CN113565079A CN202110921035.9A CN202110921035A CN113565079A CN 113565079 A CN113565079 A CN 113565079A CN 202110921035 A CN202110921035 A CN 202110921035A CN 113565079 A CN113565079 A CN 113565079A
Authority
CN
China
Prior art keywords
arc
pole
fixedly connected
wall
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110921035.9A
Other languages
Chinese (zh)
Inventor
刘亚明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110921035.9A priority Critical patent/CN113565079A/en
Publication of CN113565079A publication Critical patent/CN113565079A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0026Means for protecting offshore constructions against corrosion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/003Fenders

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses an ocean engineering operation platform, which comprises fixed rods, a chassis and a platform, wherein the four corners of the bottom of the platform are provided with the fixed rods, the bottom of each fixed rod is provided with the chassis, each fixed rod comprises a cylindrical frame, a connecting rod, an arc plate, a moving frame, a cleaning mechanism, a pressing plate, a groove, a sliding chute and an elastic sheet, the cylindrical frame is fixedly connected with the outer surface of each fixed rod, the upper end and the lower end of the left inner wall of the cylindrical frame are respectively provided with the groove, the pressing plates are respectively arranged in the ends, close to each other, of the four grooves, the ends, far away from each other, of the two pressing plates are respectively fixedly connected with the arc plate, the upper side and the lower side of the two pressing plates, far away from each other, are respectively provided with the sliding chute, the arc plates can move towards the inside of the cylindrical frame through the impact force of sea waves, and can contain the impact force of sea water through setting the arc plates into an arc shape, so that the arc plate has enough thrust.

Description

Ocean engineering work platform
Technical Field
The invention relates to the technical field of ocean engineering, in particular to an ocean engineering operation platform.
Background
An operation platform is required to be built on sponge when the operation is carried out on the sea, pipe wiping is convenient to carry out, the existing operation platform is generally fixed on the sea bottom through a fixed rod, seawater on the surface of the fixed rod can be changed into sea salt through evaporation when the seawater descends to corrode the fixed rod, the service life of the fixed rod is reduced, and therefore the ocean engineering operation platform is provided.
Disclosure of Invention
The invention aims to provide an ocean engineering work platform to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: an ocean engineering operation platform comprises fixing rods, a chassis and a platform, wherein the four corners of the bottom of the platform are provided with the fixing rods, and the bottoms of the four fixing rods are provided with the chassis;
the dead lever includes cylinder frame, connecting rod, circular arc board, removes frame, clearance mechanism, clamp plate, recess, spout and shell fragment, the fixed surface of cylinder frame and dead lever is connected, the inner wall is advanced to set up flutedly about the cylinder frame at both ends about, four the inside clamp plate that all is provided with of one end that the recess is close to each other, two the equal fixedly connected with circular arc board of one end that the clamp plate was kept away from each other, two the slide groove has all been set up to both sides about the one end is kept away from each other to the clamp plate, four the outer end of spout all is provided with removes the frame, two the equal fixedly connected with connecting rod of one end that the circular arc board is close to each other, four the one end that the connecting rod is close to each other all is provided with clearance mechanism, two the equal fixedly connected with shell fragment of one end that the inner wall of recess is close to the clamp plate.
Preferably, clearance mechanism includes arc pole, gasbag, scrapes pole and gas pocket, the quantity of arc pole has two, two arc pole and connecting rod fixed connection, two the one end inner wall fixedly connected with gasbag that the arc pole is close to each other, the connecting rod passes through the inner wall intercommunication of connecting hole and two arc poles, two the inner wall fixedly connected with who is close to the dead lever of arc pole scrapes the pole, the gasbag is close to the one end of connecting hole and has been seted up the arc pole.
Preferably, the removal frame includes disc, horizontal pole, hits pole, through-hole piece and straight-bar, the disc passes through the bearing and is connected with the left side inner wall rotation of removal frame, the right side top fixedly connected with straight-bar of disc, the bottom right side of straight-bar all is connected with the horizontal pole through the bearing rotation, the right side of horizontal pole is connected with through-hole piece through the bearing rotation, through-hole piece and the inner wall right side fixed connection who removes the frame, hit the inner wall contact of pole and through-hole piece.
Preferably, the circular arc board includes protruding board, circular arc groove, movable rod, outstanding piece and bullet pole, the inside of circular arc board is provided with the protruding board, the protruding board runs through the right side of circular arc board and extends to the outside of circular arc board, the circular arc groove has been seted up in the left side of protruding board, the inner wall bottom fixedly connected with bullet pole in circular arc groove, the center department of movable rod is all through bearing and circular arc groove's interior swing joint around, the outstanding piece of bottom fixedly connected with of movable rod.
Preferably, the protruding block contacts with the inner wall of the bottom of the arc groove.
Preferably, the disc is in contact with an outer surface of the pressure plate.
Preferably, the scraping bar is in contact with an outer surface of the fixing bar.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the arc plate can move towards the inside of the cylindrical frame through the impact force of sea waves, and the arc plate is set to be arc-shaped, so that the impact force of sea water can be captured, and the arc plate has enough thrust.
2. According to the invention, when the arc plate is subjected to certain impact force, the upper end and the lower end of the arc plate can be expanded towards one end of the cylindrical frame, the movable frame can be pushed when the arc plate moves towards the cylindrical frame, and vibration can be transmitted to the surface of the arc plate through the continuous action of the striking rod and the vibration pressing plate, so that foreign matters in sea are prevented from being attached to the surface of the arc plate, and the working effect is reduced.
3. The gas pushes the protruding plate to move in the closed space of the arc plate, the arc plate is difficult to avoid that some organisms are attached to the surface of the arc plate in the seawater for a long time, so that the arc plate cannot be pushed by the seawater, and the organisms on the surface of the arc plate can be cleaned by the movement of the protruding plate.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front sectional structural view of the cylindrical frame of the present invention;
FIG. 3 is a schematic top sectional view of the arc rod of the present invention;
FIG. 4 is a schematic top sectional view of the movable frame of the present invention;
fig. 5 is a schematic top sectional view of the circular arc plate of the present invention.
In the figure: the device comprises a fixed rod 1, a cylindrical frame 10, a connecting rod 11, an arc plate 12, a protruding plate 121, an arc groove 122, a movable rod 123, a protruding block 124, an elastic rod 125, a moving frame 13, a disc 131, a cross rod 132, a striking rod 133, a through hole block 134, a straight rod 135, a cleaning mechanism 14, an arc rod 141, an air bag 142, a scraping rod 143, an air hole 144, a pressing plate 15, a groove 16, a sliding groove 17, an elastic sheet 18, a chassis 2 and a platform 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: an ocean engineering operation platform comprises fixed rods 1, a chassis 2 and a platform 3, wherein the fixed rods 1 are arranged at four corners of the bottom of the platform 3, and the chassis 2 is arranged at the bottoms of the four fixed rods 1;
the fixing rod 1 comprises a cylindrical frame 10, a connecting rod 11, arc plates 12, a moving frame 13, a cleaning mechanism 14, pressure plates 15, grooves 16, sliding grooves 17 and elastic pieces 18, the cylindrical frame 10 is fixedly connected with the outer surface of the fixing rod 1, the grooves 16 are formed in the upper end and the lower end of the left inner wall and the right inner wall of the cylindrical frame 10, the pressure plates 15 are arranged inside the ends, close to each other, of the four grooves 16, the arc plates 12 are fixedly connected with the ends, far away from each other, of the two pressure plates 15, the arc plates 12 can move towards the inside of the cylindrical frame 10 through impact force of sea waves, the arc plates 12 can capture the impact force of sea water by being arranged in an arc shape, so that the arc plates 12 have enough thrust, the sliding grooves 17 are formed in the upper side and the lower side of the ends, far away from each other, of the two pressure plates 15, the outer ends, far away from each other, of the four sliding grooves 17 are respectively provided with the moving frame 13, and the ends, the connecting rod 11 are fixedly connected with the ends, close to each other, of the two arc plates 12, the cleaning mechanism 14 is arranged at one end, close to each other, of each of the four connecting rods 11, the elastic sheet 18 is fixedly connected at one end, close to the inner wall of the groove 16, of each of the two pressing plates 15, the upper end and the lower end of each of the arc plates 12 can be expanded towards one end of the cylindrical frame 10 when the arc plates 12 are subjected to certain impact force, the moving frame can be pushed when the arc plates 12 move towards the cylindrical frame 10, vibration can be transmitted to the surfaces of the arc plates 12 through the vibration pressing plates 15 continuously connected with the striking rods 133, foreign matters in the sea are prevented from being attached to the surfaces of the arc plates 12, and the working effect is reduced.
Cleaning mechanism 14 includes arc pole 141, gasbag 142, scrape pole 143 and gas vent 144, there are two arc poles 141's quantity, two arc poles 141 and connecting rod 11 fixed connection, the one end inner wall fixedly connected with gasbag 142 that two arc poles 141 are close to each other, connecting rod 11 passes through the inner wall intercommunication of connecting hole and two arc poles 141, two arc poles 141 are close to the inner wall fixedly connected with who fixes pole 1 and scrape pole 143, gasbag 142 has seted up arc pole 141 near the one end of connecting hole, can contact the surface of dead lever 1 when receiving the extrusion through arc pole 141, make and scrape pole 143 and give scraping the debris on dead lever 1 surface, gasbag 142 can push away the inside gas to arc pole 141's inside when receiving the extrusion.
The moving frame 13 comprises a disc 131, a cross rod 132, a striking rod 133, a through hole block 134 and a straight rod 135, the disc 131 is rotatably connected with the inner wall of the left side of the moving frame 13 through a bearing, the straight rod 135 is fixedly connected with the top of the right side of the disc 131, the cross rod 132 is rotatably connected with the bottom of the straight rod 135 through a bearing, the striking rod 133 is rotatably connected with the right side of the cross rod 132 through a bearing, the through hole block 134 is fixedly connected with the right side of the inner wall of the moving frame 13, the striking rod 133 is in contact with the inner wall of the through hole block 134, the disc 131 rotates through the contact with the surface of the pressing plate 15 when the moving frame 13 moves, and the striking rod 133 can be continuously pushed up and down to work through the continuous up-and-down movement of the straight rod 135.
The circular arc plate 12 comprises a protruding plate 121, a circular arc groove 122, a movable rod 123, a protruding block 124 and an elastic rod 125, the protruding plate 121 is arranged inside the circular arc plate 12, the protruding plate 121 penetrates through the right side of the circular arc plate 12 and extends to the outside of the circular arc plate 12, the circular arc groove 122 is formed in the left side of the protruding plate 121, the elastic rod 125 is fixedly connected to the bottom of the inner wall of the circular arc groove 122, the center of the movable rod 123 is movably connected with the front and back inner parts of the circular arc groove 122 through bearings, and the protruding block 124 is fixedly connected to the bottom of the movable rod 123.
The protrusion 124 comes into contact with the inner wall of the bottom of the circular arc groove 122.
The disc 131 is in contact with the outer surface of the pressure plate 15.
The scraping bar 143 is in contact with the outer surface of the fixing bar 1.
The working principle is as follows: when the arc plate 12 is hit by sea waves, the arc plate 12 is pushed to move, and when the arc plate 12 moves, the arc rod 141 is pushed to move, so that the scraping rod 143 can move and clean on the surface of the fixed rod 1, when the arc plate 12 is extruded, the two ends of the arc plate deform, the movable frame 13 is pushed to move through change, by moving the disc 131 and the surface of the pressing plate 15, the straight rod 135 pushes the striking rod 133 when rotating to the top, so that the striking rod 133 can be continuously contacted with the surface of the pressing plate 15, the air bag 142 inside the arc rod 141 is pressed by the pressing of the arc plate 12, so that the gas inside the air bag 142 is pushed into the inside of the arc plate 12 through the coupling hole by pressure, the protrusion 124 is pushed to move inside the sealed arc plate 12, so as to prevent something from adhering to the surface of the arc plate 141.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an ocean engineering work platform, includes dead lever (1), chassis (2) and platform (3), its characterized in that: four corners of the bottom of the platform (3) are provided with fixing rods (1), and the bottoms of the four fixing rods (1) are provided with chassis (2);
the fixing rod (1) comprises a cylindrical frame (10), connecting rods (11), arc plates (12), a moving frame (13), a cleaning mechanism (14), pressing plates (15), grooves (16), sliding grooves (17) and elastic pieces (18), the cylindrical frame (10) is fixedly connected with the outer surface of the fixing rod (1), the grooves (16) are formed in the upper end and the lower end of the left inner wall and the right inner wall of the cylindrical frame (10), the pressing plates (15) are arranged in the ends, close to each other, of the four grooves (16), the arc plates (12) are fixedly connected with the ends, far away from each other, of the two pressing plates (15), the sliding grooves (17) are formed in the upper end and the lower end of the ends, far away from each other, of the four sliding grooves (17), the moving frame (13) is arranged at the outer ends of the four arc plates (12), the connecting rods (11) are fixedly connected with the ends, close to each other, the cleaning mechanism (14) is arranged at one end, close to each other, of each of the four connecting rods (11), and the elastic pieces (18) are fixedly connected to one ends, close to the inner walls of the grooves (16), of the two pressing plates (15).
2. An ocean engineering work platform according to claim 1, wherein: clearance mechanism (14) include arc pole (141), gasbag (142), scrape pole (143) and gas pocket (144), the quantity of arc pole (141) has two, two arc pole (141) and connecting rod (11) fixed connection, two the one end inner wall fixedly connected with gasbag (142) that arc pole (141) are close to each other, connecting rod (11) are through the inner wall intercommunication of connecting hole and two arc poles (141), two inner wall fixedly connected with that arc pole (141) are close to dead lever (1) scrapes pole (143), arc pole (141) have been seted up to the one end that gasbag (142) are close to the connecting hole.
3. An ocean engineering work platform according to claim 1, wherein: remove frame (13) and include disc (131), horizontal pole (132), hit pole (133), through-hole piece (134) and straight-bar (135), disc (131) rotate with the left side inner wall that removes frame (13) through the bearing and are connected, the right side top fixedly connected with straight-bar (135) of disc (131), the bottom right side of straight-bar (135) all rotates through the bearing and is connected with horizontal pole (132), the right side of horizontal pole (132) rotates through the bearing and is connected with hits pole (133), through-hole piece (134) and the inner wall right side fixed connection who removes frame (13), hit pole (133) and the inner wall contact of through-hole piece (134).
4. An ocean engineering work platform according to claim 1, wherein: arc board (12) are including protruding board (121), arc groove (122), movable rod (123), outstanding piece (124) and bullet pole (125), the inside of arc board (12) is provided with protruding board (121), protruding board (121) run through the right side of arc board (12) and extend to the outside of arc board (12), arc groove (122) have been seted up in the left side of protruding board (121), the inner wall bottom fixedly connected with bullet pole (125) of arc groove (122), the center department of movable rod (123) is all through bearing and arc groove (122) interior swing joint around, the outstanding piece (124) of bottom fixedly connected with of movable rod (123).
5. An ocean engineering work platform according to claim 4, wherein: the protruding block (124) is in contact with the inner wall of the bottom of the arc groove (122).
6. An ocean engineering work platform according to claim 3, wherein: the disc (131) is in contact with the outer surface of the pressure plate (15).
7. An ocean engineering work platform according to claim 2, wherein: the scraping rod (143) is in contact with the outer surface of the fixing rod (1).
CN202110921035.9A 2021-08-11 2021-08-11 Ocean engineering work platform Withdrawn CN113565079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110921035.9A CN113565079A (en) 2021-08-11 2021-08-11 Ocean engineering work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110921035.9A CN113565079A (en) 2021-08-11 2021-08-11 Ocean engineering work platform

Publications (1)

Publication Number Publication Date
CN113565079A true CN113565079A (en) 2021-10-29

Family

ID=78171289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110921035.9A Withdrawn CN113565079A (en) 2021-08-11 2021-08-11 Ocean engineering work platform

Country Status (1)

Country Link
CN (1) CN113565079A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981936A (en) * 2021-12-10 2022-01-28 北部湾大学 Anti-corrosion shell structure of ocean engineering platform and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4596495A (en) * 1985-02-22 1986-06-24 Standard Oil Company Spud bushing system for mobile offshore arctic drilling structure
CN1042747A (en) * 1987-05-15 1990-06-06 Iev国际协会公司 Remove the device of marine growth on the marine structure
US5460463A (en) * 1994-02-01 1995-10-24 Atlantic Richfield Company Method for protecting marine pilings
CN209941649U (en) * 2019-05-16 2020-01-14 青岛黄海学院 Ocean platform spud leg attaches body structure
CN112681231A (en) * 2020-12-22 2021-04-20 浙江海洋大学 Ocean platform buffer stop
CN213329088U (en) * 2020-06-11 2021-06-01 长江三峡集团福建能源投资有限公司 Mud cleaning device for offshore fan jacket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4596495A (en) * 1985-02-22 1986-06-24 Standard Oil Company Spud bushing system for mobile offshore arctic drilling structure
CN1042747A (en) * 1987-05-15 1990-06-06 Iev国际协会公司 Remove the device of marine growth on the marine structure
US5460463A (en) * 1994-02-01 1995-10-24 Atlantic Richfield Company Method for protecting marine pilings
CN209941649U (en) * 2019-05-16 2020-01-14 青岛黄海学院 Ocean platform spud leg attaches body structure
CN213329088U (en) * 2020-06-11 2021-06-01 长江三峡集团福建能源投资有限公司 Mud cleaning device for offshore fan jacket
CN112681231A (en) * 2020-12-22 2021-04-20 浙江海洋大学 Ocean platform buffer stop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981936A (en) * 2021-12-10 2022-01-28 北部湾大学 Anti-corrosion shell structure of ocean engineering platform and construction method

Similar Documents

Publication Publication Date Title
CN113565079A (en) Ocean engineering work platform
CN113332775B (en) Filter screen anti-blocking equipment for cleaning sea surface ship
CN114769652A (en) Five metals drilling equipment with prevent fish tail function
CN110329451A (en) A kind of hull attachment automatic cleaning apparatus
CN113649621A (en) Injection mold thimble board punches and uses device
CN112095773A (en) Sewage pipes rubbish clean-up equipment
CN215439861U (en) Water filtering device for directional descaling
CN215046455U (en) Belt conveyor scraper device for coal mining
CN113232982B (en) Industrial wastewater is with depositing case with cleaning function
CN212400615U (en) Clear useless mechanism of environmental protection printed matter thermoprint machine
CN213077697U (en) Cleaning mechanism of horizontal vacuum belt filter
CN209963147U (en) Scraping roller device for lithium battery pole piece roll-to-roll machine
CN216522582U (en) Novel energy-saving low-consumption complete machine air-cooled flat cabinet
CN115262512B (en) Garbage treatment device with river garbage separation function
CN216281458U (en) Slag remover
CN217828992U (en) Scraper for sewage treatment
CN219095102U (en) Oil-receiving multifunctional material storage rack
CN214721659U (en) Sliding type welding slag collecting mechanism for automatic welding equipment
CN216440858U (en) Electromagnetic type iron fillings clearing device
CN217127896U (en) Roadbed structure
CN216137714U (en) Permanent magnetic drum for removing iron based on industrial cleaning
CN210409774U (en) Cobalt smelting high magnesium ammonium sulfate wastewater filtering device
CN218048372U (en) Noise reduction type tailing recycling machine for iron powder production
CN220834565U (en) Powder cleaning mechanism for press plate of filter press
CN116717990B (en) Draining device for discharged saline water of waste battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20211029