CN113555899A CN202110819015.0A CN202110819015A CN113555899A CN 113555899 A CN113555899 A CN 113555899A CN 202110819015 A CN202110819015 A CN 202110819015A CN 113555899 A CN113555899 A CN 113555899A
Authority
CN
China
Prior art keywords
power
energy storage
storage system
wind
photovoltaic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110819015.0A
Other languages
English (en)
Inventor
卢杨
孟高军
孙玉坤
谭文轶
刘海涛
夏涛
朱钰杰
陈霜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Institute of Technology
Original Assignee
Nanjing Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Technology filed Critical Nanjing Institute of Technology
Priority to CN202110819015.0A priority Critical patent/CN113555899A/zh
Publication of CN113555899A publication Critical patent/CN113555899A/zh
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/40Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation wherein a plurality of decentralised, dispersed or local energy generation technologies are operated simultaneously
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种计及负荷、风光波动性的风光储发电系统协调控制方法,包括以下步骤:利用多维密集网络算法对负荷进行预测,得出预测负荷曲线;建立风光储发电系统的预测模型,考虑风电、光伏发电系统的波动性和储能的荷电状态,构建风光储发电系统的协调优化模型,求得每一时刻最优的光伏单元和风机的数量组合,使风光储发电系统能够有效地跟踪预测负荷曲线。本发明的协调控制方法能降低储能充放电深度,防止储能过充过放,同时减小风电和光伏输出功率的波动性,提高联合发电系统负荷跟踪能力,具有切实可行的实用价值和广泛的应用前景。

Description

一种风光储发电系统协调控制方法
技术领域
本发明属于电力储能领域,具体涉及一种计及负荷、风光波动性的风光储发电系统协调控制方法。
背景技术
近年来,以风能、太阳能为代表的可再生清洁能源发电技术在全球范围内快速发展。由于风能和光能的间歇性、随机性及波动性,风、光独立运行系统很难提供连续稳定的能量输出,如果在风、光的基础上加入储能装置组成风光储联合发电系统,就可以充分利用风能和光能在时间及地域上的天然互补性,同时配合储能系统对电能的存储和释放,改善整个风光发电系统的功率输出特性,缓解风、光等可再生能源的间歇性和波动性与电力系统实时平衡之间的矛盾,降低其对电网的不利影响。
然而,目前国内外在储能系统与风电等可再生能源的协调控制方法研究主要集中在控制储能的充、放电过程以平滑风、光输出功率,一般不考虑对风电或光伏发电的调整。目前尚没有有效的风、光、储多源协调控制方法,控制风光储联合发电系统的输出功率跟踪负荷曲线。因此,在计及风光波动性的基础上,研究如何协调控制风电、光伏发电系统与储能系统以提高联合发电系统负荷跟踪能力具有重要意义。
发明内容
发明目的:本发明的目是提供一种计及负荷、风光波动性的风光储发电系统协调控制方法,充分发挥风能、光能、储能资源的优势互补,有效利用储能系统对电能存储和释放,合理调整风、光等可再生能源,提高联合发电系统负荷跟踪能力,同时还能够降低储能充放电深度,防止储能过充过放。
技术方案:一种计及负荷、风光波动性的风光储发电系统协调控制方法,包括以下步骤:
步骤1:利用多维密集网络算法对负荷进行预测,得出预测负荷曲线;
步骤2:构建风光储发电系统的协调优化模型,求得每一时刻最优的光伏单元和风机的数量组合,使风光储发电系统能够有效地跟踪预测负荷曲线。
进一步地,在步骤1中,优选采用多维密集网络算法对负荷进行预测,具体内容为:
步骤1.1:针对电力负荷有功功率P及其影响因素ξ1,ξ2,…,ξn进行等间隔采样,n∈[1,1000],采样间隔为τ,τ∈[0.1,100]分钟,采样时刻为t,t-τ,t-2×τ,…,t-(m-1)×τ,m∈[100,100000],得到(n+1)×m个采样值:ξ1(t-M×τ),ξ2(t-M×τ),…,ξn(t-M×τ),P(t-M×τ),其中,M=0,1,2,...,m-1;
步骤1.2:针对m个电力负荷有功功率采样P(t-M×τ),估计负荷系统的闵可夫斯基维数d,确定分形维数D,D∈[2d,10d]且D是整数;
步骤1.3:确定随机分形数量为r′,r′∈[1,100000],从步骤1.1中的(n+1)×m个采样值中随机选取D个采样值,选取r′次,得到r′组滞后变量组合,与电力负荷有功功率P(td)相对应的第i个滞后变量组合定义为
Figure BDA0003171200910000021
Figure BDA0003171200910000022
其中:i=1,2,…,r′,td=t-(m-1)×τ,t-(m-2)×τ,…,t,滞后步长τ1∈[τ,(m-1)×τ]、τ2∈[τ,(m-1)×τ]、τD∈[τ,(m-1)×τ];
步骤1.4:拟合每一个滞后变量组合
Figure BDA0003171200910000023
到相应电力负荷有功功率P(td)的r'个对比变量ψi,其中,i=1,2,…,r';
步骤1.5:测试r′个对比变量ψi的训练结果,得到r′个训练结果误差δi,由小到大排序,其中,i=1,2,…,r′,从中选取训练结果误差小于阈值δc1,δc1∈[0.0001,0.1],且与δi相对应的对比变量ψ′i′,其中,i′=1,2,…,r,r∈[1,100000];
步骤1.6:基于r个对比变量ψ′i′按公式(1)进行1步预测,得到r个t*时刻电力负荷有功功率预测值
Figure BDA0003171200910000024
及其预测误差δi′,由小到大排序,形成集合
Figure BDA0003171200910000025
其中,i′=1,2,…,r;
Figure BDA0003171200910000026
步骤1.7:基于式(2)、式(3),得到t*时刻电力负荷有功功率的最终预测值
Figure BDA0003171200910000027
Figure BDA0003171200910000028
Figure BDA0003171200910000029
式(2)和式(3)中:ωi′为与误差δi′相对应的权重;j为中间变量;“exp”为以自然常数e为底的指数函数;“∑”为求和符号。
进一步地,在步骤2中,构建风光储发电系统的协调优化模型,具体内容为:
在控制时域内,各时刻光伏电站和风电场的出力占比分别为λ和μ,λ和μ的表达式如下:
Figure BDA0003171200910000031
Figure BDA0003171200910000032
式中:PPVN和PWN为由超短期功率预测得出的光伏单元输出功率和风机输出功率;NPV和NW分别为光伏单元和风机的数量;(k)为k时刻的相应值。
以λ和μ作为输入,利用径向基函数(RBF)插值法求得光伏单元和风机的功率变化适应系数θ、γ。
通过控制光伏单元和风机数量的方式缩小源荷之间的差值,优化控制目标为控制时域内,各时刻光伏电站和风电场的联合输出功率和负荷预测功率的方差和最小,目标函数J1为:
Figure BDA0003171200910000033
式中:I为控制时域中的时间间隔数;PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;PPVN和PWN为由超短期功率预测得出的光伏单元输出功率和风机输出功率;ΔNPV和ΔNW为光伏单元和风机的数量变化值;
Figure BDA0003171200910000035
为电力负荷有功功率的预测值;θ、γ分别为光伏单元和风机数量的功率变化适应系数;(k)为k时刻的相应值。
储能作为辅助电源,避免过充过放、将储能电量控制在理想值附近,有利于延长储能系统的运行寿命。因此,优化控制目标为控制时域内各时刻储能系统SOC与理想值SOCL的方差和最小,目标函数J2为:
Figure BDA0003171200910000034
式中:SOC(k)为k时刻储能系统的荷电状态;SOCL为储能系统荷电状态的理想值。
由于风电和光伏输出功率的波动性,在每一时刻都存在一种最优的光伏单元和风机的数量组合,但是,按照每一时刻的最优组合投切光伏单元和风机会使得光伏单元和风机频繁启停,为防止光伏单元和风机频繁启停,设计了在控制时域内光伏单元数量变化值ΔNPV和风机数量变化值ΔNW最小为优化目标,目标函数J3为:
Figure BDA0003171200910000041
考虑光伏单元和风机的启停时间,为防止光伏单元和风机频繁启停,引入了光伏单元和风机的个数变化限制β,即在控制时域内光伏单元和风机的数量变化值应该大于等于β,当变化值小于β时,光伏单元和风机的数量不变化,如式(13)(14)所示。
风光储发电系统优化模型的约束条件如下:
Figure BDA0003171200910000042
-PBN≤PB(k)≤PBN (10)
SOCmin≤SOC(k)≤SOCmax (11)
0≤NPV≤NPVT,0≤NW≤NWT (12)
β≤ΔNPV(k)≤NPVT (13)
β≤ΔNW(k)≤NWT (14)式中:PB为储能系统的输出功率,(k)为k时刻的相应值;PBN为储能系统的额定功率;SOCmax和SOCmin分别为储能系统荷电状态的上、下限;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;β为光伏单元和风机的数量变化限制。
通过对优化目标进行求解,得出k+1时刻最优的光伏单元和风机数量,根据最优解对风光储发电系统进行控制。
进一步地,在风光储发电系统中,由于风电、光伏输出功率预测值与实测值存在一定偏差,在协调优化过程中,需要将系统当前实测的风电场和光伏电站输出功率作为下一轮优化的初始条件,使系统的调控策略符合运行要求。因此,在每一个控制时域内都会根据实测值的反馈,对系统进行校正,不会造成功率预测误差的叠加,有效降低了功率预测误差对于系统的不利影响。
进一步地,对储能系统的控制分为两种控制模式:正常运行模式和短时过载模式。正常运行模式主要应对风电和光伏出力变化相对平稳,未出现大幅跌落的情形;短时过载模式主要应对风电和光伏总出力出现快速向下爬坡,利用协调优化模型无法得出光伏单元和风机最优组合的情形。
光伏单元和风机的可调度数量函数为:
Figure BDA0003171200910000051
式中:ΔNPV_KDD为光伏单元可调度数量;ΔNW_KDD为风机可调度数量;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;NPV为光伏单元的数量;NW为风机的数量;(k)为k时刻的相应值。
根据每一时刻光伏单元和风机的可调度数量,自适应地对储能系统的控制模式进行切换,公式表达如下:
Figure BDA0003171200910000052
式中:Mode为储能系统的控制模式,1代表正常运行模式,0代表短时过载模式;(k)为k时刻的相应值。
进一步地,正常运行模式具体如下:
风电、光伏系统出力偏差ΔP表达式如下:
Figure BDA0003171200910000053
式中:PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;
Figure BDA0003171200910000055
为电力负荷有功功率的预测值,
当SOCmin<SOC<SOClow,即低电量区间:
限制储能系统的放电功率,不限制充电功率,此时储能系统的功率约束为:
Figure BDA0003171200910000054
式中:PB_dis_max为储能系统放电功率上限;PBN为储能系统的额定功率;SOClow为储能系统荷电状态正常电量区的下限,
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统的输出功率PB为零,以避免小电流充放电,提高储能系统运行寿命;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh],SOChigh为储能系统荷电状态正常电量区的上限,
PB=min{ΔP+Pthr,PB_ch_max} (19)
式中:PB_ch_max储能系统充电功率上限;Pthr为储能系统最小出力限值;
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (20)
当SOClow<SOC<SOChigh,即正常电量区间:
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (21)
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (22)
当SOChigh<SOC<SOCmax,即高电量区间:
储能系统处于高电量状态,限制储能系统的充电功率,不限制放电功率,此时储能系统的功率约束为:
Figure BDA0003171200910000061
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (24)
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh],
PB=max{ΔP-Pthr,-PB_dis_max} (25)。
进一步地,短时过载模式具体如下:
风电场和光伏电站总出力向下爬坡幅度超过某一阈值时,触发储能系统短时过载模式,触发条件如式(28)所示,排除风光为跟踪预测负荷导致出力变化大于阈值的情形:
PPV+W(k-1)-PPV+W(k)-[PPVN(k-1)ΔNPV(k-1)+PWN(k-1)ΔNW(k-1)]>ε (26)
式中:PPV+W(k-1)和PPV+W(k)分别为风电场与光伏电站上一时刻和当前时刻总的实时出力;ε为启动阈值,
短时过载模式触发后,储能系统放电时功率限制调整为:
PB_dis_max=(1+αe-t/T)PBN (27)
式中:α为过载系数,由储能系统的过载能力决定;T为过载时间系数。
有益效果:与现有技术相比,本发明具有如下显著的优点:利用多维密集网络算法对负荷进行预测,得出预测负荷曲线;建立风光储发电系统的预测模型,考虑风电、光伏发电系统的波动性和储能的荷电状态,构建风光储发电系统的协调优化模型,求得每一时刻最优的光伏单元和风机的数量组合。考虑风电和光伏出力的弱功率支撑性,对储能系统的控制分为正常运行模式和短时过载模式,引入光伏单元和风机的可调度数量函数,根据每一时刻光伏单元和风机的可调度数量,对储能系统的控制模式进行切换。本协调控制方法能降低储能充放电深度,防止储能过充过放,同时减小风电和光伏输出功率的波动性,提高联合发电系统负荷跟踪能力。
附图说明
图1为本发明的方法流程图;
图2为本发明的多维密集网络算法流程图;
图3为本发明的储能系统工作区间示意图;
图4为本发明的风光储协调控制原理图。
具体实施方式
下面结合附图对本发明的技术方案作进一步说明。
如图1所示,本发明所采用的技术方案是一种计及负荷、风光波动性的风光储发电系统协调控制方法,包括以下步骤:
步骤1:电力负荷预测方法有很多,包括负荷密度法、指数平滑法、趋势分析法、灰色模拟法等,本发明优选采用如图2所示的多维密集网络算法对短期负荷进行预测,具体内容为:
(1)针对电力负荷有功功率P及其影响因素ξ1,ξ2,…,ξn进行等间隔采样,n∈[1,1000],采样间隔为τ,τ∈[0.1,100]分钟,采样时刻为t,t-τ,t-2×τ,…,t-(m-1)×τ,m∈[100,100000],得到(n+1)×m个采样值:ξ1(t-M×τ),ξ2(t-M×τ),…,ξn(t-M×τ),P(t-M×τ),其中,M=0,1,2,...,m-1;
(2)针对m个电力负荷有功功率采样P(t-M×τ),估计负荷系统的闵可夫斯基维数d,确定分形维数D,D∈[2d,10d]且D是整数;
(3)确定随机分形数量为r',r'∈[1,100000],从步骤(1)所述的(n+1)×m个采样值中随机选取D个采样值,选取r'次,得到r'组滞后变量组合,与电力负荷有功功率P(td)相对应的第i个滞后变量组合定义为
Figure BDA0003171200910000081
Figure BDA0003171200910000082
其中:i=1,2,…,r',td=t-(m-1)×τ,t-(m-2)×τ,…,t,滞后步长τ1∈[τ,(m-1)×τ]、τ2∈[τ,(m-1)×τ]、τD∈[τ,(m-1)×τ];
(4)拟合每一个滞后变量组合
Figure BDA0003171200910000083
到相应电力负荷有功功率P(td)的r'个对比变量ψi,其中,i=1,2,…,r';
(5)测试r'个对比变量ψi的训练结果,得到r'个训练结果误差δi,由小到大排序,其中,i=1,2,…,r',从中选取训练结果误差小于阈值δc1,δc1∈[0.0001,0.1],且与δi相对应的对比变量ψ′i′,其中,i'=1,2,…,r,r∈[1,100000];
(6)基于r个对比变量ψ′i′按公式(1)进行1步预测,得到r个t*时刻电力负荷有功功率预测值
Figure BDA0003171200910000084
及其预测误差δi′,由小到大排序,形成集合
Figure BDA0003171200910000085
其中,i'=1,2,…,r;
Figure BDA0003171200910000086
(7)基于式(2)、式(3),得到t*时刻电力负荷有功功率的最终预测值
Figure BDA0003171200910000087
Figure BDA0003171200910000088
Figure BDA0003171200910000089
式(2)和式(3)中:ωi′为与误差δi′相对应的权重;j为中间变量;“exp”为以自然常数e为底的指数函数;“∑”为求和符号。
步骤2:光伏电站和风电场的控制过程可以表示为:
Figure BDA00031712009100000810
式中:NPV和NW分别为光伏单元和风机的数量;ΔNPV和ΔNW分别为光伏单元和风机的数量变化值;(k)为k时刻的相应值;(k+1)为k+1时刻的相应值。
光伏电站和风电场输出功率的变化过程为:
Figure BDA00031712009100000811
式中:PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;PPVN和PWN分别为由超短期功率预测得出的光伏单元输出功率和风机输出功率;(k)为k时刻的相应值;(k+1)为k+1时刻的相应值。
储能系统的荷电状态为储能系统当前电量和额定容量的比值,储能电量的变化过程可以表示为:
EB(k+1)=EB(k)-ηΔTBPB(k) (6)
式中:EB为储能电量;η为储能的转换效率;ΔTB为MW到MW·h的转换系数;PB为储能系统的输出功率;(k)为k时刻的相应值;(k+1)为k+1时刻的相应值。
基于风光储发电系统的功率平衡方程、储能荷电状态的变化过程和风电场、光伏电站的控制过程,建立了风光储发电系统的预测模型。风光储发电系统的状态空间模型为:
Figure BDA0003171200910000091
式中状态方程矩阵为:
Figure BDA0003171200910000092
式中:x(k)是系统的状态变量,即储能的充放电功率PB、光伏电站的输出功率PPV和风电场的输出功率PW;u(k)是系统的控制变量,即光伏单元和风机的数量变化值ΔNPV和ΔNW;r(k)表示系统的扰动量,即负荷预测功率
Figure BDA0003171200910000093
y(k)表示系统的输出量,即储能的充放电功率PB
矩阵A、B1、B2、C如下所示:
Figure BDA0003171200910000094
将参数矩阵代入状态方程,可得到风光储运行的预测模型。
预测时域包含p个时间间隔,控制时域包含I个时间间隔,且p≥I。在k时刻,通过预测模型得到预测时域内的预测序列x(k+1)、x(k+2)…x(k+p)。
在控制时域内,各时刻光伏电站和风电场的出力占比分别为λ和μ,λ和μ的表达式如下:
Figure BDA0003171200910000095
Figure BDA0003171200910000101
式中:PPVN和PWN为由超短期功率预测得出的光伏单元输出功率和风机输出功率;NPV和NW分别为光伏单元和风机的数量;(k)为k时刻的相应值。
径向基函数(RBF)插值法公式如下:
Figure BDA0003171200910000102
式中:X是输入;a是径向基函数的数量,a为正整数;ρa为第a个权值向量;
Figure BDA0003171200910000103
为第a个径向基函数;Xa是第a次输入;||X-Xa||表示差向量的模。
以λ和μ作为输入,利用径向基函数(RBF)插值法求得光伏单元和风机的功率变化适应系数θ、γ。
通过控制光伏单元和风机数量的方式缩小源荷之间的差值,优化控制目标为控制时域内,各时刻光伏电站和风电场的联合输出功率和负荷预测功率的方差和最小,目标函数J1为:
Figure BDA0003171200910000104
式中:I为控制时域中的时间间隔数;PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;PPVN和PWN为由超短期功率预测得出的光伏单元输出功率和风机输出功率;ΔNPV和ΔNW为光伏单元和风机的数量变化值;
Figure BDA0003171200910000105
为电力负荷有功功率的预测值;θ、γ分别为光伏单元和风机数量的功率变化适应系数;(k)为k时刻的相应值。
如图3所示,储能作为辅助电源,避免过充过放、将储能电量控制在理想值附近,有利于延长储能系统的运行寿命。因此,优化控制目标为控制时域内各时刻储能系统SOC与理想值SOCL的方差和最小,目标函数J2为:
Figure BDA0003171200910000106
式中:SOC(k)为k时刻储能系统的荷电状态;SOCL为储能系统荷电状态的理想值。
由于风电和光伏输出功率的波动性,在每一时刻都存在一种最优的光伏单元和风机的数量组合,但是,按照每一时刻的最优组合投切光伏单元和风机会使得光伏单元和风机频繁启停,为防止光伏单元和风机频繁启停,设计了在控制时域内光伏单元数量变化值ΔNPV和风机数量变化值ΔNW最小为优化目标,目标函数J3为:
Figure BDA0003171200910000111
考虑光伏单元和风机的启停时间,为防止光伏单元和风机频繁启停,引入了光伏单元和风机的个数变化限制β,即在控制时域内光伏单元和风机的数量变化值应该大于等于β,当变化值小于β时,光伏单元和风机的数量不变化,如式(20)(21)所示。
风光储发电系统优化模型的约束条件如下:
Figure BDA0003171200910000112
-PBN≤PB(k)≤PBN (17)
SOCmin≤SOC(k)≤SOCmax (18)
0≤NPV≤NPVT,0≤NW≤NWT (19)
β≤ΔNPV(k)≤NPVT (20)
β≤ΔNW(k)≤NWT (21)
式中:PB为储能系统的输出功率,(k)为k时刻的相应值;PBN为储能系统的额定功率;SOCmax和SOCmin分别为储能系统荷电状态的上、下限;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;β为光伏单元和风机的数量变化限制。
根据预测序列x(k+1)、x(k+2)…x(k+p),对优化目标进行求解,求得每一时刻最优的光伏单元和风机数量,得出控制时域内的最优控制序列,并只执行控制时域内第1个时间间隔的最优控制命令,最后,将实测值作为反馈,更新系统的状态变量并重复上述过程。具体控制原理如附图4所示。
在风光储发电系统中,由于风电、光伏输出功率预测值与实测值存在一定偏差,在优化过程中,需要将系统当前实测的风电场和光伏电站输出功率作为下一轮优化的初始条件,使系统的调控策略符合运行要求。因此,在每一个控制时域内都会根据实测值的反馈,对系统进行校正,不会造成功率预测误差的叠加,有效降低了功率预测误差对于系统的不利影响。
对储能系统的控制分为两种控制模式:正常运行模式和短时过载模式。正常运行模式主要应对风电和光伏出力变化相对平稳,未出现大幅跌落的情形;短时过载模式主要应对风电和光伏总出力出现快速向下爬坡,利用协调优化模型无法得出光伏单元和风机最优组合的情形。
光伏单元和风机的可调度数量函数为:
Figure BDA0003171200910000121
式中:ΔNPV_KDD为光伏单元可调度数量;ΔNW_KDD为风机可调度数量;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;NPV为光伏单元的数量;NW为风机的数量;(k)为k时刻的相应值。
根据每一时刻光伏单元和风机的可调度数量,自适应地对储能系统的控制模式进行切换,公式表达如下:
Figure BDA0003171200910000122
式中:Mode为储能系统的控制模式,1代表正常运行模式,0代表短时过载模式;(k)为k时刻的相应值。
(1)正常运行模式
风电、光伏系统出力偏差ΔP
Figure BDA0003171200910000123
式中:PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;
Figure BDA0003171200910000124
为电力负荷有功功率的预测值。
①SOCmin<SOC<SOClow,即低电量区间
储能系统处于低电量状态,应限制储能系统的放电功率,避免储能系统的过放电,而不限制充电功率。此时储能系统的功率约束为:
Figure BDA0003171200910000125
式中:PB_dis_max为储能系统放电功率上限;PBN为储能系统的额定功率;SOClow为储能系统荷电状态正常电量区的下限。
ΔP为正时,储能系统需要充电,若|ΔP|<Pthr,储能系统的输出功率PB为零,以避免小电流充放电,提高储能系统运行寿命;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh],SOChigh为储能系统荷电状态正常电量区的上限。
PB=min{ΔP+Pthr,PB_ch_max} (26)
式中:PB_ch_max储能系统充电功率上限;Pthr为储能系统最小出力限值。
ΔP为负时,储能系统需要放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (27)
②SOClow<SOC<SOChigh,即正常电量区间
ΔP为正时,储能系统需要充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (28)
ΔP为负时,储能系统需要放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (29)
③SOChigh<SOC<SOCmax,即高电量区间
储能系统处于高电量状态,应限制储能系统的充电功率,避免储能系统的过充电,而不限制放电功率。此时储能系统的功率约束为:
Figure BDA0003171200910000131
ΔP为正时,储能系统需要充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (31)
ΔP为负时,储能系统需要放电,若|ΔP|<Pthr,储能系统功率PB为零;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh]。
PB=max{ΔP-Pthr,-PB_dis_max} (32)
(2)短时过载模式
考虑风电和光伏出力的波动性,其出力可能会出现快速向下爬坡,使得风电、光伏系统系统出力大幅偏离预测负荷曲线,即使投入所有风机和光伏单元也无法满足负荷需求,此时大量的功率缺额将超过储能系统正常补偿能力。但考虑储能系统具有一定的短时过载能力,可通过其短时过载,快速增大其功率输出,以限制风电和光伏出力的跌落幅度,保证联合系统出力能够变化平稳。
风电场和光伏电站总出力向下爬坡幅度超过某一阈值时,触发储能系统短时过载模式。触发条件如式(28)所示,剔除风光为跟踪预测负荷导致出力变化大于阈值的情形。
PPV+W(k-1)-PPV+W(k)-[PPVN(k-1)ΔNPV(k-1)+PWN(k-1)ΔNW(k-1)]>ε (33)
式中:PPV+W(k-1)和PPV+W(k)分别为风电场与光伏电站上一时刻和当前时刻总的实时出力;ε为启动阈值。
短时过载模式触发后,储能系统放电时功率限制调整为:
PB_dis_max=(1+αe-t/T)PBN (34)
式中:α为过载系数,由储能系统的过载能力决定;T为过载时间系数。

Claims (7)

1.一种风光储发电系统协调控制方法,其特征在于,包括以下步骤:
步骤1:利用多维密集网络算法对负荷进行预测,得出预测负荷曲线;
步骤2:构建风光储发电系统的协调优化模型,求得每一时刻最优的光伏单元和风机的数量组合,使风光储发电系统能够有效地跟踪预测负荷曲线。
2.根据权利要求1所述的风光储发电系统协调控制方法,其特征在于,所述步骤1具体包括:
步骤1.1:针对电力负荷有功功率P及其影响因素ξ1,ξ2,…,ξn进行等间隔采样,n∈[1,1000],采样间隔为τ,τ∈[0.1,100]分钟,采样时刻为t,t-τ,t-2×τ,…,t-(m-1)×τ,m∈[100,100000],得到(n+1)×m个采样值:ξ1(t-M×τ),ξ2(t-M×τ),…,ξn(t-M×τ),P(t-M×τ),其中,M=0,1,2,...,m-1;
步骤1.2:针对m个电力负荷有功功率采样P(t-M×τ),估计负荷系统的闵可夫斯基维数d,确定分形维数D,D∈[2d,10d]且D是整数;
步骤1.3:确定随机分形数量为r',r'∈[1,100000],从所述步骤1.1中的(n+1)×m个采样值中随机选取D个采样值,选取r'次,得到r'组滞后变量组合,与电力负荷有功功率P(td)相对应的第i个滞后变量组合定义为
Figure FDA0003171200900000011
Figure FDA0003171200900000012
其中,i=1,2,…,r',td=t-(m-1)×τ,t-(m-2)×τ,…,t,滞后步长τ1∈[τ,(m-1)×τ]、τ2∈[τ,(m-1)×τ]、τD∈[τ,(m-1)×τ];
步骤1.4:拟合每一个滞后变量组合
Figure FDA0003171200900000013
到相应电力负荷有功功率P(td)的r'个对比变量ψi,其中,i=1,2,…,r';
步骤1.5:测试r'个对比变量ψi的训练结果,得到r'个训练结果误差δi,由小到大排序,其中,i=1,2,…,r',从中选取训练结果误差小于阈值δc1,δc1∈[0.0001,0.1],且与δi相对应的对比变量ψ′i′,其中,i'=1,2,…,r,r∈[1,100000];
步骤1.6:基于r个对比变量ψ′i′按公式(1)进行1步预测,得到r个t*时刻电力负荷有功功率预测值
Figure FDA0003171200900000014
及其预测误差δi′,由小到大排序,形成集合
Figure FDA0003171200900000015
其中,i'=1,2,…,r;
Figure FDA0003171200900000016
步骤1.7:基于式(2)、式(3),得到t*时刻电力负荷有功功率的最终预测值
Figure FDA0003171200900000017
Figure FDA0003171200900000021
Figure FDA0003171200900000022
式中,ωi′为与误差δi′相对应的权重;j为中间变量;“exp”为以自然常数e为底的指数函数;“∑”为求和符号。
3.根据权利要求1所述的风光储发电系统协调控制方法,其特征在于,所述步骤2中构建风光储发电系统的协调优化模型具体包括:
在控制时域内,各时刻光伏电站和风电场的出力占比分别为λ和μ,表达式如下:
Figure FDA0003171200900000023
Figure FDA0003171200900000024
式中:PPVN和PWN为分别由超短期功率预测得出的光伏单元输出功率和风机输出功率;NPV和NW分别为光伏单元和风机的数量;(k)为k时刻的相应值,
以λ和μ作为输入,利用径向基函数插值法求得光伏单元和风机的功率变化适应系数θ、γ,
通过控制光伏单元和风机数量的方式缩小源荷之间的差值,优化控制目标为控制时域内,各时刻光伏电站和风电场的联合输出功率和负荷预测功率的方差和最小,目标函数J1为:
Figure FDA0003171200900000025
式中:I为控制时域中的时间间隔数;PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;PPVN和PWN为由超短期功率预测得出的光伏单元输出功率和风机输出功率;ΔNPV和ΔNW为光伏单元和风机的数量变化值;
Figure FDA0003171200900000026
为电力负荷有功功率的预测值;θ、γ分别为光伏单元和风机数量的功率变化适应系数;(k)为k时刻的相应值,
优化控制目标为控制时域内各时刻储能系统SOC与理想值SOCL的方差和最小,目标函数J2为:
Figure FDA0003171200900000031
式中:SOC(k)为k时刻储能系统的荷电状态;SOCL为储能系统荷电状态的理想值,
在控制时域内光伏单元数量变化值ΔNPV和风机数量变化值ΔNW最小为优化目标,目标函数J3为:
Figure FDA0003171200900000032
引入光伏单元和风机的个数变化限制β,即在控制时域内光伏单元和风机的数量变化值大于等于β,当变化值小于β时,光伏单元和风机的数量不变化,如式(13)(14)所示,
风光储发电系统优化模型的约束条件如下:
Figure FDA0003171200900000033
-PBN≤PB(k)≤PBN (10)
SOCmin≤SOC(k)≤SOCmax (11)
0≤NPV≤NPVT,0≤NW≤NWT (12)
β≤ΔNPV(k)≤NPVT (13)
β≤ΔNW(k)≤NWT (14)
式中:PB为储能系统的输出功率,(k)为k时刻的相应值;PBN为储能系统的额定功率;SOCmax和SOCmin分别为储能系统荷电状态的上、下限;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;β为光伏单元和风机的数量变化限制,
通过对优化目标进行求解,得出k+1时刻最优的光伏单元和风机数量,根据最优解对风光储发电系统进行控制。
4.根据权利要求3所述的风光储发电系统的协调优化模型,其特征在于,所述风光储发电系统在协调优化过程中,将系统当前实测的风电场和光伏电站输出功率作为下一轮优化的初始条件,使系统的调控策略符合运行要求,即,在每一个控制时域内根据实测值的反馈,对系统进行校正,避免功率预测误差的叠加。
5.根据权利要求1所述的风光储发电系统协调控制方法,其特征在于,对储能系统的控制分为两种控制模式:正常运行模式和短时过载模式;所述正常运行模式用于应对风电和光伏出力变化相对平稳,未出现大幅跌落的情形;所述短时过载模式用于应对风电和光伏总出力出现快速向下爬坡,利用协调优化模型无法得出光伏单元和风机最优组合的情形,
光伏单元和风机的可调度数量函数为:
Figure FDA0003171200900000041
式中:ΔNPV_KDD为光伏单元可调度数量;ΔNW_KDD为风机可调度数量;NPVT为光伏电站中光伏单元的总数量;NWT为风电场中风机的总数量;NPV为光伏单元的数量;NW为风机的数量;(k)为k时刻的相应值,
根据每一时刻光伏单元和风机的可调度数量,自适应地对储能系统的控制模式进行切换,公式表达如下:
Figure FDA0003171200900000042
式中:Mode为储能系统的控制模式,1代表正常运行模式,0代表短时过载模式;(k)为k时刻的相应值。
6.根据权利要求5所述的风光储发电系统协调控制方法,其特征在于,所述正常运行模式具体如下:
风电、光伏系统出力偏差ΔP表达式如下:
Figure FDA0003171200900000043
式中:PPV为光伏电站的实测输出功率;PW为风电场的实测输出功率;
Figure FDA0003171200900000044
为电力负荷有功功率的预测值,
当SOCmin<SOC<SOClow,即低电量区间:
限制储能系统的放电功率,不限制充电功率,此时储能系统的功率约束为:
Figure FDA0003171200900000045
式中:PB_dis_max为储能系统放电功率上限;PBN为储能系统的额定功率;SOClow为储能系统荷电状态正常电量区的下限,
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统的输出功率PB为零,以避免小电流充放电,提高储能系统运行寿命;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh],SOChigh为储能系统荷电状态正常电量区的上限,
PB=min{ΔP+Pthr,PB_ch_max} (19)
式中:PB_ch_max储能系统充电功率上限;Pthr为储能系统最小出力限值;
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (20)
当SOClow<SOC<SOChigh,即正常电量区间:
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (21)
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=max{ΔP,-PB_dis_max} (22)
当SOChigh<SOC<SOCmax,即高电量区间:
储能系统处于高电量状态,限制储能系统的充电功率,不限制放电功率,此时储能系统的功率约束为:
Figure FDA0003171200900000051
ΔP为正时,储能系统充电,若|ΔP|<Pthr,储能系统功率PB为零;否则
PB=min{ΔP,PB_ch_max} (24)
ΔP为负时,储能系统放电,若|ΔP|<Pthr,储能系统功率PB为零;否则,储能系统出力在补偿ΔP的基础上,额外增加Pthr,以加快储能系统电量恢复到正常电量区[SOClow,SOChigh],
PB=max{ΔP-Pthr,-PB_dis_max} (25)。
7.根据权利要求5所述的风光储发电系统协调控制方法,其特征在于,所述短时过载模式具体如下:
风电场和光伏电站总出力向下爬坡幅度超过某一阈值时,触发储能系统短时过载模式,触发条件如式(28)所示,排除风光为跟踪预测负荷导致出力变化大于阈值的情形:
PPV+W(k-1)-PPV+W(k)-[PPVN(k-1)ΔNPV(k-1)+PWN(k-1)ΔNW(k-1)]>ε (26)
式中:PPV+W(k-1)和PPV+W(k)分别为风电场与光伏电站上一时刻和当前时刻总的实时出力;ε为启动阈值,
短时过载模式触发后,储能系统放电时功率限制调整为:
PB_dis_max=(1+αe-t/T)PBN (27)
式中:α为过载系数,由储能系统的过载能力决定;T为过载时间系数。
CN202110819015.0A 2021-07-20 2021-07-20 一种风光储发电系统协调控制方法 Withdrawn CN113555899A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110819015.0A CN113555899A (zh) 2021-07-20 2021-07-20 一种风光储发电系统协调控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110819015.0A CN113555899A (zh) 2021-07-20 2021-07-20 一种风光储发电系统协调控制方法

Publications (1)

Publication Number Publication Date
CN113555899A true CN113555899A (zh) 2021-10-26

Family

ID=78103529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110819015.0A Withdrawn CN113555899A (zh) 2021-07-20 2021-07-20 一种风光储发电系统协调控制方法

Country Status (1)

Country Link
CN (1) CN113555899A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113922399A (zh) * 2021-12-13 2022-01-11 国网江西省电力有限公司电力科学研究院 一种低碳排放的电网储能控制方法及装置
CN114204605A (zh) * 2021-11-30 2022-03-18 中国科学院电工研究所 一种电-热-氢综合能源系统运行模式优化设计方法
CN114977330A (zh) * 2022-07-11 2022-08-30 湖南大学 建筑分布式光伏-蓄电池系统连续运行调度方法及平台
CN115912331A (zh) * 2022-10-30 2023-04-04 淮阴工学院 一种智能风光互补发电系统的功率调节方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114204605A (zh) * 2021-11-30 2022-03-18 中国科学院电工研究所 一种电-热-氢综合能源系统运行模式优化设计方法
CN114204605B (zh) * 2021-11-30 2024-10-29 中国科学院电工研究所 一种电-热-氢综合能源系统运行模式优化设计方法
CN113922399A (zh) * 2021-12-13 2022-01-11 国网江西省电力有限公司电力科学研究院 一种低碳排放的电网储能控制方法及装置
CN114977330A (zh) * 2022-07-11 2022-08-30 湖南大学 建筑分布式光伏-蓄电池系统连续运行调度方法及平台
CN114977330B (zh) * 2022-07-11 2022-11-04 湖南大学 建筑分布式光伏-蓄电池系统连续运行调度方法及平台
CN115912331A (zh) * 2022-10-30 2023-04-04 淮阴工学院 一种智能风光互补发电系统的功率调节方法
CN115912331B (zh) * 2022-10-30 2023-09-29 淮阴工学院 一种智能风光互补发电系统的功率调节方法

Similar Documents

Publication Publication Date Title
CN113555899A (zh) 一种风光储发电系统协调控制方法
CN105846461B (zh) 一种大规模储能电站自适应动态规划的控制方法和系统
CN108667052B (zh) 一种面向虚拟电厂优化运行的多类型储能系统规划配置方法及系统
CN110581571A (zh) 一种主动配电网动态优化调度方法
CN109345019B (zh) 一种基于改进粒子群算法的微电网经济调度优化策略
Belfkira et al. Modeling and optimal sizing of hybrid renewable energy system
CN111244988B (zh) 考虑分布式电源的电动汽车和储能优化调度方法
CN112821470B (zh) 基于小生境混沌粒子群算法的微网群优化调度策略
CN107546781A (zh) 基于pso改进算法的微电网多目标运行优化方法
CN113224769B (zh) 考虑光伏多状态调节的多时间尺度配电网电压优化方法
CN114914955A (zh) 一种微电网有功与无功联合优化调度方法及系统
CN111654054A (zh) 一种储能基于自适应神经网络(ann)平抑短期风电波动的控制方法
CN110048438A (zh) 一种基于模型预测控制的配电网馈线级负荷功率控制方法
CN105207207A (zh) 基于能量管理的孤网状态下的微电网系统调度方法
CN112290571A (zh) 储能系统平滑控制方法
CN115907213A (zh) 基于云集端分层架构的考虑设备健康度的群控群调策略
CN112467717A (zh) 一种基于模糊控制的混合能源系统实时负荷分配方法
CN116805803A (zh) 基于自适应mpc的风光储离网制氢系统能量调度方法
CN111614110A (zh) 一种基于改进多目标粒子群算法的受端电网储能优化配置方法
Gonzalez et al. Model predictive control for the energy management of a hybrid PV/battery/fuel cell power plant
CN114676921A (zh) 一种考虑源荷储协调优化的系统风电可接纳能力计算方法
CN118117568A (zh) 一种适用于离网风光氢储耦合系统的复合能量管理策略
CN109995030B (zh) 一种考虑脱网风险的储能装置soc下限值最优设置方法
Al Basheri et al. Control and Energy Management Based on Decoupling Frequency of DC Microgrid
CN116231684A (zh) 一种面向二次调频的储能电站辅助电网调频方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20211026