CN113690859A - Starting and acting method and system for power grid differential protection - Google Patents
Starting and acting method and system for power grid differential protection Download PDFInfo
- Publication number
- CN113690859A CN113690859A CN202110892722.2A CN202110892722A CN113690859A CN 113690859 A CN113690859 A CN 113690859A CN 202110892722 A CN202110892722 A CN 202110892722A CN 113690859 A CN113690859 A CN 113690859A
- Authority
- CN
- China
- Prior art keywords
- value
- dtw
- differential protection
- starting
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention discloses a starting and acting method and a system of power grid differential protection, wherein the method comprises the steps of carrying out DTW calculation on a normalized current sampling sequence and carrying out unitization processing on an obtained DTW value; aiming at the DTW value after the unitization processing, calculating a starting value of a starting method and a setting value of an action method by combining a short window algorithm; judging whether a fault occurs or not and whether the fault is in a line area or not based on the calculated starting value and setting value; if the judgment result is that the power grid line has a fault, starting differential protection; if the judgment result is that the circuit area is in fault, the differential protection is controlled to immediately output an action signal. The invention can reliably start differential protection when different types of faults occur at different positions of a power grid line, and the system can greatly reduce the oscillation amplitude of the DTW distance waveform of the action method in an alternating current system and enable the differential protection to rapidly output an action signal.
Description
Technical Field
The invention belongs to the technical field of differential protection, and particularly relates to a starting and acting method and system of power grid differential protection.
Background
With the massive access of distributed new energy, the traditional staged current protection of the power distribution network line is not suitable any more. In order to effectively identify faults inside and outside the area and improve the power supply reliability of a power grid, a differential protection principle needs to be introduced and a communication channel capable of meeting the requirement of protecting data transmission is supplemented.
At present, both optical fiber and 5G communication technologies can be used for differential protection in data transmission performance. Compared with optical fiber communication, the base station in the 5G network is low in laying difficulty and flexible in site selection, so that the 5G communication is selected as a protection channel, the differential protection is promoted, and the reliability of power grid protection under the condition of high-proportion new energy access is improved. However, to use 5G communication as a data channel for differential protection, the problems of data synchronization and packet loss still need to be solved.
Differential protection based on Dynamic Time Warping (DTW) algorithm requires calculating the DTW distance between two sets of time sequences. When the problem of sampling point synchronization error increase or data loss occurs, the influence on the DTW distance is small, and the DTW algorithm weakens the adverse effect brought by 5G communication in principle.
Journal article "a differential protection algorithm for resisting communication delay and packet loss" provides a differential protection action method based on a DTW algorithm by using a DTW distance between phase currents on two sides. Journal article "positioning method for small current grounding fault section based on dynamic time bending distance" plans a differential protection action method through the DTW distance between the zero sequence currents on both sides, and can effectively detect the small current grounding fault. The chinese patent application No. 202010369821.8 discloses a method for calculating a DTW value using a normalized current sequence, which can effectively identify a single-phase ground fault. In the method in the prior art, the length of the data window is greater than or equal to one power frequency period, and in an alternating current system, if the length of the data window is reduced, extreme values occur in the DTW distance near the zero crossing point and the peak valley value of the current, and the corresponding waveform greatly oscillates. In addition, the protection starting method based on the DTW algorithm is not researched in the methods.
Disclosure of Invention
In order to solve the problems, the invention provides a starting and acting method and a system of power grid differential protection, which can realize the function of reliably starting the differential protection when different types of faults occur at different positions of a power grid line, and the system can greatly reduce the oscillation amplitude of a DTW distance waveform of an acting method in an alternating current system and enable the differential protection to rapidly output an acting signal.
In order to achieve the technical purpose and achieve the technical effects, the invention is realized by the following technical scheme:
in a first aspect, the present invention provides a method for starting and operating a power grid differential protection, including:
performing DTW calculation on the normalized current sampling sequence, and performing unitization processing on the obtained DTW value;
aiming at the DTW value after the unitization processing, calculating a starting value of a starting method and a setting value of an action method by combining a short window algorithm;
judging whether a fault occurs or not and whether the fault is in a line area or not based on the calculated starting value and setting value;
if the judgment result is that the power grid line has a fault, starting differential protection;
if the judgment result is that the circuit area is in fault, the differential protection is controlled to immediately output an action signal.
Optionally, the normalized current sampling sequence is obtained by:
after receiving a phase current sampling sequence of an opposite end, processing the phase current sampling sequence of the opposite end by using a substitution processing method, wherein the substitution processing method is to use previous effective sampling point data to substitute current abnormal sampling point data;
and selecting two current sampling sequences from all the phase current sampling sequences and the zero sequence current sampling sequences at two ends of the line, and normalizing the two current sampling sequences.
Optionally, the DTW calculation specifically includes:
intercepting the last T of the two normalized current sampling sequences0Sampling point data;
and calculating the DTW value between the sampling points of the intercepted parts of the two current sampling sequences by using a DTW algorithm.
Optionally, the calculation formula adopted by the alternative processing method is as follows:
Ii'=Ii-1,i=2,3,4...
wherein, Ii-1Is the amplitude of the current at the I-1 th effective sampling pointi' is the magnitude of the current at the ith sample point after the substitution process.
Optionally, the calculation formula of the DTW value is:
Dij=dij+min{Di,j-1,Di-1,j,Di-1,j-1}
wherein d isijRepresenting the Euclidean distance between the current amplitude of the ith sampling point of the first current sampling sequence and the current amplitude of the jth sampling point of the second current sampling sequence; dijRepresenting the ith-T of a sequence of samples taken by the first current0+1,i-T0+2, …, i sample point current amplitudes and j-T of the second sequence of current samples0+1,j-T0The DTW value between +2, …, j sample point current amplitudes.
Optionally, the formula used for unitizing the obtained DTW value is:
d is a DTW actual accumulated value between the two current sampling sequences;is the DTW value after the unit.
Optionally, the calculation formula of the short window algorithm is:
wherein the content of the first and second substances,for the first time after being optimized by a short window algorithmThe DTW difference of the phase is the DTW difference at two sampling points separated by 1/4 power frequency cyclesAverage value of (d);for the first time after being optimized by a short window algorithmDTW braking amount of phase, which is DTW braking amountAverage value of (d); t is the total number of sampling points in a power frequency period, and k is a sampling serial number.
Optionally, the promoter method comprises promoter method 1, promoter method 2, promoter method 3;
the promoter value of the promoter method 1 was calculated by the following steps:
defining a current sampling sequence to be divided into three groups of AB, BC and CA;
for group AB, then:
in the formula (I), the compound is shown in the specification,for the optimized DTW difference between the two phases AB,for the optimized DTW braking amount of the two AB phases through the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the BC group, then:
in the formula (I), the compound is shown in the specification,for the optimized BC two-phase DTW difference momentum through the short window algorithm,for the optimized BC two-phase DTW braking amount through the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the CA group, then:
in the formula (I), the compound is shown in the specification,for the DTW difference between two phases of CA after the optimization of the short window algorithm,for the optimized DTW braking amount between two phases of CA by the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
promoter method 2 promoter values were calculated by the following steps:
for phase A current, split it into odd sequences IA1And even sequence IA2;
IA1(k)=IA(2k-1),k=1,2...
-IA2(k)=-IA(2k),k=1,2...
Calculation of IA1and-IA2DTW value ofCalculation of IA1And IA2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the phase B current, split it into odd sequences IB1And even sequence IB2;
IB1(k)=IB(2k-1),k=1,2...
-IB2(k)=-IB(2k),k=1,2...
Calculation of IB1and-IB2DTW value ofCalculation of IB1And IB2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the C-phase current, split it into odd sequences IC1And even sequence IC2;
IC1(k)=IC(2k-1),k=1,2...
-IC2(k)=-IC(2k),k=1,2...
Calculation of IC1and-IC2DTW value ofCalculation of IC1And IC2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
the promoter value for promoter method 3 was calculated by the following steps:
adding the three-phase current sampling sequences and dividing by 3 to obtain zero-sequence current Im0Is shown bym0Divided into odd sequences Im01And even sequence Im02Calculating Im01and-Im02DTW value ofCalculation of Im01And Im02DTW value ofRecalculationAndthen there are:
if the starting value isGreater than a threshold value Dop3Then the differential protection is started, m represents one of the two ends of the line, and 0 represents zero sequence.
Optionally, if the determination result is that the power grid line fails, the differential protection is started, specifically:
and if the starting value of any one of the method 1, 2 and 3 is greater than the threshold value, judging that the power grid line has a fault, and starting differential protection.
Optionally, the action method comprises action submethod 1 and action submethod 2;
the setting value of the action sub-method 1 is calculated by the following steps:
obtaining the DTW differential quantity optimized by the short window algorithm by using two current sampling sequences of the same phase at two ends of the lineAnd amount of brakingThe time interval of two sampling points in the short window algorithm is 1/8 power frequency periods, and then:
if the setting valueGreater than a threshold value Dop4If so, the differential protection action is carried out, K is a braking coefficient and belongs to [0,1]];
The setting value of the action sub-method 2 is calculated by the following steps:
calculating zero sequence current at two ends of the line, dividing the zero sequence current into odd-even sequences, and obtaining the DTW differential quantity optimized by the short window algorithmAnd amount of brakingThe time interval of two sampling points in the short window algorithm is 1/8 power frequency periods, and then:
Optionally, if the determination result is an internal fault of the line area, controlling the differential protection to immediately output the action signal, specifically:
if the setting value of any one of the sub-methods 1 and 2 is larger than the threshold value, the occurrence of the fault in the line area is judged, and the differential protection immediately acts.
In a third aspect, the present invention provides a system for starting and operating a power grid differential protection, including a storage medium and a processor;
the storage medium is used for storing instructions;
the processor is configured to operate in accordance with the instructions to perform the method according to any one of the first aspects.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides a starting and acting method and a system of power grid differential protection, which can realize the function of reliably starting the differential protection when different types of faults occur at different positions of a power grid line, and the system can greatly reduce the oscillation amplitude of a DTW distance waveform of an acting method in an alternating current system and enable the differential protection to rapidly output an acting signal.
The short window algorithm can effectively solve the problem that the waveform of the DTW algorithm in the alternating current system greatly vibrates during short window calculation, and realizes differential protection setting based on the DTW algorithm, so that the required data storage capacity is small.
The substitution processing method can greatly reduce the influence of the DTW algorithm on the problem sampling points. When continuous multipoint data loss occurs or frames are lost due to check errors, differential protection can be prevented from malfunction by increasing the threshold value, and reliability is improved.
Drawings
In order that the present disclosure may be more readily and clearly understood, reference is now made to the following detailed description of the present disclosure taken in conjunction with the accompanying drawings, in which:
FIG. 1 is a flow diagram of a differential protection system comprising submethods 1 and 3 of a startup method and an action method;
FIG. 2 is a flow chart of the differential protection system consisting of submethods 2 and 3 of the startup method and the action method;
FIG. 3 is a schematic diagram of a power distribution network model in which an embodiment is implemented;
FIG. 4(a) shows a sub-method 1 of the action method without introducing the short window algorithm at f2Setting value waveform curve when ABCG fault occurs;
FIG. 4(b) shows a sub-method 1 of the action method without introducing the short window algorithm at f2A normalized current waveform curve when an ABCG fault occurs;
FIG. 5 is a diagram of a startup methodSub-method 1Andat f4A waveform curve when an AG fault occurs;
FIG. 6 shows the startup value at f in submethod 2 of the startup method3A waveform curve when an AB fault occurs;
FIG. 7 is a submethod 3 of the startup method at f2A waveform curve when an AG1000 omega fault occurs;
FIG. 8 shows that sub-method 1 of the operation method in the normal 5G communication has a setting value f under the condition of introducing and not introducing the short window algorithm4Waveform when an AB fault occurs;
FIG. 9 shows that the setting value in FIG. 8 is f when continuous 3-point data packet loss occurs2A waveform at which an ABG fault occurs;
FIG. 10 shows that the setting value in FIG. 8 is f when continuous 12-point data packet loss occurs6Waveform when an AB fault occurs;
FIG. 11 shows a sub-method 2 of the method after the short window algorithm is introduced when the 5G communication is normal and continuous 3-point data packet loss occurs, at f1ABG failure.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and do not limit the scope of the invention.
The following detailed description of the principles of the invention is provided in connection with the accompanying drawings.
Example 1
The embodiment of the invention provides a starting and acting method of power grid differential protection, which specifically comprises the following steps:
performing DTW calculation on the normalized current sampling sequence, and performing unitization processing on the obtained DTW value;
aiming at the DTW value after the unitization processing, calculating a starting value of a starting method and a setting value of an action method by combining a short window algorithm;
judging whether a fault occurs or not and whether the fault is in a line area or not based on the calculated starting value and setting value;
if the judgment result is that the power grid line has a fault, starting differential protection;
if the judgment result is that the circuit area is in fault, the differential protection is controlled to immediately output an action signal.
Referring to fig. 1-2, the detailed description of the startup and operation method in the embodiment of the present invention is provided in conjunction with the specific implementation process and the power distribution network model in fig. 3.
Step 1: sampling three-phase current values at two ends of a line in real time at a certain sampling frequency, and sending an obtained sampling sequence to a sampling selection device at one end by using a 5G network;
step 2: after receiving the current sampling sequence of the opposite end, carrying out normalization processing on each current sequence, wherein the effect is shown in fig. 4(b), the current waveform amplitude values are all in the interval of [0,1], the substitution processing method of the current abnormal sampling point is replaced by the previous effective sampling point data, the data packet loss problem is processed, and the lengths of 2 sampling sequences in the subsequent DTW calculation are ensured to be equal; the calculation formula of the alternative processing method is as follows:
I′i=Ii-1,i=2,3,4...
wherein, Ii-1Is the amplitude of the current at the I-1 th effective sampling pointi' is the magnitude of the current at the ith sample point after the substitution process.
And step 3: respectively intercepting the last T of 2 sampling sequences required by the subsequent DTW calculation according to the requirements of the differential protection starting and action method0Calculating corresponding DTW values by using short window algorithm, as shown in FIG. 6, FIG. 8, FIG. 9, FIG. 10 and FIG. 11, and then performing unitization processing on the obtained DTW values, and listing the starting values of the starting method and the setting values of the action method; the DTW calculation specifically comprises the steps of firstly calculating Euclidean distances d between sampling points in the intercepted parts of 2 current sampling sequencesijThen to dijRule makingThe DTW value D can be obtained by sexual accumulationij:
Dij=dij+min{Di,j-1,Di-1,j,Di-1,j-1}
Wherein d isijRepresenting the Euclidean distance between the current amplitude of the ith sampling point of the first current sampling sequence and the current amplitude of the jth sampling point of the second current sampling sequence; dijRepresenting the ith-T of a sequence of samples taken by the first current0+1,i-T0+2, …, i sample point current amplitudes and j-T of the second sequence of current samples0+1,j-T0The DTW value between +2, …, j sample point current amplitudes.
The short window algorithm is characterized in that the interval between the peak-valley value and the zero crossing point of the fault current is 1/4 power frequency periods before and after the peak-valley value and the zero crossing point of the fault current occur, and the maximum value and the minimum value of the DTW waveform also occur at the time interval of 1/4 power frequency periods. Therefore, the waveform oscillation can be reduced by a method of first obtaining the DTW values after unitization at two sampling points near the maximum value and the minimum value, and then obtaining the average value of the DTW values:
wherein the content of the first and second substances,for the first time after being optimized by a short window algorithmThe DTW difference of the phase is the DTW difference at two sampling points separated by 1/4 power frequency cyclesAverage value of (d);for the first time after being optimized by a short window algorithmDTW braking amount of phase, which is DTW braking amountAverage value of (d); t is the total number of sampling points in a power frequency period, and k is a sampling serial number.
The formula used for unitizing the obtained DTW value is as follows:
d is a DTW actual accumulated value between the two current sampling sequences;is the DTW value after the unit.
And 4, step 4: as for the starting method, as shown in fig. 5, 6 and 7, if the starting method includes a promoter sub method 1, a promoter sub method 2 and a promoter sub method 3, when the starting value of any one sub method is greater than a threshold value, a fault occurs in a power grid line, and differential protection is started (the starting method of the local terminal starts the differential protection of the local terminal, and the starting method of the opposite terminal starts the differential protection of the opposite terminal);
and 5: as for the operation method, as shown in fig. 8, 9, 10 and 11, if the setting value of any one of the submethods is greater than the threshold value in the operation submethods 1 and 2, an intra-line fault occurs, and the differential protection immediately sends an operation signal;
step 6: if packet loss occurs to the peer-to-peer data and the number of consecutive packet loss does not exceed 3, as shown in fig. 8, 9, and 11, the threshold values of 2 sub-methods of the action method may be increased to ensure that the action method does not malfunction when an out-of-area fault occurs; if the number of consecutive lost packets exceeds 3, as shown in fig. 10, the adjustment threshold value cannot be set reliably, so that the differential protection needs to be locked for a short time to prevent malfunction.
As shown in fig. 6, 8, 9, 10 and 11, the starting method sub-method 2 and the operation method sub-method 2 of the present invention calculate the DTW value and then calculate the starting value and the setting value by the short window algorithm.
The starting method comprises a starter method 1, as shown in fig. 5, dividing a three-phase current sequence at the m side of a home terminal into three groups of AB, BC and CA;
for group AB, then:
in the formula (I), the compound is shown in the specification,for the optimized DTW difference between the two phases AB,for the optimized DTW braking amount of the two AB phases through the short window algorithm,andare respectively asAndthe amount of change in (c);
t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the BC group, then:
in the formula (I), the compound is shown in the specification,for the optimized BC two-phase DTW difference momentum through the short window algorithm,for the optimized BC two-phase DTW braking amount through the short window algorithm,andare respectively asAndthe amount of change in (c);
t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the CA group, then:
in the formula (I), the compound is shown in the specification,for the DTW difference between two phases of CA after the optimization of the short window algorithm,for the optimized DTW braking amount between two phases of CA by the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1Then the differential protection is enabled.
The starting method comprises a starter method 2, as shown in fig. 6, splitting a three-phase current sequence at one end into odd-even sequences respectively;
for phase A current, split it into odd sequences IA1And even sequence IA2;
IA1(k)=IA(2k-1),k=1,2...
-IA2(k)=-IA(2k),k=1,2...
Calculation of IA1and-IA2DTW value ofCalculation of IA1And IA2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the phase B current, split it into odd sequences IB1And even sequence IB2;
IB1(k)=IB(2k-1),k=1,2...
-IB2(k)=-IB(2k),k=1,2...
Calculation of IB1and-IB2DTW value ofCalculation of IB1And IB2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the C-phase current, split it into odd sequences IC1And even sequence IC2;
IC1(k)=IC(2k-1),k=1,2...
-IC2(k)=-IC(2k),k=1,2...
Calculation of IC1and-IC2DTW value ofCalculation of IC1And IC2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2Then the differential protection is enabled.
The starting method comprises a starter method 3, as shown in fig. 7, taking the m side of the line as an example, calculating the zero sequence current I of the m sidem0Is shown bym0Divided into odd sequences Im01And even sequence Im02Calculating Im01and-Im02DTW value ofCalculation of Im01And Im02DTW value ofRecalculationAndthen there are:
if the left starting value is larger than the threshold value Dop3Then the differential protection is enabled.
The action method comprises an action submethod 1, as shown in fig. 8, 9 and 10, and is characterized in that two current sequences of the same phase at two ends of a line are used for obtaining a DTW difference quantity and a braking quantity, and then a short window algorithm is used for obtaining the DTW difference quantity and the braking quantityAndthe time interval between two sampling points in the short window algorithm here is 1/8 power frequency cycles. Then there are:
if the upper left setting value is larger than the threshold value Dop4Then the differential protection outlet action signal.
The action method comprises an action submethod 2, as shown in fig. 11, calculating zero sequence current at two ends of the line and dividing the zero sequence current into odd-even sequences, calculating DTW difference and braking quantity, and calculating by using a short window algorithmAndthe time interval between two sampling points in the short window algorithm here is 1/8 power frequency cycles. Then there are:
if the upper left setting value is larger than the threshold value Dop5Then the differential protection outlet action signal.
As shown in fig. 5, in steady state, the start value of the sub-method 1 of the start method is a very small positive number and is basically stable, when the line fails, at least one of the two DTW values in the maximum function corresponding to the start value will increase rapidly, and the threshold value D is takenop1Is 0.003 if the starting value is greater than Dop1Then the differential protection is enabled. Submethod 1 of the startup method can start differential protection within 2ms after the occurrence of a fault and can be used to detect various types of faults other than a high-resistance ground fault.
As shown in FIG. 6, in sub-method 2 of the start-up method, when a line fault occurs, the start-up value increases rapidly, and the threshold value D is takenop2Is 0.028, if the starting value is greater than Dop2Then the differential protection is enabled. Sub-method 2 of the start-up method can start differential protection within 8ms after the occurrence of a fault and can be used to detect various types of faults other than a single-phase earth fault.
As shown in fig. 7, sub-method 3 of the start-up method also increases the start-up value rapidly when a line fault occurs, taking threshold value Dop3Is 0.02, if the starting value is greater than Dop3Then the differential protection is enabled. Submethod 2 of the startup method can start differential protection within 2ms after the fault occurs, can be used to detect asymmetric ground faults, and is used as a complement to submethods 1 and 2 of the startup method.
As shown in fig. 8, 9, and 10, in the submethod 1 of the operation method, when an out-of-range fault occurs, the setting value is lower than the threshold value, and the differential protection does not operate. For the fault in the area, the threshold value D is taken except that the high-resistance earth fault can not be setop4And the packet loss is 0.01, and the differential protection can output the action signal within 6.75ms as long as the packet loss is not more than 3 continuously. If the number of consecutive lost packets exceeds 3, the operation speed gradually decreases.
As shown in fig. 11, if there are no more than 3 consecutive lost packets, sub-method 2 of the action method can adjust all asymmetric ground faults and can export the action signal within 6.75ms as well.
Example 2
Based on the same inventive concept as embodiment 1, the embodiment of the invention provides a starting and acting system for power grid differential protection, which comprises a storage medium and a processor;
the storage medium is used for storing instructions;
the processor is configured to operate in accordance with the instructions to perform the method of any of embodiment 1.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (12)
1. A starting and action method for power grid differential protection is characterized by comprising the following steps:
performing DTW calculation on the normalized current sampling sequence, and performing unitization processing on the obtained DTW value;
aiming at the DTW value after the unitization processing, calculating a starting value of a starting method and a setting value of an action method by combining a short window algorithm;
judging whether a fault occurs or not and whether the fault is in a line area or not based on the calculated starting value and setting value;
if the judgment result is that the power grid line has a fault, starting differential protection;
if the judgment result is that the circuit area is in fault, the differential protection is controlled to immediately output an action signal.
2. A method according to claim 1, wherein the normalized current sampling sequence is obtained by:
after receiving a phase current sampling sequence of an opposite end, processing the phase current sampling sequence of the opposite end by using a substitution processing method, wherein the substitution processing method is to use previous effective sampling point data to substitute current abnormal sampling point data;
and selecting two current sampling sequences from all the phase current sampling sequences and the zero sequence current sampling sequences at two ends of the line, and normalizing the two current sampling sequences.
3. A method according to claim 2, wherein the method further comprises: the DTW calculation specifically comprises the following steps:
intercepting the last T of the two normalized current sampling sequences0Sampling point data;
and calculating the DTW value between the sampling points of the intercepted parts of the two current sampling sequences by using a DTW algorithm.
5. The method for starting and operating the power grid differential protection according to claim 2, wherein the substitution processing method adopts a calculation formula as follows:
I′i=Ii-1,i=2,3,4...
wherein, Ii-1Is the amplitude of the current of the ith-1 valid sampling point, I'iInstead of the magnitude of the current at the ith sample point after processing.
6. The method for starting and operating grid differential protection according to claim 1, wherein the DTW value is calculated by the formula:
Dij=dij+min{Di,j-1,Di-1,j,Di-1,j-1}
wherein d isijRepresenting the Euclidean distance between the current amplitude of the ith sampling point of the first current sampling sequence and the current amplitude of the jth sampling point of the second current sampling sequence; dijRepresenting the ith-T of a sequence of samples taken by the first current0+1,i-T0+2, …, i sample point current amplitudes and j-T of the second sequence of current samples0+1,j-T0The DTW value between +2, …, j sample point current amplitudes.
7. The method for starting and operating the power grid differential protection according to claim 1, wherein the short window algorithm has a calculation formula as follows:
wherein the content of the first and second substances,for the first time after being optimized by a short window algorithmThe DTW difference of the phase is the DTW difference at two sampling points separated by 1/4 power frequency cyclesAverage value of (d);for the first time after being optimized by a short window algorithmDTW braking amount of phase, which is DTW braking amountAverage value of (d); t is the total number of sampling points in a power frequency period, and k is a sampling serial number.
8. A method according to claim 1, wherein the method further comprises the steps of: the starting method comprises a promoter method 1, a promoter method 2 and a promoter method 3;
the promoter value of the promoter method 1 was calculated by the following steps:
defining a current sampling sequence to be divided into three groups of AB, BC and CA;
for group AB, then:
in the formula (I), the compound is shown in the specification,for the optimized DTW difference between the two phases AB,for the optimized DTW braking amount of the two AB phases through the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the BC group, then:
in the formula (I), the compound is shown in the specification,for the optimized BC two-phase DTW difference momentum through the short window algorithm,for the optimized BC two-phase DTW braking amount through the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
for the CA group, then:
in the formula (I), the compound is shown in the specification,for the DTW difference between two phases of CA after the optimization of the short window algorithm,for the optimized DTW braking amount between two phases of CA by the short window algorithm,andare respectively asAndthe amount of change in (c); t is the total number of sampling points in a power frequency period, and k is a sampling serial number;
if the starting value isGreater than a threshold value Dop1If yes, differential protection is started;
promoter method 2 promoter values were calculated by the following steps:
for phase A current, split it into odd sequences IA1And even sequence IA2;
IA1(k)=IA(2k-1),k=1,2...
-IA2(k)=-IA(2k),k=1,2...
Calculation of IA1and-IA2DTW value ofCalculation of IA1And IA2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the phase B current, split it into odd sequences IB1And even sequence IB2;
IB1(k)=IB(2k-1),k=1,2...
-IB2(k)=-IB(2k),k=1,2...
Calculation of IB1and-IB2DTW value ofCalculation of IB1And IB2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
for the C-phase current, split it into odd sequences IC1And even sequence IC2;
IC1(k)=IC(2k-1),k=1,2...
-IC2(k)=-IC(2k),k=1,2...
Calculation of IC1and-IC2DTW value ofCalculation of IC1And IC2DTW value ofCalculated by short window algorithmAndthen there are:
if the starting value isGreater than a threshold value Dop2If yes, differential protection is started;
the promoter value for promoter method 3 was calculated by the following steps:
adding the three-phase current sampling sequences and dividing by 3 to obtain zero-sequence current Im0Is shown bym0Divided into odd sequences Im01And even sequence Im02Calculating Im01and-Im02DTW value ofCalculation of Im01And Im02DTW value ofRecalculationAndthen there are:
9. A method according to claim 8, wherein the method further comprises: if the judgment result is that the power grid line fails, starting differential protection, specifically:
and if the starting value of any one of the method 1, 2 and 3 is greater than the threshold value, judging that the power grid line has a fault, and starting differential protection.
10. A method according to claim 1, wherein the method further comprises the steps of: the action method comprises an action submethod 1 and an action submethod 2;
the setting value of the action sub-method 1 is calculated by the following steps:
obtaining the DTW differential quantity optimized by the short window algorithm by using two current sampling sequences of the same phase at two ends of the lineAnd amount of brakingThe time interval of two sampling points in the short window algorithm is 1/8 power frequency periods, and then:
if the setting valueGreater than a threshold value Dop4If so, the differential protection action is carried out, K is a braking coefficient and belongs to [0,1]](ii) a The setting value of the action submethod 2 is measured by the following stepsCalculating:
calculating zero sequence current at two ends of the line, dividing the zero sequence current into odd-even sequences, and obtaining the DTW differential quantity optimized by the short window algorithmAnd amount of brakingThe time interval of two sampling points in the short window algorithm is 1/8 power frequency periods, and then:
11. The method according to claim 1, wherein if the determination result is an internal fault of the line area, the method controls an immediate exit operation signal of the differential protection, specifically:
if the setting value of any one of the sub-methods 1 and 2 is larger than the threshold value, the occurrence of the fault in the line area is judged, and the differential protection immediately acts.
12. A starting and action system for power grid differential protection is characterized by comprising a storage medium and a processor;
the storage medium is used for storing instructions;
the processor is configured to operate in accordance with the instructions to perform the method of any of claims 1-11.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110892722.2A CN113690859B (en) | 2021-08-04 | 2021-08-04 | Starting and acting method and system for power grid differential protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110892722.2A CN113690859B (en) | 2021-08-04 | 2021-08-04 | Starting and acting method and system for power grid differential protection |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113690859A true CN113690859A (en) | 2021-11-23 |
CN113690859B CN113690859B (en) | 2023-02-21 |
Family
ID=78578794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110892722.2A Active CN113690859B (en) | 2021-08-04 | 2021-08-04 | Starting and acting method and system for power grid differential protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113690859B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU736254A1 (en) * | 1977-03-09 | 1980-05-25 | Предприятие П/Я В-2616 | Device for short-circuiting protection of ac generator of two-channel power supply system of aircraft in distributing network |
CN104078948A (en) * | 2014-07-15 | 2014-10-01 | 国家电网公司 | Transmission line positive sequence current split-phase differential protection method based on short data window |
CN105353271A (en) * | 2015-11-03 | 2016-02-24 | 云南电网有限责任公司电力科学研究院 | Current differential protection saturation distinguishing method |
CN105529688A (en) * | 2016-02-25 | 2016-04-27 | 三峡大学 | Transformer excitation inrush current and fault differential current recognition method based on Hausdorff distance algorithm |
CN108562820A (en) * | 2018-05-04 | 2018-09-21 | 国网甘肃省电力公司电力科学研究院 | Single-phase ground fault line selecting method of small-electric current grounding system and device |
WO2020144600A1 (en) * | 2019-01-08 | 2020-07-16 | Panoramic Power Ltd. | A methods for determining an alternate current motor fault in a non-variable frequency device based on current analysis |
CN111478297A (en) * | 2020-04-30 | 2020-07-31 | 深圳供电局有限公司 | Calculation method for power grid differential protection |
CN111987687A (en) * | 2020-07-14 | 2020-11-24 | 许继集团有限公司 | Quick-break differential protection method for preventing surge interference unwanted operation |
CN112054482A (en) * | 2020-08-06 | 2020-12-08 | 三峡大学 | Converter transformer zero sequence differential protection anti-misoperation method based on DTW algorithm |
CN113013852A (en) * | 2021-02-26 | 2021-06-22 | 许继集团有限公司 | Line protection optical fiber channel transmission data processing method and device |
CN113034305A (en) * | 2021-02-10 | 2021-06-25 | 上海千居智科技有限公司 | Non-invasive load monitoring event classification method and storage medium |
-
2021
- 2021-08-04 CN CN202110892722.2A patent/CN113690859B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU736254A1 (en) * | 1977-03-09 | 1980-05-25 | Предприятие П/Я В-2616 | Device for short-circuiting protection of ac generator of two-channel power supply system of aircraft in distributing network |
CN104078948A (en) * | 2014-07-15 | 2014-10-01 | 国家电网公司 | Transmission line positive sequence current split-phase differential protection method based on short data window |
CN105353271A (en) * | 2015-11-03 | 2016-02-24 | 云南电网有限责任公司电力科学研究院 | Current differential protection saturation distinguishing method |
CN105529688A (en) * | 2016-02-25 | 2016-04-27 | 三峡大学 | Transformer excitation inrush current and fault differential current recognition method based on Hausdorff distance algorithm |
CN108562820A (en) * | 2018-05-04 | 2018-09-21 | 国网甘肃省电力公司电力科学研究院 | Single-phase ground fault line selecting method of small-electric current grounding system and device |
WO2020144600A1 (en) * | 2019-01-08 | 2020-07-16 | Panoramic Power Ltd. | A methods for determining an alternate current motor fault in a non-variable frequency device based on current analysis |
CN111478297A (en) * | 2020-04-30 | 2020-07-31 | 深圳供电局有限公司 | Calculation method for power grid differential protection |
CN111987687A (en) * | 2020-07-14 | 2020-11-24 | 许继集团有限公司 | Quick-break differential protection method for preventing surge interference unwanted operation |
CN112054482A (en) * | 2020-08-06 | 2020-12-08 | 三峡大学 | Converter transformer zero sequence differential protection anti-misoperation method based on DTW algorithm |
CN113034305A (en) * | 2021-02-10 | 2021-06-25 | 上海千居智科技有限公司 | Non-invasive load monitoring event classification method and storage medium |
CN113013852A (en) * | 2021-02-26 | 2021-06-22 | 许继集团有限公司 | Line protection optical fiber channel transmission data processing method and device |
Non-Patent Citations (1)
Title |
---|
李海林: "时间序列数据挖掘中的动态时间弯曲研究综述", 《控制与决策》 * |
Also Published As
Publication number | Publication date |
---|---|
CN113690859B (en) | 2023-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105656038B (en) | A kind of meter and power network receive the probability load flow calculation method of ability | |
CN101562332A (en) | Self-adaptive current fast tripping protection method for distribution network comprising inverse distributed power | |
CN109038664B (en) | High-frequency turn setting method considering fan grid-involvement protection | |
WO2022242020A1 (en) | Method and system for optimizing direct current transmission limit within planning period | |
CN104361068B (en) | Parallel method of partition and system during a kind of data deduplication | |
CN113690859B (en) | Starting and acting method and system for power grid differential protection | |
CN115877129B (en) | Low-voltage distribution network neutral line disconnection comprehensive judgment method based on current and voltage | |
CN103107530A (en) | Multi-direct-current urgent coordination control method based on sensitivity | |
CN111541280A (en) | Power grid wind power maximum permeability evaluation method considering static voltage stability constraint | |
CN108736921A (en) | A kind of power line carrier communication lead detecting method for resisting random impulsive noise | |
CN110149221A (en) | A kind of construction method and device of the adaptive network based on alliance's chain | |
CN109861855B (en) | Method and device for determining importance of nodes in power communication network | |
Peng et al. | A new approximation algorithm for computing 2-restricted disjoint paths | |
EP2476211B1 (en) | A method for estimating transmission properties of a telecommunications transmission line | |
CN112102611B (en) | Urban road network key path identification method based on interruption probability influence model | |
Luo et al. | Single-Ended Time Domain Fault Location Based on Transient Signal Measurements of Transmission Lines | |
CN114725903B (en) | Self-adaptive full-line current protection method, device, medium and system for power distribution network | |
CN112561137B (en) | Power grid high-frequency generator tripping optimization method for new energy unit | |
CN111541266B (en) | Load flow calculation method of power distribution system with distributed power supply based on forward-backward substitution idea | |
Deshpande et al. | A statistical approach to anomaly detection in interdomain routing | |
Sun et al. | A new routing selection method considering network capacity and path cost | |
Ahuja | Performance based reliability Optimization for computer networks | |
CN109578208A (en) | Wind power generating set and its Yaw control method and device | |
CN117880208A (en) | Speed limiting method for realizing lock-free speed limiting by multi-core dynamic speed adjustment | |
Chen et al. | An Improved Backward/Forward Algorithm for Distribution Network Power Flow Calculation Considering Meteorological Factors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |