheel, so that the height of the lifting buckle is increased, and otherwise, the lifting buckle is lowered.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is an exploded view of the present invention;
FIG. 4 is a front view of the translation mechanism of the present invention;
FIG. 5 is an enlarged view of the translation mechanism of the present invention at A in front elevation;
FIG. 6 is a front view of the lift mechanism of the present invention;
FIG. 7 is a side view of the lift mechanism of the present invention;
FIG. 8 is a front view of the angle adjustment mechanism of the present invention;
fig. 9 is an enlarged view of the angle adjustment mechanism of the present invention in front view B.
In the figure: 1. a support leg; 2. a support frame; 201. a guide rail; 202. a first pulley; 203. a fixing frame; 204. a first fixing frame; 205. a second fixing frame; 206. a first motor; 207. a first bevel gear; 208. a second bevel gear; 209. a first rotating lever; 3. a second motor; 301. a first winding wheel; 302. a first fixed block; 303. a second winding wheel; 304. a third winding wheel; 305. fixing a rope; 306. winding a rope; 307. a fourth winding wheel; 308. hanging buckles; 4. a hoisting ring; 401. hoisting the frame; 402. a balancing rope; 403. a cross beam; 404. a third motor; 405. a second fixed block; 406. a threaded rod; 407. a third fixed block; 408. a second pulley; 409. a chute; 410. a fourth fixed block; 411. a lifting rope; 5. a triangular support block; 6. a fixed base; 7. and a limiting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1-9, the present invention provides the following technical solutions:
the utility model provides a steel case roof beam hoist device for construction, includes:
the upper ends of the four supporting legs 1 are fixedly connected with supporting frames 2;
the translation mechanism is composed of a driving assembly and two groups of sliding assemblies, the translation mechanism is arranged at the upper end of the support frame 2, each group of sliding assemblies is composed of a guide rail 201, a fixed frame 203 and two first pulleys 202, the guide rail 201 is fixedly connected to the upper end of the support frame 2, the two first pulleys 202 are both slidably clamped at the upper end of the guide rail 201, the fixed frame 203 is fixedly connected to two ends of the two first pulleys 202, the two groups of sliding assemblies are respectively arranged at two parts of the support frame 2, and a first rotating rod 209 is fixedly connected between the two first pulleys 202 positioned at the front side;
the first fixing frame 204 is fixedly connected to the upper ends of the two fixing frames 203;
the second fixing frame 205, the second fixing frame 205 is fixedly connected to the upper ends of the two fixing frames 203;
the driving assembly is composed of a first motor 206, a first bevel gear 207 and a second bevel gear 208, the first motor 206 is fixedly connected to the lower end of the second fixing frame 205, the first bevel gear 207 is fixedly connected to the output shaft of the first motor 206, the second bevel gear 208 is fixedly connected to the circumferential surface of the first rotating rod 209, and the first bevel gear 207 and the second bevel gear 208 are in meshed connection;
the lifting mechanism is connected with the first fixing frame 204 and the second fixing frame 205 so as to lift the steel box to be hoisted; and
and the angle adjusting mechanism is connected with the lifting mechanism so as to adjust the angle of the steel box to be hung.
In the embodiment of the invention, the angle adjusting mechanism is hoisted at the lower end of the lifting mechanism and is matched with the lifting mechanism to adjust the height space, the lifting mechanism is matched with the translation mechanism to enable the lifting mechanism to adjust the left and right positions in the parallel space, the driving mechanism uses the second bevel gear 208 and the first bevel gear 207 to change the output direction of the first motor 206, so that the first rotating rod 209 drives the two groups of sliding components to respectively slide at the upper ends of the two guide rails 201, the first fixing frame 204 and the second fixing frame 205 fixed at the upper ends of the two fixing frames 203 are translated, the lifting mechanism fixedly connected at the upper end of the first fixing frame 204 is displaced, the angle adjusting mechanism hoisted at the lower side of the lifting mechanism is moved, and the steel box is moved to different positions and heights.
Specifically referring to fig. 6 and 7, the lifting mechanism includes a second motor 3, a first winding wheel 301, a first fixing block 302, a second winding wheel 303, a third winding wheel 304, a fixing rope 305, a winding rope 306, a fourth winding wheel 307 and a suspension buckle 308, the second motor 3 is fixedly connected to the upper end of the first fixing frame 204, the first winding wheel 301 is fixedly connected to the circumferential surface of the output shaft of the second motor 3, one end of the winding rope 306 is fixedly sleeved on the circumferential surface of the first winding wheel 301, the first fixing block 302 and the fourth winding wheel 307 are respectively and fixedly connected to two ends of the second fixing frame 205, the winding rope 306 is sequentially sleeved on the circumferential surfaces of the second winding wheel 303, the fourth winding wheel 307 and the third winding wheel 304, the fixing rope 305 is fixedly connected to the lower end of the first fixing block 302, and the suspension buckle 308 is fixedly connected to the near ends of the third winding wheel 304 and the second winding wheel 303.
In this embodiment: by starting the second motor 3, the first winding wheel 301 winds the winding rope 306, and since the other end of the winding rope 306 is fixedly connected to one end of the first fixing block 302 by the fixing rope 305, the winding rope 306 is respectively sleeved on the circumferential surfaces of the second winding wheel 303, the fourth winding wheel 307 and the third winding wheel 304, so that the height of the suspension buckle 308 is raised, and otherwise, the suspension buckle is lowered.
Specifically referring to fig. 8 and 9, the angle adjusting mechanism includes a hoisting assembly and two sets of smoothing assemblies, the hoisting assembly includes a hoisting ring 4, a hoisting frame 401 and two cross beams 403, the hoisting ring 4 is sleeved on the lower end of the suspension buckle 308, the hoisting frame 401 is fixedly connected to the lower end of the hoisting ring 4, and two balancing ropes 402 are respectively sleeved on two inner cavities of the hoisting frame 401.
In this embodiment: rings 4 arranged in the hoisting assembly ensure that the angle adjusting mechanism can be adjusted at will under the hoisting of the suspension clasp 308 at multiple angles, two balance ropes 402 are respectively sleeved in two inner cavities of the hoisting frame 401, the adjustable angle of the angle adjusting mechanism is further increased, two groups of smooth assemblies can drive the steel boxes hoisted at two lifting ropes 411 to adjust the relative lengths of the two lifting ropes 411 according to requirements, the gravity influence is exerted on the steel boxes to change the gravity centers of the steel boxes, and therefore the angles of the steel boxes can be adjusted to meet the requirements under different environments.
Specifically referring to fig. 8, the lower ends of two balance ropes 402 are sleeved with a cross beam 403.
In this embodiment: the lower end sleeves of the two balance ropes 402 are provided with the cross beam 403, so that the balance of the cross beam 403 under the normal hoisting condition of the cross beam 403 is guaranteed.
Referring specifically to fig. 8 and 9, two sets of smoothing components are composed of a third motor 404, a second fixed block 405, a threaded rod 406, a third fixed block 407, fourth fixed block 410, lifting rope 411, two second pulleys 408 and two spouts 409 constitute, two sets of smooth subassembly set up respectively in the both sides and the symmetric distribution of crossbeam 403, third motor 404 fixed connection is in the upper end of crossbeam 403, the activity joint of third fixed block 407 is in the surface of crossbeam 403, the equal fixed connection in the upper end of crossbeam 403 of fourth fixed block 410 and second fixed block 405, threaded rod 406 fixed connection in the output shaft of third motor 404, threaded rod 406 is threaded connection in the one end of fourth fixed block 410 and third fixed block 407 respectively, two second pulleys 408 all rotate to be connected in the lower extreme of third fixed block 407, two spouts 409 are all dug in the upper end of crossbeam 403, two second pulleys 408 slide the joint respectively in the inner wall of two spouts 409.
In this embodiment: in the smoothing component, by starting the third motor 404, the rotation of the third motor 404 drives the threaded rod 406 to rotate in the fourth fixed block 410, the third fixed block 407 and the second fixed block 405 in a threaded manner, and as the fourth fixed block 410 and the second fixed block 405 are fixed at the upper end of the cross beam 403, the third fixed block 407 slides in the inner walls of the two sliding grooves 409 through the two second pulleys 408 along with the rotation of the threaded rod 406, so that the relative position of the corresponding lifting rope 411 is changed, the central position of the steel box is changed, the angle of the steel box is shifted, and the inclination angle of the steel box can be adjusted without changing the lifting rope 411 with different lengths.
Specifically, referring to fig. 8, the lower ends of the two third fixing blocks 407 are fixedly connected with a lifting rope 411.
In this embodiment: two lifting ropes 411 are used for hanging on the balance point of the steel box.
Specifically, referring to fig. 1, two ends of the two guide rails 201 are fixedly connected with the limiting blocks 7, and the height of the limiting blocks 7 is higher than the height of the two fixing frames 203.
In this embodiment: the two sets of sliding components are prevented from disengaging from the two guide rails 201 by the two limiting blocks 7.
Referring to fig. 1 and 2, a triangular support block 5 is fixedly connected to the joints of the four legs 1 and the support frame 2.
In this embodiment: the four triangular support blocks 5 are arranged to reinforce the joints of the support frame 2 and the four support legs 1.
Specifically, referring to fig. 3 and 4, the driving assembly is disposed at a side close to the arbitrary fixing frame 203.
In this embodiment: the driving assembly is arranged on one side close to any fixed frame 203, so that the driving power of the driving assembly is stronger and more stable.
Referring to fig. 1 and 2, the lower ends of the four legs 1 are fixedly connected with a fixed base 6.
In this embodiment: the arrangement of four fixed bases 6 makes the invention more stable.
The working principle and the using process of the invention are as follows: the steel box is hung at the lower ends of two lifting ropes 411, when the angle of the steel box needs to be adjusted, a third motor 404 needing to be adjusted is started, the rotation of the third motor 404 drives a threaded rod 406 to rotate in a threaded manner in a fourth fixed block 410, a third fixed block 407 and a second fixed block 405, as the fourth fixed block 410 and the second fixed block 405 are fixed at the upper end of a cross beam 403, the third fixed block 407 slides in the inner walls of two sliding grooves 409 through two second pulleys 408 along with the rotation of the threaded rod 406, so that the relative position of the corresponding lifting rope 411 is changed, the central position of the steel box is changed to cause the angle deviation, by starting a second motor 3, a first winding wheel 301 winds the winding rope 306, as the other end of the winding rope 306 is fixedly connected to one end of the first fixed block 302 by a fixed rope 305, the winding rope 306 is respectively sleeved on the circumferential surfaces of the second winding wheel 303, the fourth winding wheel 307 and the third winding wheel 304, therefore, the height of the suspension buckle 308 is increased, otherwise, the suspension buckle is descended, the first motor 206 is started, and then the first rotating rod 209 drives the two sets of sliding assemblies to respectively slide at the upper ends of the two guide rails 201, so that the first fixing frame 204 and the second fixing frame 205 which are fixed at the upper ends of the two fixing frames 203 are translated, the lifting mechanism which is fixedly connected to the upper end of the first fixing frame 204 is displaced, and the steel box is moved to different positions and heights.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that various changes, modifications and substitutions can be made without departing from the spirit and scope of the invention as defined by the appended claims. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a steel case roof beam hoist device for construction which characterized in that: the method comprises the following steps:
the upper ends of the four supporting legs (1) are fixedly connected with supporting frames (2);
translation mechanism, translation mechanism comprises drive assembly and two sets of sliding assembly, translation mechanism sets up in the upper end of support frame (2), every group sliding assembly comprises guide rail (201), fixed frame (203) and two first pulleys (202), guide rail (201) fixed connection is in the upper end of support frame (2), two first pulley (202) all slide the joint in the upper end of guide rail (201), fixed frame (203) fixed connection is in the both ends of two first pulleys (202), and two sets of sliding assembly sets up respectively in the two parts of support frame (2), is located two of front side fixedly connected with first bull stick (209) between first pulley (202), drive assembly comprises first motor (206), first conical gear (207) and second conical gear (208), first motor (206) fixed connection is in the lower extreme of second mount (205), the first bevel gear (207) is fixedly connected with an output shaft of the first motor (206), the second bevel gear (208) is fixedly connected with the circumferential surface of the first rotating rod (209), and the first bevel gear (207) is in meshed connection with the second bevel gear (208);
the first fixing frame (204), the first fixing frame (204) is fixedly connected to the upper ends of the two fixing frames (203);
the second fixing frame (205), the said second fixing frame (205) is fixedly connected to the upper end of two fixed frames (203);
the lifting mechanism is connected with the first fixing frame (204) and the second fixing frame (205) to lift the steel box to be lifted; and
and the angle adjusting mechanism is connected with the lifting mechanism so as to adjust the angle of the steel box to be hung.
2. The steel box girder hoisting device for building construction according to claim 1, characterized in that: the lifting mechanism comprises a second motor (3), a first winding wheel (301), a first fixed block (302), a second winding wheel (303), a third winding wheel (304), a fixed rope (305), a winding rope (306), a fourth winding wheel (307) and a suspension buckle (308), wherein the second motor (3) is fixedly connected to the upper end of the first fixed frame (204), the first winding wheel (301) is fixedly connected to the circumferential surface of the output shaft of the second motor (3), one end of the winding rope (306) is fixedly sleeved on the circumferential surface of the first winding wheel (301), the first fixed block (302) and the fourth winding wheel (307) are respectively and fixedly connected to the two ends of the second fixed frame (205), the winding rope (306) is sequentially sleeved on the circumferential surfaces of the second winding wheel (303), the fourth winding wheel (307) and the third winding wheel (304), and the fixed rope (305) is fixedly connected to the lower end of the first fixed block (302), the suspension buckle (308) is fixedly connected to the near ends of the third winding wheel (304) and the second winding wheel (303).
3. The steel box girder hoisting device for building construction of claim 2, characterized in that: angle adjustment mechanism is by hoisting component and two sets of level and smooth subassemblies, hoisting component includes rings (4), hoist and mount frame (401) and two crossbeams (403), the lower extreme of suspension clasp (308) is located to rings (4) cover, hoist and mount frame (401) fixed connection is in the lower extreme of rings (4), two inner chambers of hoist and mount frame (401) are located to balanced rope (402) cover respectively.
4. The steel box girder hoisting device for building construction of claim 3, characterized in that: the lower end sleeves of the two balance ropes (402) are provided with a cross beam (403).
5. The steel box girder hoisting device for building construction according to claim 4, characterized in that: the two groups of smooth components are composed of a third motor (404), a second fixed block (405), a threaded rod (406), a third fixed block (407), a fourth fixed block (410), a lifting rope (411), two second pulleys (408) and two sliding grooves (409), the two groups of smooth components are respectively arranged on two sides of the cross beam (403) and are symmetrically distributed, the third motor (404) is fixedly connected to the upper end of the cross beam (403), the third fixed block (407) is movably clamped on the surface of the cross beam (403), the fourth fixed block (410) and the second fixed block (405) are both fixedly connected to the upper end of the cross beam (403), the threaded rod (406) is fixedly connected to an output shaft of the third motor (404), the threaded rod (406) is respectively in threaded connection with one end of the fourth fixed block (410) and one end of the third fixed block (407), and the two second pulleys (408) are both rotatably connected to the lower end of the third fixed block (407), two spout (409) are all cut in the upper end of crossbeam (403), two second pulley (408) slip joint respectively in the inner wall of two spouts (409).
6. The steel box girder hoisting device for building construction according to claim 5, characterized in that: the lower ends of the two third fixed blocks (407) are fixedly connected with lifting ropes (411).
7. The steel box girder hoisting device for building construction of claim 6, wherein: two equal fixedly connected with stopper (7) in both ends of guide rail (201), the height that highly is higher than two fixed frames (203) of stopper (7).
8. The steel box girder hoisting device for building construction according to claim 7, characterized in that: and the joints of the four supporting legs (1) and the supporting frame (2) are fixedly connected with triangular supporting blocks (5).
9. The steel box girder hoisting device for building construction according to claim 8, wherein: the driving assembly is arranged on one side close to any fixed frame (203).
10. The steel box girder hoisting device for building construction of claim 9, wherein: the lower ends of the four supporting legs (1) are fixedly connected with a fixed base (6).
CN202111018838.XA 2021-09-01 2021-09-01 Steel box girder hoisting device for building construction Active CN113734983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111018838.XA CN113734983B (en) 2021-09-01 2021-09-01 Steel box girder hoisting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111018838.XA CN113734983B (en) 2021-09-01 2021-09-01 Steel box girder hoisting device for building construction

Publications (2)

Publication Number Publication Date
CN113734983A true CN113734983A (en) 2021-12-03
CN113734983B CN113734983B (en) 2023-12-01

Family

ID=78734668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111018838.XA Active CN113734983B (en) 2021-09-01 2021-09-01 Steel box girder hoisting device for building construction

Country Status (1)

Country Link
CN (1) CN113734983B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114314407A (en) * 2021-12-31 2022-04-12 新乡学院 Centering hoist device that multi freedom was adjusted
CN114522826A (en) * 2022-02-17 2022-05-24 江西洪涛建筑消防设备有限公司 Electromechanical integration automatic processing equipment for aluminum alloy door and window processing
CN114560410A (en) * 2022-02-26 2022-05-31 安徽省公路桥梁工程有限公司 Hoisting mechanism for constructing large-span steel box girder and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1173010A (en) * 1966-12-15 1969-12-03 Walter Gottel Ltd Container Handling Unit
CN105329766A (en) * 2015-11-17 2016-02-17 无锡市新华起重工具有限公司 Automatic balance type lifting beam
CN207618918U (en) * 2017-12-16 2018-07-17 江苏百崮钢结构工程有限公司 A kind of gantry crane for bridge construction
CN207891749U (en) * 2018-01-27 2018-09-21 中交三公局桥梁隧道工程有限公司 A kind of steel box-girder suspender
CN207890884U (en) * 2018-01-31 2018-09-21 四川雄港玻璃有限公司 Sucking disc lifting frame
CN211687924U (en) * 2019-12-16 2020-10-16 校俊 Assembled wall body hoist and mount auxiliary device
CN112173987A (en) * 2020-09-29 2021-01-05 长沙开湖设备有限公司 Prefabricated assembling equipment that assembles of underground pipe gallery construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1173010A (en) * 1966-12-15 1969-12-03 Walter Gottel Ltd Container Handling Unit
CN105329766A (en) * 2015-11-17 2016-02-17 无锡市新华起重工具有限公司 Automatic balance type lifting beam
CN207618918U (en) * 2017-12-16 2018-07-17 江苏百崮钢结构工程有限公司 A kind of gantry crane for bridge construction
CN207891749U (en) * 2018-01-27 2018-09-21 中交三公局桥梁隧道工程有限公司 A kind of steel box-girder suspender
CN207890884U (en) * 2018-01-31 2018-09-21 四川雄港玻璃有限公司 Sucking disc lifting frame
CN211687924U (en) * 2019-12-16 2020-10-16 校俊 Assembled wall body hoist and mount auxiliary device
CN112173987A (en) * 2020-09-29 2021-01-05 长沙开湖设备有限公司 Prefabricated assembling equipment that assembles of underground pipe gallery construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114314407A (en) * 2021-12-31 2022-04-12 新乡学院 Centering hoist device that multi freedom was adjusted
CN114522826A (en) * 2022-02-17 2022-05-24 江西洪涛建筑消防设备有限公司 Electromechanical integration automatic processing equipment for aluminum alloy door and window processing
CN114560410A (en) * 2022-02-26 2022-05-31 安徽省公路桥梁工程有限公司 Hoisting mechanism for constructing large-span steel box girder and method thereof
CN114560410B (en) * 2022-02-26 2024-04-30 安徽省公路桥梁工程有限公司 Hoisting mechanism for building large-span steel box girder and method thereof

Also Published As

Publication number Publication date
CN113734983B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
CN113734983A (en) Steel case roof beam hoist device for construction
CN101775969B (en) Tower type combined drive pumping unit without guide wheel
CN107178211B (en) Truss hanging system for installing steel structure
CN103030074A (en) Hinge points-variable combined type multi-functional crawler crane
CN101559905A (en) Deck unit erection gantry
CN206768618U (en) A kind of lowering or hoisting gear for bridge installation
CN208617223U (en) A kind of hanging apparatus for metal drum
CN112573347B (en) Connecting structure between balance beams on crane
CN1304268C (en) Method and apparatus for assembly of portal crane in shipbuilding
CN109019364A (en) A kind of constructional engineering mud boom hoisting
CN206970027U (en) Main frame jack up unit
CN210558937U (en) Large-scale mould clamp gets overhead traveling crane
CN210002233U (en) Hoisting system suitable for suspension bridge steel structure bridge deck system
CN106115546A (en) A kind of cargo elevator structure and freight moving equipment
CN101585489A (en) Rail-mounted tower crane with combination arm and movable arm
CN207564077U (en) A kind of assembly system that pavement step and chain are assembled based on assembly line form
CN111606265B (en) Deformation approaching method and structure of suspension lifting platform
CN217867758U (en) Four-point hanging beam for large-scale floating crane
CN220703063U (en) Hanging equipment for overhauling coal-fired power equipment
CN219280476U (en) Light movable spliced bridge overhauling hanging basket
CN215160476U (en) Simple crane of offshore oilfield steel wire operation blowout prevention system
CN218989908U (en) Truss bridge on-site arch lifting device
CN217921183U (en) Additional counterweight capable of increasing crane stability
CN214402951U (en) Lifting mechanism of side direction elevator
CN217352166U (en) Anticollision wall template platform truck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant