CN113538164A - Modeling method and device for power system production simulation model and electronic equipment - Google Patents

Modeling method and device for power system production simulation model and electronic equipment Download PDF

Info

Publication number
CN113538164A
CN113538164A CN202010283864.4A CN202010283864A CN113538164A CN 113538164 A CN113538164 A CN 113538164A CN 202010283864 A CN202010283864 A CN 202010283864A CN 113538164 A CN113538164 A CN 113538164A
Authority
CN
China
Prior art keywords
power
simulation model
target
production simulation
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010283864.4A
Other languages
Chinese (zh)
Other versions
CN113538164B (en
Inventor
苏辛一
杜忠明
刘世宇
高雷
杨硕
王爽
王雅婷
陈俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Intelligence New Technology Industry Development Co ltd
Electric Power Planning and Engineering Institute Co Ltd
Original Assignee
China Energy Intelligence New Technology Industry Development Co ltd
Electric Power Planning and Engineering Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Intelligence New Technology Industry Development Co ltd, Electric Power Planning and Engineering Institute Co Ltd filed Critical China Energy Intelligence New Technology Industry Development Co ltd
Priority to CN202010283864.4A priority Critical patent/CN113538164B/en
Publication of CN113538164A publication Critical patent/CN113538164A/en
Application granted granted Critical
Publication of CN113538164B publication Critical patent/CN113538164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling

Abstract

The invention provides a modeling method, a device and electronic equipment of a power system production simulation model, wherein the power system comprises at least one power element, and the method comprises the following steps: constructing a production simulation model, wherein the production simulation model comprises electric power sub-models which correspond to the electric power elements one by one, and the electric power sub-models are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the electric power elements; under the condition that a target power element needs to be added to the power system, parameter setting is carried out on the universal element model according to the output characteristic of the target power element, and a target power sub-model is obtained; and updating the production simulation model based on the target power sub-model to obtain a first target production simulation model. The embodiment of the invention provides a modeling method and device for a production simulation model of an electric power system and electronic equipment, which can solve the problem of high maintenance cost for the production simulation model in the prior art.

Description

Modeling method and device for power system production simulation model and electronic equipment
Technical Field
The invention relates to the field of power systems, in particular to a modeling method and device for a power system production simulation model and electronic equipment.
Background
With the rapid development of new energy sources such as wind power generation, solar power generation and the like, the development bottleneck of the new energy sources starts to be gradually changed from the restriction of technical equipment and development capacity to the restriction of aspects such as consumption capacity and operation mechanism of a power system. The key for guaranteeing the healthy development of new energy is that the new energy consumption capability of the power system is scientifically analyzed, evaluated and predicted. With the advance of energy production and consumption revolution, large-scale new energy power generation and novel electrified consumption terminals are rapidly increased, new technologies and new states in an electric power system are continuously emerged, so that the existing electric power system production simulation tool is difficult to adapt to new situations, and each new electric power production and consumption technology element needs to be greatly modified and adjusted on the existing production simulation model. Therefore, the problem that the maintenance cost of the production simulation model is high exists in the prior art.
Disclosure of Invention
The embodiment of the invention provides a modeling method and device for a production simulation model of a power system and electronic equipment, and aims to solve the problem that in the prior art, the maintenance cost for the production simulation model is high.
In order to solve the technical problem, the invention is realized as follows: in a first aspect, an embodiment of the present invention provides a modeling method for a production simulation model of an electric power system, where the electric power system includes at least one electric power element, and the method includes:
constructing a production simulation model, wherein the production simulation model comprises electric power sub-models which correspond to the electric power elements one by one, and the electric power sub-models are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the electric power elements;
under the condition that a target power element needs to be added to the power system, parameter setting is carried out on the universal element model according to the output characteristic of the target power element, and a target power sub-model is obtained;
and updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
Optionally, the production simulation model is:
Figure BDA0002447761510000021
the first target production simulation model is as follows:
Figure BDA0002447761510000022
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure BDA0002447761510000023
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tProducing a mold for said first targetAnd (4) the energy rejection power of the simulation model at the time t.
Optionally, the updating the production simulation model based on the target power sub-model to obtain a first target production simulation model includes:
and updating the production simulation model based on the target power sub-model by taking the energy curtailment power value as an optimization target to obtain a first target production simulation model.
Optionally, after the building the production simulation model, the method further comprises:
under the condition that the power system needs to reduce second power elements, updating the production simulation model to obtain a second target production simulation model, wherein the second target production simulation model is as follows:
Figure BDA0002447761510000024
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
In a second aspect, an embodiment of the present invention further provides a modeling apparatus for a production simulation model of an electric power system, where the electric power system includes at least one electric power element, the apparatus includes:
the power supply simulation system comprises a construction module, a simulation module and a control module, wherein the construction module is used for constructing a production simulation model, the production simulation model comprises power submodels which correspond to the power elements one by one, and the power submodels are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the power elements;
the parameter setting module is used for carrying out parameter setting on the universal element model according to the output characteristic of the target power element under the condition that the target power element needs to be added to the power system to obtain a target power sub-model;
and the updating module is used for updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
Optionally, the production simulation model is:
Figure BDA0002447761510000031
the first target production simulation model is as follows:
Figure BDA0002447761510000032
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure BDA0002447761510000033
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
Optionally, the updating module is specifically configured to update the production simulation model based on the target power sub-model with the energy curtailment power value as an optimization target, so as to obtain a first target production simulation model.
Optionally, the updating module is further configured to update the production simulation model to obtain a second target production simulation model when the power system needs to reduce a second power element, where the second target production simulation model is:
Figure BDA0002447761510000034
wherein the second power element is any one of the at least one power element, W3tIs the second targetAnd (5) generating the energy curtailment power of the simulation model at the time t.
In a third aspect, an embodiment of the present invention further provides an electronic device, including a processor, a communication interface, a memory, and a communication bus, where the processor, the communication interface, and the memory complete mutual communication through the communication bus;
a memory for storing a computer program;
and the processor is used for executing the steps of the modeling method of the power system production simulation model when executing the program stored in the memory.
In a fourth aspect, the embodiments of the present invention further provide a computer-readable storage medium, which stores instructions that, when executed on a computer, cause the computer to perform the above-mentioned modeling method steps of the power system production simulation model.
In the embodiment of the invention, the production simulation model of the power system is formed by setting the universal element model and establishing independent sub-models for each power element in the power system based on the universal element model. Therefore, when the target power element needs to be added to the power system, the model can be updated only by establishing the target power sub-model based on the general element model and adding the target power sub-model to the production simulation model. In the process, the submodel of the target power element does not need to be built again, and the direct updating can be realized on the basis of the existing production simulation model, so that the maintenance cost of the production simulation model is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments of the present invention will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a flow chart of a method for modeling a power system production simulation model according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of the structure of a generic component model in an embodiment of the invention;
FIG. 3 is a schematic structural diagram of a modeling apparatus for a power system production simulation model according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a modeling method of a power system production simulation model according to an embodiment of the present invention, where the power system includes at least one power element, and the method includes:
step 101, constructing a production simulation model, wherein the production simulation model comprises electric power sub-models which correspond to the electric power elements one by one, and the electric power sub-models are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the electric power elements;
the power system may include a plurality of power elements, wherein the power elements may include power generation elements, power storage elements, and the like. For example, one power system may include a hydraulic power generation element, a thermal power generation element, a wind power generation element, a photovoltaic power generation element, a photothermal power generation element, an electrical energy storage and extraction element, an electrical heat storage electric vehicle element, and the like at the same time.
In actual production, the production activities of the power system are realized by the cooperation of the multiple power elements. Therefore, in order to avoid blind production, it is generally necessary to set a production model for modeling the generated energy or the stored energy output by each power element at each time, so as to ensure that sufficient power resources are provided for users while avoiding waste of power resources.
Referring to fig. 2, fig. 2 is a schematic structural diagram of a general component in the above embodiment, and the general component model may be represented as:
P(t)-C(t)=I(t)-O(t);
wherein, p (t) is the electric power output by the general-purpose element at the time t, c (t) is the stored power of the general-purpose element at the time t, i (t) is the generated power of the general-purpose element at the time t, and o (t) is the consumed power of the general-purpose element at the time t.
Furthermore, the following constraints may also be set for the above general component model:
Pi,min(t)≤Pi(t)≤Pi,max(t);
-RDi(t)≤Pi(t)-Pi-1(t)≤RUi(t);
Ci,min(t)≤Ci(t)≤Ci,max(t);
-CDi(t)≤Ci(t)-Ci-1(t)≤CUi(t);
SCi,min(t)≤Si(t)≤SCi,max(t);
Si(t)-Si(t-1)=Ii(t)-Pi(t)-ηi(t)*Ci(t)-Wi(t);
wherein, Pi,min(t) is the maximum external output power of the ith power element at time t, Pi,max(t) is the minimum external output electric power, RD, of the ith power element at time ti(t) maximum ramp-down rate of the ith power element at time t, RUi(t) maximum ascent rate of ith power element at time t, Ci,min(t) minimum charging power of the ith power element at time t, Ci,max(t) maximum charging power of the ith power element at time t, SCi,min(t) is the minimum energy storage of the ith power element at time t, Si(t) is the energy storage of the ith power element at time t, SCi,max(t) is the maximum energy storage of the ith power element at time t, ηi(t) is the charging efficiency of the ith power element at time t, Wi(t) represents the energy rejection power of the ith power element at time t. Pi(t) the output electric power of the ith power element at the time of t, Ii(t) is the generated power of the ith power element at time t.
Specifically, the parameters of the general component model may be set according to the output characteristics of each power component to obtain a power sub-model corresponding to the power component, for example:
(1) aiming at a thermal power generation element, the output of a thermal power generating unit can be freely adjusted between the maximum output constraint and the minimum output constraint according to the requirement, wherein the maximum output and the minimum technical output of the thermal power generating unit are input according to the actual conditions according to factors such as a heat supply period, high-temperature weather and the like, the climbing rate is determined by the inherent characteristics of the thermal power generating unit, the non-electric input is sufficient, and other maximum electricity storage power, energy storage and power consumption power are zero, so the parameters can be set as follows:
Figure BDA0002447761510000061
wherein, PiFP,min(t)、PiFP,max(t) is the maximum and minimum output constraint of the thermal power generating unit at the t moment, RDiFP、RUiFPThe maximum and minimum climbing rates of the thermal power generating unit are obtained.
(2) For wind power and photovoltaic models, wind power and photovoltaic non-electric input power are determined by theoretical output obtained by resource characteristics, wind power and photovoltaic output power are determined by theoretical output, the maximum value is non-electric maximum input power, and both energy storage and non-electric output power are zero, so that the following parameters can be set:
Figure BDA0002447761510000071
wherein Ii,TAnd (t) is the theoretical output of wind power and photovoltaic.
(3) To the water and electricity model, the minimum power of water and electricity is the expected power of water and electricity, and the maximum power of water and electricity is decided by guaranteeing to exert oneself, and the non-electric input of water and electricity is decided by the water condition, generally equals the average power of water and electricity, and water and electricity energy storage capacity is decided by the storage capacity, consequently, can set up the parameter as follows:
Figure BDA0002447761510000072
(4) for the pumped storage and electrochemical energy storage model, the maximum input or output power of pumped storage and energy storage is determined by the installed capacity, the minimum output power is zero, and the energy storage capacity is determined by the storage capacity or the energy storage duration, so the following parameters can be set:
Figure BDA0002447761510000073
wherein, PiSP(t) pumped storage or stored installed power, RCiSPFor storing storage capacity or energy, etaiSPFor energy storage conversion efficiency.
(5) For electric vehicles and electric heat storage models, the following parameters can be set:
Figure BDA0002447761510000081
wherein, PiSU(t) pumped storage or storage installed capacity, SCiSUDegree of flexibility of energy storage capacity for electric vehicles, electric heat storage, OiSUThe term (t) denotes the non-electric output power, and is determined by the output characteristics of an electric vehicle, electric heat storage, and the like.
(6) For the photothermal model, the parameters may be set as follows:
Figure BDA0002447761510000082
and 102, under the condition that a target power element needs to be added to the power system, performing parameter setting on the universal element model according to the output characteristic of the target power element to obtain a target power sub-model.
As can be seen from the above discussion, the parameters of the conventional and common power components can be set based on the general component model to obtain the corresponding target power sub-model, so that when a power system needs to add a target power component, the target power sub-model can be constructed based on the output characteristics of the target power component to be configured according to the above method.
And 103, updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
Specifically, the production simulation model is:
Figure BDA0002447761510000083
the first target production simulation model is as follows:
Figure BDA0002447761510000091
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure BDA0002447761510000092
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
Therefore, when the production simulation model is updated based on the target power sub-model, only the actual external output power (P) of the newly added target power sub-model is required to be updatedi(t)-Ci(t)) adding the target production simulation model to the power system side of the production simulation model to obtain the first target production simulation model.
In the embodiment of the invention, the production simulation model of the power system is formed by setting the universal element model and establishing independent sub-models for each power element in the power system based on the universal element model. Therefore, when the target power element needs to be added to the power system, the model can be updated only by establishing the target power sub-model based on the general element model and adding the target power sub-model to the production simulation model. In the process, when the target power element needs to be added, the submodel of the target power element does not need to be built again, and the direct updating can be realized on the basis of the existing production simulation model, so that the maintenance cost of the production simulation model is reduced.
Optionally, the updating the production simulation model based on the target power sub-model to obtain a first target production simulation model includes:
and updating the production simulation model based on the target power sub-model by taking the energy curtailment power value as an optimization target to obtain a first target production simulation model.
In the prior art, the problems of wind power wind abandonment and photovoltaic light abandonment are severe in partial regional power grids, and the wind power wind abandonment and the photovoltaic light abandonment mean that the power of wind power generation and photovoltaic power generation is easy to be influenced by the environment and is in continuous change, so that the wind power and the photovoltaic power are regarded as unstable power sources and cannot be connected to the grid.
Specifically, since the wind power generation element, the photovoltaic power generation element, and the like are greatly affected by the weather conditions, the generated power is large when the wind power and the illumination are sufficient, and the generated power is small otherwise. Therefore, in the conventional art, it is found that there is uncertainty in the output power of a power generation element, such as a wind power generation element or a photovoltaic power generation element, which is greatly affected by weather conditions. In contrast, in the prior art, in order to ensure the stability of the power consumption of the user, for the power generation elements such as the wind power generation element and the photovoltaic power generation element which are greatly influenced by the climate conditions, only a part of the generated power is used to ensure that the power generation elements can stably output a small power, and when the wind power and the illumination are sufficient, the generated excessive electric power is usually selected to be abandoned.
In order to avoid waste of power resources, in this embodiment, an optimization target may be set to be the minimum energy curtailment power value, and the production simulation model is updated based on the target power sub-model to obtain a first target production simulation model. I.e. with W2tAnd taking the minimum value as an optimization target, and optimizing the simulation model generated by the first target. Therefore, the resource waste in the power system can be effectively reduced.
Optionally, after the building the production simulation model, the method further comprises:
under the condition that the power system needs to reduce second power elements, updating the production simulation model to obtain a second target production simulation model, wherein the second target production simulation model is as follows:
Figure BDA0002447761510000101
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
In the power system, part of the traditional power generation elements may be eliminated due to the problems of low power generation efficiency, severe environmental pollution caused by the power generation process and the like. Therefore, when the second power element in the power system needs to be eliminated, the power sub-model corresponding to the second power element can be deleted in the production simulation model. Since the second power element no longer participates in the power generation in the production simulation model, but the electric power required by the power consuming device does not change, the generated power of the other power elements in the production simulation model will increase accordingly. Therefore, in order to avoid the blind increase of the output power of each power element, after deleting the submodel of the second power element, the production simulation model is optimized by taking the minimum energy curtailment power as an optimization target to obtain a second target production model, and the second target production model can simulate and output the actual output power of each power element in the power system, so that a worker can control the output power of each power element according to the simulation result, and the waste of power resources is ensured under the condition of meeting the power consumption requirement.
Referring to fig. 3, fig. 3 is a device 300 for creating a production simulation model according to an embodiment of the present invention, where the power system includes at least one power element, and the device includes:
a building module 301, configured to build a production simulation model, where the production simulation model includes power submodels corresponding to the power elements one to one, and the power submodels are models obtained by setting parameters of a general element model according to output characteristics of the power elements;
a parameter setting module 302, configured to perform parameter setting on the general component model according to the output characteristics of the target power component to obtain a target power sub-model when the power system needs to add the target power component;
and the updating module 303 is configured to update the production simulation model based on the target power sub-model to obtain a first target production simulation model.
The production simulation model is as follows:
Figure BDA0002447761510000111
the first target production simulation model is as follows:
Figure BDA0002447761510000112
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure BDA0002447761510000113
For the power loss of the transmission line at time t, LtFor the power supply areaRequired power at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
Optionally, the updating module is specifically configured to update the production simulation model based on the target power sub-model with the energy curtailment power value as an optimization target, so as to obtain a first target production simulation model.
Optionally, the updating module is further configured to update the production simulation model to obtain a second target production simulation model when the power system needs to reduce a second power element, where the second target production simulation model is:
Figure BDA0002447761510000114
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
An embodiment of the present invention further provides an electronic device, as shown in fig. 4, including a processor 401, a communication interface 402, a memory 403, and a communication bus 404, where the processor 401, the communication interface 402, and the memory 403 complete mutual communication through the communication bus 404,
a memory 403 for storing a computer program;
the processor 401, when executing the program stored in the memory 403, implements the following steps:
constructing a production simulation model, wherein the production simulation model comprises electric power sub-models which correspond to the electric power elements one by one, and the electric power sub-models are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the electric power elements;
under the condition that a target power element needs to be added to the power system, parameter setting is carried out on the universal element model according to the output characteristic of the target power element, and a target power sub-model is obtained;
and updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
Optionally, the production simulation model is:
Figure BDA0002447761510000121
the first target production simulation model is as follows:
Figure BDA0002447761510000122
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure BDA0002447761510000123
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
Optionally, the updating the production simulation model based on the target power sub-model to obtain a first target production simulation model includes:
and updating the production simulation model based on the target power sub-model by taking the energy curtailment power value as an optimization target to obtain a first target production simulation model.
Optionally, after the building the production simulation model, the method further comprises:
under the condition that the power system needs to reduce second power elements, updating the production simulation model to obtain a second target production simulation model, wherein the second target production simulation model is as follows:
Figure BDA0002447761510000131
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
The communication bus mentioned in the electronic device may be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus may be divided into an address bus, a data bus, a control bus, etc. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus.
The communication interface is used for communication between the electronic equipment and other equipment.
The Memory may include a Random Access Memory (RAM) or a non-volatile Memory (non-volatile Memory), such as at least one disk Memory. Optionally, the memory may also be at least one memory device located remotely from the processor.
The Processor may be a general-purpose Processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the Integrated Circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, a discrete Gate or transistor logic device, or a discrete hardware component.
In yet another embodiment provided by the present invention, there is also provided a computer-readable storage medium having stored therein instructions, which when run on a computer, cause the computer to execute the method of modeling a power system production simulation model according to any of the embodiments.
In a further embodiment provided by the present invention, there is also provided a computer program product containing instructions which, when run on a computer, cause the computer to perform the method of modeling a power system production simulation model according to any of the embodiments.
In the described embodiments, this may be implemented in whole or in part by software, hardware, firmware, or any combination thereof. When implemented in software, may be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When loaded and executed on a computer, cause the processes or functions described in accordance with the embodiments of the invention to occur, in whole or in part. The computer may be a general purpose computer, a special purpose computer, a network of computers, or other programmable device. The computer instructions may be stored in a computer readable storage medium or transmitted from one computer readable storage medium to another, for example, from one website site, computer, server, or data center to another website site, computer, server, or data center via wired (e.g., coaxial cable, fiber optic, Digital Subscriber Line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device, such as a server, a data center, etc., that incorporates one or more of the available media. The usable medium may be a magnetic medium (e.g., floppy Disk, hard Disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium (e.g., Solid State Disk (SSD)), among others.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
All the embodiments in the present specification are described in a related manner, and the same and similar parts among the embodiments may be referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to the partial description of the method embodiment.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention shall fall within the protection scope of the present invention.

Claims (10)

1. A method of modeling a power system production simulation model, the power system including at least one power element, the method comprising:
constructing a production simulation model, wherein the production simulation model comprises electric power sub-models which correspond to the electric power elements one by one, and the electric power sub-models are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the electric power elements;
under the condition that a target power element needs to be added to the power system, parameter setting is carried out on the universal element model according to the output characteristic of the target power element, and a target power sub-model is obtained;
and updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
2. The method of claim 1, wherein the production simulation model is:
Figure FDA0002447761500000011
the first target production simulation model is as follows:
Figure FDA0002447761500000012
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure FDA0002447761500000013
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
3. The method of claim 2, wherein the updating the production simulation model based on the target power sub-model to obtain a first target production simulation model comprises:
and updating the production simulation model based on the target power sub-model by taking the energy curtailment power value as an optimization target to obtain a first target production simulation model.
4. The method of claim 2, wherein after the building a production simulation model, the method further comprises:
under the condition that the power system needs to reduce second power elements, updating the production simulation model to obtain a second target production simulation model, wherein the second target production simulation model is as follows:
Figure FDA0002447761500000021
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
5. A modeling apparatus for a power system production simulation model, the power system including at least one power element, the apparatus comprising:
the power supply simulation system comprises a construction module, a simulation module and a control module, wherein the construction module is used for constructing a production simulation model, the production simulation model comprises power submodels which correspond to the power elements one by one, and the power submodels are models obtained by carrying out parameter setting on a universal element model according to the output characteristics of the power elements;
the parameter setting module is used for carrying out parameter setting on the universal element model according to the output characteristic of the target power element under the condition that the target power element needs to be added to the power system to obtain a target power sub-model;
and the updating module is used for updating the production simulation model based on the target power sub-model to obtain a first target production simulation model.
6. The apparatus of claim 5, wherein the production simulation model is:
Figure FDA0002447761500000022
the first target production simulation model is as follows:
Figure FDA0002447761500000023
wherein, the Pi(t) is the generated power of the ith power element at the time t, Ci(t) is the stored energy power of the ith power element at the moment t, the
Figure FDA0002447761500000024
For the power loss of the transmission line at time t, LtRequired power for the supply area at time t, DtReserve power for the supply area at time t, W1tThe energy rejection power of the production simulation model at the time t, W2tAnd generating the energy curtailment power of the simulation model for the first target at the time t.
7. The apparatus according to claim 6, wherein the updating module is specifically configured to update the production simulation model based on the target power sub-model with the energy curtailment power value as an optimization target, so as to obtain a first target production simulation model.
8. The method of claim 6, wherein the updating module is further configured to update the production simulation model to obtain a second goal production simulation model if the power system needs to reduce a second power element, and the second goal production simulation model is:
Figure FDA0002447761500000031
wherein the second power element is any one of the at least one power element, W3tAnd generating the energy curtailment power of the simulation model for the second target at the time t.
9. An electronic device is characterized by comprising a processor, a communication interface, a memory and a communication bus, wherein the processor and the communication interface are used for realizing mutual communication by the memory through the communication bus;
a memory for storing a computer program;
a processor for performing the method steps of any of claims 1-4 when executing a program stored in the memory.
10. A computer-readable storage medium, having stored therein instructions, which, when run on a computer, cause the computer to perform the method steps of any of claims 1-4.
CN202010283864.4A 2020-04-13 2020-04-13 Modeling method and device for power system production simulation model and electronic equipment Active CN113538164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010283864.4A CN113538164B (en) 2020-04-13 2020-04-13 Modeling method and device for power system production simulation model and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010283864.4A CN113538164B (en) 2020-04-13 2020-04-13 Modeling method and device for power system production simulation model and electronic equipment

Publications (2)

Publication Number Publication Date
CN113538164A true CN113538164A (en) 2021-10-22
CN113538164B CN113538164B (en) 2023-04-25

Family

ID=78087805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010283864.4A Active CN113538164B (en) 2020-04-13 2020-04-13 Modeling method and device for power system production simulation model and electronic equipment

Country Status (1)

Country Link
CN (1) CN113538164B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544336B (en) * 2012-03-23 2016-02-03 山东电力集团公司青岛供电公司 The modeling of the electric network model of logic-based relation
CN104537178B (en) * 2014-12-31 2017-10-13 南京邮电大学 A kind of power system associative simulation modeling method based on Matlab and Netlogo
CN106951694B (en) * 2017-03-07 2020-01-14 国网冀北电力有限公司 Adaptive modeling method for online monitoring system of secondary equipment of power system
JP7219542B2 (en) * 2018-03-06 2023-02-08 一般財団法人電力中央研究所 POWER SYSTEM CONTROL DEVICE, POWER SYSTEM CONTROL SYSTEM, POWER SYSTEM CONTROL METHOD AND POWER SYSTEM CONTROL PROGRAM
CN109861301B (en) * 2018-11-27 2021-06-15 国网能源研究院有限公司 Production simulation method for source-grid load-storage coordination power system

Also Published As

Publication number Publication date
CN113538164B (en) 2023-04-25

Similar Documents

Publication Publication Date Title
WO2022036778A1 (en) Optimal control method and system for load recovery of transmission and distribution coordination
WO2024046137A1 (en) Power prediction model construction method for multi-energy combined power generation system and power prediction method for multi-energy combined power generation system
Wang Risk assessment of stochastic spinning reserve of a wind‐integrated multi‐state generating system based on a cross‐entropy method
CN115456304A (en) Offshore wind farm reliability index calculation method and device considering typhoon influence
CN111725808A (en) Singular perturbation-based distributed convergence control method and system for comprehensive energy system
CN103400217B (en) Wind-powered electricity generation and conventional energy resources coordinated scheduling wind-powered electricity generation consistency network security analytical procedure
CN115906408A (en) Energy scheduling system and method based on building load prediction
Cao et al. Using stochastic programming and statistical extrapolation to mitigate long-term extreme loads in wind turbines
CN111509700A (en) Power grid operation management method and device based on electricity price prediction
CN113363976B (en) Scene graph-based wind-solar-water complementary power generation system medium-term optimization scheduling method
CN113723793A (en) Method, device, equipment and medium for realizing park comprehensive energy system
CN113538164A (en) Modeling method and device for power system production simulation model and electronic equipment
CN117239754A (en) Carbon emission considered wind-light-fire multi-power coordination operation method and system
CN111476411A (en) Photovoltaic power station generated energy calculation method and server
CN115545793A (en) Novel power system power grid foundation model construction method, system, equipment and medium
CN115167131A (en) Adaptive event trigger estimation method of sewage treatment system based on disturbance observer
CN113298329A (en) Training and strategy generating method, system, computer device and storage medium
KR102126490B1 (en) System and Method for Energy Forecasting using Directional Cost Function
CN116388183B (en) Designated time distributed economic scheduling method under directed unbalanced network
CN113241800B (en) Intelligent power grid control system based on regional electricity prices and control method thereof
CN111682535B (en) Power system distributed economic dispatching method based on dynamic event triggering
CN117787606A (en) Network storage collaborative planning method and system for iteratively incorporating typical scene
CN117194458A (en) Updating method, device and equipment of electric power carbon intensity and storage medium
Zhou et al. Multi-Time scale unit commitment optimization under hybrid uncertainties
CN117856300A (en) Advanced adiabatic compressed air energy storage capacity configuration method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant