CN113516350A - Intelligent three-creation rating system and method for power generation enterprise - Google Patents

Intelligent three-creation rating system and method for power generation enterprise Download PDF

Info

Publication number
CN113516350A
CN113516350A CN202110429529.5A CN202110429529A CN113516350A CN 113516350 A CN113516350 A CN 113516350A CN 202110429529 A CN202110429529 A CN 202110429529A CN 113516350 A CN113516350 A CN 113516350A
Authority
CN
China
Prior art keywords
rating
company
management
big data
creation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110429529.5A
Other languages
Chinese (zh)
Inventor
马勇
王栩
黄涛
唐培全
谢云明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Shandong Power Generation Co Ltd
Original Assignee
Huaneng Shandong Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Shandong Power Generation Co Ltd filed Critical Huaneng Shandong Power Generation Co Ltd
Priority to CN202110429529.5A priority Critical patent/CN113516350A/en
Publication of CN113516350A publication Critical patent/CN113516350A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an intelligent three-way rating system and method for a power generation enterprise. The method comprises the following steps: the business system stores data information and performs unified processing on the data information; the big data platform is connected with the business system through a data interface and can acquire data information of the business system; and the big data platform calculates the three-created scores of the company according to the data information and the scoring rules of the three-created scores of the company to obtain the three-created scores of the company. The intelligent three-creation rating system for the power generation enterprises solves the problem that in the prior art, the three-creation rating work of the companies needs manual statistics, so that time and labor are wasted.

Description

Intelligent three-creation rating system and method for power generation enterprise
Technical Field
The invention relates to the technical field of generator rating, in particular to an intelligent three-generation rating system and method for a power generation enterprise.
Background
The company creates rating work in three times in the past year, has no system support, is offline manual statistics, and wastes time and labor. Cannot meet the refined management requirements of groups and companies.
Disclosure of Invention
The invention aims to provide an intelligent three-creation rating system and method for a power generation enterprise, and the intelligent three-creation rating system for the power generation enterprise can solve the problem that in the prior art, the three-creation rating work needs manual statistics, so that time and labor are wasted.
In order to achieve the above purpose, the invention provides the following technical scheme:
an intelligent, triple-created rating system for a power generation enterprise, comprising:
the business system stores data information and performs unified processing on the data information;
the big data platform is connected with the business system through a data interface and can acquire data information of the business system; and the big data platform calculates the three-created scores of the company according to the data information and the scoring rules of the three-created scores of the company to obtain the three-created scores of the company.
On the basis of the technical scheme, the invention can be further improved as follows:
further, the big data platform comprises a data storage layer, and the data storage layer is used for supporting and storing data information of the big data platform.
Furthermore, the big data platform further comprises a technical support layer, and the technical support layer builds a front-end framework and a rear-end framework of the big data platform through a front-end and rear-end development technology of the element.
Further, the big data platform further comprises a platform foundation layer, and the platform foundation layer comprises user management, role management, authority management, process management and calculation management.
Further, the big data platform further comprises an application function layer, and the application function layer comprises rating item management, rating standard management, data acquisition and auditing, expert approval and comprehensive query.
Furthermore, the big data platform also comprises a user access layer, and the user access layer logs in an intelligent three-creation rating system for the power generation enterprise in a mode of accessing an intranet domain name.
A method for company triage rating, the method comprising in particular:
s101, unifying data information through a service system;
s102, collecting data information of the service system through a big data platform;
s103, storing the data information and the index information through a big data platform;
and S104, calculating the three-created score of the company by the big data platform according to the data information and the three-created scoring rule of the company to obtain the three-created score of the company.
Further, storing the data information and the index information through a big data platform specifically includes: and storing the data information of the big data platform through a data storage layer.
Further, obtaining the rating score created by the company specifically includes: building a front-end frame and a rear-end frame of the big data platform through a technical support layer;
and user management, role management, authority management, process management and calculation management are carried out through a platform base layer.
Further, obtaining the rating score created by the company specifically further includes: performing rating item management, rating standard management, data acquisition and examination, expert approval and comprehensive query through an application functional layer;
and logging in an intelligent three-creation rating system for the power generation enterprise through a user access layer in a mode of accessing an intranet domain name.
The invention has the following advantages:
the intelligent three-creation rating system and method for the power generation enterprises, disclosed by the invention, are characterized in that data information stored by a business system is collected through a big data platform, and the big data platform calculates the three-creation score of a company according to the data information and the three-creation rating rule of the company to obtain the three-creation score of the company; the problem of thereby it is wasted time and energy that company's three creations rating work need the manual work to count among the prior art is solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural diagram of an intelligent three-way rating system in an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a big data platform according to an embodiment of the present invention;
FIG. 3 is a schematic flow chart of a company three-created rating method according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of a third creation rating section of a company in an embodiment of the invention;
FIG. 5 is a diagram of an intelligent triage rating system in an embodiment of the invention.
Description of reference numerals:
the system comprises a business system 10, a big data platform 20, a data storage layer 201, a technology support layer 202, a platform base layer 203, an application function layer 204 and a user access layer 205.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in FIG. 1, the present invention provides an intelligent triple-initiative rating system for power generation enterprises, comprising:
the business system 10 stores data information and performs unified processing on the data information;
the big data platform 20 is connected with the service system 10 through a data interface, and the big data platform 20 can collect data information of the service system 10; and the big data platform 20 calculates the three-created score of the company according to the data information and the scoring rule of the three-created score of the company to obtain the three-created score of the company.
In order to further improve the unit rating and the 'three-creation' work, the Shanneng Shandong company further develops a sound evaluation system from five aspects of safety management, equipment management, operation management, technical management and reliability management and quantifies and optimizes evaluation standards from five aspects of safety indexes, technical and economic indexes, overhaul quality indexes, technical supervision indexes and benefit indexes in order to organically combine the unit rating work and the 'three-creation' work.
The project construction of the intelligent three-level-creation rating system for the power generation enterprises adopts a centralized deployment mode, and the architecture design is carried out based on the modes of centralized deployment and two-level application; the system is intensively deployed in the Shandong company in Huaneng, the lower-level power plant accesses through the intranet, and the power plant does not need to build the system.
The system overall architecture is based on a unified data standard and comprises unified unit codes, company three-creation codes, index codes and classification codes; the data source layer is integrated with other information systems of a company, and the existing information platform data is fully utilized as a source of the rating data of the company three creations; the big data platform 20 functions include storage of data information and index information, a computing engine with the capability of rapidly computing data; the business system 10 includes existing information platform data.
Other business systems 10 already built by the Shandong Huaneng company contain data to be used by the intelligent three-creation rating system for the power generation enterprise, and in order to reduce repeated reporting of data of the power plant, the data of the other business systems 10 are automatically collected to be used in the intelligent three-creation rating system for the power generation enterprise through a data interface mode. The method has the advantages that the construction of the intelligent three-creation rating system for the power generation enterprises is realized, the functions of the intelligent three-creation rating system for the power generation enterprises comprise basic information, work flow, operation authority and resource template configuration functions, and a flexible management function is provided for effectively supporting the operation of the intelligent three-creation rating system for the power generation enterprises;
the intelligent three-creation rating system for the power generation enterprise meets the management functions of three-creation operators of the company, and comprises three-creation parameter configuration of the company, management index data acquisition and auditing, technical index data acquisition and auditing, plus-minus score evaluation index data acquisition and online checking, field checking, online scoring, field scoring and scoring calculation scoring result display; and the data integration function of a company side system and a group side system is realized.
An intelligent three-creation rating system for power generation enterprises of a company is built in an informatization means, the objectivity and the normative of the performance assessment work of the company production management are improved, and the production management refinement level is improved. The benchmarking management is used as a carrier, the fine management of equipment is used as a means, and the quantitative analysis, scientific study and judgment and accurate grasp of production and operation results are enhanced through the three-created rating of companies, so that the electric power enterprises are promoted to continuously improve the management level. The three-creation rating work of the company is further perfected, the efficiency is improved, the management and control are enhanced, the visualization degree and the decision-making assisting effect of the rating result are improved, the process management is realized, and a rating normalization mechanism is established.
As shown in fig. 2, the big data platform 20 includes a data storage layer 201, and the data storage layer 201 is used for supporting and storing data information of the big data platform 20.
Further, the big data platform 20 further includes a technology support layer 202, and the technology support layer 202 builds a front-end framework and a back-end framework of the big data platform 20 through an open front-end and back-end development technology. The technology support layer 202 uses mainstream, open-source, front-end development technologies including Spring Cloud2, VUE, jasperport, and Echarts.
Further, the big data platform 20 further includes a platform base layer 203, and the platform base layer 203 includes user management, role management, authority management, process management, and calculation management.
Further, the big data platform 20 further includes an application function layer 204, and the application function layer 204 includes rating item management, rating standard management, data collection and review, expert approval, and comprehensive query. The application function layer 204 is an application of a company three-created rating business report, such as a company three-created rating management index and a company three-created rating technical index.
Further, the big data platform 20 further includes a user access layer 205, and the user access layer 205 logs in an intelligent three-created rating system for a power generation enterprise by accessing an intranet domain name.
Based on the big data platform 20, a mixed mode of combining HDFS/Hbase and MySql relational database products is adopted for construction, and data storage and data application are respectively carried out in storage layers of the MySql and the big data platform 20 according to different applications of structured data and unstructured data, management type data, query analysis type data and the like in the company three-created rating service. Based on the micro-service architecture, the advantages of the basic platform are fully exerted.
As shown in fig. 3, a method for company triple creation rating, the method specifically comprises:
s101, unifying data information;
in this step, data information is unified through the service system 10;
s102, collecting data information;
in this step, data information of the service system 10 is collected through a big data platform 20;
s103, storing data information and index information;
in this step, the data information and the index information are stored through the big data platform 20;
s104, obtaining the three-creation score of the company;
in this step, the big data platform 20 calculates the score of the company created by three times according to the data information and the scoring rule of the company created by three times, so as to obtain the score of the company created by three times.
Further, the storing the data information and the index information through the big data platform 20 specifically includes: the data information of the big data platform 20 is stored through the data storage layer 201.
Further, obtaining the rating score created by the company specifically includes: building a front-end framework and a rear-end framework of the big data platform 20 through a technical support layer 202;
user management, role management, authority management, process management and calculation management are performed through the platform base layer 203.
Further, obtaining the rating score created by the company specifically further includes: the application function layer 204 is used for carrying out rating item management, rating standard management, data acquisition and examination, expert approval and comprehensive query;
the intelligent three-created rating system for the power generation enterprise is logged in by the user access layer 205 in a mode of accessing an intranet domain name.
As shown in fig. 4-5, an intelligent three-created rating system for power generation enterprises of Shandong companies is built in an informatization means, so that the construction target that the companies promote year by year in the ranking of group regional companies is realized.
Calculating the three-creation score of the company; data integration and data acquisition are realized; realizing the grading work flow management; realizing intelligent application of a rating result; the company three-created rating comprises: online verification, field verification, online scoring, and field scoring data.
An intelligent three-created rating system for a power generation enterprise needs to automatically acquire data from an ERP system. The system score is evaluated by an intelligent three-creation rating system for power generation enterprises. The intelligent three-creation rating system for the power generation enterprises evaluates system scores and establishes a company three-creation rating scoring rule according to group management requirements. An intelligent, three-created rating system for a power generation enterprise may share data for use by other systems. The rating data issued by the group is collected in a data interface mode, and the requirement of a company for standard work development is met.
The intelligent three-creation rating system for the power generation enterprises has the following use process:
when in use, an operator unifies data information through the service system 10; collecting data information of the service system 10 through a big data platform 20; storing the data information and the index information through the big data platform 20; and the big data platform 20 calculates the three-created score of the company according to the data information and the scoring rule of the three-created score of the company to obtain the three-created score of the company.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include more than one of the feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. An intelligent, triple-creation rating system for power generation enterprises, comprising:
the business system stores data information and performs unified processing on the data information;
the big data platform is connected with the business system through a data interface and can acquire data information of the business system; and the big data platform calculates the three-created scores of the company according to the data information and the scoring rules of the three-created scores of the company to obtain the three-created scores of the company.
2. The intelligent triage rating system for power generation enterprises of claim 1 wherein the big data platform comprises a data storage layer for supporting and storing data information of the big data platform.
3. The intelligent triage rating system for power generation enterprises of claim 2 further comprising a technology support layer, wherein the technology support layer builds the front end framework and the back end framework of the big data platform through an open front and back end development technology.
4. The intelligent triage rating system for power generation enterprises of claim 3 wherein the big data platform further comprises a platform foundation layer, the platform foundation layer comprising user management, role management, rights management, process management, and computing management.
5. The intelligent, triple-invasive rating system for power generation enterprises of claim 4 wherein the big data platform further comprises application functional layers including rating item management, rating standard management, data collection and review, expert approval, and comprehensive queries.
6. The intelligent triple-creation rating system for power generation enterprises of claim 5 wherein the big data platform further comprises a user access layer, and the user access layer logs in the intelligent triple-creation rating system for power generation enterprises by accessing an intranet domain name.
7. A method for company triage rating, the method comprising in particular:
s101, unifying data information through a service system;
s102, collecting data information of the service system through a big data platform;
s103, storing the data information and the index information through a big data platform;
and S104, calculating the three-created score of the company by the big data platform according to the data information and the three-created scoring rule of the company to obtain the three-created score of the company.
8. The method for company triage rating of claim 7, wherein storing the data information and the index information through a big data platform specifically comprises: and storing the data information of the big data platform through a data storage layer.
9. The method for company triple creation rating of claim 7, wherein obtaining a company triple creation rating score specifically comprises: building a front-end frame and a rear-end frame of the big data platform through a technical support layer;
and user management, role management, authority management, process management and calculation management are carried out through a platform base layer.
10. The method for company triple creation rating of claim 9, wherein obtaining a company triple creation rating score further comprises: performing rating item management, rating standard management, data acquisition and examination, expert approval and comprehensive query through an application functional layer;
and logging in an intelligent three-creation rating system for the power generation enterprise through a user access layer in a mode of accessing an intranet domain name.
CN202110429529.5A 2021-04-21 2021-04-21 Intelligent three-creation rating system and method for power generation enterprise Pending CN113516350A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110429529.5A CN113516350A (en) 2021-04-21 2021-04-21 Intelligent three-creation rating system and method for power generation enterprise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110429529.5A CN113516350A (en) 2021-04-21 2021-04-21 Intelligent three-creation rating system and method for power generation enterprise

Publications (1)

Publication Number Publication Date
CN113516350A true CN113516350A (en) 2021-10-19

Family

ID=78062604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110429529.5A Pending CN113516350A (en) 2021-04-21 2021-04-21 Intelligent three-creation rating system and method for power generation enterprise

Country Status (1)

Country Link
CN (1) CN113516350A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112598264A (en) * 2020-12-18 2021-04-02 江苏未至科技股份有限公司 Scenario comprehensive evaluation system for credit field
CN112686553A (en) * 2020-12-31 2021-04-20 民生科技有限责任公司 Enterprise automatic rating management system, method, server and readable storage device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112598264A (en) * 2020-12-18 2021-04-02 江苏未至科技股份有限公司 Scenario comprehensive evaluation system for credit field
CN112686553A (en) * 2020-12-31 2021-04-20 民生科技有限责任公司 Enterprise automatic rating management system, method, server and readable storage device

Similar Documents

Publication Publication Date Title
CN106557991B (en) Voltage monitoring data platform
CN105574652B (en) Intelligent power distribution network planning big data management and control system and method
CN111815132A (en) Network security management information publishing method and system for power monitoring system
CN105894217A (en) Power marketing multi-business system data center construction method
CN102708149A (en) Data quality management method and system
CN110852601A (en) Big data application method and system for environmental monitoring law enforcement decision
CN104573024B (en) The self-adaptation extraction method and system of heterogeneous secure log information under a kind of complex network system
CN109740872A (en) The diagnostic method and system of a kind of area's operating status
Hongxun et al. Data quality assessment for on-line monitoring and measuring system of power quality based on big data and data provenance theory
CN110175324A (en) A kind of operation of power networks operational order method of calibration and system based on data mining
CN109885601A (en) A kind of power distribution network basic data collection and analysis system
CN106355489A (en) Data center system and data processing method for management
Zou et al. A data mining framework within the Chinese NPPs operating experience feedback system for identifying intrinsic correlations among human factors
CN105975595B (en) A kind of real time data centre data quality-monitoring wire examination method
CN113516350A (en) Intelligent three-creation rating system and method for power generation enterprise
CN115016902B (en) Industrial flow digital management system and method
CN113256063A (en) Intelligent rating system and method for generator set
CN111178676A (en) Power distribution network project investment assessment method and system
Feng et al. The design and implementation of global energy interconnection digital research platform
CN115660580A (en) Data analysis management system based on whole-process engineering consultation platform
Lu Data Protection Software for Civil Aviation Control Flight Information System Based on FPE Algorithm
CN110298585B (en) Hierarchical automatic auditing method for monitoring information of substation equipment
CN113990479A (en) Medical monitoring system and method
CN114066189A (en) Three-dimensional evaluation and evaluation method based on power transmission and transformation project
CN112784129A (en) Pump station equipment operation and maintenance data supervision platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211019