CN113564996A - Construction method for directly laying asphalt based on cement pavement - Google Patents

Construction method for directly laying asphalt based on cement pavement Download PDF

Info

Publication number
CN113564996A
CN113564996A CN202110657987.4A CN202110657987A CN113564996A CN 113564996 A CN113564996 A CN 113564996A CN 202110657987 A CN202110657987 A CN 202110657987A CN 113564996 A CN113564996 A CN 113564996A
Authority
CN
China
Prior art keywords
pavement
concrete
crack
cutting
cracks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110657987.4A
Other languages
Chinese (zh)
Inventor
赵晓光
郑彭元
韩金晶
周鹏腾
吕奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Yijian Construction Group Ltd
Original Assignee
Zhejiang Provincial Yijian Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Yijian Construction Group Ltd filed Critical Zhejiang Provincial Yijian Construction Group Ltd
Priority to CN202110657987.4A priority Critical patent/CN113564996A/en
Publication of CN113564996A publication Critical patent/CN113564996A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0906Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating cuts, grooves, recesses or, excluding forming, cracks, e.g. cleaning by sand-blasting or air-jet ; for trimming paving edges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • E01C23/0973Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants
    • E01C23/098Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants and working the surface of the filling or applying particulate material thereto, e.g. smoothing, gritting
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/12Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor

Abstract

The invention provides a construction method for directly paving asphalt on the basis of a cement pavement, which comprises the following steps of firstly, lifting the old cement concrete pavement and milling the pavement; step two, disease treatment is carried out on the old cement concrete pavement, the diseases of the cement concrete pavement comprise pavement cracks, plate settlement and hole repairing, and when various types of the diseases of the cement concrete pavement exist in the unit slab block, the diseases are treated according to a full-depth patching method of a patching method; and step three, paving asphalt concrete on the repaired old cement concrete pavement. The method can solve the problems of arch camber of the asphalt concrete pavement and cracking of a new asphalt concrete pavement caused by the original concrete expansion joint after the asphalt is directly paved on the original cement concrete pavement, and the paved asphalt pavement has longer service life and higher stability.

Description

Construction method for directly laying asphalt based on cement pavement
Technical Field
The invention relates to the technical field of road construction, in particular to a construction method for directly paving asphalt on a cement road surface.
Background
At present, cement pavements laid in the past can be seen everywhere in China, although the cement pavements are almost complete after long-time use and maintenance, the height of the pavements is severe, repair traces can be seen everywhere, meanwhile, road pavements are not uniformly settled due to cracks, pits and plates, and the phenomena of large-area crazing, cracks and road settlement caused by the poor quality control of road building materials during the construction of the concrete pavements are caused, when asphalt concrete needs to be paved above the original cement pavements, the problems of settlement and dislocation of the cracks, pits and plates existing on the original pavements are mainly caused, and the problems easily cause the phenomena of arching of the newly laid asphalt concrete pavements, cracking of the new asphalt concrete pavements caused by the rising of underground water vapor of the original concrete base layer when the asphalt concrete pavements are paved, and in order to prevent the original concrete pavements and the ground water from permeating into the base layer to influence the base layer strength, the above disease problem needs to be dealt with.
Disclosure of Invention
In order to solve certain or some technical problems in the prior art, the invention provides a construction method for directly laying asphalt on the basis of a cement road surface, which can solve the problems that the asphalt concrete road surface is arched after the asphalt is directly laid on the original cement concrete road surface, the original concrete expansion joint causes the cracking of the new asphalt concrete road surface and the like, and the laid asphalt road surface has longer service life and higher stability.
In order to solve the above-mentioned existing technical problem, the invention adopts the following scheme:
a construction method for directly laying asphalt based on cement pavement comprises
The method comprises the following steps of firstly, lifting an old cement concrete pavement, and milling the pavement: when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by 10CM-15CM, mechanically napping the pavement by using a milling machine, when the elevation of the old concrete pavement is higher than the elevation of the finished pavement by more than 15CM, pouring C30 concrete to lift the pavement, after the concrete pavement is initially set, mechanically napping the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 10CM and more than 5CM, milling and digging the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 5CM and even higher than the elevation of the finished pavement, crushing and digging out the original concrete plate, and mechanically napping the pavement by using the milling machine after pouring the concrete base plate again, so that the final elevation of the concrete pavement is completely lower than the elevation of the finished pavement by 10 +/-1 CM and then finishing the operation;
step two, carrying out disease treatment on the old cement concrete pavement: the mud concrete pavement diseases comprise pavement cracks, plate settlement and hole repairing, and when various mud concrete pavement disease types exist in the unit plate blocks, the mud concrete pavement diseases are treated according to a full-depth patching method of a patching method;
and step three, paving asphalt concrete on the repaired old cement concrete pavement.
Further, the pavement cracks comprise contraction joints, expansion joints, longitudinal joints and road joints, and the method for treating the cracks of the old cement concrete pavement comprises the following steps:
s1, replacing all the broken plates with concentrated cracks in the original mud concrete pavement;
s2, using a non-concentrated crack plate, removing impurities in cracks of the pavement, and refilling filler, wherein the cracks of the pavement are divided into slight cracks, medium cracks and serious cracks according to the width, the slight cracks are crack defects with the width of less than 3mm in the pavement, the medium cracks are crack defects with the width of 3-15 mm in the pavement, and the serious cracks are crack defects with the width of more than 15mm in the pavement;
and S3, repairing the cracks in the same plate by adopting a thin layer repairing method.
Further, the method for repairing the slight crack comprises the following steps: a1, cutting along the crack by a cutting machine, widening along the crack into a groove with the depth of 1.5-2.0 CM, wherein the depth of the groove can not exceed the thickness of 2/3 plates to the maximum extent; a2, adopting SBS modified asphalt pouring sealant to perform groove pouring, keeping the groove pouring level with the original road surface, and performing vibration tamping treatment; a3, after the crack pouring material is solidified, milling and milling the cement concrete pavement; a4, coating SBS modified asphalt pouring sealant on two sides of the slight crack, and then paving the anti-crack paste along the cutting crack.
Furthermore, the coating width of the SBS modified asphalt pouring sealant on two sides of the cutting seam of the slight crack is 35-40cm, the width of the anti-crack paste is 34-40cm, and the central line of the anti-crack paste is aligned to the center of the crack.
Further, the method for repairing the medium fracture comprises the following steps: b1, cutting the two sides of the crack, wherein the cutting width is not less than 20cm, the cutting crack needs to be parallel to the contraction joint, the cutting depth is 10cm, B2, C30 concrete is poured in the groove and is vibrated to be compact, and after B3 and the concrete in the groove meet the strength requirement, milling and planning the cement concrete pavement; b4, coating SBS modified asphalt pouring sealant on two sides of the joint of the medium crack, then paving an anti-crack paste along the cutting crack, wherein the width of the anti-crack paste is 34-40cm, and the central line of the paved anti-crack paste is aligned to the center of the cutting crack.
Further, the severe cracks are repaired by adopting a digging and repairing method or a full-depth block repairing method.
The specific implementation mode of the full-depth block filling method by the digging and filling method comprises the following steps:
firstly, for the serious crack plate needing to be dismantled, a water horse fence is arranged, and a reasonable number of warning slogans are arranged.
Secondly, drawing a line along the position of the contraction joint, cutting the contraction joint in full depth, and cutting a 5 cm-deep joint along the position 4cm inside.
And thirdly, severe crack plates (one plate is used as a minimum unit) are chiseled, and the base layer, the adjacent face plate and the road shoulder cannot be damaged in the process of crushing and removing the old concrete. And (3) crushing the pavement concrete blocks by using a 120-model pick head machine, a pneumatic pick and the like, roughening the vertical joint surface of the edge old concrete pavement, and cleaning the fragments and dust at the bottom and the wall of the excavated groove once to ensure that the inside of the groove is clean.
Fourthly, paving the phi 8@200 reinforcing mesh sheet at the bottom of the excavated surface, then pouring C30 concrete, paving and leveling the pavement concrete manually, keeping the pavement concrete level with the original concrete surface layer, uniformly vibrating by using an inserted vibrating rod after the pavement concrete is roughly leveled, and slowly and uniformly reciprocating twice by using a vibrating flat beam to enable the surface of newly poured concrete to be starched, so as to ensure the surface of the concrete to be level, and manually leveling is assisted during vibrating.
And fifthly, covering with a thin film in time after the concrete is poured, and covering with a felt for maintenance within 12 hours, wherein the felt is always in a wet state. The water horse enclosure is not removed before traffic is opened, so that safety accidents of vehicle personnel are prevented from happening and the concrete structure is prevented from being damaged. And (5) after the concrete is poured, regularly maintaining, and developing traffic after the concrete reaches the strength requirement for about 7 days.
Further, the method for treating the diseases of the pot holes and the slab staggering comprises the following steps:
c1, when repairing individual pits, removing sundries in the pits, filling the pits with SBS modified asphalt crack pouring glue, brushing the SBS modified asphalt crack pouring glue around the pits and fully sticking the crack resisting paste;
c2, when more pothole department was mended, at first to the pothole lofting cutting to carry out artifical chisel hair with the smooth surface in the cutting face, the figure of cutting area should be parallel or perpendicular with the way central line, the degree of depth of cutting is greater than 10cm, then with C30 concrete filling tank in, the vibration is closely knit, keeps flushing with original concrete surface course, adopts the film to cover after having pour the concrete at last and maintains.
Furthermore, the coating range of the SBS modified asphalt crack pouring glue around the pot holes is 40 CM-40 CM square or round.
Further, the repair method for plate sedimentation comprises the following steps:
d1, when the height difference of the plate settlement is less than or equal to 10mm, adopting manual leveling, extending from the highest point of the staggered platform to the periphery, and leveling by using a three-meter ruler for edge grinding until two adjacent plates are leveled;
d2, when the height difference of plate settlement is larger than or equal to 10mm, chiseling the lowest sinking plate of the slab staggering by 2-3 cm, calculating the repairing length according to the height of the slab staggering divided by 1% of the slope, paving a phi 8@200 steel bar net, pouring C30 concrete, and after the concrete is poured, adopting a film to cover for maintenance.
Further, the concrete base layer plate poured again sequentially comprises a cement stabilized macadam base layer and a 200-thick C30 concrete base layer plate from bottom to top.
Compared with the prior art, the invention has the beneficial effects that:
the method has the advantages that the phenomena that the asphalt concrete pavement is arched after the old cement concrete pavement and the defects thereof are treated and then the asphalt concrete is paved, the phenomena that the asphalt concrete pavement is arched after the original cement concrete pavement is directly paved with asphalt, the original concrete expansion joint causes the new asphalt concrete pavement to crack and the like can be solved, the service life of the paved asphalt pavement is longer, the stability is higher, and particularly, the phenomena that the newly paved asphalt concrete pavement is arched due to the rising of underground water vapor of the original concrete base layer, the new asphalt concrete pavement cracks due to the original concrete expansion joint and the like can be effectively reduced after the original crack is grouted and the crack resistance paste is matched for repairing.
Drawings
FIG. 1 is a schematic process flow diagram of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that any combination of the embodiments or technical features described below can be used to form a new embodiment without conflict.
As shown in figure 1, a construction method for directly laying asphalt based on a cement pavement comprises
The method comprises the following steps of firstly, lifting an old cement concrete pavement, and milling the pavement: when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by 10CM-15CM, mechanically napping the pavement by using a milling machine, when the elevation of the old concrete pavement is higher than the elevation of the finished pavement by more than 15CM, pouring C30 concrete to lift the pavement, after the concrete pavement is initially set, mechanically napping the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 10CM and more than 5CM, milling and digging the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 5CM and even higher than the elevation of the finished pavement, crushing and digging out the original concrete plate, and mechanically napping the pavement by using the milling machine after pouring the concrete base plate again, so that the final elevation of the concrete pavement is completely lower than the elevation of the finished pavement by 10 +/-1 CM and then finishing the operation; the concrete base layer plate poured again sequentially comprises a cement stabilized macadam base layer and a C30 concrete base layer plate with the thickness of 200 from bottom to top;
step two, carrying out disease treatment on the old cement concrete pavement: the mud concrete pavement diseases comprise pavement cracks, plate settlement and hole repairing, and when various mud concrete pavement disease types exist in the unit plate blocks, the mud concrete pavement diseases are treated according to a full-depth patching method of a patching method;
and step three, paving asphalt concrete on the repaired old cement concrete pavement.
Before asphalt concrete is paved, the original cement concrete pavement is comprehensively treated, so that the root cause of reflection cracks is reduced; replacing all the broken plates of the original pavement, including whole plate breaking, plate corner breaking, plate edge breaking and the like, removing sundries in a shrinkage joint, an expansion joint and a longitudinal joint of the pavement, pouring filling materials again, repairing pits, staggered platforms and the like; for some non-structural damages, such as surface peeling, exposed bones, peeling, pitted surface and the like, because the damage only affects the driving comfort of the original road surface, when the old road is reconstructed and the base layer is made on the old concrete road surface, the damage in the forms only does not specially treat the surface and the defects.
The construction method for lifting and milling the old cement concrete pavement comprises the following specific steps:
firstly, the old concrete pavement is lower than the finished pavement elevation by 10-15 CM, and the pavement is napped.
1. The construction section is provided with a warning sign, a water horse fence and the like.
2. And (4) mechanically roughening the road surface by using a milling machine.
3. Removing the enclosure and opening the traffic.
And secondly, pouring C30 concrete to lift the pavement when the elevation of the old concrete pavement is lower than that of the finished pavement by more than 15 CM.
1. The construction section is provided with a warning sign, a water horse fence and the like.
2. And (5) performing road surface lifting operation, and pouring C30 concrete.
3. And (5) conducting elevation retest to ensure that the elevation of the concrete pouring surface is 10CM lower than that of the finished asphalt concrete pavement, and vibrating the concrete to be compact.
4. And after the concrete pavement is initially set, roughening the surface.
5. Removing the enclosure and opening the traffic.
Thirdly, the old concrete pavement is lower than the finished pavement, the elevation of the finished pavement is less than 10CM and more than 5CM, and pavement milling operation is carried out.
1. The construction section is provided with a warning sign, a water horse fence and the like.
2. And measuring the elevation according to the original pavement, and ensuring that the elevation of the milled and planed concrete pavement is 10CM lower than the elevation of the finished pavement by combining the elevation of the finished asphalt concrete pavement with the design requirement. After confirming the thickness to be milled, the milling machine is used for milling the road surface.
3. And cleaning the milled pavement by using a sweeper, retesting the elevation, and if the elevation does not meet the elevation requirement, retesting the milling and the elevation again so as to circulate. And finishing the working procedure until the elevation of the milled concrete pavement is 10CM lower than the elevation of the finished asphalt concrete pavement.
4. Removing the enclosure and opening the traffic.
Fourthly, the old concrete pavement is lower than the finished pavement, the elevation of the finished pavement is less than 5CM, even higher than the finished pavement, the original concrete plate is broken and dug out, and the concrete base plate is poured again.
1. The construction section is provided with a warning sign, a water horse fence and the like.
2. And determining the elevation according to the original pavement, and confirming the excavation depth of the chiseled concrete slab by combining the elevation of the finished asphalt concrete pavement with the design requirement.
3. And pouring the C30 concrete base plate again, wherein the node is composed of a cement stabilized macadam base layer, a C30 concrete base plate with the thickness of 200 and the upper part according to the method from bottom to top.
4. After the concrete pavement is initially set, the surface is subjected to galling treatment and periodic maintenance for seven days.
5. Removing enclosure and opening traffic
In a further improvement, the pavement cracks comprise contraction joints, expansion joints, longitudinal joints and road joints, and the method for treating the cracks of the old cement concrete pavement comprises the following steps:
s1, replacing all the broken plates with concentrated cracks in the original mud concrete pavement;
s2, using a non-concentrated crack plate, removing impurities in cracks of the pavement, and refilling filler, wherein the cracks of the pavement are divided into slight cracks, medium cracks and serious cracks according to the width, the slight cracks are crack defects with the width of less than 3mm in the pavement, the medium cracks are crack defects with the width of 3-15 mm in the pavement, and the serious cracks are crack defects with the width of more than 15mm in the pavement;
and S3, repairing the cracks in the same plate by adopting a thin layer repairing method.
When the original road joint of the road is treated, a cutting machine is used for cutting the contraction joint, a high-pressure air gun is used for cleaning the joint, the cleaning is thorough, no other sundries exist, SBS modified asphalt crack pouring glue is used for performing crack pouring treatment, the crack pouring is saturated, the crack pouring is finished and leveled, and the crack pouring and the original road surface are kept in the same horizontal plane. And (4) treating the road base layer after the crack pouring material is cured. Because the pavement needs milling and planing treatment, the surface is rough and uneven, and the SBS modified asphalt pouring sealant is coated at the expansion joint for one time before the anti-crack paste is pasted, so that the binding force of the self-adhesive anti-crack paste is increased. The width of the anti-crack paste is 34CM, road surface scraps and dust within the width range of 40CM around the expansion joint are cleaned, the SBS modified asphalt pouring sealant with the width of 40CM is coated, and after the completion, the anti-crack paste with the width of 34CM is spread along the expansion joint. Paving the anti-crack paste with the central line aligned with the expansion joint. Wherein the usage amount of the SBS modified asphalt pouring sealant for painting the contraction joint is 3.75kg/m 2.
In a further improvement, the method for repairing a slight crack comprises: a1, cutting along the crack by a cutting machine, widening along the crack into a groove with the depth of 1.5-2.0 CM, wherein the depth of the groove can not exceed the thickness of 2/3 plates to the maximum extent; a2, adopting SBS modified asphalt pouring sealant to perform groove pouring, keeping the groove pouring level with the original road surface, and performing vibration tamping treatment; a3, after the crack pouring material is solidified, milling and milling the cement concrete pavement; a4, coating SBS modified asphalt pouring sealant on two sides of the slight crack, and then paving an anti-crack sticker along the cutting crack; the coating width of the SBS modified asphalt pouring sealant on two sides of the cutting seam of the slight crack is 35-40cm, the width of the anti-crack paste is 34-40cm, and the central line of the anti-crack paste is aligned to the center of the crack. The method comprises the following specific steps:
safety sign placement and water horse maintenance
Secondly, cutting along the crack by using a cutting machine, widening along the crack into a groove with the depth of 1.5-2.0 CM, wherein the groove depth can be determined according to the crack depth and can not exceed the thickness of 2/3 boards to the maximum extent.
And thirdly, manually chiseling and removing concrete scraps left in the groove.
Fourthly, adopting SBS modified asphalt pouring sealant to perform groove pouring, keeping the groove pouring level with the original road surface, and performing vibration tamping treatment.
Fifthly, treating the road base layer after the crack pouring material is cured. Because the pavement needs to be milled and planed, the surface is rough and uneven, and the SBS modified asphalt pouring sealant is coated at the crack position for one time before the anti-crack paste is pasted, so that the binding force of the self-adhesive anti-crack paste is increased. The width of the anti-crack paste is 34CM, road surface scraps and dust within the width range of 40CM around the crack are cleaned, 40CM wide SBS modified asphalt pouring sealant is coated, and after the completion, 34CM wide anti-crack paste is pasted along the crack. And paving the crack-resistant paste, wherein the central line of the crack-resistant paste is aligned with the crack for paving. Wherein the usage amount of the SBS modified asphalt pouring sealant for painting the cracks of the pavement is 3.75kg/m 2.
Removing enclosure and opening traffic
In a further improvement, the method for repairing a medium fracture comprises: b1, cutting the two sides of the crack, wherein the cutting width is not less than 20cm, the cutting crack needs to be parallel to the contraction joint, the cutting depth is 10cm, B2, C30 concrete is poured in the groove and is vibrated to be compact, and after B3 and the concrete in the groove meet the strength requirement, milling and planning the cement concrete pavement; b4, coating SBS modified asphalt pouring sealant on two sides of the joint of the medium crack, then paving an anti-crack paste along the cutting crack, wherein the width of the anti-crack paste is 34-40cm, and the central line of the paved anti-crack paste is aligned to the center of the cutting crack. The method comprises the following specific steps:
cutting seams at two sides of the crack, wherein the cutting width is not less than 20cm, the cutting seams are parallel to the contraction seams, and the cutting depth is 10 cm.
And secondly, manually chiseling and breaking the concrete in the groove after cutting, chiseling and removing loose concrete fragments, surface dust and bare stones.
Thirdly, C30 concrete is poured in the groove and is vibrated to be compact.
Fourthly, after the concrete in the groove meets the strength requirement, the road base layer is processed. Before the anti-crack paste is pasted, the crack is coated with SBS modified asphalt pouring sealant for one time so as to increase the binding force of the self-adhesive anti-crack paste. The width of the anti-crack paste is 34CM, road surface scraps and dust in the width range of 40CM around the crack are cleaned, 40CM wide SBS modified asphalt pouring sealant is coated, and after the completion, 34CM wide anti-crack paste is spread along the crack. And paving the crack-resistant paste, wherein the central line of the crack-resistant paste is aligned with the crack for paving. Wherein the usage amount of the SBS modified asphalt pouring sealant for painting the cracks of the pavement is 3.75kg/m 2.
If the cracks are concentrated, and a plurality of cracks are concentrated in the same plate, the thin layer repairing method can be adopted for repairing.
In a further improvement, the severe cracks are repaired by adopting a digging repair method or a full-depth patch method.
The specific implementation mode of the full-depth block filling method by the digging and filling method comprises the following steps:
firstly, for the serious crack plate needing to be dismantled, a water horse fence is arranged, and a reasonable number of warning slogans are arranged.
Secondly, drawing a line along the position of the contraction joint, cutting the contraction joint in full depth, and cutting a 5 cm-deep joint along the position 4cm inside.
And thirdly, severe crack plates (one plate is used as a minimum unit) are chiseled, and the base layer, the adjacent face plate and the road shoulder cannot be damaged in the process of crushing and removing the old concrete. And (3) crushing the pavement concrete blocks by using a 120-model pick head machine, a pneumatic pick and the like, roughening the vertical joint surface of the edge old concrete pavement, and cleaning the fragments and dust at the bottom and the wall of the excavated groove once to ensure that the inside of the groove is clean.
Fourthly, paving the phi 8@200 reinforcing mesh sheet at the bottom of the excavated surface, then pouring C30 concrete, paving and leveling the pavement concrete manually, keeping the pavement concrete level with the original concrete surface layer, uniformly vibrating by using an inserted vibrating rod after the pavement concrete is roughly leveled, and slowly and uniformly reciprocating twice by using a vibrating flat beam to enable the surface of newly poured concrete to be starched, so as to ensure the surface of the concrete to be level, and manually leveling is assisted during vibrating.
And fifthly, covering with a thin film in time after the concrete is poured, and covering with a felt for maintenance within 12 hours, wherein the felt is always in a wet state. The water horse enclosure is not removed before traffic is opened, so that safety accidents of vehicle personnel are prevented from happening and the concrete structure is prevented from being damaged. And (5) after the concrete is poured, regularly maintaining, and developing traffic after the concrete reaches the strength requirement for about 7 days.
In a further improvement, the method for treating the diseases of the pits and the slab staggering comprises the following steps:
c1, when repairing individual pits, removing sundries in the pits, filling the pits with SBS modified asphalt crack pouring glue, brushing the SBS modified asphalt crack pouring glue around the pits and fully sticking the crack resisting paste;
c2, when more pothole department was mended, at first to the pothole lofting cutting to carry out artifical chisel hair with the smooth surface in the cutting face, the figure of cutting area should be parallel or perpendicular with the way central line, the degree of depth of cutting is greater than 10cm, then with C30 concrete filling tank in, the vibration is closely knit, keeps flushing with original concrete surface course, adopts the film to cover after having pour the concrete at last and maintains.
The repairing method of the individual pit hole comprises the following steps: and removing impurities in the holes, filling the holes with SBS modified asphalt crack pouring glue, wherein the periphery of each hole is in a boundary range of 40 CM-40 CM square, and the SBS modified asphalt crack pouring glue is coated in the boundary range and is fully adhered with the crack resistance paste. Wherein the usage amount of the SBS modified asphalt pouring sealant for painting the cracks of the pavement is 3.75kg/m 2.
The repairing method for more pits comprises the following steps:
firstly, lofting and cutting the pits, wherein the graph of the cutting area is parallel to or vertical to the central line of the road.
Secondly, the cutting depth is more than 10cm (considering the excavation depth according to the actual situation on site), and the smooth surface in the cutting surface is manually roughened.
And thirdly, the pneumatic pick breaks the cutting surface to the cutting depth and cleans concrete chips and dust.
Fourthly, C30 concrete is filled into the groove, is vibrated to be compact and is kept to be flush with the original concrete surface (concrete construction process and maintenance mode refer to concrete construction process and maintenance in severe cracks)
And fifthly, covering with a thin film in time after the concrete is poured, and covering with a felt for maintenance within 12 hours, wherein the felt is always in a wet state. The water horse enclosure is not removed before traffic is opened, so that safety accidents of vehicle personnel are prevented from happening and the concrete structure is prevented from being damaged. And (5) after the concrete is poured, regularly maintaining, and developing traffic after the concrete reaches the strength requirement for about 7 days.
In a further improvement, the coating range of the SBS modified asphalt crack pouring glue around the pot holes is 40CM by 40CM square or round.
In a further improvement, the repair method for plate sedimentation comprises the following steps:
d1, when the height difference of the plate settlement is less than or equal to 10mm, adopting manual leveling, extending from the highest point of the staggered platform to the periphery, and leveling by using a three-meter ruler for edge grinding until two adjacent plates are leveled;
d2, when the height difference of plate settlement is larger than or equal to 10mm, chiseling the lowest sinking plate of the slab staggering by 2-3 cm, calculating the repairing length according to the height of the slab staggering divided by 1% of the slope, paving a phi 8@200 steel bar net, pouring C30 concrete, and after the concrete is poured, adopting a film to cover for maintenance.
1.1 the concrete base layer plate poured again sequentially comprises a cement stabilized macadam base layer and a 200-thick C30 concrete base layer plate from bottom to top.
When the plates are staggered and the same plate is treated by a plurality of cracks and other sporadic diseases,
dislocation treatment with height difference less than or equal to 10mm
Firstly, manual leveling is adopted, the leveling is expanded from the highest point of the dislocation to the periphery, and the edge grinding is performed by using a three-meter ruler until two adjacent boards are leveled. And secondly, removing sundries in the joint after grinding. Removing enclosure and opening traffic
Treatment for serious dislocation with height difference of more than or equal to 10mm
Firstly, chiseling the depth of 2-3 cm of the lowest sinking plate of the slab staggering, and calculating the repairing length according to the height of the slab staggering divided by the gradient (1%). And secondly, chiseling the surface to remove impurities and dust. Thirdly, paving a phi 8@200 steel bar mesh, pouring C30 concrete, covering the concrete in time by using a thin film after the concrete is poured, and then covering a felt for maintenance within 12 hours to use the mesh in a wet state as a standard all the time. The water horse enclosure is not removed before traffic is opened, so that safety accidents of vehicle personnel are prevented from happening and the concrete structure is prevented from being damaged. And fourthly, after the concrete is poured, regularly maintaining, and developing traffic after the strength requirement is met for about 7 days.
When the unit plate block is encountered, a plurality of road disease types are all according to severe cracks.
When the obvious settlement plate is treated, because the service life of the road is longer, part of the road plates have obvious settlement, and the structure of the road is seriously damaged, the treatment method adopts the whole plate chiseling treatment, the settlement plate is crushed, and then the C30 pouring concrete is carried out again, and the concrete steps are as follows:
firstly, the water horse encloses the fender, sets up warning sign.
Secondly, manual road cutting is carried out along the settlement plate.
And thirdly, the 120-type pickaxe machine crushes the road to the base layer part.
And fourthly, placing the phi 8@200 steel bar net piece and paving the C30 concrete again.
The general cement concrete pavement renovation project mainly has the problems of road pavement cracks, pits, uneven settlement of plates and the like, and the phenomena of large-area cracks, cracks and road settlement caused by the poor control of the quality of road building materials during the concrete pavement construction. Therefore, the construction key point of the engineering needs to be strictly processed in the aspect of road damage, when the road damage is processed, the principle of firstly lifting the road, milling the road and then processing the road damage is mainly adopted, the construction process is confirmed according to the height difference measured on site by the lifting and milling of the road, the road sealing construction is carried out one by one according to the progress plan and the construction subareas, the processing of the road damage is the key point and the difficulty point of the whole road engineering, and the speed of the processing of the road damage directly influences the construction of the subsequent pavement structure engineering. The method has the advantages that the phenomena that the asphalt concrete pavement is arched after the old cement concrete pavement and the defects thereof are treated and then the asphalt concrete is paved, the phenomena that the asphalt concrete pavement is arched after the original cement concrete pavement is directly paved with asphalt, the original concrete expansion joint causes the new asphalt concrete pavement to crack and the like can be solved, the service life of the paved asphalt pavement is longer, the stability is higher, and particularly, the phenomena that the newly paved asphalt concrete pavement is arched due to the rising of underground water vapor of the original concrete base layer, the new asphalt concrete pavement cracks due to the original concrete expansion joint and the like can be effectively reduced after the original crack is grouted and the crack resistance paste is matched for repairing.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are within the protection scope of the present invention.

Claims (10)

1. A construction method for directly paving asphalt on the basis of a cement pavement is characterized by comprising the following steps of: comprises that
The method comprises the following steps of firstly, lifting an old cement concrete pavement, and milling the pavement: when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by 10CM-15CM, mechanically napping the pavement by using a milling machine, when the elevation of the old concrete pavement is higher than the elevation of the finished pavement by more than 15CM, pouring C30 concrete to lift the pavement, after the concrete pavement is initially set, mechanically napping the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 10CM and more than 5CM, milling and digging the pavement by using the milling machine, when the elevation of the old concrete pavement is lower than the elevation of the finished pavement by less than 5CM and even higher than the elevation of the finished pavement, crushing and digging out the original concrete plate, and mechanically napping the pavement by using the milling machine after pouring the concrete base plate again, so that the final elevation of the concrete pavement is completely lower than the elevation of the finished pavement by 10 +/-1 CM and then finishing the operation;
step two, carrying out disease treatment on the old cement concrete pavement: the mud concrete pavement diseases comprise pavement cracks, plate settlement and hole repairing, and when various mud concrete pavement disease types exist in the unit plate blocks, the mud concrete pavement diseases are treated according to a full-depth patching method of a patching method;
and step three, paving asphalt concrete on the repaired old cement concrete pavement.
2. The construction method for directly laying asphalt based on cement road surface according to claim 1, characterized in that: the method for treating the cracks of the old cement concrete pavement comprises the following steps:
s1, replacing all the broken plates with concentrated cracks in the original mud concrete pavement;
s2, using a non-concentrated crack plate, removing impurities in cracks of the pavement, and refilling filler, wherein the cracks of the pavement are divided into slight cracks, medium cracks and serious cracks according to the width, the slight cracks are crack defects with the width of less than 3mm in the pavement, the medium cracks are crack defects with the width of 3-15 mm in the pavement, and the serious cracks are crack defects with the width of more than 15mm in the pavement;
and S3, repairing the cracks in the same plate by adopting a thin layer repairing method.
3. The construction method for directly laying asphalt based on cement road surface according to claim 2, characterized in that: the method for repairing the slight crack comprises the following steps: a1, cutting along the crack by a cutting machine, widening along the crack into a groove with the depth of 1.5-2.0 CM, wherein the depth of the groove can not exceed the thickness of 2/3 plates to the maximum extent; a2, adopting SBS modified asphalt pouring sealant to perform groove pouring, keeping the groove pouring level with the original road surface, and performing vibration tamping treatment; a3, after the crack pouring material is solidified, milling and milling the cement concrete pavement; a4, coating SBS modified asphalt pouring sealant on two sides of the slight crack, and then paving the anti-crack paste along the cutting crack.
4. The construction method for directly laying asphalt based on cement road surface according to claim 3, characterized in that: the coating width of the SBS modified asphalt pouring sealant on two sides of the cutting seam of the slight crack is 35-40cm, the width of the anti-crack paste is 34-40cm, and the central line of the anti-crack paste is aligned to the center of the crack.
5. The construction method for directly laying asphalt based on cement road surface according to claim 2, characterized in that: the medium crack repairing method comprises the following steps: b1, cutting the two sides of the crack, wherein the cutting width is not less than 20cm, the cutting crack needs to be parallel to the contraction joint, the cutting depth is 10cm, B2, C30 concrete is poured in the groove and is vibrated to be compact, and after B3 and the concrete in the groove meet the strength requirement, milling and planning the cement concrete pavement; b4, coating SBS modified asphalt pouring sealant on two sides of the joint of the medium crack, then paving an anti-crack paste along the cutting crack, wherein the width of the anti-crack paste is 34-40cm, and the central line of the paved anti-crack paste is aligned to the center of the cutting crack.
6. The construction method for directly laying asphalt based on cement road surface according to claim 2, characterized in that: and repairing the serious cracks by adopting a digging and repairing method or a full-depth block repairing method.
7. The construction method for directly laying asphalt based on cement road surface according to claim 1, characterized in that: the method for treating the diseases of the pits and the slab staggering comprises the following steps:
c1, when repairing individual pits, removing sundries in the pits, filling the pits with SBS modified asphalt crack pouring glue, brushing the SBS modified asphalt crack pouring glue around the pits and fully sticking the crack resisting paste;
c2, when more pothole department was mended, at first to the pothole lofting cutting to carry out artifical chisel hair with the smooth surface in the cutting face, the figure of cutting area should be parallel or perpendicular with the way central line, the degree of depth of cutting is greater than 10cm, then with C30 concrete filling tank in, the vibration is closely knit, keeps flushing with original concrete surface course, adopts the film to cover after having pour the concrete at last and maintains.
8. The construction method for directly laying asphalt based on cement road surface according to claim 7, characterized in that: the coating range of the SBS modified asphalt crack pouring glue around the pot hole is 40CM by 40CM square or round.
9. The construction method for directly laying asphalt based on cement road surface according to claim 1, characterized in that: the plate sedimentation repairing method comprises the following steps:
d1, when the height difference of the plate settlement is less than or equal to 10mm, adopting manual leveling, extending from the highest point of the staggered platform to the periphery, and leveling by using a three-meter ruler for edge grinding until two adjacent plates are leveled;
d2, when the height difference of plate settlement is larger than or equal to 10mm, chiseling the lowest sinking plate of the slab staggering by 2-3 cm, calculating the repairing length according to the height of the slab staggering divided by 1% of the slope, paving a phi 8@200 steel bar net, pouring C30 concrete, and after the concrete is poured, adopting a film to cover for maintenance.
10. The construction method for directly laying asphalt based on cement road surface according to claim 1, characterized in that: the concrete base layer plate poured again sequentially comprises a cement stabilized macadam base layer and a C30 concrete base layer plate with the thickness of 200 from bottom to top.
CN202110657987.4A 2021-06-15 2021-06-15 Construction method for directly laying asphalt based on cement pavement Pending CN113564996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110657987.4A CN113564996A (en) 2021-06-15 2021-06-15 Construction method for directly laying asphalt based on cement pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110657987.4A CN113564996A (en) 2021-06-15 2021-06-15 Construction method for directly laying asphalt based on cement pavement

Publications (1)

Publication Number Publication Date
CN113564996A true CN113564996A (en) 2021-10-29

Family

ID=78162043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110657987.4A Pending CN113564996A (en) 2021-06-15 2021-06-15 Construction method for directly laying asphalt based on cement pavement

Country Status (1)

Country Link
CN (1) CN113564996A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115491945A (en) * 2022-05-30 2022-12-20 安徽省交通规划设计研究总院股份有限公司 Treatment method for reflection cracks of white-to-black road surface

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132420A (en) * 2013-03-20 2013-06-05 深圳市市政设计研究院有限公司 Repairing and transforming method of old cement concrete pavement
CN105133455A (en) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 Asphalt overlay treatment method of extreme-cold region cement concrete pavement
CN109082969A (en) * 2018-08-29 2018-12-25 河南省增达公路养护管理有限公司 A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN112030690A (en) * 2020-08-19 2020-12-04 中交路桥建设有限公司 Construction method for treating pavement cracks

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132420A (en) * 2013-03-20 2013-06-05 深圳市市政设计研究院有限公司 Repairing and transforming method of old cement concrete pavement
CN105133455A (en) * 2015-07-22 2015-12-09 济南市市政工程设计研究院(集团)有限责任公司 Asphalt overlay treatment method of extreme-cold region cement concrete pavement
CN109082969A (en) * 2018-08-29 2018-12-25 河南省增达公路养护管理有限公司 A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN112030690A (en) * 2020-08-19 2020-12-04 中交路桥建设有限公司 Construction method for treating pavement cracks

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘添来: "浅谈惠深高速公路惠州段改扩建加铺沥青混凝土施工前病害处理", 《中国新技术新产品》 *
李二新等: "G247线文九路白改黑加铺罩面反射裂缝防治技术", 《公路交通科技(应用技术版)》 *
王芳: "重载交通下旧混凝土路面加铺沥青层设计方案", 《山西建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115491945A (en) * 2022-05-30 2022-12-20 安徽省交通规划设计研究总院股份有限公司 Treatment method for reflection cracks of white-to-black road surface
CN115491945B (en) * 2022-05-30 2023-11-24 安徽省交通规划设计研究总院股份有限公司 Treatment method for reflection crack of white-to-black pavement

Similar Documents

Publication Publication Date Title
CN105133455A (en) Asphalt overlay treatment method of extreme-cold region cement concrete pavement
CN108642988B (en) Comprehensive treatment and repair structure for embankment base layer diseases and construction method
CN111663385A (en) Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
CN110644337A (en) Rapid repairing construction method for airport cement concrete pavement
CN111827022A (en) Quick maintenance method for double-block ballastless track
CN113564996A (en) Construction method for directly laying asphalt based on cement pavement
CN116536992A (en) Airport pavement broken board repairing method
CN111021186A (en) Method for repairing large-space joint of concrete pavement slab
KR100786357B1 (en) Reinforcement equipment and method for joint of concrete paved road
KR101593998B1 (en) Expansion joint maintenance facility and using the repair method
CN110878502A (en) Soft soil matrix pavement asphalt concrete construction method
CN214992966U (en) Concrete road surface fracture subsidence section punishment structure
CN114319007A (en) Pavement repairing method
RU2710585C1 (en) Method for repair of road surface
Liu et al. Study on cement concrete pavement treatment methods of common damage diseases
CN108221715A (en) A kind of renovation technique of bridge pavement
Ghafoori et al. Bridge deck asphalt plug joints: problems and solutions
CN111809533A (en) Concrete bridge asphalt pavement pit hole repairing method
CN219527284U (en) Construction structure of superimposed concrete pavement
Neal et al. 13 Pavement Defects and Failures You Should Know!
CN210031374U (en) V-shaped groove repairing structure for embankment
Siddique et al. Crack survey, crack repair methodology and overlay design for rehabilitation of a runway pavement
CN116536993A (en) Airport pavement broken board repairing method
CN217203430U (en) Assembly structure of precast concrete paving block
KR19990086047A (en) Road paver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211029

WD01 Invention patent application deemed withdrawn after publication