CN113700332A - Construction method for blocking pay-off measuring hole of building construction engineering floor slab - Google Patents

Construction method for blocking pay-off measuring hole of building construction engineering floor slab Download PDF

Info

Publication number
CN113700332A
CN113700332A CN202111002619.2A CN202111002619A CN113700332A CN 113700332 A CN113700332 A CN 113700332A CN 202111002619 A CN202111002619 A CN 202111002619A CN 113700332 A CN113700332 A CN 113700332A
Authority
CN
China
Prior art keywords
floor slab
measuring hole
pay
concrete
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111002619.2A
Other languages
Chinese (zh)
Inventor
李洋
栾广民
黄宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202111002619.2A priority Critical patent/CN113700332A/en
Publication of CN113700332A publication Critical patent/CN113700332A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method for plugging a pay-off measuring hole of a floor slab in a building construction project, and relates to the technical field of plugging of pay-off holes in the building industry. The prefabricated trapezoidal plugging block is lifted by the mold lifting mechanism, the stress is transferred to the floor slab, and the post-cast section is prevented from sinking. The invention aims to effectively solve the problem of platform staggering between the post-cast section of the pay-off measuring hole and the original floor, and avoid the increase of construction cost caused by the need of consuming manpower and material resources to perform secondary maintenance during ceiling construction.

Description

Construction method for blocking pay-off measuring hole of building construction engineering floor slab
Technical Field
The invention relates to the technical field of blocking of pay-off holes in the building industry, in particular to a construction method for blocking a pay-off measuring hole of a floor slab in a building construction project.
Background
After the construction of the existing building concrete main body is finished, the paying-off measuring hole left in the construction of the main body is generally required to be plugged. According to the traditional plugging method, steel bars are planted on two sides of the measuring hole, then the two steel bars with the planted bars are bound by steel wires, then a steel pipe scaffold formwork is erected on the next floor or a steel bar formwork is hung on the next floor, and finally same-model concrete pouring is carried out.
Disclosure of Invention
In order to solve the technical problems, the invention provides a construction method for plugging a pay-off measuring hole of a floor slab in a building construction project, which effectively solves the problem that the post-cast section of the pay-off measuring hole is staggered with the original floor slab, and avoids the increase of construction cost caused by the need of consuming manpower and material resources to perform secondary maintenance during the construction of a ceiling.
In order to realize the technical purpose, the invention adopts the following scheme: the construction method for blocking the floor pay-off measuring hole of the building construction project comprises the following steps:
s1, chiseling the side wall of the floor pay-off measuring hole by using an electric pick;
s2, cleaning the paying-off measuring hole, and placing the prefabricated concrete trapezoidal prism with the threaded steel bar into the drilled paying-off measuring hole;
s3, horizontally implanting steel bars with the same type as the steel bars of the floor slab into the floor slab, finally placing the customized mould hanging mechanism on the floor slab, connecting the mould hanging mechanism with the threaded steel bars on the precast concrete trapezoidal prism table by using threaded sleeves, and pouring concrete with the same type as the floor slab;
and S4, disassembling the mould hanging mechanism by rotating the threaded sleeve after initial setting and before final setting of the concrete, and performing surface treatment to finish the plugging operation.
Compared with the prior art, the invention has the beneficial effects that:
(1) according to the invention, the lifting force applied to the prefabricated trapezoidal prismoid by the mould lifting mechanism is upwards, the gravity of the trapezoidal prismoid is dispersed to the floor slab around the pay-off measuring hole through the mould lifting mechanism, and when the post-cast section is poured, the phenomenon of dislocation between the trapezoidal prismoid and the original floor slab caused by sinking of the post-cast section is effectively avoided;
(2) the operation is simple, and the problem that the construction cost is increased due to the fact that manpower and material resources are consumed to carry out secondary maintenance when the ceiling construction is carried out at the later stage is avoided;
(3) the filling of the irregular shape of the side wall of the pay-off measuring hole is ensured by utilizing the fluidity and plasticity of the concrete.
Drawings
FIG. 1 is a schematic structural view of a wire-laying measuring hole roughening provided by an embodiment of the present invention;
FIG. 2 is a schematic view of a concrete trapezoid block placed in a pay-off measuring hole according to an embodiment of the present invention;
FIG. 3 is a connection diagram of a formwork lifting mechanism and a precast concrete trapezoid block according to an embodiment of the present invention;
FIG. 4 is a schematic structural diagram of a mold lifting mechanism according to an embodiment of the present invention;
labeled as: 1. a floor slab; 2. a trapezoidal block; 3. a mould hanging mechanism; 31. a support bar; 32. a column; 33. a connecting rod; 34. a sleeve; 4. and (7) horizontal reinforcing steel bars.
Detailed Description
The present invention will be described in detail with reference to the following embodiments in order to fully understand the objects, features and effects of the invention, but the present invention is not limited thereto.
The invention provides a construction method for blocking a floor pay-off measuring hole in a building construction project, which comprises the following steps of:
step one, adopting an electric pick to chisel the periphery of a pay-off measuring hole of a floor slab 1, as shown in figure 1.
And step two, cleaning the pay-off measuring hole, and then putting the prefabricated concrete trapezoidal block 2 embedded with the threaded steel bar into the roughened pay-off measuring hole, as shown in figure 2. The concrete trapezoid blocks 2 are made by using a template tool, the bottom surface of the template is square, and the four side surfaces are inverted isosceles trapezoids to form a quadrangular frustum pyramid structure. When the concrete trapezoid block 2 is poured, the steel bar with the thread is vertically inserted into the concrete, so that the protruded thread steel bar is fixed on the upper end face of the concrete trapezoid prism table after final setting.
And step three, horizontally implanting horizontal reinforcing steel bars 4 which are designed to be the same as the original floor slab 1 into the floor slab 1, and manufacturing a mould hanging mechanism 3 at the same time. The die lifting mechanism 3 is composed of a support rod 31 and a threaded sleeve 34, the plane portion of the support rod 31 is a Y-shaped structure formed by three support rods, the three support rods are equal in length, an outer end point of each support rod is fixedly provided with a vertical downward upright post 32, the lower surface of a middle connecting point of the three support rods is fixedly provided with a vertical downward connecting rod 33, the lower portion of the connecting rod 33 is provided with external threads, and the lower portion of the connecting rod 33 is in threaded connection with one end of the threaded sleeve 34.
The customized formwork lifting mechanism 3 is placed into the floor slab 1, the upright column 32 is placed on the floor slab 1, the threaded sleeve 34 is connected with a steel bar (with threads) on the precast concrete trapezoidal block 2, as shown in fig. 3 and 4, the effect of lifting the concrete trapezoidal block 2 is achieved, concrete with the same type as the floor slab 1 is poured, and the post-pouring section is flush with the original floor slab 1 in height. Before the concrete is finally set, the weight of the precast concrete trapezoidal block 2 and the weight of the post-cast section are borne by the mold hanging mechanism 3, the stress is dispersed to the floor slab 1 around the pay-off measuring hole, the force applied to the side wall of the pay-off measuring hole by the precast concrete trapezoidal block 2 is reduced, and the phenomenon that the post-cast section presses down the precast concrete trapezoidal block 2 to sink and cause slab staggering with the original floor slab 1 is effectively prevented.
And step four, removing the mould hanging mechanism 3 through the rotation of the threaded sleeve 34 after the initial setting and before the final setting of the concrete, performing surface treatment, and finishing the plugging operation after the surface treatment.
Finally, it is noted that: the above-mentioned list is only the preferred embodiment of the present invention, and naturally those skilled in the art can make modifications and variations to the present invention, which should be considered as the protection scope of the present invention provided they are within the scope of the claims of the present invention and their equivalents.

Claims (1)

1. A construction method for plugging a floor pay-off measuring hole of a building construction project is characterized by comprising the following steps:
s1, chiseling the side wall of the floor pay-off measuring hole by using an electric pick;
s2, cleaning the paying-off measuring hole, and placing the prefabricated concrete trapezoidal prism with the threaded steel bar into the drilled paying-off measuring hole;
s3, horizontally implanting steel bars with the same type as the steel bars of the floor slab into the floor slab, finally placing the customized mould hanging mechanism on the floor slab, connecting the mould hanging mechanism with the threaded steel bars on the precast concrete trapezoidal prism table by using threaded sleeves, and pouring concrete with the same type as the floor slab;
and S4, disassembling the mould hanging mechanism by rotating the threaded sleeve after initial setting and before final setting of the concrete, and performing surface treatment to finish the plugging operation.
CN202111002619.2A 2021-08-30 2021-08-30 Construction method for blocking pay-off measuring hole of building construction engineering floor slab Pending CN113700332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111002619.2A CN113700332A (en) 2021-08-30 2021-08-30 Construction method for blocking pay-off measuring hole of building construction engineering floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111002619.2A CN113700332A (en) 2021-08-30 2021-08-30 Construction method for blocking pay-off measuring hole of building construction engineering floor slab

Publications (1)

Publication Number Publication Date
CN113700332A true CN113700332A (en) 2021-11-26

Family

ID=78656657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111002619.2A Pending CN113700332A (en) 2021-08-30 2021-08-30 Construction method for blocking pay-off measuring hole of building construction engineering floor slab

Country Status (1)

Country Link
CN (1) CN113700332A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203808265U (en) * 2014-03-06 2014-09-03 中国建筑第六工程局有限公司 Blocking structure for small reserved opening members of floor
CN204001722U (en) * 2014-05-21 2014-12-10 中国建筑土木建设有限公司 Pump line and paying-off floor penetrating reserved hole steel sleeve die
CN206267520U (en) * 2016-10-31 2017-06-20 成都华创盛世科技有限公司 A kind of self-supporting post-cast strip is poured with hanging mould
CN110388055A (en) * 2019-08-02 2019-10-29 中铁建设集团有限公司 A kind of structure floor horizontal hole mouth modularization plugging construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203808265U (en) * 2014-03-06 2014-09-03 中国建筑第六工程局有限公司 Blocking structure for small reserved opening members of floor
CN204001722U (en) * 2014-05-21 2014-12-10 中国建筑土木建设有限公司 Pump line and paying-off floor penetrating reserved hole steel sleeve die
CN206267520U (en) * 2016-10-31 2017-06-20 成都华创盛世科技有限公司 A kind of self-supporting post-cast strip is poured with hanging mould
CN110388055A (en) * 2019-08-02 2019-10-29 中铁建设集团有限公司 A kind of structure floor horizontal hole mouth modularization plugging construction method

Similar Documents

Publication Publication Date Title
CN108457421B (en) Manufacturing die and manufacturing method of assembled reinforced concrete U-shaped frame beam
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN206174120U (en) Prefabricated constructional column and structure thereof
CN204571288U (en) Floor slab preformed hole mould
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN108560842B (en) Precast concrete stair section with multipurpose holes and preparation and application thereof
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN113700332A (en) Construction method for blocking pay-off measuring hole of building construction engineering floor slab
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN109732773B (en) Mounting node and mounting method of support hinged concrete prefabricated part
CN218091465U (en) Assembled non-bearing masonry wall structure
CN216893504U (en) Pore-forming device of prestressing force steel beam preformed hole
CN110541567A (en) Plugging die for pipeline hanging hole gap and construction method
CN207526118U (en) For pre-buried and closure unwrapping wire hole unwrapping wire punch die
CN212743356U (en) Reverse construction method hangs mould system
CN209907923U (en) Template system for pouring water stop platform and floor lowering plate simultaneously in kitchen and bathroom
CN215106590U (en) Assembled prefabricated hollow column and production and manufacturing process thereof
CN211114435U (en) A half grout connecting sleeve of automatic rectifying for prefabricated post wall
CN204590011U (en) A kind of prestressing force props up hole fender pile
CN113404057A (en) Integral pouring structure and construction method for foundation pit side wall cushion layer of elevator shaft
CN103628684A (en) Construction method for casting floor slab and shear wall simultaneously
CN211340765U (en) Device for cast-in-place pile construction
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
CN107965143B (en) Multifunctional paying-off hole die and method for plugging and forming paying-off hole by using die

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211126