CN113592322A
CN113592322A CN202110895230.9A CN202110895230A CN113592322A CN 113592322 A CN113592322 A CN 113592322A CN 202110895230 A CN202110895230 A CN 202110895230A CN 113592322 A CN113592322 A CN 113592322A
Authority
CN
China
Prior art keywords
module
unit
cost
input
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110895230.9A
Other languages
Chinese (zh)
Inventor
任丰宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110895230.9A priority Critical patent/CN113592322A/en
Publication of CN113592322A publication Critical patent/CN113592322A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations

Abstract

The invention discloses an enterprise cost management system based on big data, which comprises a cost budget unit and relates to the technical field of enterprise management. This cost management system of enterprise based on big data, through the weather forecast module in the condition of the weather of a period of time in the future of network forecast, and let weather record module record the weather of a period of time in the future, make time limit prediction module pass through the weather condition of weather record module record, the time limit is further put in order, when the weather of a period of time in the future is bad, can know the weather condition of a period of time in the future through the weather forecast module, the length of reasonable distribution time limit, improve the management of system, change the workman price through the worker price, let the workman catch up with the worker at night or during the day, shorten the time limit, improve the efficiency of system management, through the performance that strengthens the supply material, let cost management system when prolonging the time limit, the performance of material still can reach standard requirement.

Description

Enterprise cost management system based on big data
Technical Field
The invention relates to the technical field of enterprise management, in particular to an enterprise cost management system based on big data.
Background
The cost management system specially processes material cost accounting by adopting plan cost, materials of a plan cost method are recorded into a plan price adjustment list through the system to adjust the plan price, the plan price adjustment list can be inquired, modified and audited, historical plan prices of the materials of the plan cost method are inquired, a reward and punishment mechanism needs to be established for cost management informatization, and supervision needs to be executed.
When the building cost management system used in each building enterprise at present is used, most of the building cost management systems do not consider the influence of weather on the construction period, and the building cost cannot be correctly managed in the system, so that technical personnel provide the enterprise cost management system based on big data, know the weather condition for a period of time in the future through the weather forecasting module, reasonably allocate the length of the construction period, and improve the management of the system.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides an enterprise cost management system based on big data, and solves the problem that the construction cost cannot be correctly managed in the system without considering the influence of weather on the construction period.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the enterprise cost management system based on the big data comprises a cost budget unit, wherein the output end of the cost budget unit is connected with the input end of a material selection extraction module, the output end of the material selection extraction module is connected with the input end of an information interaction unit, the output ends of the information interaction unit and the cost budget unit are both connected with the input end of a cost comparison unit, the output end of the cost comparison unit is connected with the input end of a plan emergency unit, the output end of the plan emergency unit is respectively connected with the input ends of a plan planning unit and an information interaction unit, and the output ends of the information interaction unit, the cost comparison unit, the plan emergency unit and the plan planning unit are all connected with the input end of a cost positioning module.
Preferably, the emergency planning unit comprises a weather forecasting module, a weather recording module, a construction period forecasting module, a construction period shortening module and a construction period prolonging module, wherein an output end of the weather forecasting module is connected with an input end of the weather recording module, an output end of the weather recording module is connected with an input end of the construction period forecasting module, and an output end of the construction period forecasting module is respectively connected with input ends of the cost positioning module, the construction period prolonging module and the construction period shortening module.
Preferably, the information interaction unit comprises an information storage interaction unit, an information material selection unit and a cost integration module, an output end of the information storage interaction unit is connected with an input end of the information material selection unit, and an output end of the information material selection unit is connected with an input end of the cost integration module.
Preferably, the cost budget unit comprises a labor price input module and a material selection input module;
the labor price input module inputs the labor price of the implementing personnel into the system;
the material selection input module inputs the type of material and the property of the material required in the project into the system.
Preferably, the cost comparison unit comprises a price comparison module, a material comparison module and a comparison integration module, and the output ends of the price comparison module and the material comparison module are connected with the input end of the comparison integration module.
Preferably, the information material selecting unit comprises a model material selecting module, a material performance material selecting module and a material selecting price module, wherein the output end of the model material selecting module is connected with the input end of the material performance material selecting module, and the output end of the material performance material selecting module is connected with the input end of the material selecting price module.
Preferably, the plan planning unit comprises a work price changing module, a night work driving recording module and a day work driving recording module, the output end of the construction period shortening module is connected with the input end of the work price changing module, the output end of the work price changing module is respectively connected with the input ends of the night work driving recording module and the day work driving recording module, and the output ends of the night work driving recording module and the day work driving recording module are both connected with the input end of the cost positioning module.
Preferably, the information storage and interaction unit comprises an information interaction module, a credit classification module, a first information storage module, a second information storage module and a storage and extraction module, the output ends of the material selection and extraction module and the construction period extension module are connected with the input end of the information interaction module, the output end of the information interaction module is connected with the input end of the credit classification module, the output end of the credit classification module is respectively connected with the input ends of the first information storage module and the second information storage module, the output ends of the first information storage module and the second information storage module are respectively connected with the input end of the storage and extraction module, and the output end of the storage and extraction module is respectively connected with the input ends of the price comparison module, the material comparison module, the model material selection module and the cost positioning module;
the first information storage module is used for storing high-quality and high-credit supply and supply merchants;
the second information storage module is used for storing low-quality and low-credit suppliers.
Preferably, the output end of the storage and extraction module is connected with the input end of the model material selection module, and the output end of the material selection price module is connected with the input end of the cost integration module.
(III) advantageous effects
The invention provides an enterprise cost management system based on big data. The method has the following beneficial effects:
(1) this cost management system of enterprise based on big data, weather forecast module is through the condition of the weather of network forecast a period of time in the future in the same day, and let weather record module record the weather of a period of time in the future, make the weather condition of time limit prediction module through the recording of gas record module, further arrange the time limit in order, when the weather of a period of time in the future is bad, the time limit is changed into time limit extension module and time limit shortening module two kinds for the time limit, can know the weather condition of a period of time in the future through weather forecast module like this, the length of reasonable distribution time limit, improve the management of system.
(2) This cost management system of enterprise based on big data, when the weather of future time is bad, need the reduction of erection time and divide into time limit for a project and time limit for a project in the evening, change workman's price through the worker price, let the worker number record of the recording module of driving a worker in the evening and the recording module of driving a worker in the daytime, can change workman's price through the worker price, let the workman carry out the time and drive a worker in the evening or the time of driving a worker in the daytime, the reduction of erection time, the efficiency of improvement system management.
(3) According to the enterprise cost management system based on the big data, when the weather is severe for a period of time in the future and the construction period needs to be prolonged, the quality of materials is improved, the materials needed in the project are transmitted into the information interaction module, the information interaction module connects the material suppliers inquired by the first information storage module through the credit classification module, and the materials with the similar models are screened in the material suppliers through the storage and extraction module, so that the performance of the supplied materials can be enhanced, and the performance of the materials can still meet the standard requirements when the construction period is prolonged by the cost management system.
Drawings
FIG. 1 is a schematic block diagram of the system of the present invention;
FIG. 2 is a schematic block diagram of a system for planning an emergency unit according to the present invention;
FIG. 3 is a system schematic block diagram of an information interaction unit of the present invention;
FIG. 4 is a system schematic block diagram of the cost budgeting unit of the present invention;
FIG. 5 is a system schematic block diagram of the cost comparison unit of the present invention;
FIG. 6 is a system schematic block diagram of an information material selection unit of the present invention;
FIG. 7 is a system schematic block diagram of a planning and planning unit of the present invention;
FIG. 8 is a system schematic block diagram of an information storage interaction unit of the present invention;
in the figure, 1, cost budget unit; 2. a material selection and extraction module; 3. an information interaction unit; 4. a cost comparison unit; 5. a cost positioning module; 6. a planning emergency unit; 7. a plan planning unit; 8. a weather forecasting module; 9. a weather recording module; 10. a construction period prediction module; 11. a construction period shortening module; 12. a construction period prolonging module; 13. an information storage interaction unit; 14. an information material selection unit; 15. a cost integration module; 16. a work price input module; 17. a storage and extraction module; 18. a material selection input module; 19. a price comparison module; 20. a material comparison module; 21. a comparison and integration module; 22. a model material selection module; 23. a material performance material selection module; 24. a material selection price module; 25. a cost change module; 26. a working driving recording module at night; 27. a daytime driving recording module; 28. an information interaction module; 29. a credit classification module; 30. a first information storage module; 31. and a second information storage module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 8, an embodiment of the present invention provides a technical solution: the enterprise cost management system based on the big data comprises a cost budget unit 1, wherein the output end of the cost budget unit 1 is connected with the input end of a material selecting and extracting module 2, the output end of the material selecting and extracting module 2 is connected with the input end of an information interaction unit 3, the output ends of the information interaction unit 3 and the cost budget unit 1 are both connected with the input end of a cost comparison unit 4, the output end of the cost comparison unit 4 is connected with the input end of a plan emergency unit 6, the output end of the plan emergency unit 6 is respectively connected with the input ends of a plan planning unit 7 and the information interaction unit 3, and the output ends of the information interaction unit 3, the cost comparison unit 4, the plan emergency unit 6 and the plan planning unit 7 are all connected with the input end of a cost positioning module 5.
Further, the plan emergency unit 6 includes a weather forecast module 8, a weather recording module 9, a construction period prediction module 10, a construction period shortening module 11 and a construction period extending module 12, an output end of the weather forecast module 8 is connected with an input end of the weather recording module 9, an output end of the weather recording module 9 is connected with an input end of the construction period prediction module 10, an output end of the construction period prediction module 10 is respectively connected with the cost positioning module 5, the construction period extending module 12 and an input end of the construction period shortening module 11, so that a weather condition of a future period can be solved through the weather forecast module 8, the construction period can be reasonably distributed, and management of the system is improved.
Further, the information storage and interaction unit 13 includes an information interaction module 28, a credit classification module 29, a first information storage module 30, a second information storage module 31 and a storage and extraction module 17, the output ends of the material selection and extraction module 2 and the construction period extension module 12 are connected to the input end of the information interaction module 28, the output end of the information interaction module 28 is connected to the input end of the credit classification module 29, the output end of the credit classification module 29 is connected to the input ends of the first information storage module 30 and the second information storage module 31, the output ends of the first information storage module 30 and the second information storage module 31 are connected to the input end of the storage and extraction module 17, the output end of the storage and extraction module 17 is connected to the input ends of the price comparison module 19, the material comparison module 20, the model material selection module 22 and the cost positioning module 5, the first information storage module 30 is used for storing high-quality and high-credit suppliers, the second information storage module 31 is used to store low quality and low credit suppliers, which can make the performance of the material unchanged by the cost management system for a prolonged period of time by enhancing the performance of the supplied material.
Further, the information interaction unit 3 comprises an information storage interaction unit 13, an information material selection unit 14 and a cost integration module 15, wherein the output end of the information storage interaction unit 13 is connected with the input end of the information material selection unit 14, and the output end of the information material selection unit 14 is connected with the input end of the cost integration module 15.
Further, the cost budget unit 1 comprises a labor price input module 16 and a material selection input module 18;
the labor price input module 16 inputs the labor price of the implementing personnel into the system;
the material selection input module 18 inputs the type of material and the properties of the material required in the project into the system.
Further, the cost comparison unit 4 comprises a price comparison module 19, a material comparison module 20 and a comparison integration module 21, and the output ends of the price comparison module 19 and the material comparison module 20 are connected with the input end of the comparison integration module 21.
Further, the information material selecting unit 14 includes a model material selecting module 22, a material performance material selecting module 23, and a material selecting price module 24, an output end of the model material selecting module 22 is connected with an input end of the material performance material selecting module 23, and an output end of the material performance material selecting module 23 is connected with an input end of the material selecting price module 24.
Further, plan planning unit 7 includes price of labor change module 25, the night is driven to the worker and is recorded module 26 and the day is driven to the worker and is recorded module 27, the output of time limit for a project shorten module 11 is connected with price of labor change module 25's input, price of worker can be changed through price of labor change module 25 respectively with the night is driven to the worker and is recorded module 26 and the day is driven to the worker and is recorded module 27's input with cost positioning module 5, it is driven to the worker to let the worker carry out night and is driven to the worker or the day is driven to the worker, the time limit for a project is shortened, the efficiency of system management is improved.
Further, the output end of the storage and extraction module 17 is connected with the input end of the model material selection module 22, and the output end of the material selection price module 24 is connected with the input end of the cost integration module 15.
During working, a worker firstly transmits the work price of a construction worker on the market to the inside of the cost management system through the work price input module 16, then inputs the material type and the material performance used by a project into the system through the material selection input module 18, the material selection extraction module 2 extracts the material of the material type and the material performance in the project, then transmits the material required in the project into the information interaction module 28, the information interaction module 28 connects the material supplier inquired by the second information storage module 31 through the credit classification module 29, screens the material with the similar model in the material supplier through the storage extraction module 17, stores the model in the model material selection budget 22, allows the material performance material selection module 23 to select the material with the similar performance, and allows the material selection price module 24 to search the material with the lowest price in the material performance material selection module 23, integrating the searched material with the lowest price through the cost integration module 15, comparing the searched material with the material entries in the budget through the price comparison module 19 and the material comparison module 20, integrating the compared material through the comparison integration module 21, thereby reducing the material cost to the lowest price, predicting the weather condition in a future period of time through the network when the weather prediction module 8 predicts the weather condition in the future period of time, recording the weather condition in the future period of time through the weather recording module 9, making the construction period prediction module 10 further arrange the construction period, changing the construction period into the construction period extension module 12 and the construction period reduction module 11 when the weather in the future period of time is severe, when the weather in the future period of time is not abnormal, the construction period is not changed, integrating the material cost and the labor cost into the final cost of the project through the cost positioning module 5, and integrating the material cost and the labor cost into the final cost of the project when the weather in the future period of time is severe, the construction period needs to be shortened and divided into a night construction period and a day construction period, the worker price is changed through the worker price changing module 25, the number of workers in the night driving recording module 26 and the day driving recording module 27 is recorded, when the weather in a future period is bad and the construction period needs to be prolonged, the quality of materials is improved, the materials needed in the project are transmitted into the information interaction module 28, the information interaction module 28 is connected with the material supplier inquired by the first information storage module 30 through the credit classification module 29, and the materials with similar models are screened in the material supplier through the storage and extraction module 17.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A big data based enterprise cost management system, comprising a cost budgeting unit (1), characterized in that: the output end of the cost budget unit (1) is connected with the input end of the material selection extraction module (2), the output end of the material selection extraction module (2) is connected with the input end of the information interaction unit (3), the output ends of the information interaction unit (3) and the cost budget unit (1) are both connected with the input end of the cost comparison unit (4), the output end of the cost comparison unit (4) is connected with the input end of the plan emergency unit (6), the output end of the plan emergency unit (6) is respectively connected with the input ends of the plan planning unit (7) and the information interaction unit (3), and the output ends of the information interaction unit (3), the cost comparison unit (4), the plan emergency unit (6) and the plan planning unit (7) are all connected with the input end of the cost positioning module (5);
the plan emergency unit (6) comprises a weather forecasting module (8), a weather recording module (9), a construction period forecasting module (10), a construction period shortening module (11) and a construction period prolonging module (12), wherein the output end of the weather forecasting module (8) is connected with the input end of the weather recording module (9), the output end of the weather recording module (9) is connected with the input end of the construction period forecasting module (10), and the output end of the construction period forecasting module (10) is connected with the input ends of the cost positioning module (5), the construction period prolonging module (12) and the construction period shortening module (11) respectively.
2. The big-data based enterprise cost management system of claim 1, wherein: the information interaction unit (3) comprises an information storage interaction unit (13), an information material selection unit (14) and a cost integration module (15), wherein the output end of the information storage interaction unit (13) is connected with the input end of the information material selection unit (14), and the output end of the information material selection unit (14) is connected with the input end of the cost integration module (15).
3. The big-data based enterprise cost management system of claim 2, wherein: the cost budget unit (1) comprises a labor price input module (16) and a material selection input module (18);
the work price input module (16) inputs the work price of the implementer into the system;
the material selection input module (18) inputs the type of material and the properties of the material required in the project into the system.
4. The big-data based enterprise cost management system of claim 3, wherein: the cost comparison unit (4) comprises a price comparison module (19), a material comparison module (20) and a comparison integration module (21), and the output ends of the price comparison module (19) and the material comparison module (20) are connected with the input end of the comparison integration module (21).
5. The big-data based enterprise cost management system of claim 4, wherein: the information material selecting unit (14) comprises a model material selecting module (22), a material performance material selecting module (23) and a material selecting price module (24), wherein the output end of the model material selecting module (22) is connected with the input end of the material performance material selecting module (23), and the output end of the material performance material selecting module (23) is connected with the input end of the material selecting price module (24).
6. The big-data based enterprise cost management system of claim 1, wherein: plan planning unit (7) are driven to worker recording module (26) and are driven to worker in the daytime including price change module (25), night and are driven to worker recording module (27), the output of time limit for a project shorten module (11) is connected with the input of price change module (25), the output of price change module (25) is driven to worker with the night respectively and is driven to worker recording module (26) and the input of being driven to worker recording module (27) in the daytime and be connected, the output of being driven to worker recording module (26) in the night and being driven to worker recording module (27) in the daytime all is connected with the input of cost orientation module (5).
7. The big-data based enterprise cost management system of claim 5, wherein: the information storage interaction unit (13) comprises an information interaction module (28), a credit classification module (29), a first information storage module (30), a second information storage module (31) and a storage extraction module (17), the output ends of the material selection extraction module (2) and the construction period extension module (12) are connected with the input end of the information interaction module (28), the output end of the information interaction module (28) is connected with the input end of the credit classification module (29), the output end of the credit classification module (29) is respectively connected with the input ends of the first information storage module (30) and the second information storage module (31), the output ends of the first information storage module (30) and the second information storage module (31) are respectively connected with the input end of the storage extraction module (17), and the output end of the storage extraction module (17) is respectively connected with a price comparison module (19), The material comparison module (20), the model material selection module (22) and the input end of the cost positioning module (5) are connected;
the first information storage module (30) is used for storing high-quality and high-credit suppliers;
the second information storage module (31) is used for storing low-quality and low-credit suppliers.
8. The big-data based enterprise cost management system of claim 5, wherein: the output end of the storage and extraction module (17) is connected with the input end of the model material selection module (22), and the output end of the material selection price module (24) is connected with the input end of the cost integration module (15).
CN202110895230.9A 2021-08-05 2021-08-05 Enterprise cost management system based on big data Pending CN113592322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110895230.9A CN113592322A (en) 2021-08-05 2021-08-05 Enterprise cost management system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110895230.9A CN113592322A (en) 2021-08-05 2021-08-05 Enterprise cost management system based on big data

Publications (1)

Publication Number Publication Date
CN113592322A true CN113592322A (en) 2021-11-02

Family

ID=78255349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110895230.9A Pending CN113592322A (en) 2021-08-05 2021-08-05 Enterprise cost management system based on big data

Country Status (1)

Country Link
CN (1) CN113592322A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008171122A (en) * 2007-01-10 2008-07-24 Takaaki Umezawa Project integrated management system
CN107480912A (en) * 2017-08-31 2017-12-15 福建四创软件有限公司 Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things
CN110728489A (en) * 2019-09-07 2020-01-24 北京市建壮咨询有限公司 Cost management system and method for complex environment
CN112183905A (en) * 2020-11-30 2021-01-05 江苏康行信息技术有限公司 Building design plan comprehensive optimization method based on BIM modeling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008171122A (en) * 2007-01-10 2008-07-24 Takaaki Umezawa Project integrated management system
CN107480912A (en) * 2017-08-31 2017-12-15 福建四创软件有限公司 Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things
CN110728489A (en) * 2019-09-07 2020-01-24 北京市建壮咨询有限公司 Cost management system and method for complex environment
CN112183905A (en) * 2020-11-30 2021-01-05 江苏康行信息技术有限公司 Building design plan comprehensive optimization method based on BIM modeling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕绮玲 等: "浅谈施工企业工程成本的控制", 广东水利水电, no. 4, pages 93 - 94 *

Similar Documents

Publication Publication Date Title
US20080319923A1 (en) Investment Analysis and Planning System and Method
CN102654909B (en) SLA pro-jobs level establishing method and system
Makui et al. Accelerating Benders decomposition approach for robust aggregate production planning of products with a very limited expiration date
US20070016496A1 (en) Spare plug management system
US7996284B2 (en) Spare plug management system
Bounou et al. Inventory models for spare parts management: a review
US7324860B2 (en) Method, apparatus and program storage device for providing a cascading timeline of manufacturing events leading to completion of a manufactured product
CN111612325A (en) Management system for equipment leasing
Mogre et al. Mitigating supply and production uncertainties with dynamic scheduling using real-time transport information
US20110137693A1 (en) Method and computer program product for maintenance and modernization backlogging
OLALEKE Transportation management and economic performance of selected textile firms in Lagos State
CN113592322A (en) Enterprise cost management system based on big data
CN102542432B (en) Inventory management system and method
JP5056962B2 (en) Sales production delivery system and sales production delivery method for steel strip products
Wang et al. Configuring information updating schemes of partial imperfect advance demand information in production-inventory systems
Tin AComparative ANALYSIS OF COST-VOLUME-PROFIT (CVP) ANALYSIS AND ACTIVITY-BASED COSTING (ABC) IN IMPROVING MANAGERIAL DECISION-MAKING
Huanhuan et al. Research on After-Sales Information System And Data Of Automotive OEMs
Makarova et al. Intellectualization of the spare parts supplier selection by the analysis of multi-criterial solutions
JP4716151B2 (en) Sales production delivery system and sales production delivery method for steel strip products
JP7233622B2 (en) Parts procurement risk/value calculation device and parts procurement risk/value calculation program
Harrison et al. Exploring an optimization strategy at the maintenance department of an oil company
Choure et al. On-site material management
Makarova et al. Application of the Statistical Analysis Methods for Improving the Managing the Dealer-service Network Efficiency.
Zhao et al. Newsvendor Model-based Vehicle Renting Strategy for Logistics Companies during Online Shopping Promotion Seasons
Gong et al. Inventory models with returns and remanufacturing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination