CN113550765B - Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel - Google Patents

Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel Download PDF

Info

Publication number
CN113550765B
CN113550765B CN202110865304.4A CN202110865304A CN113550765B CN 113550765 B CN113550765 B CN 113550765B CN 202110865304 A CN202110865304 A CN 202110865304A CN 113550765 B CN113550765 B CN 113550765B
Authority
CN
China
Prior art keywords
lining
side wall
tunnel
reinforcement cage
outer side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110865304.4A
Other languages
Chinese (zh)
Other versions
CN113550765A (en
Inventor
何泉
辛国平
刘盛
刘龙卫
郭得福
齐如见
杨海航
朱光楠
陈杭桥
石川
牛昭倩
秦正明
罗先刚
张永雄
韩广平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN202110865304.4A priority Critical patent/CN113550765B/en
Publication of CN113550765A publication Critical patent/CN113550765A/en
Application granted granted Critical
Publication of CN113550765B publication Critical patent/CN113550765B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention discloses a construction method for preventing a high cantilever tunnel side wall lining reinforcement cage from tilting inwards by using section steel, which comprises the following steps that a plurality of section steel are buried at intervals in the longitudinal direction of the edge base pouring front edge; b, pouring a side base; step C, binding a tunnel lining side wall reinforcement cage after the side base concrete reaches a certain strength; the lining outer side annular main ribs on the left side and the right side of the tunnel lining side wall reinforcement cage are connected into a ring at the tunnel arch part, one end of the radial rib, which is close to the lining outer side annular main rib, is bent into a 7 shape, and the bent parts are arranged along the lining outer side annular main rib in parallel; binding the upper end of the section steel with the corresponding lining outer side circumferential main rib, and tensioning and connecting the lining inner side circumferential main rib with the corresponding section steel by adopting an external iron wire; and D, positioning the side wall template trolley, and pouring side wall lining concrete. The wall reinforcement cage can be prevented from tilting inwards, and the stability and construction safety of the cantilever-state reinforcement during the binding of the side wall lining reinforcement can be ensured.

Description

Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel
Technical Field
The invention belongs to the technical field of tunnel concrete lining construction, and particularly relates to a construction method for preventing a high cantilever tunnel side wall lining reinforcement cage from tilting inwards by using section steel, which is specially used for a side wall of an assembled lining structure.
Background
The traditional construction process of the second lining of the tunnel adopts full-ring steel bar binding, and then combines with a full-hydraulic lining trolley to perform full-ring second lining concrete pouring in a mode of injecting concrete into vertical pouring holes at the top hole by hole. The side wall and the arch steel bars are arranged in a full ring, after the ring is bound to the inner and outer steel bars into a ring, the inner and outer steel bars are connected in series through longitudinal steel bars, the inner and outer steel bars are connected in opposite pull through radial steel bars, and the joint is bound and formed. The traditional construction process utilizes the principle that concrete gravity automatically fills the space of the second lining, but because the fluidity of the concrete is difficult to reach an ideal state, after the concrete is poured into a tunnel vault, the whole pouring longitudinal section is basically distributed in an isosceles triangle shape, the isosceles sides of the isosceles triangle change along with the size of the pouring opening spacing, and the larger the pouring opening spacing is, the longer the isosceles side of the isosceles triangle is, which means that the back of the second lining is more hollow. The phenomenon can also change along with the pressure of the concrete pouring pump, the void phenomenon can be reduced when the pouring pressure is larger, the void phenomenon can be increased when the pouring pressure is smaller, and meanwhile, the air between the two vault pouring holes is difficult to completely empty, so that the vault cavitation phenomenon is unavoidable.
In order to solve the problem that the arch part of the back of the second lining is empty, the project group provides that the second lining of the tunnel is divided into side walls and tunnel arches at the left side and the right side, the side walls are cast in situ firstly, then the prefabricated arch duct pieces outside the tunnel are transported into the tunnel, and the side walls are arranged on the cast-in-situ side walls for assembly, so that the construction of the second lining is completed. As shown in fig. 1 and 2, the tunnel lining side wall reinforcement cage is composed of a lining outer side annular main rib 1, a lining inner side annular main rib 2, a lining outer side longitudinal skeleton rib 3 and a lining inner side longitudinal skeleton rib 4. After the lining outer side annular main rib 1 and the lining inner side annular main rib 2 are bound, the lining outer side longitudinal skeleton rib 3 and the lining inner side longitudinal skeleton rib 4 are respectively connected in series, the inner layer and the outer layer are connected in a opposite-pulling way through radial ribs 6, and the joint is bound and formed.
The circumferential main rib is formed by using the flexibility of the main rib, and the main rib is not subjected to a cold bending process; the outside circumferential main rib is processed in a nonstandard size, and the influence variation along with the supporting surface is large; the number of the positioning points of the binding rack is limited, the inner annular main rib is positioned and bound on the basis of the outer annular main rib, and the precision is difficult to guarantee. The method is only suitable for the integrally looped lining steel bars, and the stability of the steel bar cage of the fabricated lining tunnel structure is difficult to control. The assembled lining structure side wall adopts a cast-in-situ process, and the arch part is assembled by prefabricated segment. The arch is needed to be cut off by the side wall reinforcement cage, the side wall reinforcement is not integrally looped, the two side wall reinforcement cages on the left side and the right side are respectively in a cantilever state, the original positioning and reinforcing modes cannot meet the stability of a cantilever reinforcement structure, the side wall reinforcement cage is inclined inwards easily, and the stability requirement of the cantilever reinforcement cage cannot be met.
Disclosure of Invention
The invention aims to solve the problem that the lining reinforcement cage of the side wall of the high-cantilever tunnel tilts inwards, and ensure that the stability of the side wall reinforcement cage is good.
The technical scheme adopted by the invention is as follows: a construction method for preventing a high cantilever tunnel side wall lining reinforcement cage from tilting inwards by using section steel comprises the following steps:
step A, a plurality of section steel are buried at intervals along the longitudinal direction of the pouring front edge of the side base, the part of the section steel above the exposed side base is arranged between the inner and outer annular main ribs of the design position of the side wall reinforcement cage, the upper end of the section steel is gradually inclined outwards relative to the lower end, and the longitudinal distance of the section steel is consistent with the longitudinal distance of the annular main ribs of the side wall reinforcement cage;
b, pouring a side base;
step C, binding a tunnel lining side wall reinforcement cage after the side base concrete reaches a certain strength;
the tunnel lining side wall reinforcement cage comprises lining outer side annular main ribs, lining inner side annular main ribs, lining outer side longitudinal skeleton ribs, lining inner side longitudinal skeleton ribs and radial ribs, lining side wall reinforcement cages on the left side and the right side are bound at the same time, lining outer side annular main ribs on the left side and the right side are connected into a ring at a tunnel arch part, lining inner side annular main ribs on the left side and the right side are matched with tunnel side walls in height, one end of each radial rib, which is close to each lining outer side annular main rib, is bent to be 7-shaped, and bent parts are arranged along the lining outer side annular main ribs in a parallel mode; binding the upper end of the section steel with the corresponding lining outer side circumferential main rib, and tensioning and connecting the lining inner side circumferential main rib with the corresponding section steel by adopting an external iron wire;
and D, positioning the side wall template trolley, and pouring side wall lining concrete.
Further preferably, in the step D, the top of the formed side wall lining concrete is a plane, and a row of hemispherical grooves are arranged at equal intervals along the longitudinal direction. The distance between two adjacent hemispherical grooves is equal to the thickness of a single arch prefabricated segment, and the arch prefabricated segments are assembled in a regrouping mode; correspondingly, hemispherical bulges are arranged on the arch prefabricated pipe piece, the arch prefabricated pipe piece and the side wall are assembled in a hemispherical mode, and compared with an L-shaped assembling mode, the novel arc prefabricated pipe piece can effectively reduce working stress, effectively slow down abrasion and reduce negative conditions of bending, cracking and fracture of components.
Further preferably, the tunnel lining side wall reinforcement cage further comprises a reinforcing reinforcement bar, wherein the reinforcing reinforcement bar is arranged at the upper part of the tunnel lining side wall reinforcement cage so as to enhance the strength of the joint position of the top, and the reinforcing reinforcement bar is a net structure surrounded by an n-shaped outer side annular reinforcement bar, an n-shaped inner side annular reinforcement bar, a radial reinforcement bar and a longitudinal reinforcement bar; the outer side annular reinforcing ribs of the 'n' shape are bound on the lining outer side annular main rib, the top ends of the outer side annular reinforcing ribs of the 'n' shape extend to the upper side of the lining outer side annular main rib, the inner side annular reinforcing ribs of the 'n' shape are bound on the lining inner side annular main rib, and the top ends of the inner side annular reinforcing ribs of the 'n' shape extend to the upper side of the lining inner side annular main rib, so that an 'n' -shaped lug is formed on the inner side and the outer side of the hemispherical groove of the tunnel lining side wall reinforcement cage respectively, and the inner side 'n' -shaped lug is higher than the outer side 'n' -shaped lug. The joint of the top of the side wall and the prefabricated segment of the arch part is stressed complicated and is easy to collide in the construction process, and reinforcing bars are additionally arranged in a certain range of cast-in-situ side wall reinforcement cages at the joint so as to enhance the strength at the splicing position; the reinforcing ribs adopt a net structure formed by surrounding an n-shaped outer circumferential reinforcing rib plus an n-shaped inner circumferential reinforcing rib plus a radial reinforcing rib plus a longitudinal reinforcing rib, and an n-shaped lug is formed on the inner side and the outer side of the hemispherical groove of the tunnel lining side wall reinforcement cage respectively, so that the splicing strength of the hemispherical groove position is further enhanced.
Further preferably, the tunnel lining side wall reinforcement cage further comprises a tie anchor rod, wherein the tie anchor rod is a hollow arch foot anchor rod, the outer side end of the tie anchor rod is welded and fixed with the top of the tunnel lining side wall reinforcement cage, and the inner side end of the tie anchor rod is vertically driven into a tunnel rock soil layer; the lining outer side annular main ribs of the tunnel lining side wall reinforcement cage gradually incline towards the tunnel wall, so that the width of the upper part of the tunnel lining side wall reinforcement cage is gradually increased. The width of the top of the reinforcement cage is increased, the annular main ribs outside the lining are limited to incline towards the tunnel wall gradually, the annular main ribs inside the lining are unchanged, and the stability of the whole structure is better.
Further preferably, the longitudinal spacing of the lining outer side annular main rib, the lining inner side annular main rib and the tie anchor rod is 2m, and the annular spacing of the lining outer side longitudinal skeleton rib, the lining inner side longitudinal skeleton rib and the radial rib is 2m; the diameters of the lining outer side annular main ribs and the lining inner side annular main ribs are phi 25mm, and the diameter of the tie anchor rod is phi 32mm; the lining outer side longitudinal skeleton rib, the lining inner side longitudinal skeleton rib and the reinforcing reinforcement rib are all made of steel bars with phi 10 mm.
Further preferably, the section steel is I-steel, and the depth of the section steel embedded into the edge base is 0.5m.
The invention has the beneficial effects that:
(1) The tunnel lining side wall reinforcement cage adopts a fixing mode that an outer side annular main rib is fully annular, an inner side annular main rib is disconnected, an outer side longitudinal skeleton rib and a radial rib are bent to form a 7 shape, and pre-buried section steel is combined before pouring of a side base;
(2) The side wall steel reinforcement cages on the left side and the right side are connected into a ring only through the main ribs on the outer ring, the main ribs on the inner ring are disconnected respectively, the stability of the side wall steel reinforcement cages on the left side and the right side can be ensured, enough space can be vacated for assembling the prefabricated arch duct pieces, and the prefabricated arch duct pieces are installed in a lifting mode from bottom to top.
Drawings
Fig. 1 is a schematic structural view of a side wall reinforcement cage before modification.
Fig. 2 is a partial enlarged view of fig. 1.
Fig. 3 is a schematic view of the installation of the side wall reinforcement cage and the embedded section steel of the present invention.
Fig. 4 is a schematic structural view of the side wall reinforcement cage of the present invention.
Fig. 5 is a partial enlarged view of fig. 4.
Fig. 6 is a schematic structural view of the radial rib.
Detailed Description
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
according to the construction method for preventing the steel reinforcement cage from tilting inwards by using the profile steel to form the side wall lining of the high-cantilever tunnel shown in fig. 3-6, the construction method comprises the following steps:
and A, embedding a plurality of section steel 13 at longitudinal intervals along the casting front edge of the side base 12, wherein the part of the section steel 13 above the exposed side base 12 is arranged between the inner and outer circumferential main ribs of the design position of the side wall reinforcement cage so as to ensure that the section steel 13 is hidden in the side wall reinforcement cage when the side wall reinforcement cage is bound. The upper end of the section steel 13 is gradually inclined outwards relative to the lower end, so that the upper end of the section steel 13 can be propped against the lining outer side annular main rib 1 of the side wall reinforcement cage, and then the lining inner side annular main rib 2 is in tensioning connection with the corresponding section steel 13 by adopting an external iron wire 14, so that the side wall reinforcement cage can not incline inwards. The longitudinal spacing of the section steel 13 is consistent with the longitudinal spacing of the annular main ribs of the side wall reinforcement cage, namely, each annular lining outer annular main rib 1 and each lining inner annular main rib 2 correspond to one section steel together. The section steel 13 is I-shaped steel, and the depth of the section steel 13 embedded into the side base 12 is 0.5m.
And B, pouring the edge base.
And C, binding a tunnel lining side wall reinforcement cage after the side base concrete reaches a certain strength.
The tunnel lining side wall reinforcement cage mainly comprises lining outer side annular main ribs 1, lining inner side annular main ribs 2, lining outer side longitudinal skeleton ribs 3, lining inner side longitudinal skeleton ribs 4 and radial ribs 6. The lining side wall reinforcement cages on the left side and the right side are bound simultaneously, the lining outer side annular main ribs 1 on the left side and the right side are connected into a ring at the arch part of the tunnel, the lining inner side annular main ribs 2 on the left side and the right side are matched with the height of the side wall of the tunnel, and the lining inner side annular main ribs on the left side and the right side are disconnected respectively so as to vacate the space on the inner ring for splicing prefabricated segments of the arch part.
One end of the radial rib 6, which is close to the lining outer side annular main rib 1, is bent to be 7-shaped, and the bent part is arranged along the lining outer side annular main rib 1 in a parallel line manner so as to increase the strength of the lining outer side annular main rib 1.
The upper end of the section steel 13 is bound with the corresponding lining outer side annular main rib 1, and then the lining inner side annular main rib 2 is in tensioning connection with the corresponding section steel 13 by adopting an external iron wire 14.
And D, positioning the side wall template trolley, and pouring side wall lining concrete.
Preferably, the tunnel lining side wall reinforcement cage further comprises a tie anchor rod 5, wherein the tie anchor rod 5 is a hollow arch foot anchor rod, the outer side end of the tie anchor rod 5 is welded and fixed with the top of the tunnel lining side wall reinforcement cage, and the inner side end of the tie anchor rod is vertically driven into a tunnel rock soil layer; after the side wall template trolley is in place, the exposed section of the tie anchor rod of the tunnel lining side wall reinforcement cage is required to be cut off, and then side wall lining concrete pouring is required. The tunnel lining side wall steel reinforcement cage is characterized in that the fixing mode of the tie anchor rod is increased on the basis that the outer side annular main rib full ring, the inner side annular main rib disconnection, the outer side, the inner side longitudinal skeleton rib and the radial rib bending are 7-shaped and the pre-buried section steel is tensioned, double insurance is carried out on preventing the side wall steel reinforcement cage from being inclined inwards, and the positioning accuracy of the side wall steel reinforcement cage is further improved.
In addition, in step D, the formed side wall lining concrete is preferably flat at the top and provided with a series of hemispherical grooves 7 at equal intervals in the longitudinal direction. Each hemispherical groove 7 is correspondingly provided with an arch prefabricated segment, and the distance between two adjacent hemispherical grooves 7 is equal to the thickness of a single arch prefabricated segment. The arch prefabricated segment is prefabricated and formed outside the tunnel hole.
Preferably, the tunnel lining side wall reinforcement cage further comprises reinforcing bars. The reinforcing bars are arranged on the upper part of the tunnel lining side wall reinforcement cage so as to strengthen the strength of the splicing position of the top. The reinforcing rib is a net structure surrounded by an n-shaped outer circumferential reinforcing rib 8, an n-shaped inner circumferential reinforcing rib 9, a radial reinforcing rib 10 and a longitudinal reinforcing rib 11. The n-shaped outer circumferential reinforcing rib 8 is bound on the lining outer circumferential main rib 1, the top end of the n-shaped outer circumferential reinforcing rib 8 extends to the upper side of the lining outer circumferential main rib 1, the n-shaped inner circumferential reinforcing rib 9 is bound on the lining inner circumferential main rib 2, and the top end of the n-shaped inner circumferential reinforcing rib 9 extends to the upper side of the lining inner circumferential main rib 2, so that an n-shaped lug is formed on the inner side and the outer side of the hemispherical groove 7 of the tunnel lining side wall reinforcement cage, and the n-shaped lug on the inner side is higher than the n-shaped lug on the outer side.
In addition, the outer side end of the tie anchor rod 5 is welded and fixed with the n-shaped lugs on the inner side of the reinforcing ribs and is positioned above the n-shaped lugs on the outer side. On the basis that main ribs on an outer ring are connected into a ring, the outer side end of the tie anchor rod is welded with an n-shaped lug on the inner side of the reinforcing rib to form a crossed stress structure for pulling the outer rib in the circumferential direction and the inner rib in the radial direction, and the stability of the reinforcement cage in the vertical mold is better.
The lining outer circumferential main rib 1 of the tunnel lining side wall reinforcement cage gradually inclines towards the tunnel wall, so that the width of the upper portion of the tunnel lining side wall reinforcement cage is gradually increased.
Preferably, the longitudinal spacing of the lining outer side annular main rib 1, the lining inner side annular main rib 2 and the tie anchor rods 5 is 2m, and the circumferential spacing of the lining outer side longitudinal skeleton rib 3, the lining inner side longitudinal skeleton rib 4 and the radial rib 6 is 2m; the diameters of the lining outer side annular main ribs 1 and the lining inner side annular main ribs 2 are phi 25mm, and the diameter of the tie anchor rod 5 is phi 32mm; the lining outer side longitudinal skeleton rib 3, the lining inner side longitudinal skeleton rib 4 and the reinforcing reinforcement are all made of steel bars with phi 10 mm.
In the actual construction process, the step-assembled structural form of the side wall and the prefabricated segment of the arch part is also tried, as shown in fig. 1. In the practical application process, the construction quality control difficulty of the structural form of the step assembly is high, and the analysis reasons are as follows:
1) Because of factors such as template positioning accuracy, concrete shrinkage deformation, whole convergence deformation of the side wall and the like, the cast-in-situ side wall has a corner at the step position, and the construction accuracy cannot meet the design requirement, so that gaps exist in contact when the prefabricated arch duct pieces are assembled, the contact surfaces along the radial direction of the lining rings cannot be contacted or locally (point) contacted, the side wall and the prefabricated arch duct piece lining cannot transmit axial force, and the structural stability of the side wall is affected.
2) The vibration of the top of the cast-in-situ side wall is problematic, because the top of the side wall has corner steps, the requirement on forming precision is high, the concrete injection of the top of the side wall is difficult to deepen, the quality defect of the concrete at the joint of the top of the side wall is caused, in the injection process, coarse aggregate is caused to sink if a vibrator is adopted, and the joint casting is not full if an attached vibrator is adopted;
3) The corner step cover die is easy to be blocked in the process of removing, the proper die removing time of the side wall is difficult to be mastered, the concrete corner is easy to be broken due to early removal time (strength is not reached), and the die plate is easy to adhere to the concrete after the removal time, so that the die removing difficulty is increased. Even if the first plate side wall lining strength reaches 13MPa and then the cover mould is removed, part of the concrete surface is damaged during demoulding, and the mould removing strength is controlled at 15-20MPa to ensure the integrity of the concrete surface, but the mould removing difficulty is increased;
4) When the prefabricated arch duct pieces are assembled after the side wall pouring is completed, the prefabricated arch duct pieces are adjusted to be aligned due to the existence of the corner steps, and collision damage is very easy to occur.
Therefore, the corner steps are optimized to be hemispherical joints on the basis of splicing the prefabricated segments of the arch part and the cast-in-situ side wall lining. Compared with the corner step, the hemispherical joint greatly reduces friction between the prefabricated arch duct piece and the cast-in-situ side wall during installation, the installation speed is faster than that of the corner step, collision between lining concrete is reduced, the unfilled edges and the corners are reduced, the hemispherical joint is compact, axial force of the side wall and the prefabricated arch duct piece can be effectively transferred, the side wall is stable in structure, the difficulty that axial force cannot be transferred between the corner step side wall and the prefabricated arch duct piece, the structural stability of the side wall is affected is overcome, the structural form is reasonable in stress, good in stability and economical and feasible, the secondary lining defect of the arch in the driving limit range of the whole railway tunnel is eliminated, and the novel requirements of national assembly type component development can be met.

Claims (6)

1. The construction method for preventing the steel reinforcement cage from tilting inwards by utilizing the profile steel to form the side wall lining of the high-cantilever tunnel is characterized by comprising the following steps of:
step A, embedding a plurality of section steel (13) at longitudinal intervals along the casting front edge of the side base (12), wherein the part of the section steel (13) above the exposed side base (12) is arranged between the inner and outer annular main ribs of the design position of the side wall reinforcement cage, the upper end of the section steel (13) is gradually inclined outwards relative to the lower end, and the longitudinal spacing of the section steel (13) is consistent with the longitudinal spacing of the inner and outer annular main ribs of the side wall reinforcement cage;
b, pouring a side base;
step C, binding a tunnel lining side wall reinforcement cage after the side base concrete reaches a certain strength;
the tunnel lining side wall reinforcement cage comprises lining outer side annular main ribs (1), lining inner side annular main ribs (2), lining outer side longitudinal skeleton ribs (3), lining inner side longitudinal skeleton ribs (4) and radial ribs (6), wherein the lining side wall reinforcement cage on the left side and the lining outer side is bound at the same time, the lining outer side annular main ribs (1) on the left side and the lining outer side are connected into rings on tunnel arch parts, the lining inner side annular main ribs (2) on the left side and the lining inner side are matched with the tunnel side walls in height, one end of the radial ribs (6) close to the lining outer side annular main ribs (1) is bent to be 7-shaped, and bent parts are arranged along the lining outer side annular main ribs (1) in parallel; binding the upper end of the section steel (13) with the corresponding lining outer side circumferential main rib (1), and tensioning and connecting the lining inner side circumferential main rib (2) with the corresponding section steel (13) by adopting an external iron wire (14);
and D, positioning the side wall template trolley, and pouring side wall lining concrete.
2. The construction method for preventing the steel reinforcement cage from being tilted inwards by utilizing the profile steel to prevent the side wall of the high-cantilever tunnel from being tilted inwards is characterized by comprising the following steps of: in the step D, the top of the molded side wall lining concrete is a plane, and a row of hemispherical grooves (7) are formed at equal intervals along the longitudinal direction.
3. The construction method for preventing the steel reinforcement cage from being tilted inwards by utilizing the profile steel to prevent the side wall of the high-cantilever tunnel from being tilted inwards is characterized by comprising the following steps of: the tunnel lining side wall reinforcement cage further comprises a reinforcing reinforcement bar, wherein the reinforcing reinforcement bar is arranged at the upper part of the tunnel lining side wall reinforcement cage so as to strengthen the strength of a top splicing position, and the reinforcing reinforcement bar is a net structure surrounded by an n-shaped outer side annular reinforcement bar (8), an n-shaped inner side annular reinforcement bar (9), a radial reinforcement bar (10) and a longitudinal reinforcement bar (11); the n-shaped outer side annular reinforcing ribs (8) are bound on the lining outer side annular main rib (1), the top ends of the n-shaped outer side annular reinforcing ribs (8) extend to the upper portion of the lining outer side annular main rib (1), the n-shaped inner side annular reinforcing ribs (9) are bound on the lining inner side annular main rib (2), and the top ends of the n-shaped inner side annular reinforcing ribs (9) extend to the upper portion of the lining inner side annular main rib (2), so that an n-shaped lug is formed on the inner side and the outer side of the hemispherical groove (7) of the tunnel lining side wall reinforcement cage, and the n-shaped lugs on the inner side are higher than the n-shaped lugs on the outer side.
4. The construction method for preventing the steel reinforcement cage from being tilted inwards by utilizing the profile steel to prevent the side wall of the high-cantilever tunnel from being tilted inwards is characterized by comprising the following steps of: the lining outer side annular main rib (1) of the tunnel lining side wall reinforcement cage gradually inclines towards the tunnel wall, so that the width of the upper portion of the tunnel lining side wall reinforcement cage is gradually increased.
5. The construction method for preventing the steel reinforcement cage from being tilted inwards by using the profile steel to prevent the side wall of the high-cantilever tunnel from being tilted inwards by using the profile steel is characterized in that: the tunnel lining side wall reinforcement cage further comprises a tie anchor rod (5), wherein the tie anchor rod (5) is a hollow arch foot anchor rod, the outer side end of the tie anchor rod (5) is welded and fixed with the top of the tunnel lining side wall reinforcement cage, and the inner side end of the tie anchor rod is vertically driven into a tunnel rock soil layer; the longitudinal spacing between the lining outer side circumferential main rib (1), the lining inner side circumferential main rib (2) and the tie anchor rods (5) is 2m, and the circumferential spacing between the lining outer side longitudinal skeleton rib (3), the lining inner side longitudinal skeleton rib (4) and the radial rib (6) is 2m; the diameters of the lining outer side annular main ribs (1) and the lining inner side annular main ribs (2) are phi 25mm, and the diameter of the tie anchor rod (5) is phi 32mm; the lining outer side longitudinal skeleton rib (3), the lining inner side longitudinal skeleton rib (4) and the reinforcing reinforcement are all made of steel bars with the diameter of 10 mm.
6. The construction method for preventing the steel reinforcement cage from being tilted inwards by utilizing the profile steel to prevent the side wall of the high-cantilever tunnel from being tilted inwards is characterized by comprising the following steps of: the section steel (13) is I-shaped steel, and the depth of the section steel (13) embedded into the side base (12) is 0.5m.
CN202110865304.4A 2021-07-29 2021-07-29 Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel Active CN113550765B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110865304.4A CN113550765B (en) 2021-07-29 2021-07-29 Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110865304.4A CN113550765B (en) 2021-07-29 2021-07-29 Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel

Publications (2)

Publication Number Publication Date
CN113550765A CN113550765A (en) 2021-10-26
CN113550765B true CN113550765B (en) 2023-12-12

Family

ID=78133357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110865304.4A Active CN113550765B (en) 2021-07-29 2021-07-29 Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel

Country Status (1)

Country Link
CN (1) CN113550765B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE829470A (en) * 1974-05-27 1975-11-26 CUVELAGE VESSEL
JPH03147984A (en) * 1989-11-02 1991-06-24 Shimizu Corp Construction of concrete side wall
CN101818645A (en) * 2010-03-22 2010-09-01 中铁十二局集团第二工程有限公司 Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN105909281A (en) * 2016-06-13 2016-08-31 王亚莉 Large-section tunnel arch wall lining reinforcement reinforcing structure
CN108756937A (en) * 2018-07-12 2018-11-06 中铁第四勘察设计院集团有限公司 The shield tunnel lining structure and method of long service life under strong corrosive environment
CN109356046A (en) * 2018-10-31 2019-02-19 四川路航建设工程有限责任公司 Grid steel construction keeps off stone walling and construction method
CN109594991A (en) * 2018-12-29 2019-04-09 中铁隧道集团二处有限公司 Shallow Buried Soft Rock Super-large-section tunnel CD method combines rapid constructing method with benching tunnelling method
CN109681238A (en) * 2018-12-30 2019-04-26 中铁隧道局集团有限公司 The lining of tunnel side wall two pours and vault prefabricated pipe section transfer formwork jumbo
CN111156002A (en) * 2020-01-19 2020-05-15 北京市市政工程设计研究总院有限公司 Construction vertical shaft arranged at four-way joint at bottom above underground excavation station and construction method
CN111271087A (en) * 2020-01-23 2020-06-12 中铁二院工程集团有限责任公司 Construction method for arch prefabricated lining structure with post-cast strip connection
CN211038657U (en) * 2019-10-31 2020-07-17 中铁二十局集团有限公司 Cover encircles based deeply buries loess tunnel deformation control construction structures
CN211258631U (en) * 2019-10-31 2020-08-14 中铁二十局集团第六工程有限公司 Loess tunnel basement reinforcement construction structure based on high pressure jet grouting pile

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE829470A (en) * 1974-05-27 1975-11-26 CUVELAGE VESSEL
JPH03147984A (en) * 1989-11-02 1991-06-24 Shimizu Corp Construction of concrete side wall
CN101818645A (en) * 2010-03-22 2010-09-01 中铁十二局集团第二工程有限公司 Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN105909281A (en) * 2016-06-13 2016-08-31 王亚莉 Large-section tunnel arch wall lining reinforcement reinforcing structure
CN108756937A (en) * 2018-07-12 2018-11-06 中铁第四勘察设计院集团有限公司 The shield tunnel lining structure and method of long service life under strong corrosive environment
CN109356046A (en) * 2018-10-31 2019-02-19 四川路航建设工程有限责任公司 Grid steel construction keeps off stone walling and construction method
CN109594991A (en) * 2018-12-29 2019-04-09 中铁隧道集团二处有限公司 Shallow Buried Soft Rock Super-large-section tunnel CD method combines rapid constructing method with benching tunnelling method
CN109681238A (en) * 2018-12-30 2019-04-26 中铁隧道局集团有限公司 The lining of tunnel side wall two pours and vault prefabricated pipe section transfer formwork jumbo
CN211038657U (en) * 2019-10-31 2020-07-17 中铁二十局集团有限公司 Cover encircles based deeply buries loess tunnel deformation control construction structures
CN211258631U (en) * 2019-10-31 2020-08-14 中铁二十局集团第六工程有限公司 Loess tunnel basement reinforcement construction structure based on high pressure jet grouting pile
CN111156002A (en) * 2020-01-19 2020-05-15 北京市市政工程设计研究总院有限公司 Construction vertical shaft arranged at four-way joint at bottom above underground excavation station and construction method
CN111271087A (en) * 2020-01-23 2020-06-12 中铁二院工程集团有限责任公司 Construction method for arch prefabricated lining structure with post-cast strip connection

Also Published As

Publication number Publication date
CN113550765A (en) 2021-10-26

Similar Documents

Publication Publication Date Title
CN109184740A (en) Assembled tube coupling and preparation method thereof
CN113550765B (en) Construction method for preventing high cantilever tunnel side wall lining reinforcement cage from inward tilting by using section steel
CN105780971A (en) I-shaped steel and concrete combined structural member
CN110886204B (en) Prefabricated segment pier of assembled
CN113374510B (en) Construction method for controlling stability of vertical formwork of reinforcement cage of cast-in-situ lining side wall of tunnel
CN113565539B (en) Construction method for preventing primary support side rebound of tunnel cantilever type cast-in-situ side wall
CN106884664B (en) Tunnel inverted arch template and tunnel inverted arch filling rapid construction method
CN111691402A (en) Prefabricated concrete-filled steel tube tubular pile capable of being connected with each other and manufacturing method thereof
CN115949091A (en) Pile foundation structure and method suitable for underpinning pile foundation of pile-falling tunnel
KR102209116B1 (en) Manufacturing method of precast concrete member using tube
CN215408681U (en) Cantilever type side wall steel reinforcement cage inward-inclination-preventing mounting structure
CN211229702U (en) Assembly structure for overhauling stand column and train overhauling platform
CN113417668B (en) Pouring construction method of high cantilever tunnel side wall
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN112030985A (en) Hollow steel pipe concrete support, prefabricated member, construction method and support system
CN113417669B (en) Lining construction method for cast-in-situ side wall and assembling arch prefabricated segment spherical joint
CN109339038B (en) Cast-in-situ wedge-shaped pipe wall opening hollow pile and construction method thereof
CN215332903U (en) Cantilever type side wall reinforcement cage capable of preventing side rebound of primary support
CN111691400A (en) Precast concrete tubular pile with hidden embedded lock catch and manufacturing method thereof
CN212614767U (en) City gate hole-shaped semi-fabricated lining
CN218521839U (en) Assembled floor column retaining wall
JP6217102B2 (en) Joint structure and method of head and foundation of cast-in-place concrete pile
CN220789827U (en) Integral plastic steel cushion cap mould and cushion cap
CN212865960U (en) Hollow steel pipe concrete supports, prefab and braced system
CN219175149U (en) Assembled and cast-in-situ combined open channel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant