CN113684860A - Pipeline with embedded part and construction method - Google Patents
Pipeline with embedded part and construction method Download PDFInfo
- Publication number
- CN113684860A CN113684860A CN202010424859.0A CN202010424859A CN113684860A CN 113684860 A CN113684860 A CN 113684860A CN 202010424859 A CN202010424859 A CN 202010424859A CN 113684860 A CN113684860 A CN 113684860A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- embedded
- side wall
- connecting unit
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 238000004519 manufacturing process Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 9
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000001680 brushing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/08—Installations of electric cables or lines in or on the ground or water in tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Electromagnetism (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The invention provides a pipeline with an embedded part and a construction method, belonging to the technical field of cable construction; the pipeline comprises a pipeline body, a plurality of embedded parts and a connecting unit; the embedded part is fixedly arranged on the inner side wall of the pipeline body; the connecting unit is fixedly connected with the embedded part, and the outer side wall of the connecting unit is tightly attached to the inner side wall of the pipeline body; the embedded parts are arranged on the inner side wall of the pipeline body in an encircling manner at equal intervals; the design of the invention has convenient installation, no need of welding, convenient construction, reduced safety risk and adjustable bracket position according to actual requirements; pre-buried bolt or spout in earlier stage in the pipeline, the later stage can be the direct mount support according to the position, and convenient and fast improves efficiency.
Description
Technical Field
The invention relates to the technical field of cable construction, in particular to a pipeline with embedded parts and a construction method.
Background
The traditional underground cable tunnel mounting support is mostly assembled and welded, so that the mounting is clumsy and the efficiency is low.
Disclosure of Invention
Aiming at the technical defects, the invention aims to provide a pipeline with an embedded part and a construction method, which are convenient to install, do not need welding, are convenient to construct, reduce the safety risk and adjust the position of a bracket according to actual needs; pre-buried bolt or spout in earlier stage in the pipeline, the later stage can be the direct mount support according to the position, and convenient and fast improves efficiency.
In order to solve the technical problems, the invention adopts the following technical scheme:
a pipeline with embedded parts is characterized by comprising a pipeline body, a plurality of embedded parts and a connecting unit; the embedded part is fixedly arranged on the inner side wall of the pipeline body; the connecting unit is fixedly connected with the embedded part, and the outer side wall of the connecting unit is tightly attached to the inner side wall of the pipeline body; the embedded parts are arranged on the inner side wall of the pipeline body in an encircling mode at equal intervals.
Preferably, the embedded part is an embedded sliding groove; the connecting unit is a chute bracket; the sliding chute bracket comprises an arc-shaped fixing plate and a supporting rod; one end of the supporting rod is fixedly arranged on the arc-shaped fixing plate; the supporting rod is provided with a plurality of mounting holes.
Preferably, the embedded part is an embedded bolt; the connecting unit is a bolt bracket; the bolt support comprises an arc support main body and a connecting plate; the connecting plate is fixedly arranged on one side of the arc-shaped support main body, and the connecting plate and the arc-shaped main body are integrally formed; the connecting plate is fixedly connected with the embedded bolts.
A method of constructing a pipe having an embedment, the method comprising the steps of:
1) determining and selecting a bolt or a chute according to a design scheme;
2) according to the size requirement, a fixed hole lining chute is provided with phi 12mm holes, phi 10 screws are adopted for fixing, 5 holes are formed in each chute, phi 25mm holes are formed in lining bolts, phi 24 screws are adopted for fixing, 4 rings are formed in each section of pipe according to the size requirement, 24 holes are formed in each ring, the number of the rings is 96, and the bolts or the chutes are fixed through the fixed holes;
3) manufacturing a pipeline according to a pipeline production procedure and maintaining;
4) jacking the maintained pipeline in a construction site for construction;
5) and carrying out support operation after the pipeline jacking is finished.
Preferably, the pipeline production procedure comprises the steps of firstly, cleaning a mold and brushing a release agent; placing a reinforcement cage; fixing the sliding chute or the bolt; fourthly, die assembly is carried out; pouring concrete, and vibrating and molding; sixthly, steam curing; and seventhly, watering and maintaining after demoulding.
The invention has the beneficial effects that: the design of the invention has convenient installation, no need of welding, convenient construction, reduced safety risk and adjustable bracket position according to actual requirements; pre-buried bolt or spout in earlier stage in the pipeline, the later stage can be the direct mount support according to the position, and convenient and fast improves efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a pipe with embedded parts according to embodiment 1 of the present invention;
fig. 2 is a schematic structural diagram of a pipe with an embedded part according to embodiment 2 of the present invention.
Description of reference numerals:
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that in the description of the present invention, the terms "in", "upper", "lower", "lateral", "inner", etc. indicate directions or positional relationships based on those shown in the drawings, which are merely for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; may be a mechanical connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Example 1
As shown in fig. 1, a pipe with embedded parts includes a pipe body 1, a plurality of embedded parts, and a connection unit; the embedded part is fixedly arranged on the inner side wall of the pipeline body 1; the connecting unit is fixedly connected with the embedded part, and the outer side wall of the connecting unit is tightly attached to the inner side wall of the pipeline body 1; the embedded parts are arranged on the inner side wall of the pipeline body 1 in an encircling mode at equal intervals.
Further, the embedded part is an embedded sliding groove 3; the connecting unit is a chute bracket; the sliding chute bracket comprises an arc-shaped fixing plate 2 and a supporting rod 4; one end of the support rod 4 is fixedly arranged on the arc-shaped fixing plate 2; the support rod 4 is provided with a plurality of mounting holes.
Example 2
As shown in fig. 2, a pipe with embedments includes a pipe body 1, a plurality of embedments, and a connection unit; the embedded part is fixedly arranged on the inner side wall of the pipeline body 1; the connecting unit is fixedly connected with the embedded part, and the outer side wall of the connecting unit is tightly attached to the inner side wall of the pipeline body 1; the embedded parts are arranged on the inner side wall of the pipeline body 1 in an encircling mode at equal intervals.
Further, the embedded part is an embedded bolt; the connecting unit is a bolt bracket; the bolt support comprises an arc support main body 6 and a connecting plate 5; the connecting plate 5 is fixedly arranged on one side of the arc-shaped support main body 6, and the connecting plate 5 and the arc-shaped main body are integrally formed; the connecting plate 5 is fixedly connected with the embedded bolt.
A construction method of a pipeline with embedded parts comprises the following steps:
1) determining and selecting a bolt or a chute according to a design scheme;
2) according to the size requirement, a fixed hole lining chute is provided with phi 12mm holes, phi 10 screws are adopted for fixing, 5 holes are formed in each chute, phi 25mm holes are formed in lining bolts, phi 24 screws are adopted for fixing, 4 rings are formed in each section of pipe according to the size requirement, 24 holes are formed in each ring, the number of the rings is 96, and the bolts or the chutes are fixed through the fixed holes;
3) manufacturing a pipeline according to a pipeline production procedure and maintaining;
4) jacking the maintained pipeline in a construction site for construction;
5) and carrying out support operation after the pipeline jacking is finished.
Further, the pipeline production procedure comprises the steps of firstly, cleaning the mould and brushing a release agent; placing a reinforcement cage; fixing the sliding chute or the bolt; fourthly, die assembly is carried out; pouring concrete, and vibrating and molding; sixthly, steam curing; and seventhly, watering and maintaining after demoulding.
The design of the invention has convenient installation, no need of welding, convenient construction, reduced safety risk and adjustable bracket position according to actual requirements; pre-buried bolt or spout in earlier stage in the pipeline, the later stage can be the direct mount support according to the position, and convenient and fast improves efficiency.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.
Claims (5)
1. A pipeline with embedded parts is characterized by comprising a pipeline body, a plurality of embedded parts and a connecting unit; the embedded part is fixedly arranged on the inner side wall of the pipeline body; the connecting unit is fixedly connected with the embedded part, and the outer side wall of the connecting unit is tightly attached to the inner side wall of the pipeline body; the embedded parts are arranged on the inner side wall of the pipeline body in an encircling mode at equal intervals.
2. The pipeline with the embedded parts as claimed in claim 1, wherein the embedded parts are embedded chutes; the connecting unit is a chute bracket; the sliding chute bracket comprises an arc-shaped fixing plate and a supporting rod; one end of the supporting rod is fixedly arranged on the arc-shaped fixing plate; the supporting rod is provided with a plurality of mounting holes.
3. The pipeline with the embedded part as claimed in claim 1, wherein the embedded part is an embedded bolt; the connecting unit is a bolt bracket; the bolt support comprises an arc support main body and a connecting plate; the connecting plate is fixedly arranged on one side of the arc-shaped support main body, and the connecting plate and the arc-shaped main body are integrally formed; the connecting plate is fixedly connected with the embedded bolts.
4. A method of constructing a pipe having an embedment, the method comprising the steps of:
1) determining and selecting a bolt or a chute according to a design scheme;
2) according to the size requirement, a fixed hole lining chute is provided with phi 12mm holes, phi 10 screws are adopted for fixing, 5 holes are formed in each chute, phi 25mm holes are formed in lining bolts, phi 24 screws are adopted for fixing, 4 rings are formed in each section of pipe according to the size requirement, 24 holes are formed in each ring, the number of the rings is 96, and the bolts or the chutes are fixed through the fixed holes;
3) manufacturing a pipeline according to a pipeline production procedure and maintaining;
4) jacking the maintained pipeline in a construction site for construction;
5) and carrying out support operation after the pipeline jacking is finished.
5. The construction method according to claim 4, wherein the pipeline production process comprises (i) cleaning a mold, applying a release agent; placing a reinforcement cage; fixing the sliding chute or the bolt; fourthly, die assembly is carried out; pouring concrete, and vibrating and molding; sixthly, steam curing; and seventhly, watering and maintaining after demoulding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010424859.0A CN113684860A (en) | 2020-05-19 | 2020-05-19 | Pipeline with embedded part and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010424859.0A CN113684860A (en) | 2020-05-19 | 2020-05-19 | Pipeline with embedded part and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113684860A true CN113684860A (en) | 2021-11-23 |
Family
ID=78575886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010424859.0A Pending CN113684860A (en) | 2020-05-19 | 2020-05-19 | Pipeline with embedded part and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113684860A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114498522A (en) * | 2021-11-30 | 2022-05-13 | 湖南志同兴环保建材有限公司 | Reinforced concrete pre-buried bolt electric jacking pipe |
-
2020
- 2020-05-19 CN CN202010424859.0A patent/CN113684860A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114498522A (en) * | 2021-11-30 | 2022-05-13 | 湖南志同兴环保建材有限公司 | Reinforced concrete pre-buried bolt electric jacking pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103612323B (en) | A kind of concrete member mould and application thereof | |
CN100510280C (en) | Method for the earthwork of a foundation sunk for a wind energy facility | |
JP4850151B2 (en) | Hybrid tower for wind power generation and its construction method | |
CN111749714B (en) | Window-by-window layered pouring system for circular water delivery tunnel wall and construction method | |
CN106640545B (en) | Transition connecting piece, concrete tower and concrete tower construction method | |
CN112252476A (en) | Large-scale steel pipe concrete column pouring construction structure and construction method | |
CN105904580B (en) | Using the mould of the prefabricated concrete hollow slab of rubber tube pore-forming | |
CN113684860A (en) | Pipeline with embedded part and construction method | |
CN211257074U (en) | Support bearing height adjusting bracket for telescopic bottom plate mold | |
CN102367704A (en) | Concrete pouring construction method for steel plate embedded part | |
CN215630145U (en) | Cast-in-place well pouring construction template structure | |
CN203566830U (en) | Concrete member mould | |
CN211113740U (en) | Prestressed steel cylinder concrete pipe with base | |
CN209868938U (en) | Prefabricated piping lane forming die | |
CN111331711A (en) | Tunnel pre-buried groove mould locking device | |
CN200940346Y (en) | Support mould for pipeline mounting and filling holes | |
CN114263206B (en) | Assembled concrete foundation and construction method thereof | |
CN203865359U (en) | Storage facility for housing industrialization pre-cast concrete component | |
CN201024556Y (en) | Heat preservation reinforced bar concrete hollow slab | |
JP2012140850A (en) | Construction method for installation foundation | |
CN100392198C (en) | Precast hollow unit type cast-in-situ reinforced concrete vacuum floor | |
CN207160052U (en) | A kind of skewback for connecting arcuate bead steel construction | |
CN205077974U (en) | Split type iron tower base | |
CN221031639U (en) | Connecting node for building | |
CN221095204U (en) | Assembled drainage inspection shaft pouring template device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |