CN113673013A - Pile cap elevation calculation method and system based on BIM technology - Google Patents
Pile cap elevation calculation method and system based on BIM technology Download PDFInfo
- Publication number
- CN113673013A CN113673013A CN202110912271.4A CN202110912271A CN113673013A CN 113673013 A CN113673013 A CN 113673013A CN 202110912271 A CN202110912271 A CN 202110912271A CN 113673013 A CN113673013 A CN 113673013A
- Authority
- CN
- China
- Prior art keywords
- elevation
- pile cap
- pile
- bim
- cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004364 calculation method Methods 0.000 title claims abstract description 40
- 238000005516 engineering process Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 abstract description 10
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
Abstract
The invention relates to a pile cap elevation calculation method and a pile cap elevation calculation system based on a BIM technology, wherein the pile cap elevation calculation method comprises the following steps: acquiring a design drawing and design parameters of a pile cap to be constructed, and introducing the design drawing and the design parameters into BIM software to form a BIM model; and calculating and generating elevation data of the pile cap by utilizing BIM software according to the BIM model. The method effectively solves the problem of difficulty in calculating the elevation of the pile cap, is suitable for construction projects with large volume, multiple types of the pile caps and large elevation change of the pile cap, has high calculation efficiency and low cost, greatly reduces the error rate, and ensures the subsequent construction quality.
Description
Technical Field
The invention relates to the field of building construction, in particular to a pile cap elevation calculation method and a pile cap elevation calculation system based on a BIM technology.
Background
The most common problem is that the conversion elevation of a project with large volume, multiple types of bearing platforms and large elevation change of the pile bearing platform is easy to be confused and mistaken in the construction process, and the conversion error of the elevation of the pile top leads to the fact that pile splicing is needed in engineering construction, so that the engineering progress and the engineering quality are influenced.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a pile cap elevation calculation method and a pile cap elevation calculation system based on the BIM technology, solves the problem of difficulty in calculation of the elevation of the pile cap, is suitable for construction projects with large size, multiple types of the pile caps and large elevation change of the pile cap, and is high in calculation efficiency, low in cost, capable of greatly reducing error rate and capable of ensuring subsequent construction quality.
The technical scheme for realizing the purpose is as follows:
the invention provides a pile cap elevation calculation method based on a BIM technology, which comprises the following steps:
acquiring a design drawing and design parameters of a pile cap to be constructed, and introducing the design drawing and the design parameters into BIM software to form a BIM model;
and calculating and generating elevation data of the pile cap by utilizing BIM software according to the BIM model.
The method for calculating the elevation of the pile cap based on the BIM technology is adopted, the BIM model is established by obtaining the design drawing and the design parameters of the pile cap, and then BIM software is used for calculating and generating the elevation data of the pile cap according to the BIM model, so that the problem of difficulty in calculating the elevation of the pile cap is solved, the method is suitable for construction projects with large size, multiple types of the pile caps and large elevation change of the pile cap, the calculation efficiency is high, the cost is low, the error rate is greatly reduced, and the subsequent construction quality is ensured.
The pile cap elevation calculation method based on the BIM technology is further improved in that when the design drawing and the design parameters are led into the BIM software, the method further comprises the following steps:
and determining the type of the pile cap in BIM software according to a design drawing, and further inputting design parameters to generate a corresponding BIM model.
The pile cap elevation calculation method based on the BIM technology is further improved in that the design parameters comprise the pile cap elevation, the cap size and the length of the anchored cap.
The pile cap elevation calculation method based on the BIM technology is further improved in that the elevation data of the pile cap comprises the pile bottom elevation, the pile top elevation and the pile cap bottom elevation of the pile cap.
The invention also provides a pile cap elevation calculation system based on the BIM technology, which comprises the following steps:
the data acquisition module is used for acquiring a design drawing and design parameters of the pile cap;
the model establishing module is used for establishing a corresponding BIM (building information modeling) model according to the design drawing and the design parameters acquired by the data acquiring module; and
and the elevation calculation module is used for calculating and generating elevation data of the pile cap according to the BIM.
The pile cap elevation calculation system based on the BIM technology is further improved in that the design drawing comprises the arrangement position of the pile cap and the type of the pile cap;
the data acquisition module is used for acquiring the arrangement position and the type of the pile cap.
The pile cap elevation calculation system based on the BIM technology is further improved in that the design parameters comprise the pile cap elevation, the cap size and the anchoring-in cap length.
The pile cap elevation calculation system based on the BIM technology is further improved in that the elevation data of the pile cap comprises the pile bottom elevation, the pile top elevation and the pile cap bottom elevation of the pile cap.
Drawings
Fig. 1 is a flowchart of the pile cap elevation calculation method based on the BIM technology.
Detailed Description
The invention is further described with reference to the following figures and specific examples.
Referring to fig. 1, the invention provides a pile cap elevation calculation method based on the BIM technology, which is used for establishing a BIM model by obtaining design drawings and design parameters of a pile cap, and further utilizing BIM software to calculate and generate elevation data of the pile cap according to the BIM model, so that the problem of difficulty in calculation of the elevation of the pile cap is solved, and the method is suitable for construction projects with large size, multiple types of the pile caps and large elevation change of the pile cap, is high in calculation efficiency and low in cost, greatly reduces error rate, and ensures subsequent construction quality. The following describes the pile cap elevation calculation based on the BIM technology and the system method thereof in the present invention with reference to the accompanying drawings.
Referring to fig. 1, fig. 1 is a flowchart of a pile cap elevation calculation method based on the BIM technology. The method for calculating the elevation of the pile cap based on the BIM technology of the invention is described below with reference to FIG. 1.
As shown in fig. 1, the pile cap elevation calculation method based on the BIM technology of the present invention includes the following steps:
acquiring a design drawing and design parameters of a pile cap to be constructed, and introducing the design drawing and the design parameters into BIM software to form a BIM model;
and calculating and generating elevation data of the pile cap by utilizing BIM software according to the BIM model.
As a preferred embodiment of the present invention, when importing the design drawing and the design parameters into the BIM software, the method further includes:
and determining the type of the pile cap in BIM software according to a design drawing, and further inputting design parameters to generate a corresponding BIM model.
Specifically, the design parameters include pile bearing table elevation, bearing table size and anchor-in bearing table length.
Specifically, the elevation data of the pile cap includes a pile bottom elevation, a pile top elevation and a cap bottom elevation of the pile cap.
The specific embodiment of the invention is as follows:
determining the setting position and type of the pile cap according to a design drawing, and inputting design parameters of the pile cap to establish a BIM (building information modeling) model of the pile cap;
marking the information and the elevation of all pile cap by using the structure foundation annotation marking function, wherein the size and the elevation of the pile cap marked in the plane at the moment;
if the type of the pile cap and the design parameters of the pile cap are changed, the type of the pile cap is reset and the design parameters are input.
The invention also provides a pile cap elevation calculation system based on the BIM technology, which comprises the following steps:
the data acquisition module is used for acquiring a design drawing and design parameters of the pile cap;
the model establishing module is used for establishing a corresponding BIM (building information modeling) model according to the design drawing and the design parameters acquired by the data acquiring module; and
and the elevation calculation module is used for calculating and generating elevation data of the pile cap according to the BIM.
Further, the design drawing comprises the arrangement position of the pile cap and the type of the pile cap;
the data acquisition module is used for acquiring the arrangement position and the type of the pile cap.
Specifically, the design parameters include pile bearing table elevation, bearing table size and anchor-in bearing table length.
Specifically, the elevation data of the pile cap includes a pile bottom elevation, a pile top elevation and a cap bottom elevation of the pile cap.
The specific application method of the invention is as follows:
the data acquisition module acquires design drawings and design parameters of the pile cap to determine the setting position, type and design parameters of the pile cap, and the model establishment module establishes a BIM (building information modeling) model of the pile cap according to the data acquired by the data acquisition module;
calculating the elevation of the pile cap by utilizing an elevation calculation module according to the BIM model, and marking the size of the pile cap and the elevation of the pile top in the plane model;
if the type of the pile cap and the design parameters of the pile cap are changed, the type of the pile cap is obtained again and the design parameters are input.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the invention is to be determined by the appended claims.
Claims (8)
1. A pile cap elevation calculation method based on a BIM technology is characterized by comprising the following steps:
acquiring a design drawing and design parameters of a pile cap to be constructed, and importing the design drawing and the design parameters into BIM software to form a BIM model;
and calculating and generating elevation data of the pile cap by utilizing the BIM software according to the BIM model.
2. The method for calculating the elevation of the pile cap based on the BIM technology of claim 1, wherein when the design drawing and the design parameters are imported into BIM software, the method further comprises the following steps:
and determining the type of the pile cap in the BIM software according to the design drawing, and further inputting the design parameters to generate a corresponding BIM model.
3. The BIM technology-based pile cap elevation calculation method of claim 1, wherein the design parameters include pile cap elevation, cap size and anchor-in cap length.
4. The BIM technology-based pile cap elevation calculation method of claim 1, wherein the elevation data of the pile cap includes a pile bottom elevation, a pile top elevation, and a cap bottom elevation of the pile cap.
5. A pile cap elevation calculation system based on BIM technology, comprising:
the data acquisition module is used for acquiring a design drawing and design parameters of the pile cap;
the model establishing module is used for establishing a corresponding BIM (building information modeling) model according to the design drawing acquired by the data acquisition module and the design parameters; and
and the elevation calculation module is used for calculating and generating elevation data of the pile cap according to the BIM.
6. The BIM technology-based pile cap elevation calculation method according to claim 5, wherein the design drawing includes an arrangement position of the pile cap and a type of the pile cap;
the data acquisition module is used for acquiring the arrangement position and the type of the pile cap.
7. The BIM technology-based pile cap elevation calculation method of claim 5, wherein the design parameters include pile cap elevation, cap size and anchor-in cap length.
8. The BIM technology-based pile cap elevation calculation method of claim 5, wherein the elevation data of the pile cap includes a pile bottom elevation, a pile top elevation, and a cap bottom elevation of the pile cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110912271.4A CN113673013A (en) | 2021-08-10 | 2021-08-10 | Pile cap elevation calculation method and system based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110912271.4A CN113673013A (en) | 2021-08-10 | 2021-08-10 | Pile cap elevation calculation method and system based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113673013A true CN113673013A (en) | 2021-11-19 |
Family
ID=78541988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110912271.4A Pending CN113673013A (en) | 2021-08-10 | 2021-08-10 | Pile cap elevation calculation method and system based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113673013A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018040838A1 (en) * | 2016-08-29 | 2018-03-08 | 广州地铁设计研究院有限公司 | Modeling and designing method for elevated structure bim model |
CN110046364A (en) * | 2018-01-16 | 2019-07-23 | 中国建筑第八工程局有限公司 | A kind of method for computing work amount based on BIM technology |
CN111506954A (en) * | 2020-05-13 | 2020-08-07 | 中建三局第三建设工程有限责任公司 | Pile length estimation method based on BIM model |
CN111651823A (en) * | 2020-06-05 | 2020-09-11 | 中建八局轨道交通建设有限公司 | BIM technology-based foundation pit earth excavation amount calculation method |
CN112699437A (en) * | 2020-12-25 | 2021-04-23 | 深圳高速工程顾问有限公司 | BIM bridge pile foundation length automatic calculation method, system, equipment and storage medium |
-
2021
- 2021-08-10 CN CN202110912271.4A patent/CN113673013A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018040838A1 (en) * | 2016-08-29 | 2018-03-08 | 广州地铁设计研究院有限公司 | Modeling and designing method for elevated structure bim model |
CN110046364A (en) * | 2018-01-16 | 2019-07-23 | 中国建筑第八工程局有限公司 | A kind of method for computing work amount based on BIM technology |
CN111506954A (en) * | 2020-05-13 | 2020-08-07 | 中建三局第三建设工程有限责任公司 | Pile length estimation method based on BIM model |
CN111651823A (en) * | 2020-06-05 | 2020-09-11 | 中建八局轨道交通建设有限公司 | BIM technology-based foundation pit earth excavation amount calculation method |
CN112699437A (en) * | 2020-12-25 | 2021-04-23 | 深圳高速工程顾问有限公司 | BIM bridge pile foundation length automatic calculation method, system, equipment and storage medium |
Non-Patent Citations (1)
Title |
---|
李想: "BIM 技术在施工阶段深化设计中的应用", 《建筑技术 应用》, pages 122 - 124 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102542901B (en) | Line segment vacuating device for electronic map and method thereof | |
CN110990504B (en) | Ship track compression method based on course and speed change rate | |
CN102855232B (en) | A kind of tabular analysis adapts job operation | |
CN109408897B (en) | PDMS-to-AutoCAD drawing size labeling identification-based conversion method and system | |
CN105512235B (en) | A kind of GIS and AutoCAD method for interchanging data and intermediate file | |
CN101944128A (en) | Data export and import method and device | |
CN105607902A (en) | Component model based system visualization design and code generation system and method | |
CN109933324A (en) | A kind of nuclear power DCS man-machine interface automatic generation method | |
KR20210128907A (en) | A method, a device, an electronic equipment and a storage medium for extracting information | |
CN102314798B (en) | Method and device for automatically simplifying shape points of polygonal surface elements of electronic map | |
CN113673013A (en) | Pile cap elevation calculation method and system based on BIM technology | |
CN112100712A (en) | Road lofting conversion method based on CAD and storage medium | |
CN102867322A (en) | Method and device for realizing Chinese marking in three-dimensional scene | |
CN106406561B (en) | Character library lattice generation method based on generator set controller | |
CN104484512A (en) | Pattern generation method based on AUTOCAD in PDMS (plant design management system) | |
CN110069861B (en) | Method and system for automatically generating curved surface type value table | |
CN105630750A (en) | Business card picture processing method and apparatus | |
CN105095538B (en) | The dimensionally-optimised system and method for connector | |
CN107861725B (en) | iOS data reverse automatic analysis strategy | |
CN113015117A (en) | User positioning method and device, electronic equipment and storage medium | |
CN102026033A (en) | Method for displaying Myanmar by set-top box (STB) | |
CN111753344A (en) | Generation method of assembly type component data set, CAD platform and storage medium | |
CN103929478A (en) | Video and audio file storing and downloading method and system | |
CN107633543A (en) | Consider the stripe shape corresponding method of local topology | |
CN112579723A (en) | GIS-based infinite scaling optimization display method for power grid line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |