CN113502846A CN202110739767.6A CN202110739767A CN113502846A CN 113502846 A CN113502846 A CN 113502846A CN 202110739767 A CN202110739767 A CN 202110739767A CN 113502846 A CN113502846 A CN 113502846A
Authority
CN
China
Prior art keywords
precise
bolt holes
tool
foundation
foundation bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110739767.6A
Other languages
Chinese (zh)
Inventor
闫显亮
刘斌
单业恒
杨振
曾安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202110739767.6A priority Critical patent/CN113502846A/en
Publication of CN113502846A publication Critical patent/CN113502846A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention relates to the technical field of equipment installation, in particular to an installation tool for a precise foundation bolt, which comprises a frame, a longitudinal support and a transverse support, wherein the longitudinal support and the transverse support are arranged in the frame, bolt holes are symmetrically formed in the transverse support on two sides of the longitudinal support, and the forming positions of the bolt holes are set according to the positions and the number of fixing bolts of a stretcher body. The mounting tool can ensure that the positioning precision of the precise foundation bolt required by equipment mounting is obtained, and the condition of incapability of grouting is avoided due to the structure of the equipment body, so that convenience is provided for mounting the precise foundation bolt of large-scale equipment.

Description

Mounting tool for precise foundation bolt and operation method thereof
Technical Field
The invention relates to the technical field of equipment installation, in particular to an installation tool of a precise foundation bolt and an operation method thereof.
Background
In the installation process of conventional mechanical equipment, the foundation bolts required by the equipment are mostly directly buried, or grouting of the foundation bolts is performed after holes are reserved and then the equipment is installed. The installation of foundation bolts of the stretching machine equipment on the pop-top can production line cannot be realized, on one hand, the stretching machine equipment is directly installed on the equipment foundation (epoxy paint must be coated on the surface of the equipment foundation before the equipment installation for preventing dust and oil pollution), and the equipment body directly covers the bolt holes, so that grouting cannot be performed. On the other hand (as shown in figure 1), because the stretcher equipment is relatively precise, the accuracy deviation of the direct-buried foundation bolt is large, and the direct-buried foundation bolt cannot be normally installed.
Disclosure of Invention
The invention aims to overcome the defects and provides a mounting tool for a precise foundation bolt and a working method thereof.
In order to achieve the above object, the present invention is realized by:
the mounting tool for the precise foundation bolts of the stretcher comprises a frame, and a longitudinal support and a transverse support which are arranged in the frame, wherein bolt holes are symmetrically formed in the transverse support on two sides of the longitudinal support, and the forming positions of the bolt holes are set according to the positions and the number of fixing bolts of a stretcher body.
The operation method of the installation tool of the precise foundation bolt of the stretcher comprises the following steps
Step 1, preparing an installation tool, wherein the installation tool is formed by welding flat steel and square steel pipes, holes are drilled in the installation tool according to the positions and the number of bolt holes fixed by a stretcher body, the aperture is smaller than the size of a hexagon nut, and the number of the flat steel is determined by the number of the bolt holes;
step 2, when the foundation bolts are installed, one ends of the precise foundation bolts for fixing the equipment body penetrate through bolt holes of an installation tool and are fixed on the installation tool through hexagon nuts, so that the installation tool and the precise foundation bolts are integrated;
step 3, putting the whole formed by the mounting tool and the precise foundation bolts into foundation bolt holes which are constructed in advance, adjusting the precise foundation bolts to enable the upper surfaces of studs of the precise foundation bolts to be 2-5 mm lower than the upper surface of the equipment foundation, adjusting the longitudinal and transverse centers of the whole mounting tool to meet the requirement of a drawing for non-deviation, ensuring that the precise foundation bolts are located at the center positions of the foundation bolt holes, and finally performing horizontal measurement on the whole mounting tool to enable the whole mounting tool to be at the same level so as to enable all the precise foundation bolts to be in a horizontal state;
and 4, in order to ensure grouting strength and facilitate cleaning of oil stains flowing out during later equipment operation, grouting is performed by using epoxy resin grouting material, and after grouting is completed, after 24 hours, mounting tools are removed for recycling.
The mounting tool can ensure that the positioning precision of the precise foundation bolt required by equipment mounting is obtained, and the condition of incapability of grouting is avoided due to the structure of the equipment body, so that convenience is provided for mounting the precise foundation bolt of large-scale equipment.
Drawings
FIG. 1 is a schematic view of a construction process for installing foundation bolts of equipment by using the tool.
Fig. 2 is a top view of the tool.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and 2, the installation tool for the precise foundation bolt of the stretcher comprises a frame 1, a longitudinal support 2 and a transverse support 3, wherein the longitudinal support 2 and the transverse support 3 are arranged in the frame 1, bolt holes 4 are symmetrically formed in the transverse support 3 on two sides of the longitudinal support 2, and the forming positions of the bolt holes 4 are set according to the positions and the number of fixing bolts of a stretcher body.
As shown in FIG. 2, the working method of the installation tool of the precise anchor bolt of the stretcher comprises the following steps
Step 1, preparing an installation tool, wherein the installation tool is formed by welding flat steel and square steel pipes, holes are drilled in the installation tool according to the positions and the number of bolt holes fixed by a stretcher body, the aperture is smaller than the size of a hexagon nut, and the number of the flat steel is determined by the number of the bolt holes;
step 2, when the foundation bolts are installed, one ends of the precise foundation bolts for fixing the equipment body penetrate through bolt holes of an installation tool and are fixed on the installation tool through hexagon nuts, so that the installation tool and the precise foundation bolts are integrated;
step 3, putting the whole formed by the mounting tool and the precise foundation bolts into foundation bolt holes which are constructed in advance, adjusting the precise foundation bolts to enable the upper surfaces of studs of the precise foundation bolts to be 2-5 mm lower than the upper surface of the equipment foundation, adjusting the longitudinal and transverse centers of the whole mounting tool to meet the requirement of a drawing for non-deviation, ensuring that the precise foundation bolts are located at the center positions of the foundation bolt holes, and finally performing horizontal measurement on the whole mounting tool to enable the whole mounting tool to be at the same level so as to enable all the precise foundation bolts to be in a horizontal state;
and 4, in order to ensure grouting strength and facilitate cleaning of oil stains flowing out during later equipment operation, grouting is performed by using epoxy resin grouting material, and after grouting is completed, after 24 hours, mounting tools are removed for recycling.
The mounting tool can ensure that the positioning precision of the precise foundation bolt required by equipment mounting is obtained, and the condition of incapability of grouting is avoided due to the structure of the equipment body, so that convenience is provided for mounting the precise foundation bolt of large-scale equipment.

Claims (2)

1. The utility model provides a mounting tool of accurate rag bolt of stretcher, characterized by: the stretcher comprises a frame, a longitudinal support and a transverse support, wherein the longitudinal support and the transverse support are arranged in the frame, bolt holes are symmetrically formed in the transverse support on two sides of the longitudinal support, and the forming positions of the bolt holes are set according to the positions and the number of fixing bolts of a stretcher body.
2. The method of operating a tool for installing a precision anchor bolt of a drawing machine according to claim 1, wherein: comprises that
Step 1, preparing an installation tool, wherein the installation tool is formed by welding flat steel and square steel pipes, holes are drilled in the installation tool according to the positions and the number of bolt holes fixed by a stretcher body, the aperture is smaller than the size of a hexagon nut, and the number of the flat steel is determined by the number of the bolt holes;
step 2, when the foundation bolts are installed, one ends of the precise foundation bolts for fixing the equipment body penetrate through bolt holes of an installation tool and are fixed on the installation tool through hexagon nuts, so that the installation tool and the precise foundation bolts are integrated;
step 3, putting the whole formed by the mounting tool and the precise foundation bolts into foundation bolt holes which are constructed in advance, adjusting the precise foundation bolts to enable the upper surfaces of studs of the precise foundation bolts to be 2-5 mm lower than the upper surface of the equipment foundation, adjusting the longitudinal and transverse centers of the whole mounting tool to meet the requirement of a drawing for non-deviation, ensuring that the precise foundation bolts are located at the center positions of the foundation bolt holes, and finally performing horizontal measurement on the whole mounting tool to enable the whole mounting tool to be at the same level so as to enable all the precise foundation bolts to be in a horizontal state;
and 4, in order to ensure grouting strength and facilitate cleaning of oil stains flowing out during later equipment operation, grouting is performed by using epoxy resin grouting material, and after grouting is completed, after 24 hours, mounting tools are removed for recycling.
CN202110739767.6A 2021-06-30 2021-06-30 Mounting tool for precise foundation bolt and operation method thereof Pending CN113502846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110739767.6A CN113502846A (en) 2021-06-30 2021-06-30 Mounting tool for precise foundation bolt and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110739767.6A CN113502846A (en) 2021-06-30 2021-06-30 Mounting tool for precise foundation bolt and operation method thereof

Publications (1)

Publication Number Publication Date
CN113502846A true CN113502846A (en) 2021-10-15

Family

ID=78009517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110739767.6A Pending CN113502846A (en) 2021-06-30 2021-06-30 Mounting tool for precise foundation bolt and operation method thereof

Country Status (1)

Country Link
CN (1) CN113502846A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1776340C (en) * 1990-06-08 1992-11-15 Бобруйский машиностроительный завод им.В.И.Ленина Support for fastening of equipment on foundation
CN203770336U (en) * 2014-02-24 2014-08-13 中国化学工程第十四建设有限公司 Free expansion mounting structure for foundation bolt of compressor unit
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN205421311U (en) * 2015-12-01 2016-08-03 中国建筑第八工程局有限公司 Rag bolt fixes a position mounting tool
CN108222056A (en) * 2018-03-06 2018-06-29 防城港中重工有限公司 Apparatus foundation bolt group's installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1776340C (en) * 1990-06-08 1992-11-15 Бобруйский машиностроительный завод им.В.И.Ленина Support for fastening of equipment on foundation
CN203770336U (en) * 2014-02-24 2014-08-13 中国化学工程第十四建设有限公司 Free expansion mounting structure for foundation bolt of compressor unit
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN205421311U (en) * 2015-12-01 2016-08-03 中国建筑第八工程局有限公司 Rag bolt fixes a position mounting tool
CN108222056A (en) * 2018-03-06 2018-06-29 防城港中重工有限公司 Apparatus foundation bolt group's installation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
倪文杰主编: "《简明物资词典》", 30 April 1988, 北京:水利电力出版社 *
向才旺编著: "《建筑装饰材料》", 31 October 1999, 北京:中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
CN108425509B (en) Bolt ball joint net rack house steel structure replacement rod piece and bolt ball construction method
CN101451397A (en) Steel structure modularization construction process
CN113502846A (en) Mounting tool for precise foundation bolt and operation method thereof
CN211395729U (en) A pre-buried rag bolt positioner for building framework
CN112343180A (en) Foundation bolt pre-embedding deviation processing structure and method
CN218116533U (en) Pre-buried bolt crowd high accuracy fixing device of large-scale equipment basis
CN201283503Y (en) Angle crank positioning pin hole boring clamp
CN102704696B (en) Space locator for high, big and heavy steel upright column
CN101760209A (en) Method for installing steel structure for coke dry quenching slot
CN211849566U (en) Roughing mill body reserved bolt hole support-free template
CN203509110U (en) High-strength bolt hole manufacturing device of large steel structure crane beam braking system
CN109877945B (en) Hole-forming positioning construction method for reserved hole channel of concrete beam
CN212428127U (en) Simple tool for accurate calibration of component installation
CN111622350A (en) Technological steel structure foundation bolt mounting and positioning device and mounting method
CN110747914A (en) Large tower equipment inclination correction method
CN216999374U (en) Quick connector for concrete embedded pull rod
CN219152226U (en) Tool device for machining and positioning guide vane blank of steam turbine
CN211661427U (en) Special mould for assembling tower foot of iron tower
CN219992071U (en) Ground rail bolt fixed mounting system
CN220768912U (en) Rag bolt installs location work piece
CN219426041U (en) Large excavator side plate assembling tool
CN109944270B (en) Quick positioner of light and heat power station pylon basis rag bolt
CN217331163U (en) Detachable positioning and measuring device for bridge steel anchor box
CN219604047U (en) Bucket wheel machine foundation rail bolt installation fixing device
CN218656887U (en) Duplex drilling machine platform for drilling holes in nuclear power station ring crane corbels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211015

WD01 Invention patent application deemed withdrawn after publication