CN113685841B - Working medium supply system for wind tunnel experiment heat storage heater and construction method - Google Patents

Working medium supply system for wind tunnel experiment heat storage heater and construction method Download PDF

Info

Publication number
CN113685841B
CN113685841B CN202110987931.5A CN202110987931A CN113685841B CN 113685841 B CN113685841 B CN 113685841B CN 202110987931 A CN202110987931 A CN 202110987931A CN 113685841 B CN113685841 B CN 113685841B
Authority
CN
China
Prior art keywords
valve
pressure
air
sensor
path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110987931.5A
Other languages
Chinese (zh)
Other versions
CN113685841A (en
Inventor
高占彪
李东霞
顾洪斌
岳连捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Mechanics of CAS
Original Assignee
Institute of Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Mechanics of CAS filed Critical Institute of Mechanics of CAS
Priority to CN202110987931.5A priority Critical patent/CN113685841B/en
Publication of CN113685841A publication Critical patent/CN113685841A/en
Application granted granted Critical
Publication of CN113685841B publication Critical patent/CN113685841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N1/00Regulating fuel supply
    • F23N1/02Regulating fuel supply conjointly with air supply
    • F23N1/027Regulating fuel supply conjointly with air supply using mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64FGROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT; DESIGNING, MANUFACTURING, ASSEMBLING, CLEANING, MAINTAINING OR REPAIRING AIRCRAFT, NOT OTHERWISE PROVIDED FOR; HANDLING, TRANSPORTING, TESTING OR INSPECTING AIRCRAFT COMPONENTS, NOT OTHERWISE PROVIDED FOR
    • B64F5/00Designing, manufacturing, assembling, cleaning, maintaining or repairing aircraft, not otherwise provided for; Handling, transporting, testing or inspecting aircraft components, not otherwise provided for
    • B64F5/60Testing or inspecting aircraft components or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23DBURNERS
    • F23D14/00Burners for combustion of a gas, e.g. of a gas stored under pressure as a liquid
    • F23D14/46Details
    • F23D14/48Nozzles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23DBURNERS
    • F23D14/00Burners for combustion of a gas, e.g. of a gas stored under pressure as a liquid
    • F23D14/46Details
    • F23D14/72Safety devices, e.g. operative in case of failure of gas supply
    • F23D14/78Cooling burner parts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M11/00Safety arrangements
    • F23M11/04Means for supervising combustion, e.g. windows
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/10Reduction of greenhouse gas [GHG] emissions
    • Y02P10/143Reduction of greenhouse gas [GHG] emissions of methane [CH4]

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Transportation (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Regulation And Control Of Combustion (AREA)

Abstract

The invention belongs to the technical field of aerospace ground test equipment, and aims to solve the technical problem of reduced structural strength of a heat storage tank in the prior art, and provides a working medium supply system for a wind tunnel experiment heat storage heater and a construction method thereof, wherein a natural gas point path and an air point path are respectively connected with an igniter, and the igniter is controlled to ignite through the natural gas point path and the air point path; the natural gas main path, the air main path and the oxygen supplementing path are respectively connected with the main burner, the wide-range flow is regulated through the natural gas main path and the air main path, and the oxygen supplementing path is used for providing oxygen supplementation during high-temperature large flow; the cooling air path is connected with the cooling burner; the total pressure of the igniter is measured through a pressure sensor, and the main flame of the burner is detected through a flame detector. The invention can realize the function of stepless regulation of flow in the measuring range, and avoids the possibility of ceramic material damage caused by over-quick heating temperature rise and the risk of structural strength reduction of the heat storage tank body caused by local overheating during heating.

Description

一种风洞实验蓄热加热器用工质供应系统及构造方法A working fluid supply system and construction method for a regenerative heater in a wind tunnel experiment

技术领域technical field

本发明属于航空航天地面试验设备技术领域,具体涉及一种风洞实验蓄热加热器用工质供应系统及构造方法。The invention belongs to the technical field of aerospace ground test equipment, and in particular relates to a working fluid supply system and a construction method for a regenerative heater in a wind tunnel experiment.

背景技术Background technique

纯净空气风洞能够提供相对洁净的高焓气体来流,是高超声速飞行器地面试验必不可少的设备,在国际上得到了广泛的认可。但由于技术难度较大,国内外研制成功的纯净空气风洞寥寥无几。其中,工质供应系统即是技术难点之一。如图1所示,蓄热加热工作过程如下:通过计算机控制系统控制工质供应系统为燃烧器的提供天然气和空气,点火器点燃天然气形成小功率的火炬,火炬引燃工质供应系统输送的主路天然气和空气形成高温火焰,其通过换热将主蓄热体加热至预设温度。开展风洞试验时,冷空气从底部进入与蓄热体换热,获得约1700K、5MPa的高温高压洁净空气。蓄热加热过程中就工质供应系统设计而言难点有二:1)对工质流量调节有严格要求。目前蓄热主体只能采用熔点可高于2000K的陶瓷材料。但陶瓷耐热冲击性能很差,对于燃烧器火焰的温度变化有严格的要求,温升太快会造成陶瓷材料开裂甚至粉碎。蓄热罐体对火焰功率变化亦有严格要求。要避免蓄热罐体内部局部过热,否则将带来蓄热罐体结构强度下降,造成不可挽回的损失。由燃烧学可知,火焰的温度和功率问题就是工质供应流量匹配问题,要求工质供应系统具备流量调节能力,调节分辨率越高越好。2)工质供应系统要具备为燃烧器提供冷却空气的能力。风洞运行充气过程中(高背压无燃烧状态),要防止蓄热体对燃烧器的内壁辐热损害;高温环境中燃烧器自身的结构冷却问题。The pure air wind tunnel can provide relatively clean high-enthalpy gas flow, which is an indispensable equipment for the ground test of hypersonic aircraft, and has been widely recognized in the world. However, due to the technical difficulty, few pure air wind tunnels have been successfully developed at home and abroad. Among them, the working fluid supply system is one of the technical difficulties. As shown in Figure 1, the regenerative heating process is as follows: the computer control system controls the working medium supply system to provide natural gas and air for the burner, the igniter ignites the natural gas to form a low-power torch, and the torch ignites the working medium supply system. The main road natural gas and air form a high temperature flame, which heats the main regenerator to a preset temperature through heat exchange. During the wind tunnel test, cold air enters from the bottom to exchange heat with the regenerator, and obtains clean air with high temperature and high pressure of about 1700K and 5MPa. There are two difficulties in the design of the working medium supply system in the regenerative heating process: 1) There are strict requirements for the adjustment of the working medium flow. At present, the main body of heat storage can only use ceramic materials whose melting point can be higher than 2000K. However, the thermal shock resistance of ceramics is very poor, and there are strict requirements for the temperature change of the burner flame. If the temperature rises too fast, the ceramic material will be cracked or even crushed. The heat storage tank also has strict requirements on the change of flame power. It is necessary to avoid local overheating inside the heat storage tank, otherwise the structural strength of the heat storage tank will be reduced, resulting in irreparable losses. It can be seen from the combustion science that the temperature and power of the flame is the problem of matching the flow of the working medium supply. The working medium supply system is required to have the ability to adjust the flow, and the higher the adjustment resolution, the better. 2) The working fluid supply system should have the ability to provide cooling air for the burner. During the charging process of wind tunnel operation (high back pressure and no combustion state), it is necessary to prevent the heat accumulator from damaging the inner wall of the burner by radiant heat; the structural cooling problem of the burner itself in a high temperature environment.

鉴于上述原因,目前的技术方法是,提前准备多个口径不同的限流设备,控制前端开关阀门通断,通过不同的组合方式来实现工质流量的调节。该方法初步实现了工质流量阶梯式调节,但方法不够灵活,可调范围有限,精度无法保证,依然存在温升不合理造成陶瓷材料或设备损坏的风险,尤其是无法保证风洞试验后可根据罐体温度再次加热的能力。另外,目前蓄热燃烧器基本是水冷方案,水冷最大的风险就是一旦泄露,蓄热材料遇水将出现炸裂,冷却水遇热瞬间气化,蓄热罐内压力陡增,后果是灾难性的。In view of the above reasons, the current technical method is to prepare multiple current-limiting devices with different diameters in advance, control the on-off of the front-end switch valve, and realize the adjustment of the working fluid flow through different combinations. This method preliminarily realizes the stepwise adjustment of the working fluid flow, but the method is not flexible enough, the adjustable range is limited, and the accuracy cannot be guaranteed. The ability to reheat depending on the tank temperature. In addition, the current regenerative burner is basically a water-cooled solution. The biggest risk of water cooling is that once it leaks, the regenerative material will burst when it encounters water, the cooling water will instantly vaporize when it is heated, and the pressure in the regenerative tank will increase sharply, and the consequences will be catastrophic. .

发明内容SUMMARY OF THE INVENTION

针对现有技术中存在的因工质供应系统无法实现宽范围连续调节而导致的加热温升过快而导致陶瓷材料损坏,以及加热局部过热带来蓄热罐体结构强度下降的技术问题,本发明的目的在于提供一种风洞实验蓄热加热器用工质供应系统及构造方法。In view of the existing technical problems in the prior art that the heating temperature rises too fast and the ceramic material is damaged due to the inability of the working medium supply system to achieve wide-range continuous adjustment, and the structural strength of the heat storage tank is reduced due to the local overheating of heating, the present invention The purpose of the invention is to provide a working fluid supply system and a construction method for a regenerative heater in a wind tunnel experiment.

本发明采取的技术方案为:The technical scheme adopted in the present invention is:

一种风洞实验蓄热加热器用工质供应系统,包括天然气点路、空气点路、天然气主路、空气主路、氧气补充路(简称氧气路)、冷却空气路(简称空冷)、压力传感器和火焰检测仪;A working medium supply system for a regenerative heater in a wind tunnel experiment, comprising a natural gas point circuit, an air point circuit, a natural gas main circuit, an air main circuit, an oxygen supplementary circuit (referred to as oxygen circuit), a cooling air circuit (referred to as air cooling), and a pressure sensor and flame detectors;

所述天然气点路、空气点路、天然气主路、空气主路、氧气补充路、冷却空气路各路调压阀前后均设置一道截止阀,分别为各路一阀(第一道开关阀)、各路二阀(第二道开关阀);The natural gas point circuit, the air point circuit, the natural gas main circuit, the air main circuit, the oxygen supplementary circuit, and the cooling air circuit are provided with a shut-off valve before and after each pressure regulating valve, which is a valve for each circuit (the first switch valve) , Two valves for each channel (the second switch valve);

所述天然气点路和空气点路分别与点火器相连接,通过天然气点路和空点路为点火器输送定流量的天然气和空气;The natural gas point road and the air point road are respectively connected with the igniter, and the natural gas point road and the empty point road are used to deliver a constant flow of natural gas and air to the igniter;

所述天然气主路、空气主路、氧气补充路(简称氧气路)分别与主燃烧器相连接,通过天然气主路和空气主路调节宽范围流量,通过氧气补充路为蓄热加热器超高温工况提供氧气输入;The natural gas main circuit, the air main circuit, and the oxygen supplementary circuit (referred to as the oxygen circuit) are respectively connected with the main burner, and the wide-range flow rate is adjusted through the natural gas main circuit and the air main circuit. Provide oxygen input under working conditions;

所述冷却空气路与燃烧器冷却通道相连接;通过压力传感器测量点火器总压,通过火焰检测仪检测燃烧器主火焰。The cooling air path is connected with the burner cooling channel; the total pressure of the igniter is measured by a pressure sensor, and the main flame of the burner is detected by a flame detector.

进一步的,所述天然气点路和空气点路结构设置相同,且均包括输气管路、传感器、减压阀、节流装置、止回阀,所述传感器设置在一阀前,通过传感器测量气源压力;所述减压阀设置在一阀和二阀之间,二阀后端连接节流装置,输气管路末尾靠近燃烧器接口处连接止回阀,止回阀下游连接燃烧器。Further, the natural gas point circuit and the air point circuit have the same structure, and both include a gas pipeline, a sensor, a pressure reducing valve, a throttling device, and a check valve. The sensor is arranged before a valve, and the gas is measured by the sensor. The pressure reducing valve is arranged between the first valve and the second valve, the rear end of the second valve is connected to the throttling device, the end of the gas pipeline is connected to the check valve near the burner interface, and the downstream of the check valve is connected to the burner.

更进一步的,天然气点路和空气点路结构设置相同,均包括输送工质的输气管路,所述天然气点路的测量气源压力的传感器a和传感器b分别设置在一阀a和一阀b前,减压阀a和减压阀b设置在两道截止阀之间,二阀a和二阀b后端分别连接节流装置a和节流装置b,输气管路末尾靠近燃烧器接口处分别连接止回阀a和止回阀b,止回阀a和止回阀b下游连接燃烧器。Further, the natural gas point road and the air point road have the same structure, and both include a gas transmission pipeline for conveying the working fluid, and the sensor a and the sensor b of the natural gas point road for measuring the pressure of the gas source are respectively provided with a valve a and a valve. Before b, the pressure reducing valve a and the pressure reducing valve b are arranged between the two shut-off valves. The rear ends of the second valve a and the second valve b are respectively connected to the throttle device a and the throttle device b, and the end of the gas pipeline is close to the burner interface. The check valve a and the check valve b are connected to the burner respectively, and the downstream of the check valve a and the check valve b are connected to the burner.

进一步的,所述点火器设置为固定功率点火器,天然气点路和空气点路采用固定值减压阀,天然气点路和空气点路输出固定流量和压力的介质,系统通过控制截止阀开关实现介质输出通断。Further, the igniter is set as a fixed power igniter, the natural gas point circuit and the air point circuit use a fixed value pressure reducing valve, and the natural gas point circuit and the air point circuit output a medium with a fixed flow and pressure, and the system is realized by controlling the stop valve switch. The medium output is on and off.

进一步的,所述天然气主路和空气主路包括多路不同流量系数的支路,根据实际需要增加或减少支路,天然气主路、空气主路均设置有输气管路、测量气源压力的传感器,测量气源压力的传感器设置在一阀前,一阀后分设多条支路管路,各支路包括调压阀组、测量阀后压力的传感器组和节流装置,通过调压阀组调节介质压力,调压阀组下游安装测量阀后压力的传感器,二阀后端连接节流装置,各支路在节流装置后汇合成一条管路,输气管路末尾靠近燃烧器接口处连接止回阀,止回阀下游连接燃烧器。Further, the natural gas main circuit and the air main circuit include multiple branches with different flow coefficients, and the branches are increased or decreased according to actual needs. The sensor, the sensor for measuring the pressure of the air source is arranged in front of a valve, and there are multiple branch pipelines behind a valve. Each branch includes a pressure regulating valve group, a sensor group for measuring the pressure behind the valve and a throttling device. The group adjusts the medium pressure. A sensor for measuring the pressure behind the valve is installed downstream of the pressure regulating valve group. The rear end of the second valve is connected to a throttling device. After the throttling device, each branch is merged into a pipeline. Connect the check valve, downstream of the check valve to the burner.

更进一步的,天然气主路、空气主路主要包括多路不同流量系数的支路。天然气主路、空气主路均包括用于输送工质的管路,测量气源压力的传感器c和传感器d设置在一阀c和一阀d前,一阀c和一阀d后分设为多条支路管路,各支路包括调节介质压力的调压阀c、调压阀d、调压阀e和调压阀f,调压阀c、调压阀d、调压阀e和调压阀f下游分别安装有测量阀后压力的传感器e、传感器f、传感器g和传感器h,二阀c、二阀d、二阀e和二阀f后分别连接节流装置c、节流装置d、节流装置e和节流装置f。各支路在节流装置后汇合成一条管路,输气管路末尾靠近燃烧器接口处连接止回阀c和止回阀d,止回阀c和止回阀d下游连接燃烧器。Further, the natural gas main road and the air main road mainly include multiple branches with different flow coefficients. Both the natural gas main road and the air main road include pipelines for conveying the working medium. The sensors c and d for measuring the pressure of the gas source are arranged before a valve c and a valve d, and a valve c and a valve d are divided into multiple A branch pipeline, each branch includes pressure regulating valve c, pressure regulating valve d, pressure regulating valve e and pressure regulating valve f, pressure regulating valve c, pressure regulating valve d, pressure regulating valve e and pressure regulating valve The downstream of the pressure valve f are respectively installed with a sensor e, a sensor f, a sensor g and a sensor h for measuring the pressure behind the valve. The second valve c, the second valve d, the second valve e and the second valve f are respectively connected to the throttling device c and the throttling device. d. Throttle device e and throttle device f. Each branch is merged into a pipeline after the throttle device, the end of the gas pipeline is connected to the check valve c and the check valve d near the burner interface, and the downstream of the check valve c and the check valve d is connected to the burner.

优选的,本发明的天然气主路、空气主路是多路不同流量系数的支路的组合,可根据实际需要增加或减少支路。该设计可灵活调整支路数量,实现宽范围的流量调节功能。Preferably, the natural gas main circuit and the air main circuit of the present invention are a combination of multiple branches with different flow coefficients, and the branches can be increased or decreased according to actual needs. The design can flexibly adjust the number of branches to achieve a wide range of flow regulation functions.

进一步的,所述氧气补充路(简称氧气路)包括用于输气管路、调压阀g、传感器i、传感器j、节流装置g、止回阀e,测量气源压力的传感器i设置在一阀e前,调压阀g设置在一阀e和二阀f之间,调压阀g下游安装有测量阀后压力的传感器j,二阀f后连接节流装置g,输气管路末尾靠近燃烧器接口处连接止回阀e,止回阀e后通过三通与空气主路相连。Further, the oxygen supplementary circuit (abbreviated as oxygen circuit) includes a gas pipeline, a pressure regulating valve g, a sensor i, a sensor j, a throttle device g, and a check valve e, and the sensor i for measuring the pressure of the gas source is provided at Before the first valve e, the pressure regulating valve g is arranged between the first valve e and the second valve f. A sensor j for measuring the pressure behind the valve is installed downstream of the pressure regulating valve g. After the second valve f is connected to the throttling device g, the end of the gas pipeline The check valve e is connected to the interface of the burner, and the check valve e is connected to the main air circuit through a tee.

优选的,氧气路与空气主路位于进燃烧器前相连接,该设计目的在于延长了掺混过程,可使掺混更加均匀,提高了燃烧效率。Preferably, the oxygen path and the main air path are connected before entering the burner. The purpose of this design is to prolong the mixing process, make the mixing more uniform, and improve the combustion efficiency.

进一步的,所述冷却空气路(简称空冷)包括用于输气管路、传感器k、一阀f、调压阀h、传感器l、二阀g、节流装置h、开关阀a、开关阀b、止回阀f,测量气源压力的传感器k设置在一阀f前,调压阀h设置在一阀f和二阀g之间,调压阀h下游安装有测量阀后压力的传感器l,二阀g后端连接节流装置h,输气管路末尾靠近燃烧器接口处连接燃烧器冷却通道进口,燃烧器冷却通道出口通过管路连接一道开关阀a,开关阀a后端通过管路排向室外;Further, the cooling air circuit (referred to as air cooling) includes a gas pipeline, a sensor k, a valve f, a pressure regulating valve h, a sensor 1, a second valve g, a throttling device h, an on-off valve a, and an on-off valve b. , check valve f, the sensor k for measuring the pressure of the air source is set before the first valve f, the pressure regulating valve h is set between the first valve f and the second valve g, and the downstream of the pressure regulating valve h is installed with a sensor l measuring the pressure behind the valve , the rear end of the second valve g is connected to the throttling device h, the end of the gas pipeline is connected to the burner cooling channel inlet near the burner interface, the burner cooling channel outlet is connected to a switch valve a through the pipeline, and the rear end of the switch valve a is connected through the pipeline discharge to the outside;

所述冷却空气路(简称空冷)在燃烧器冷却通道出口通过三通分为两路,一路连接一道开关阀c通向室外;另外一路通过一道开关阀b后端连接到空气主路的止回阀d与燃烧器之间。The cooling air path (referred to as air cooling) is divided into two paths at the outlet of the cooling passage of the burner through a three-way, one path is connected to an on-off valve c and leads to the outside; between valve d and the burner.

进一步的,所述节流装置与上游的调压阀配合控制单支路量程范围的流量调节,节流装置设置为基于音速喷嘴的专用装置,如图3所示,该装置沿气流方向依次是上游管道、稳压腔室、音速喷嘴,下游管道。腔室上设置有压力传感器和温度传感器,通过节流装置将管路流量的控制转变成腔室压力的调节。通过压力传感器和温度传感器分别测量气体压力和温度;该设计目的在于稳定来流压力,将不易得到气体流量转变为容易测量的压力数据和温度数据。Further, the throttling device cooperates with the upstream pressure regulating valve to control the flow regulation in the range of the single branch, and the throttling device is set as a special device based on the sonic nozzle. Upstream piping, pressure chamber, sonic nozzle, downstream piping. The chamber is provided with a pressure sensor and a temperature sensor, and the control of the pipeline flow is transformed into the regulation of the chamber pressure through the throttling device. The gas pressure and temperature are respectively measured by a pressure sensor and a temperature sensor; the purpose of this design is to stabilize the incoming flow pressure and convert the difficult-to-obtain gas flow into easily measurable pressure data and temperature data.

进一步的,所述调压阀与下游压力传感器构成闭环回路,根据压力传感器数据实时调整调压阀输出值。该设计目的在于通过下游压力反馈实现自身压力的精确输出,进而提高管路流量调节精度。进而可在风洞试验后,根据罐内温度设定工况精确控制火焰温度,实现再次加热的能力。极大提高了试验效率,节约了资源。Further, the pressure regulating valve and the downstream pressure sensor form a closed loop, and the output value of the pressure regulating valve is adjusted in real time according to the data of the pressure sensor. The purpose of this design is to achieve accurate output of its own pressure through downstream pressure feedback, thereby improving the accuracy of pipeline flow regulation. Furthermore, after the wind tunnel test, the flame temperature can be precisely controlled according to the set working conditions of the temperature in the tank, so as to realize the ability of reheating. It greatly improves the test efficiency and saves resources.

与工质接触的阀门均设置为氮气驱动的气动阀,该设计目的在于是为了将可燃气体和空气(或氧气)隔离,将可燃气体和电路隔离,最大限度的避免了发生危险的可能。The valves in contact with the working medium are all set as pneumatic valves driven by nitrogen. The purpose of this design is to isolate the combustible gas from air (or oxygen), and to isolate the combustible gas from the circuit, so as to avoid the possibility of danger to the greatest extent.

一种风洞实验蓄热加热器用工质供应构造方法,采用所述一种风洞实验蓄热加热器用工质供应系统,具体包括如下步骤:A construction method for supplying working medium for a heat storage heater in a wind tunnel experiment, adopting the working medium supply system for a heat storage heater in a wind tunnel experiment, specifically comprising the following steps:

(1)根据试验要求,确定各路供气所需的流量值或范围;(1) According to the test requirements, determine the flow value or range required for each gas supply;

(2)根据供气体温度、气源压力、燃烧室压力确定各主路或支路的文丘里流量计通径取值范围及支路数目;(2) Determine the value range and the number of branches of the Venturi flowmeter of each main circuit or branch according to the temperature of the gas supply, the pressure of the gas source, and the pressure of the combustion chamber;

(3)选取流量计通径,核算上游调压阀调压值或范围;(3) Select the diameter of the flowmeter, and calculate the pressure regulating value or range of the upstream pressure regulating valve;

(4)根据各支路最大流量确定管路和开关阀通径、调压阀Cv值。(4) Determine the diameter of the pipeline and the on-off valve and the Cv value of the pressure regulating valve according to the maximum flow of each branch.

进一步的,所述步骤(2)中根据供气体温度T0、气路气源压力P0、燃烧室压力P来确定天然气点、空点文丘里流量计通径DN,确定天然气主路、空气主路、空冷路各分支路的数目N及各文丘里流量计通径DN,对于喉道形成声速的气体流动,符合关系式:Further, in the step (2), the natural gas point and the empty point Venturi flowmeter path DN are determined according to the supply gas temperature T 0 , the gas path gas source pressure P 0 , and the combustion chamber pressure P, and the natural gas main path, the air The number N of each branch circuit of the main circuit and the air-cooling circuit and the diameter DN of each Venturi flowmeter, for the gas flow with the sound velocity in the throat, it conforms to the relationship:

Figure BDA0003231411080000061
Figure BDA0003231411080000061

式中,Qm为质量流量;C为流出系数;P0为入口处绝对滞止压力;T0为入口处绝对滞止温度;D为文丘里流量计的喉部直径尺寸;通过该关系式计算得到喉道直径范围。In the formula, Q m is the mass flow rate; C is the outflow coefficient; P 0 is the absolute stagnation pressure at the inlet; T 0 is the absolute stagnation temperature at the inlet; D is the throat diameter of the venturi flowmeter; Calculate the throat diameter range.

本发明的有益效果为:The beneficial effects of the present invention are:

本发明提供了一种风洞实验蓄热加热器用工质供应系统及构造方法,其能够实现量程内流量无级调节的功能,避免了因加热温升过快而导致陶瓷材料损坏的可能,以及加热局部过热带来蓄热罐体结构强度下降的风险。典型工况精确控制,实现了风洞试验后根据罐体温度再次加热的能力。极大的提高了试验效率。实现了高背压无燃烧条件下为燃烧器提供流量可调的冷却用空气,避免了燃烧器受到热辐射的损害。实现了燃烧器自身结构气体冷却,提高了设备的可靠性,并且冷却气体还可继续用于主路空气参与燃烧,节省了能源。本发明原理清楚、结构简单、易于实现,具有极高的应用价值。The invention provides a working fluid supply system and a construction method for a regenerative heater in a wind tunnel experiment, which can realize the function of stepless adjustment of flow within a range, avoid the possibility of damage to ceramic materials caused by excessive heating temperature rise, and The local overheating of heating brings the risk of reducing the structural strength of the thermal storage tank. The typical working conditions are precisely controlled, and the ability to reheat according to the temperature of the tank after the wind tunnel test is realized. Greatly improve the test efficiency. The cooling air with adjustable flow rate is provided for the burner under the condition of high back pressure and no combustion, and the damage of the burner by heat radiation is avoided. The gas cooling of the burner's own structure is realized, the reliability of the equipment is improved, and the cooling gas can continue to be used for the main road air to participate in the combustion, saving energy. The invention has clear principle, simple structure and easy realization, and has extremely high application value.

附图说明Description of drawings

图1为现有技术中蓄热加热器工作过程示意图;1 is a schematic diagram of the working process of a regenerative heater in the prior art;

图2为本发明中工质供应系统原理图;2 is a schematic diagram of a working medium supply system in the present invention;

图3为本发明中基于文丘里流量计的节流装置原理图;3 is a schematic diagram of a throttling device based on a Venturi flowmeter in the present invention;

图4为本发明中工质供应系统构造步骤图;4 is a structural step diagram of a working medium supply system in the present invention;

图5为本发明中实施例试验数据图;Fig. 5 is the test data diagram of the embodiment in the present invention;

其中,00、点火器;01、火焰检测仪;2、燃烧器;Among them, 00, igniter; 01, flame detector; 2, burner;

11、传感器a;12、传感器c;13、传感器k;14、传感器b;15、传感器i;16、传感器d;17、总压力传感器;21、一阀a;22、一阀c;23、一阀f;24、一阀b;25、一阀e;26、一阀d;11, sensor a; 12, sensor c; 13, sensor k; 14, sensor b; 15, sensor i; 16, sensor d; 17, total pressure sensor; 21, a valve a; 22, a valve c; 23, A valve f; 24, a valve b; 25, a valve e; 26, a valve d;

31、减压阀a;32、减压阀b;31. Pressure reducing valve a; 32. Pressure reducing valve b;

41、调压阀c;42、调压阀d;43、调压阀h;44、调压阀g;45、调压阀e;46、调压阀f;41, pressure regulating valve c; 42, pressure regulating valve d; 43, pressure regulating valve h; 44, pressure regulating valve g; 45, pressure regulating valve e; 46, pressure regulating valve f;

51、传感器e;52、传感器f;53、传感器j;54、传感器g;55、传感器h;56、传感器l;51, sensor e; 52, sensor f; 53, sensor j; 54, sensor g; 55, sensor h; 56, sensor l;

61、二阀a;62、二阀c;63、二阀d;64、二阀g;65、二阀b;66、二阀f;67、二阀e;68、二阀f;69、开关阀a;61, two valves a; 62, two valves c; 63, two valves d; 64, two valves g; 65, two valves b; 66, two valves f; 67, two valves e; 68, two valves f; 69, On-off valve a;

71、节流装置a;72、节流装置c;73、节流装置d;74、节流装置h;75、节流装置b;76、节流装置g;77、节流装置e;78、节流装置f;701、上游管道;702、稳压腔室;703、音速喷嘴;704、下游管道;705、压力传感器;706、温度传感器;71, throttle device a; 72, throttle device c; 73, throttle device d; 74, throttle device h; 75, throttle device b; 76, throttle device g; 77, throttle device e; 78 701, upstream pipeline; 702, pressure stabilization chamber; 703, sonic nozzle; 704, downstream pipeline; 705, pressure sensor; 706, temperature sensor;

81、止回阀c;82、止回阀a;83、止回阀b;84、止回阀e;85、止回阀d;81, check valve c; 82, check valve a; 83, check valve b; 84, check valve e; 85, check valve d;

91、开关阀b;92、开关阀c;91. On-off valve b; 92. On-off valve c;

具体实施方式Detailed ways

下面结合附图进一步说明本发明。The present invention will be further described below in conjunction with the accompanying drawings.

实施例1Example 1

如图2所示,根据风洞试验要求,该蓄热加热器需要提供温度1200K-1600K,流量最大10kg/s的高温高压气流,为实现技术要求选用氧化铝作为多孔蓄热陶瓷材料。为均匀加热和换热,蓄热陶瓷的采用圆孔多层同心布置方案。蓄热主体材料采用堆积体积为直径0.8米,高5米。由于氧化铝的耐冷热激变属性,要求每小时温升不得超过80℃。实施例的燃烧器2工作时为常压燃烧,即燃烧压力为0.1MPa。风洞试验时,蓄热罐内充装空气时最高压力为5MPa,即高背压无燃烧状态时承压不低于5MPa,此时需要冷却空气100g/s燃烧器2功率约600kW,无级可调大比率(10:1)变功率情况下火焰的稳定燃烧。结合实施例具体说明如下:As shown in Figure 2, according to the wind tunnel test requirements, the regenerative heater needs to provide high temperature and high pressure airflow with a temperature of 1200K-1600K and a maximum flow rate of 10kg/s. In order to achieve the technical requirements, alumina is selected as the porous regenerative ceramic material. In order to uniformly heat and exchange heat, the regenerative ceramic adopts a multi-layer concentric arrangement of circular holes. The main material of heat storage adopts the accumulation volume of 0.8 meters in diameter and 5 meters in height. Due to the thermal shock resistance properties of alumina, it is required that the temperature rise per hour should not exceed 80 °C. The burner 2 of the embodiment works at atmospheric pressure, that is, the combustion pressure is 0.1 MPa. During the wind tunnel test, the maximum pressure when filling air in the heat storage tank is 5MPa, that is, the pressure is not less than 5MPa when the high back pressure is not in the combustion state. At this time, 100g/s of cooling air is required for the burner 2 with a power of about 600kW, stepless Adjustable large ratio (10:1) stable combustion of flame under variable power. The specific description is as follows in conjunction with the embodiment:

本实施例包括用于点火器00的天然气点路和空气点路;用于主燃烧器2的可宽范围流量调节的天然气主路、空气主路(简称空气主路),用于冷却燃烧器2本体的冷却空气路(简称空冷),用于高温大流量时的氧气补充路(简称氧气路)。还包括用于测量点火器总压的总压力传感器17,用于检测燃烧器2主火焰的火焰检测仪01,以及基于PLC的控制系统。This embodiment includes a natural gas point circuit and an air point circuit for the igniter 00; a natural gas main circuit and an air main circuit (referred to as the air main circuit) for the main burner 2 with wide-range flow adjustment, which are used for cooling the burner 2. The cooling air circuit of the main body (referred to as air cooling) is used for the oxygen supplementary circuit (referred to as oxygen circuit) at high temperature and large flow. Also included are a total pressure sensor 17 for measuring the total pressure of the igniter, a flame detector 01 for detecting the main flame of the burner 2, and a PLC based control system.

在实施例1的基础上,本发明的又一实施例,如图2所示,本实施例的天然气点路和空气点路结构相同。On the basis of Embodiment 1, another embodiment of the present invention, as shown in FIG. 2 , has the same structure of the natural gas point circuit and the air point circuit of this embodiment.

所述天然气点路包括输送工质的输气管路,测量气源压力的传感器a11设置在一阀a21前,减压阀a31设置在一阀a21和二阀a61组成的两道开关阀之间,二阀a61后端连接节流装置a71,输气管路末尾靠近燃烧器2接口处分别连接止回阀a82,止回阀a82下游连接燃烧器2。The natural gas point road includes a gas transmission pipeline for conveying working fluid, the sensor a11 for measuring the pressure of the gas source is arranged in front of the first valve a21, the pressure reducing valve a31 is arranged between the two on-off valves composed of the first valve a21 and the second valve a61, The rear end of the second valve a61 is connected to the throttle device a71, the end of the gas pipeline is connected to the check valve a82 near the interface of the burner 2, and the downstream of the check valve a82 is connected to the burner 2.

所述空气点路包括输送工质的输气管路,测量气源压力的传感器b14设置在一阀b24前,减压阀b32设置在两道开关阀之间,二阀b65后端连接节流装置b75,输气管路末尾靠近燃烧器2接口处连接止回阀b83,止回阀b83下游连接燃烧器2。The air point circuit includes an air pipeline for conveying the working medium. The sensor b14 for measuring the pressure of the air source is arranged before the first valve b24, the pressure reducing valve b32 is arranged between the two on-off valves, and the rear end of the second valve b65 is connected to the throttling device. b75, the end of the gas transmission pipeline is connected to the check valve b83 near the interface of the burner 2, and the downstream of the check valve b83 is connected to the burner 2.

在实施例1的基础上,本发明的又一实施例,如图2所示,本实施例所涉及的点火器为固定功率点火器,天然气点路和空点路只需输出固定流量和压力的介质,因此天然气点路和空点路设计为固定值减压阀,计算机控制系统通过控制截止阀开关实现介质输出通断。这样做的好处在于减少了控制环,简化了结构,提高了系统可靠性,降低了成本。On the basis of Embodiment 1, another embodiment of the present invention, as shown in FIG. 2 , the igniter involved in this embodiment is a fixed power igniter, and the natural gas point circuit and the empty point circuit only need to output a fixed flow and pressure Therefore, the natural gas point circuit and the empty point circuit are designed as fixed value pressure reducing valves, and the computer control system realizes the medium output on and off by controlling the shut-off valve switch. The advantage of this is that the control loop is reduced, the structure is simplified, the system reliability is improved, and the cost is reduced.

本发明的又一实施例,如图2所示,本实施例的天然气主路包括两路不同流量系数的支路,天然气主路包括用于输送工质的管路,测量气源压力的传感器c12设置在一阀c22前,第一之路和第二之路呈并连连接,一阀c22后设为2条支路管路;In another embodiment of the present invention, as shown in FIG. 2 , the natural gas main circuit in this embodiment includes two branches with different flow coefficients, the natural gas main circuit includes a pipeline for conveying working fluid, and a sensor for measuring the pressure of the gas source. c12 is set before a valve c22, the first road and the second road are connected in parallel, and a valve c22 is set as two branch pipelines;

第一支路包括调压阀c41、传感器e51、二阀c62、节流装置c72,调节介质压力的调压阀c41下游安装有测量阀后压力的传感器e51,二阀c62后连接节流装置c72;The first branch includes a pressure regulating valve c41, a sensor e51, a second valve c62, and a throttling device c72. A sensor e51 for measuring the pressure behind the valve is installed downstream of the pressure regulating valve c41 that adjusts the medium pressure, and the second valve c62 is connected to the throttling device c72. ;

第二支路包括调压阀d42、传感器f52、二阀d63、节流装置d73,调节介质压力的调压阀d42下游安装有测量阀后压力的传感器f52,二阀d63后连接节流装置d73。The second branch includes a pressure regulating valve d42, a sensor f52, a second valve d63, and a throttling device d73. A sensor f52 for measuring the pressure behind the valve is installed downstream of the pressure regulating valve d42 that adjusts the medium pressure, and the second valve d63 is connected to the throttling device d73. .

第一支路和第二支路在节流装置c72和节流装置d73后汇合成一条管路,输气管路末尾靠近燃烧器2接口处连接止回阀c81,止回阀c81下游连接燃烧器2。The first branch and the second branch are merged into one pipeline after the throttle device c72 and the throttle device d73. The end of the gas pipeline is connected to the check valve c81 near the interface of burner 2, and the downstream of the check valve c81 is connected to the burner 2.

如图2所示,本实施例的空气主路主要包括多路不同流量系数的支路,空气主路包括用于输送工质的输气管路,测量气源压力的传感器d16设置在一阀d26前,一阀d26后分设为2条支路管路;As shown in FIG. 2 , the main air circuit in this embodiment mainly includes multiple branches with different flow coefficients, the main air circuit includes an air pipeline for conveying working fluid, and a sensor d16 for measuring the pressure of the air source is provided in a valve d26 In the front, a valve d26 is divided into 2 branch pipelines in the rear;

第一支路包括调节介质压力的调压阀e45,调压阀e45下游分别安装有测量阀后压力的传感器g54,二阀e67后连接节流装置e77;The first branch includes a pressure regulating valve e45 for adjusting the pressure of the medium, a sensor g54 for measuring the pressure behind the valve is installed downstream of the pressure regulating valve e45, and the second valve e67 is connected to a throttling device e77;

第二支路包括调节介质压力的调压阀f46,调压阀f46下游安装有测量阀后压力的传感器h55,二阀f68后连接节流装置f78;The second branch includes a pressure regulating valve f46 for adjusting the pressure of the medium, a sensor h55 for measuring the pressure behind the valve is installed downstream of the pressure regulating valve f46, and a throttling device f78 is connected behind the second valve f68;

第一支路和第二支路在节流装置e77和节流装置f78后汇合成一条管路,输气管路末尾靠近燃烧器2接口处连接止回阀d85,止回阀d85下游连接燃烧器2。The first branch and the second branch are merged into one pipeline after the throttle device e77 and the throttle device f78. The end of the gas pipeline is connected to the check valve d85 near the interface of burner 2, and the downstream of the check valve d85 is connected to the burner 2.

进一步的,本发明的天然气主路、空气主路是多路不同流量系数的支路的组合,可根据实际需要增加或减少支路。这样做的好处在于,可灵活调整支路数量,实现宽范围的流量调节功能。Further, the natural gas main circuit and the air main circuit of the present invention are a combination of multiple branches with different flow coefficients, and the branches can be increased or decreased according to actual needs. The advantage of this is that the number of branches can be flexibly adjusted to achieve a wide range of flow adjustment functions.

在实施例1的基础上,本发明的又一实施例,如图2所示,本发明的氧气路包括用于输送工质的输气管路,测量气源压力的传感器i15设置在一阀e25前,调压阀g44设置在一阀e25和二阀f66组成的两道开关阀之间,调压阀g44下游安装有测量阀后压力的传感器j53,二阀f66后连接节流装置g76,输气管路末尾靠近燃烧器2接口处连接止回阀e84,止回阀e84后通过三通与空气主路相连。On the basis of Embodiment 1, in another embodiment of the present invention, as shown in FIG. 2 , the oxygen circuit of the present invention includes a gas transmission pipeline for conveying the working medium, and the sensor i15 for measuring the pressure of the gas source is arranged in a valve e25 Before, the pressure regulating valve g44 is arranged between the two on-off valves consisting of a valve e25 and a second valve f66, a sensor j53 for measuring the pressure behind the valve is installed downstream of the pressure regulating valve g44, and a throttle device g76 is connected behind the second valve f66, and the output is The end of the air pipeline is connected to the check valve e84 near the interface of the burner 2, and the check valve e84 is connected to the main air circuit through a tee.

进一步的,氧气路与空气主路位于进燃烧器2前相连接,这样做的好处在于延长了掺混过程,可使掺混更加均匀,提高了燃烧效率。Further, the oxygen path and the air main path are connected before entering the burner 2, which has the advantage of prolonging the mixing process, making the mixing more uniform, and improving the combustion efficiency.

在实施例1的基础上,本发明的又一实施例,如图2所示,本发明的空冷路包括用于输送工质的输气管路,用于测量气源压力的传感器k13设置在一阀f23前,调压阀h43设置在一阀f23和二阀g64组成的两道开关阀之间,调压阀h43下游安装有测量阀后压力的传感器l56,二阀g64后连接节流装置h74,输气管路直接连接燃烧器2冷却通道进口,燃烧器2冷却通道出口通过管路一阀a69,开关阀a69后通过管路排向室外。On the basis of Embodiment 1, in another embodiment of the present invention, as shown in FIG. 2 , the air-cooling circuit of the present invention includes a gas transmission pipeline for conveying the working medium, and the sensor k13 for measuring the pressure of the gas source is arranged in a Before the valve f23, the pressure regulating valve h43 is arranged between the two on-off valves composed of the first valve f23 and the second valve g64. A sensor l56 for measuring the pressure after the valve is installed downstream of the pressure regulating valve h43, and the second valve g64 is connected to the throttling device h74. , the gas transmission pipeline is directly connected to the inlet of the cooling channel of the burner 2, the outlet of the cooling channel of the burner 2 passes through a valve a69 of the pipeline, and after the valve a69 is switched on and off, it is discharged to the outdoor through the pipeline.

在实施例1的基础上,本发明的又一实施例,如图2所示,本发明空冷路在燃烧器2冷却通道出口通过三通分为两路,一路连接一道开关阀c92通向室外;另外一路通过一道开关阀b91后连接到空气主路止回阀d85与燃烧器2之间。空冷路用于冷却燃烧器2的空气可通过上述结构再次为空主提供大流量空气。这样做的好处在于,为空气主路提供了大流量的空气,实现空冷路空气的再利用,节省了能源;有效减少了空气主路分支,简化了结构,提高了系统可靠性,降低了成本。On the basis of Embodiment 1, in another embodiment of the present invention, as shown in FIG. 2 , the air-cooling circuit of the present invention is divided into two paths at the outlet of the cooling passage of the burner 2 through a three-way, and one is connected to an on-off valve c92 leading to the outdoor. ; The other road is connected to the main air check valve d85 and the burner 2 after passing through a switch valve b91. The air used in the air cooling circuit to cool the burner 2 can again provide a large flow of air for the air master through the above structure. The advantage of this is that it provides a large flow of air for the main air circuit, realizes the reuse of air in the air cooling circuit, and saves energy; effectively reduces the branches of the main air circuit, simplifies the structure, improves system reliability, and reduces costs. .

在实施例1的基础上,本发明的又一实施例,本发明所用的节流装置设置为基于音速喷嘴的专用装置,如图3所示,该装置沿气流方向依次是上游管道701、稳压腔室702、音速喷嘴703,下游管道704。稳压腔室702上集成了可以测量气体压力和温度的压力传感器705和温度传感器706。这个结构的好处在于稳定来流压力,提高音速喷嘴的流量控制精度。另外,通过该装置将管路流量的调节转变成腔室压力的调节。其与上游的调压阀配合可实现单支路量程范围的流量调节。On the basis of Embodiment 1, in another embodiment of the present invention, the throttling device used in the present invention is set as a special device based on sonic nozzles. As shown in FIG. 3 , the device is followed by the upstream pipeline 701 , the stable Pressure chamber 702 , sonic nozzle 703 , downstream pipeline 704 . A pressure sensor 705 and a temperature sensor 706 that can measure the gas pressure and temperature are integrated on the plenum chamber 702 . The advantage of this structure is to stabilize the incoming flow pressure and improve the flow control accuracy of the sonic nozzle. In addition, regulation of line flow is converted into regulation of chamber pressure by this device. It cooperates with the upstream pressure regulating valve to realize flow regulation in the range of a single branch.

在实施例1的基础上,本发明的又一实施例,如图2所示,本发明所用调压阀与下游压力传感器构成闭环回路,可根据压力传感器数据实时调整调压阀输出值。这样做的好处在于通过下游压力反馈实现自身压力的精确输出,进而提高管路流量调节精度。进而可在风洞试验后,根据罐内温度设定工况精确控制火焰温度,实现再次加热的能力。极大提高了试验效率,节约了资源。On the basis of Embodiment 1, in another embodiment of the present invention, as shown in FIG. 2 , the pressure regulating valve used in the present invention and the downstream pressure sensor form a closed-loop circuit, and the output value of the pressure regulating valve can be adjusted in real time according to the data of the pressure sensor. The advantage of this is to achieve accurate output of its own pressure through downstream pressure feedback, thereby improving the accuracy of pipeline flow regulation. Furthermore, after the wind tunnel test, the flame temperature can be precisely controlled according to the set working conditions of the temperature in the tank, so as to realize the ability of reheating. It greatly improves the test efficiency and saves resources.

进一步的,本发明与工质接触的阀门全部设置为氮气驱动的气动阀,这样做的好处在于是为了将可燃气体和空气(或氧气)隔离,将可燃气体和电路隔离,最大限度的避免了发生危险的可能。Further, the valves in contact with the working medium of the present invention are all set as pneumatic valves driven by nitrogen. The advantage of this is to isolate the combustible gas from the air (or oxygen), and to isolate the combustible gas from the circuit. the possibility of danger.

在实施例1的基础上,本发明的又一实施例,如图4所示,本发明还包括工质供给系统的构造方法,下面通过具体实例介绍:On the basis of Embodiment 1, another embodiment of the present invention, as shown in Figure 4, the present invention also includes the construction method of the working medium supply system, which is introduced below through specific examples:

1)开始1) start

2)确定各路供气所需的流量值Q或范围Qmin-Qmax2) Determine the flow value Q or the range Qmin - Qmax required for each gas supply;

本实施例需要满足的空气、天然气、氧气的流量参数:The flow parameters of air, natural gas, and oxygen that need to be satisfied in this embodiment:

Figure BDA0003231411080000121
Figure BDA0003231411080000121

3)确定各路(支路)文丘里流量计通径和分支数目3) Determine the path and branch number of each channel (branch) Venturi flowmeter

根据供气体温度T0、气路气源压力P0、燃烧室压力P来确定天然气点、空点文丘里流量计通径DN,确定天然气主路、空气主路、空冷路各分支路的数目N及各文丘里流量计通径DN。According to the supply gas temperature T 0 , the gas source pressure P 0 of the gas path, and the combustion chamber pressure P, the natural gas point and empty point Venturi flowmeter DN is determined, and the number of each branch of the natural gas main path, the air main path, and the air cooling path is determined. N and the diameter of each Venturi flowmeter DN.

实施例可以提供的上游气源的压力The pressure of the upstream gas source that the embodiment can provide

空气Air 天然气natural gas 氧气oxygen 上游气源压力Upstream air pressure 18-18.5MPa18-18.5MPa 2.0-2.1MPa2.0-2.1MPa 13-13.5MPa13-13.5MPa

众所众知,气体具有一个重要特征,即通过变截面管道可以加速,使得喉道处(即管道截面最小处)形成音速,流动特征如图3所示。对于喉道形成声速的气体流动,其流量、总温、总压和喉道直径有确定关系式:As we all know, gas has an important feature, that is, it can be accelerated through a variable-section pipe, so that the speed of sound is formed at the throat (that is, where the pipe cross-section is the smallest), and the flow characteristics are shown in Figure 3. For the gas flow with the sound velocity in the throat, the flow rate, total temperature, total pressure and throat diameter have a certain relationship:

Figure BDA0003231411080000122
Figure BDA0003231411080000122

式中,Qm为质量流量,kg/s;C为流出系数;P0为入口处绝对滞止压力,Pa;T0为入口处绝对滞止温度,K;D文丘里流量计的喉部直径尺寸,m;In the formula, Q m is the mass flow rate, kg/s; C is the outflow coefficient; P 0 is the absolute stagnation pressure at the inlet, Pa; T 0 is the absolute stagnation temperature at the inlet, K; D is the throat of the Venturi flowmeter Diameter size, m;

计算中,C可查气体物性获得。由实施例提供的流量需求,T0选取室温300K,P0或P0-Pn按上述压力选取。由上述关系式可得到一个满足条件的喉道直径范围如下:In the calculation, C can be obtained by checking the physical properties of the gas. According to the flow requirement provided by the embodiment, T 0 is selected at room temperature of 300K, and P 0 or P 0 -P n is selected according to the above-mentioned pressure. From the above relationship, a range of throat diameters that satisfies the conditions can be obtained as follows:

空点路流量计喉道可选范围:0.94mm-2.63mm;天然气点路流量计喉道可选范围:2.4mm-5.6mm;氧气路流量计喉道可选范围0.98mm-1.16mm;空气主路一路不能满足流量要求,经迭代计算,可分为两条支路:流量计可选范围分别为0.86mm-2.14mm和0.86mm-2.14mm;空冷路氧气路流量计喉道可选范围1.72mm-4.36mm。Optional range of throat of empty point flowmeter: 0.94mm-2.63mm; optional range of throat of natural gas point flowmeter: 2.4mm-5.6mm; optional range of throat of oxygen flowmeter: 0.98mm-1.16mm; The main circuit can not meet the flow requirements. After iterative calculation, it can be divided into two branches: the optional range of the flowmeter is 0.86mm-2.14mm and 0.86mm-2.14mm respectively; the optional range of the air-cooled oxygen path flowmeter throat 1.72mm-4.36mm.

4)选取流量计,核算上游调压值4) Select the flow meter and calculate the upstream pressure regulation value

根据各支路上游气源压力、文丘里流量计通径DN、所需流量范围Q0-Qn确定调压阀调压范围P0-PnDetermine the pressure regulating range P 0 -P n of the pressure regulating valve according to the upstream air source pressure of each branch, the diameter DN of the venturi flowmeter, and the required flow range Q 0 -Q n .

考虑到加工工艺和喉道测量的方便,喉道直径尽量选取整数值,然后带入关系式核算上游压力是否能够满足条件:Considering the convenience of processing technology and throat measurement, the throat diameter should be selected as an integer value as much as possible, and then brought into the relationship to calculate whether the upstream pressure can meet the conditions:

Figure BDA0003231411080000131
Figure BDA0003231411080000131

该关系式是根据流体力学模型、连续性方程、伯努利方程,ISO9300给出了临界流文丘里管质量流量计算公式:The relationship is based on the fluid mechanics model, continuity equation, Bernoulli equation, ISO9300 gives the critical flow Venturi mass flow calculation formula:

Figure BDA0003231411080000132
Figure BDA0003231411080000132

推导而来,并用风洞试验习惯长度、质量、压力单位折算国际单位其中,在不影响计算精度的前提下,方便了计算,可快速准确的得到结果。It is derived and converted into SI units using the customary length, mass, and pressure units of the wind tunnel test. The calculation is convenient and the results can be obtained quickly and accurately without affecting the calculation accuracy.

空点流量计喉道选取2mm,流量为25g/s时,固定减压阀为3.45MPa;天然气点路流量计喉道设为2mm,流量为1.5g/s时,固定减压阀为1.40MPa;氧气路流量计喉道设为1.1mm,流量为10g/s-25g/s时,调压阀压力调节范围为2.17MPa-10.08MPa;空主1路流量计喉道设为2mm,流量为25g/s-120g/s时,调压阀调节范围为3.45MPa-16.4MPa;空主2路流量计喉道设为4mm,流量为120g/s-350g/s时,调压阀调节范围为4.13MPa-12.04MPa;空冷路流量计喉道设为4mm,流量为100g/s-400g/s时,调压阀调节范围为3.44MPa-13.76MPa;天然气1路流量计喉道设为5mm,流量为1.5g/s-6g/s时,调压阀调节范围为0.5MPa-2MPa;天然气2路流量计喉道设为10mm,流量为6g/s-20g/s时,调压阀调节范围为0.5MPa-1.67MPa。整理如下表:The throat of the empty point flowmeter is set to 2mm, and when the flow rate is 25g/s, the fixed pressure reducing valve is 3.45MPa; the throat of the natural gas point flowmeter is set to 2mm, and the flow rate is 1.5g/s, the fixed pressure reducing valve is 1.40MPa ; When the throat of the oxygen flowmeter is set to 1.1mm and the flow rate is 10g/s-25g/s, the pressure adjustment range of the pressure regulating valve is 2.17MPa-10.08MPa; the throat of the air-main 1-way flowmeter is set to 2mm, and the flow rate is When the flow rate is 25g/s-120g/s, the adjustment range of the pressure regulating valve is 3.45MPa-16.4MPa; when the throat of the air-main 2-way flowmeter is set to 4mm, and the flow rate is 120g/s-350g/s, the adjustment range of the pressure regulating valve is 4.13MPa-12.04MPa; when the air-cooled flowmeter throat is set to 4mm and the flow rate is 100g/s-400g/s, the adjustment range of the pressure regulating valve is 3.44MPa-13.76MPa; the natural gas 1-way flowmeter throat is set to 5mm, When the flow rate is 1.5g/s-6g/s, the adjustment range of the pressure regulating valve is 0.5MPa-2MPa; when the throat of the natural gas 2-way flowmeter is set to 10mm, and the flow rate is 6g/s-20g/s, the adjustment range of the pressure regulating valve It is 0.5MPa-1.67MPa. Organize the following table:

Figure BDA0003231411080000141
Figure BDA0003231411080000141

5)确定各路管路通径和调压阀Cv值5) Determine the diameter of each pipeline and the Cv value of the pressure regulating valve

根据各路(支路)最大流量及国标中确定的各种气体相关流速确定管路和开关阀通径、调压阀Cv值、压力传感器量程等。Determine the diameter of pipeline and switch valve, Cv value of pressure regulating valve, range of pressure sensor, etc.

在温度不变的情况下,由理想气体方程可得到关系式In the case of constant temperature, the relationship can be obtained from the ideal gas equation

Figure BDA0003231411080000142
Figure BDA0003231411080000142

该关系式是由理想气体方程推导而来,并用风洞试验习惯长度、质量、压力单位折算国际单位其中,在不影响计算结果的前提下,方便了计算,可快速准确的得到结果。This relational expression is derived from the ideal gas equation, and is converted into SI units using the customary length, mass, and pressure units of the wind tunnel test. The calculation results are convenient and the results can be obtained quickly and accurately without affecting the calculation results.

式中,ρ是气体密度,kg/m2;M是气体摩尔质量,mol;P是气体压力,MPa;22.4理想气体摩尔体积,L;0.1是标况下气体压力,MPa。由上述关系式可以获得不同压力下的气体密度,将获得的密度带入流速和流量的关系式:In the formula, ρ is the gas density, kg/m 2 ; M is the gas molar mass, mol; P is the gas pressure, MPa; 22.4 is the ideal gas molar volume, L; 0.1 is the gas pressure under standard conditions, MPa. The gas density at different pressures can be obtained from the above relationship, and the obtained density is brought into the relationship between flow rate and flow rate:

Figure BDA0003231411080000151
Figure BDA0003231411080000151

式中,D是管道直径,m;Qm是气体流量,kg/s;v是气体流速,m/s;ρ是气体密度,kg/m2。参照国家标准《氧气及相关气体安全技术规程GB16912-1997》《GB50184-2011工业金属管道工程施工质量验收规范》《压力管道监督检验规则TSGD7006-2020》及实施现场使用情况,由上述关系式可确定流速后得到管道直径:In the formula, D is the pipe diameter, m; Q m is the gas flow rate, kg/s; v is the gas flow rate, m/s; ρ is the gas density, kg/m 2 . With reference to the national standards "Oxygen and Related Gas Safety Technical Regulations GB16912-1997", "GB50184-2011 Industrial Metal Pipeline Engineering Construction Quality Acceptance Specifications", "Pressure Pipeline Supervision and Inspection Rules TSGD7006-2020" and the use of the implementation site, the above relationship can be determined. The pipe diameter is obtained after the flow rate:

Figure BDA0003231411080000152
Figure BDA0003231411080000152

考虑系统采购和维护的便利性,空主2和空冷路管路DN选取20mm。Considering the convenience of system procurement and maintenance, the DN of the air main 2 and the air cooling circuit is selected as 20mm.

Cv值是用来表示调节阀的流量系数,有如下公式:The Cv value is used to represent the flow coefficient of the control valve, which has the following formula:

1.P1<2P2 2.P1≥2P21. When P 1 < 2P 2 2. When P 1 ≥ 2P 2

Figure BDA0003231411080000153
Figure BDA0003231411080000153

式中,Qg流量(在760mmHgabs,15.6℃条件下),ft3/min;Sg比重,空气为1,其他按近似分子量计算;P1进口绝对压力,bar;P2,出口绝对压力,bar;压差△P=P1-P2。根据关系式可初步获获得调压阀的Cv值。In the formula, Q g flow rate (under the condition of 760mmHgabs, 15.6 ℃), ft 3 /min; S g specific gravity, air is 1, others are calculated according to approximate molecular weight; P 1 inlet absolute pressure, bar; P2, outlet absolute pressure, bar ; Differential pressure ΔP=P1-P2. According to the relational expression, the Cv value of the pressure regulating valve can be obtained initially.

Figure BDA0003231411080000154
Figure BDA0003231411080000154

6)结束。6) End.

图5是本发明一次有效试验加热数据,从图可以看出,加热过程温度上升平滑、连续。实现了量程内流量无级调节的功能。还实现了典型工况精确控制,风洞试验后再次加热的能力,极大的提高了试验效率。本发明原理清楚、结构简单、易于实现,具有极高的应用价值。Fig. 5 is the heating data of an effective test of the present invention. It can be seen from the figure that the temperature rises smoothly and continuously during the heating process. It realizes the function of stepless adjustment of flow within the range. It also realizes the precise control of typical working conditions and the ability to reheat after wind tunnel test, which greatly improves the test efficiency. The invention has clear principle, simple structure and easy realization, and has extremely high application value.

以上所述并非是对本发明的限制,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明实质范围的前提下,还可以做出若干变化、改型、添加或替换,这些改进和润饰也应视为本发明的保护范围。The above is not a limitation of the present invention, it should be pointed out: for those skilled in the art, under the premise of not departing from the essential scope of the present invention, several changes, modifications, additions or replacements can also be made. Improvements and modifications should also be considered within the scope of the present invention.

Claims (7)

1. A working medium supply system for a heat storage heater in a wind tunnel experiment is characterized by comprising a natural gas point path, an air point path, a natural gas main path, an air main path, an oxygen supplementing path, a cooling air path, a pressure sensor and a flame detector;
the natural gas point way and the air point way are respectively connected with the igniter, and natural gas and air with constant flow are conveyed to the igniter through the natural gas point way and the air point way;
the natural gas main road, the air main road and the oxygen supplement road are respectively connected with the main burner, wide-range flow is regulated through the natural gas main road and the air main road, oxygen input is provided for the ultra-high temperature working condition of the heat storage heater through the oxygen supplement road, the natural gas main road and the air main road comprise a plurality of branches with different flow coefficients, branches are added or reduced according to actual needs, the natural gas main road and the air main road are respectively provided with a gas transmission pipeline and a sensor for measuring gas source pressure, the sensor for measuring the gas source pressure is arranged in front of a valve, a plurality of branch pipelines are respectively arranged behind the valve, each branch comprises a pressure regulating valve group, a sensor group for measuring the pressure behind the valve and a throttling device, the medium pressure is regulated through the pressure regulating valve group, the sensor for measuring the pressure behind the valve is arranged at the downstream of the pressure regulating valve group, the throttling device is connected at the rear end of the valve, and the branches are converged into a pipeline behind the throttling device, the tail end of the gas transmission pipeline is connected with a check valve near the interface of the burner, and the downstream of the check valve is connected with the burner;
the cooling air path and the air point path are connected with the cooling burner; measuring the total pressure of an igniter through a pressure sensor, and detecting the main flame of a burner through a flame detector;
the throttling device is matched with an upstream pressure regulating valve to control the flow regulation of the single branch measuring range, the throttling device is a special device based on a sonic nozzle, the device sequentially comprises an upstream pipeline, a pressure stabilizing chamber, the sonic nozzle and a downstream pipeline along the airflow direction, the chamber is provided with a pressure sensor and a temperature sensor, the control of the pipeline flow is converted into the regulation of the chamber pressure through the throttling device, and the pressure sensor and the temperature sensor are used for respectively measuring the gas pressure and the temperature;
the pressure regulating valve and a downstream pressure sensor form a closed loop, and the output value of the pressure regulating valve is adjusted in real time according to the data of the pressure sensor; and valves in contact with the working medium are all set as pneumatic valves driven by nitrogen.
2. The working medium supply system for the heat storage heater in the wind tunnel experiment as claimed in claim 1, wherein the natural gas point path and the air point path are the same in structure and comprise a gas transmission pipeline, a sensor, a pressure reducing valve, a throttling device and a check valve, wherein the sensor is arranged in front of a valve and measures the pressure of a gas source through the sensor; the pressure reducing valve is arranged between the first valve and the second valve, the rear end of the second valve is connected with the throttling device, the tail end of the gas transmission pipeline is close to the burner interface and is connected with the check valve, and the downstream of the check valve is connected with the burner.
3. The working medium supply system for the wind tunnel experiment heat accumulation heater, according to claim 1, is characterized in that the igniter is set to be a fixed power igniter, a fixed value pressure reducing valve is adopted for a natural gas point circuit and an air point circuit, media with fixed flow and pressure are output from the natural gas point circuit and the air point circuit, and the system is used for realizing on-off of output of the media by controlling a switch valve.
4. The working medium supply system for the heat storage heater in the wind tunnel experiment according to claim 1, wherein the oxygen supply path comprises a gas transmission line, a pressure regulating valve g, a sensor i, a sensor j, a throttling device g and a check valve e, the sensor i for measuring the pressure of a gas source is arranged in front of the valve e, the pressure regulating valve g is arranged between the valve e and the valve f, the sensor j for measuring the pressure behind the valve is arranged at the downstream of the pressure regulating valve g, the throttling device g is connected behind the valve f, the check valve e is connected at the tail end of the gas transmission line close to the interface of the burner, and the check valve e is connected with the main air path through a tee joint.
5. The working medium supply system for the heat storage heater in the wind tunnel experiment is characterized in that the cooling air path comprises a gas transmission pipeline, a sensor k, a valve f, a pressure regulating valve h, a sensor l, a valve g, a throttling device h, a switch valve a, a switch valve b and a switch valve c, the sensor k for measuring the pressure of a gas source is arranged in front of the valve f, the pressure regulating valve h is arranged between the valve f and the valve g, the sensor l for measuring the pressure behind the valve is arranged at the downstream of the pressure regulating valve h, the rear end of the valve g is connected with the throttling device h, the tail of the gas transmission pipeline close to the interface of the combustor is connected with the inlet of a combustor cooling channel, the outlet of the combustor cooling channel is connected with the switch valve a through a pipeline, and the rear end of the switch valve a is discharged to the outside through a pipeline;
the cooling air path is divided into two paths at the outlet of the cooling channel of the burner through a tee joint, and one path is connected with a switch valve c and led to the outside; the other path is connected between the check valve d of the air main path and the burner through the back end of a switch valve b.
6. A working medium supply construction method for a heat storage heater for a wind tunnel experiment adopts the working medium supply system for the heat storage heater for the wind tunnel experiment as claimed in any one of claims 1 to 5, and is characterized by comprising the following steps:
(1) determining the flow value or range required by each path of air supply according to the test requirements;
(2) determining the drift diameter value range and the branch number of the Venturi flowmeter of each main path or branch according to the temperature of the gas supply, the pressure of the gas source and the pressure of the combustion chamber;
(3) selecting a drift diameter of the flowmeter, and checking a pressure regulating value or range of an upstream pressure regulating valve;
(4) and determining the drift diameters of the pipelines and the switching valves and the Cv value of the pressure regulating valve according to the maximum flow of each branch.
7. The working medium supply construction method for the wind tunnel experiment heat storage heater according to claim 6, wherein in the step (2), the working medium is supplied according to the temperature T of the supplied gas 0 Gas source pressure P of gas circuit 0 The combustion chamber pressure P determines the drift diameter DN of the Venturi flowmeters at the natural gas point and the dead point, determines the number N of the branch circuits of the natural gas main circuit, the air main circuit and the air cooling circuit and the drift diameter DN of each Venturi flowmeter, and accords with the relational expression for the gas flow of the throat forming sound velocity:
Figure FDF0000018347470000031
in the formula, Q m Is the mass flow rate; c is an outflow coefficient; p 0 Absolute stagnation pressure at the inlet; t is 0 Absolute stagnation temperature at the inlet; d is the diameter size of the throat part of the Venturi flowmeter; and calculating the diameter range of the throat according to the relational expression.
CN202110987931.5A 2021-08-26 2021-08-26 Working medium supply system for wind tunnel experiment heat storage heater and construction method Active CN113685841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110987931.5A CN113685841B (en) 2021-08-26 2021-08-26 Working medium supply system for wind tunnel experiment heat storage heater and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110987931.5A CN113685841B (en) 2021-08-26 2021-08-26 Working medium supply system for wind tunnel experiment heat storage heater and construction method

Publications (2)

Publication Number Publication Date
CN113685841A CN113685841A (en) 2021-11-23
CN113685841B true CN113685841B (en) 2022-09-02

Family

ID=78582933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110987931.5A Active CN113685841B (en) 2021-08-26 2021-08-26 Working medium supply system for wind tunnel experiment heat storage heater and construction method

Country Status (1)

Country Link
CN (1) CN113685841B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115561119B (en) * 2022-11-08 2025-08-29 中国科学院力学研究所 An experimental device and method for measuring solid-liquid two-phase flow characteristics in a vertical pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020043680A (en) * 2000-12-02 2002-06-12 이구택 Multiplex control system of boiler air and fuel ratio
DE102007019830B3 (en) * 2007-04-25 2008-07-31 Uhde Gmbh Reactor for catalytic primary reformation of hydrocarbons with water vapor under increased pressure, has device for top firring of reformation process furnace, and supply mechanism, which has main inlet channel and secondary inlet channel
CN108592396A (en) * 2018-04-23 2018-09-28 中国科学院上海应用物理研究所 Heat storage boiler constant temperature constant exhaust apparatus and its outlet air method
CN209960542U (en) * 2019-04-30 2020-01-17 中国航发沈阳发动机研究所 Gas supply system for natural gas combustion test
CN213253871U (en) * 2020-08-27 2021-05-25 衡阳华菱钢管有限公司 Gas mixing device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT4978U1 (en) * 2000-11-22 2002-01-25 Avl List Gmbh METHOD FOR CONDITIONING THE INTAKE AIR AND THE EXHAUST GAS PRESSURE OF AN INTERNAL COMBUSTION ENGINE
US20190265125A1 (en) * 2018-02-23 2019-08-29 Global Reach Aerospace LLC Large test area compressed air wind tunnel
CN108593303B (en) * 2018-03-08 2020-06-16 西北工业大学 Preheating system using method based on heat accumulating type heater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020043680A (en) * 2000-12-02 2002-06-12 이구택 Multiplex control system of boiler air and fuel ratio
DE102007019830B3 (en) * 2007-04-25 2008-07-31 Uhde Gmbh Reactor for catalytic primary reformation of hydrocarbons with water vapor under increased pressure, has device for top firring of reformation process furnace, and supply mechanism, which has main inlet channel and secondary inlet channel
CN108592396A (en) * 2018-04-23 2018-09-28 中国科学院上海应用物理研究所 Heat storage boiler constant temperature constant exhaust apparatus and its outlet air method
CN209960542U (en) * 2019-04-30 2020-01-17 中国航发沈阳发动机研究所 Gas supply system for natural gas combustion test
CN213253871U (en) * 2020-08-27 2021-05-25 衡阳华菱钢管有限公司 Gas mixing device

Also Published As

Publication number Publication date
CN113685841A (en) 2021-11-23

Similar Documents

Publication Publication Date Title
CN109682924B (en) Test device and test method for jet fire formed by ignition of high pressure gas pipeline leakage
CN113701982B (en) A measurement and control method of regenerative heater for wind tunnel experiment
CN113685841B (en) Working medium supply system for wind tunnel experiment heat storage heater and construction method
CN111735520A (en) A gas flow standard device with high and low pressure dual calibration sections and its calibration method
CN107244424A (en) The experimental method and device of a kind of simulation material aerothermal ablation
KR101201051B1 (en) Indirect heat exchanger
CN104914036B (en) A kind of pipeline corrosion resistance characteristic pilot system
CN108534981B (en) High temperature wind tunnel is with collecting mouthful water spray heat sink
CN104849310B (en) Experimental device for measuring high-temperature heat exchange between porous material in tube and airflow
CN108213630A (en) It is a kind of to carry out the soldering system for heating/cooling down by medium of gas
WO2020244473A1 (en) Supercritical carbon dioxide cryogenic treatment method and device and gas recycling system
CN102229360B (en) An aviation kerosene high temperature gas flow generating device
CN118278117A (en) Steam flow control nozzle and its design method and test system
CN204300700U (en) With the control pressurer system of vortex heater
CN119198042A (en) A high-temperature large fan performance test device
CN107345729A (en) A cryogenic treatment device
CN209655836U (en) A kiln pressure detection system for a kiln
CN209876975U (en) Coal-fired power plant boiler variable load air-coal matching control device
CN108592396A (en) Heat storage boiler constant temperature constant exhaust apparatus and its outlet air method
CN213684559U (en) Aircraft spout oil source pump test bench
CN206974846U (en) A kind of boiler tube wear test platform with sample cooling system
CN202972518U (en) Evacuating and heating system for Dewar bottle
CN109932182B (en) Carbon dioxide high enthalpy incoming flow generating device
CN203720125U (en) Gas distributing system of combustion fuel gas heat value measurement device
CN106123336A (en) The heat accumulating type pure air heating system that a kind of outlet temperature is constant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant