CN113700170A - Assembly type shear wall connecting mechanism, shear wall and shear wall construction method - Google Patents

Assembly type shear wall connecting mechanism, shear wall and shear wall construction method Download PDF

Info

Publication number
CN113700170A
CN113700170A CN202111048334.2A CN202111048334A CN113700170A CN 113700170 A CN113700170 A CN 113700170A CN 202111048334 A CN202111048334 A CN 202111048334A CN 113700170 A CN113700170 A CN 113700170A
Authority
CN
China
Prior art keywords
shear wall
steel
steel ring
shear
connecting mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111048334.2A
Other languages
Chinese (zh)
Inventor
黄晨光
季永新
孙清臣
胡晨晞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202111048334.2A priority Critical patent/CN113700170A/en
Publication of CN113700170A publication Critical patent/CN113700170A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings

Abstract

The invention discloses an assembly type shear wall connecting mechanism, a shear wall and a shear wall construction method, wherein the assembly type shear wall connecting mechanism comprises a steel ring, steel plates symmetrically arranged on two opposite sides of the steel ring and anchoring pieces connected with the steel plates, and the outer side surfaces of the steel ring and the steel plates are fixedly connected. The assembly type shear wall connecting mechanism has the advantages of simple structure, construction efficiency improvement, capability of improving the hysteretic property of the shear wall and shock resistance.

Description

Assembly type shear wall connecting mechanism, shear wall and shear wall construction method
Technical Field
The invention relates to the field of building walls, in particular to an assembled shear wall connecting mechanism, a shear wall and a shear wall construction method.
Background
The existing construction mode of the fabricated concrete shear wall panel is a connection mode of forming a vertical joint between two shear wall bodies, then overlapping reinforcing steel bars in the vertical joint and post-pouring concrete. However, the connection of the circumferential anchoring steel bars in the vertical joints is complex, specifically, the annular steel bars are reserved at the vertical joints, the annular steel bars on the two sides are overlapped with each other, and the overlapped annular steel bars are bound by using steel wires. And then, inserting vertical steel bars into a square area formed by the annular steel bars, binding and positioning the vertical steel bars by using steel wires and supporting templates, and finally connecting the vertical seams into a whole by post-pouring concrete. Therefore, the existing mode needs to carry out a large amount of binding positioning and other work on a reinforcing steel bar site, has a complex structure and low construction speed, is not beneficial to production and construction, and ensures that the assembled shear wall has poor hysteretic performance and poor shock resistance.
Disclosure of Invention
The invention aims to provide a shear wall which is simple in structure, improves construction efficiency, and can improve hysteretic performance and shock resistance of the shear wall.
Another object of the present invention is to provide an assembled shear wall with high hysteretic and seismic capabilities.
The third purpose of the invention is to provide a shear wall construction method which is simple and convenient in construction and high in construction efficiency.
In order to achieve the purpose, the assembly type shear wall connecting mechanism provided by the invention comprises a steel ring, steel plates symmetrically arranged on two opposite sides of the steel ring and an anchoring piece connected with the steel plates, wherein the outer side surfaces of the steel ring and the steel plates are fixedly connected.
Compared with the prior art, the steel ring, the steel plate and the anchoring piece are arranged, so that the anchoring piece is fixed on the steel plate, and the steel ring is connected with the steel plate, so that a connecting mechanism is formed, when the connecting mechanism is arranged in the vertical seam of the shear wall bodies, the two shear wall bodies can be effectively connected, and the steel ring, the steel plate and the anchoring piece are fixedly connected, so that the steel ring, the steel plate and the steel plate do not need to be bound and positioned by using steel wires, the structure is very simple, and the construction efficiency is greatly improved. In addition, the steel ring has good hysteresis characteristics, so that the energy consumption capability of a vertical joint between the shear walls can be effectively improved, and the shock resistance of the shear walls can be improved.
Preferably, the anchoring piece is connected to the side of the steel plate, which is far away from the steel ring.
Preferably, the number of the anchoring parts on the same steel plate is multiple, and at least two anchoring parts have different lengths. Therefore, the anchoring part can be stably and firmly anchored on the shear wall body, and the connection firmness is improved.
Preferably, the anchor is an expanded head anchor.
Preferably, the steel ring is provided with a long through hole in the middle, and the two ends of the steel ring are in circular arc structures. The structure can enable the steel ring to have better hysteretic characteristic, so that the shock resistance of the shear wall is improved.
Preferably, the steel ring and the steel plate are connected in a welding mode. Through using the fixed mode of welded connection, can avoid using the steel wire ligature to reduce the construction strength, improve the efficiency of construction, and improve the stability of connecting.
A shear wall comprises two shear wall bodies and an assembly type shear wall connecting mechanism, wherein the assembly type shear wall connecting mechanism is arranged between the two shear wall bodies, and the anchoring parts of the assembly type shear wall connecting mechanism are anchored on the shear wall bodies on the same side of the assembly type shear wall connecting mechanism.
According to the invention, the assembled shear wall connecting mechanism is arranged at the vertical joint between the two shear wall bodies, so that the hysteresis performance of the shear wall can be improved, the energy consumption capability of the vertical joint between the shear wall bodies can be effectively improved, and the shock resistance of the shear wall is improved.
Preferably, the depth of the steel ring is smaller than the thickness of the shear wall body.
Preferably, a vertical joint is formed between the two shear walls, a filling material is arranged in the vertical joint, and the steel ring is wrapped by the filling material.
A shear wall construction method comprises the following steps: connecting a steel plate to an anchoring piece, prefabricating a shear wall body, so that the anchoring piece is pre-buried in the shear wall body, and the steel plate is positioned on the outer side of the shear wall body; assembling the two shear wall bodies to form a vertical joint between the two shear wall bodies; placing a steel ring into the vertical seam, and welding the steel ring with the steel plates on the two sides of the steel ring; arranging templates which enclose two sides of the vertical joint; and pouring a solidified filling material through the hole at the upper end of the vertical joint, so that the two shear wall bodies are connected into a whole after the filling material is solidified.
According to the invention, the steel ring, the steel plate and the anchoring piece are used as the connecting mechanism between the two shear walls, when the shear walls are prefabricated, the anchoring piece can be pre-embedded firstly, so that the anchoring piece and the steel plate are arranged on the shear walls in advance, and when the two shear walls are assembled, only the steel ring is required to be placed on a vertical joint between the two shear walls and the steel ring and the steel plate are welded together, therefore, the steel ring, the steel plate and the like do not need to be bound and positioned by using steel wires, the structure and the construction are very simple, and the construction efficiency is greatly improved.
Drawings
FIG. 1 is a schematic structural view of a fabricated shear wall connection according to the present invention.
FIG. 2 is an exploded view of the fabricated shear wall connection of the present invention.
Fig. 3 is a schematic structural view of the fabricated shear wall of the present invention.
FIG. 4 is a cross-sectional view of a fabricated shear wall of the present invention.
FIG. 5 is a construction flow chart of the construction method of the fabricated shear wall according to the present invention.
Detailed Description
In order to explain technical contents, structural features, and effects achieved by the present invention in detail, the following detailed description is given with reference to the embodiments and the accompanying drawings.
As shown in fig. 1 and 2, the assembly type shear wall connection mechanism 100 of the present invention includes a steel ring 1, steel plates 2 symmetrically disposed on two opposite sides of the steel ring 1, and an anchoring member 3 fixedly connected to the steel plates 2, wherein the outer side surfaces of the steel ring 1 and the steel plates 2 are fixedly connected by welding. The anchoring piece 3 is fixedly connected to one side of the steel plate 2, which is far away from the steel ring 1, through welding. The number of the anchoring parts 3 on the same steel plate 2 is multiple, and at least two anchoring parts 3 have different lengths. The anchor members are arranged in the longitudinal direction and the width direction of the steel plate 2. Specifically, in the length direction of the steel plate 2, the length of the anchoring piece 3 near the two ends of the steel ring 1 is greater than the length of the anchoring piece 3 near the middle of the steel ring 1. The end part of the anchoring part 3 close to the middle part of the steel ring 1 is also provided with a head part with the diameter larger than that of the anchoring part 3 so as to improve the connection stability of the steel ring and the shear wall 201. And the length of the anchors 3 positioned in the same row is equal in the width direction of the steel plate 2. Therefore, the anchoring piece 3 can be stably and firmly anchored on the shear wall body 201, and the connection firmness is improved. The anchoring member 3 in this embodiment is an expanded head anchor rod.
As shown in fig. 1 and 2, the steel ring 1 is an O-shaped steel ring 1. Specifically, the middle of the steel ring 1 is provided with a long through hole, and two ends of the steel ring are of circular arc structures. The structure can enable the steel ring 1 to have better hysteretic characteristic, so that the shock resistance of the shear wall is improved. The steel ring 1 and the steel plate 2 are connected in a welding mode. Through using the fixed mode of welded connection, can avoid using the steel wire ligature to reduce the construction strength, improve the efficiency of construction, and improve the stability of connecting.
Compared with the prior art, the steel ring 1, the steel plate 2 and the anchoring piece 3 are arranged, so that the anchoring piece 3 is fixed on the steel plate 2, and the steel ring 1 is connected with the steel plate 2, so that the connecting mechanism 100 is formed, when the connecting mechanism 100 is arranged in the vertical seam 202 of the shear wall 201, the two shear walls 201 can be effectively connected, and the three are fixedly connected, so that the steel wire binding and positioning are not needed, the structure is very simple, and the construction efficiency is greatly improved. In addition, the steel ring 1 has good hysteresis characteristics, so that the energy consumption capability of the vertical joints 202 between the shear walls 201 can be effectively improved, and the seismic capacity of the shear wall can be improved.
Referring to fig. 3 and 4, the shear wall 200 of the present invention includes two shear walls 201 and the fabricated shear wall connection mechanism 100, wherein a vertical joint 202 is formed between the two shear walls 201. The perps 202 run through from one end to the other end of the shear wall 201 and from the front side to the back side of the shear wall 201. The vertical slit 202 has a width at a position near the middle thereof which is constant and has the largest width, and has a width at a position near the end thereof which is constant and has a smaller width, and has a structure in which the width gradually narrows from a gap having a larger width to a gap having a smaller width. The fabricated shear wall connection mechanism 100 is disposed between the two shear walls 201, the anchoring members 3 of the fabricated shear wall connection mechanism 100 are anchored to the shear walls 201 on the same side, and the steel plates 2 on the same side are attached to the side surfaces of the respective shear walls 201. The steel plate 2 and the steel ring 1 are both positioned in the vertical seam 202 and are positioned in the middle of the gap with larger width. In addition, the length of the steel plates 2 and the number of the steel rings 1 arranged between the two steel plates 2 can be manufactured according to the size of the shear wall. In the figure of this embodiment, it is shown that two steel rings 1 are arranged between two shear walls 201, and both sides of the two steel rings 1 are welded and fixed with the steel plate 2 corresponding to the side. And two adjacent steel rings 1 can be contacted side by side or separated from each other without contact, and the two steel rings do not need to be connected. The depth of the two steel rings 1 is equal to the width of the steel plate 2 and is smaller than the thickness of the shear wall 201. And a filling material 203 is arranged between the two shear walls 201, and the steel ring 1 is wrapped by the filling material 203. The filling material 203 is the same as the two shear walls 201, and is a concrete material. According to the invention, the fabricated shear wall connecting mechanism 100 is arranged at the vertical joint 202 between the two shear walls 201, so that the hysteresis performance of the shear wall can be improved, the energy consumption capability of the vertical joint 202 between the shear walls 201 can be effectively improved, and the seismic capacity of the shear wall can be improved.
As shown in fig. 5, the shear wall construction method of the present invention includes the following steps:
and step S1, prefabricating a plurality of steel rings 1, steel plates 2 and anchoring pieces 3.
Step S2, fixedly connecting a plurality of anchoring pieces 3 to one side of the steel plate 2 through welding; the shear wall 201 is prefabricated by using a concrete material, the anchoring piece 3 is pre-embedded in the shear wall 201 in the process of prefabricating the shear wall 201, and the steel plate 2 is located on the outer end face of the shear wall 201.
Step S3, assembling the two shear walls 201 to form a vertical joint 202 therebetween.
And step S4, placing the steel ring 1 into the vertical seam 202, and welding and fixing the steel ring 1 and the steel plates 2 on the two sides of the steel ring.
Step S5, setting a template enclosing the front and rear sides of the vertical seam 202 and the holes at the lower end of the vertical seam 202.
Step S6, pouring a curable filling material 203 through the hole at the upper end of the vertical joint 202, so that the two shear walls 201 are connected into a whole after the filling material 203 is cured. The filler material 203 is a concrete material, which is the same as the material of the shear wall 201.
And step S7, removing the template to obtain the shear wall.
According to the invention, the steel ring 1, the steel plate 2 and the anchoring piece 3 are used as the connecting mechanism 100 between the two shear walls 201, when the shear walls 201 are prefabricated, the anchoring piece 3 can be pre-embedded firstly, so that the anchoring piece 3 and the steel plate 2 are arranged on the shear walls 201 in advance, and when the two shear walls 201 are assembled, the steel ring 1 only needs to be placed on the vertical seam 202 between the two shear walls, and the steel ring 1 and the steel plate 2 are welded together, so that the steel ring 1, the steel plate 2 and the like do not need to be bound and positioned by using steel wires, the structure and the construction are very simple, and the construction efficiency is greatly improved.
The above disclosure is only a preferred embodiment of the present invention, and certainly should not be taken as limiting the scope of the present invention, which is therefore intended to cover all equivalent changes and modifications within the scope of the present invention.

Claims (10)

1. The utility model provides an assembled shear force wall coupling mechanism which characterized in that: the steel ring anchoring device comprises a steel ring, steel plates symmetrically arranged on two opposite sides of the steel ring and anchoring parts connected with the steel plates, wherein the outer side surface of the steel ring is fixedly connected with the outer side surfaces of the steel plates.
2. The fabricated shear wall connection of claim 1, wherein: the anchoring piece is connected to one side of the steel plate, which is far away from the steel ring.
3. The fabricated shear wall connection of claim 1, wherein: the number of the anchoring parts on the same steel plate is multiple, and at least two anchoring parts are different in length.
4. The fabricated shear wall connection of claim 1, wherein: the anchoring piece is an expanded anchor rod.
5. The fabricated shear wall connection of claim 1, wherein: the middle of the steel ring is provided with a long through hole, and two ends of the steel ring are of arc structures.
6. The fabricated shear wall connection of claim 1, wherein: the steel ring and the steel plate are connected in a welding mode.
7. A shear wall, comprising: the assembled shear wall connecting mechanism comprises two shear walls and the assembled shear wall connecting mechanism as claimed in any one of claims 1 to 6, wherein the assembled shear wall connecting mechanism is arranged between the two shear walls, and the anchoring parts of the assembled shear wall connecting mechanism are anchored on the shear walls on the same side of the assembled shear wall connecting mechanism.
8. The shear wall of claim 7, wherein: the depth of the steel ring is smaller than the thickness of the shear wall body.
9. The shear wall of claim 7, wherein: and a vertical joint is formed between the two shear wall bodies, a filling material is arranged in the vertical joint, and the steel ring is wrapped by the filling material.
10. A shear wall construction method is characterized by comprising the following steps:
connecting an anchoring piece to a steel plate, prefabricating a shear wall body, so that the anchoring piece is pre-buried in the shear wall body, and the steel plate is positioned on the outer side of the shear wall body;
assembling the two shear wall bodies to form a vertical joint between the two shear wall bodies;
placing a steel ring into the vertical seam, and welding the steel ring with the steel plates on the two sides of the steel ring;
arranging templates which enclose two sides of the vertical joint;
and pouring a solidified filling material through the hole at the upper end of the vertical joint, so that the two shear wall bodies are connected into a whole after the filling material is solidified.
CN202111048334.2A 2021-09-06 2021-09-06 Assembly type shear wall connecting mechanism, shear wall and shear wall construction method Pending CN113700170A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111048334.2A CN113700170A (en) 2021-09-06 2021-09-06 Assembly type shear wall connecting mechanism, shear wall and shear wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111048334.2A CN113700170A (en) 2021-09-06 2021-09-06 Assembly type shear wall connecting mechanism, shear wall and shear wall construction method

Publications (1)

Publication Number Publication Date
CN113700170A true CN113700170A (en) 2021-11-26

Family

ID=78659202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111048334.2A Pending CN113700170A (en) 2021-09-06 2021-09-06 Assembly type shear wall connecting mechanism, shear wall and shear wall construction method

Country Status (1)

Country Link
CN (1) CN113700170A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050009086A (en) * 2003-07-15 2005-01-24 유승룡 Constructing method of prefabricated bearing wall and wall member therefor
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN208072705U (en) * 2017-09-30 2018-11-09 沈阳建筑大学 A kind of energy-dissipating and shock-absorbing connection structure of coupling beam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050009086A (en) * 2003-07-15 2005-01-24 유승룡 Constructing method of prefabricated bearing wall and wall member therefor
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN208072705U (en) * 2017-09-30 2018-11-09 沈阳建筑大学 A kind of energy-dissipating and shock-absorbing connection structure of coupling beam

Similar Documents

Publication Publication Date Title
CN103195172B (en) A kind of prefabrication and assembly construction concrete frame beam-column connection structure
CN110469043A (en) A kind of steel plate combined shear wall and preparation method by the connection of intersection bending-type partition
CN108442512B (en) Prefabricated column/beam and connecting structure and construction method thereof
CN206144032U (en) Mosaic structure of assembled steel core concrete column and post
KR20140089735A (en) Reinforcing metal strip for retaining wall
CN108442534A (en) A kind of connecting node and its construction method of steel column/beam and prefabricated board
CN111519825A (en) Prefabricated stiff concrete shear wall plate with U-shaped anchoring steel plates, assembled stiff concrete shear wall and manufacturing method
CN113700170A (en) Assembly type shear wall connecting mechanism, shear wall and shear wall construction method
CN102061702A (en) joint with anti-seismic slots for precast concrete piles
WO2019206192A1 (en) Prefabricated column/beam and connection structure thereof and construction method thereof
CN209760513U (en) Shear wall column structure with concrete filled steel tube key connection
KR101939949B1 (en) Half-pc column based on framed rebar column
CN113775078A (en) Assembly type shear wall connecting mechanism, shear wall and shear wall construction method
CN215593973U (en) Prefabricated PHC high strength prestressing force tubular pile head
CN106801428B (en) Reinforced tensile-shear PHC pipe pile foundation structure and construction method thereof
CN213014819U (en) Reinforced node of corrugated steel plate wall side column and steel beam
CN210238769U (en) Assembled concrete frame node
JP4502192B2 (en) Structure and construction method of column base joints of steel pipe columns
JP3681367B2 (en) Joint structure of steel column and foundation concrete
CN215563518U (en) Shear force wall prefabricated plate with connection structure
CN111794377A (en) L-shaped prefabricated assembly type beam-column joint
JP3120941U (en) Box culvert
JP2001107509A (en) Shearing reinforcement bar and shearing reinforcement structure of flat slab
CN209760601U (en) Plug-in type multi-cavity concrete filled steel tube special-shaped column assembly type node
CN110409652A (en) Fabricated shear wall group and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211126

RJ01 Rejection of invention patent application after publication