Device for rapidly chiseling pile foundation pile head Download PDFInfo
- Publication number
- CN113502809A CN113502809A CN202110842615.9A CN202110842615A CN113502809A CN 113502809 A CN113502809 A CN 113502809A CN 202110842615 A CN202110842615 A CN 202110842615A CN 113502809 A CN113502809 A CN 113502809A
- Authority
- CN
- China
- Prior art keywords
- pile
- embedded
- reinforcement cage
- isolation plate
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 40
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 238000002955 isolation Methods 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 239000002002 slurry Substances 0.000 claims abstract description 8
- 230000035515 penetration Effects 0.000 claims abstract description 4
- 239000004576 sand Substances 0.000 claims description 6
- 210000003205 muscle Anatomy 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 5
- 238000005259 measurement Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 2
- 125000006850 spacer group Chemical group 0.000 abstract 1
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 6
- 235000017491 Bambusa tulda Nutrition 0.000 description 6
- 241001330002 Bambuseae Species 0.000 description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 6
- 239000011425 bamboo Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000005192 partition Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000011241 protective layer Substances 0.000 description 2
- 238000005553 drilling Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A device for rapidly chiseling pile heads of a pile foundation is characterized in that a steel reinforcement cage of the pile foundation is provided with a main rib and a sound measurement pipe and comprises a jack and an arc-shaped isolation plate matched with the steel reinforcement cage, the isolation plate is provided with a row of mounting holes capable of enabling the main rib to penetrate through and a plurality of slurry penetration holes, the isolation plate is discontinuously mounted on the main rib above the designed pile top of the pile foundation, and the isolation plate is obliquely mounted at intervals by taking the sound measurement pipe as a spacer; a plurality of embedded cylinders are arranged on a main rib between the designed pile top and the isolation plate, jacks can be placed in the embedded cylinders, and one ends of the jacks, which are connected with the pressure pumps, face the inner side of the reinforcement cage. According to the invention, the isolation plate is pre-embedded before the reinforcement cage is lifted, and an isolation effect is formed between pile top concrete and floating slurry concrete; meanwhile, the embedded jacks jack the pile head concrete after the concrete is solidified, floating slurry concrete can be broken, and the construction is simple and efficient.
Description
Technical Field
The invention relates to the technical field of bridge engineering pile foundation construction, in particular to a device for rapidly chiseling a pile head of a pile foundation.
Background
In the process of pouring the pile foundation concrete, the strength of the pile top concrete at the pile top cannot meet the design requirement due to the factors that the coarse aggregate floats on the surface along with the self-weight lower layer and the slag soil. Therefore, in order to ensure the strength of the concrete on the pile top, the concrete can be over-poured for 1 m in actual construction, and the pile top is chiseled after the concrete reaches the designed strength.
The traditional pile head drilling method is many, but due to various factors, the method used on the spot is still: cutting off the concrete protective layer, and breaking the concrete by using an air pick; the method has the advantages of low construction speed and high labor cost.
Disclosure of Invention
In order to solve the problems, the invention provides a device for rapidly chiseling a pile head of a pile foundation, which has the following specific technical scheme:
a device for rapidly chiseling a pile head of a pile foundation is characterized in that a steel reinforcement cage of the pile foundation is provided with a main rib and a sound measurement pipe, and comprises a jack and an arc-shaped isolation plate matched with the steel reinforcement cage, wherein the isolation plate is provided with a row of mounting holes capable of enabling the main rib to penetrate and a plurality of slurry penetration holes, the isolation plate is discontinuously mounted on the main rib above a designed pile top of the pile foundation, and the isolation plate is obliquely mounted in a separated manner by the sound measurement pipe; a plurality of embedded cylinders are arranged on a main rib between the designed pile top and the isolation plate, jacks can be placed in the embedded cylinders, and one ends of the jacks, which are connected with the pressure pumps, face the inner side of the reinforcement cage.
Furthermore, the top surface and the bottom surface of the embedded cylinder are both welded with round steel plates with diameters larger than that of the embedded cylinder.
Furthermore, a conical cylinder is arranged on the round steel plate on the bottom surface of the embedded cylinder.
Furthermore, there are two pre-buried section of thick bamboo, and the contained angle that two pre-buried section of thick bamboo and the central line of steel reinforcement cage formed is 120 degrees.
Furthermore, before grouting is carried out in the pile foundation, medium coarse sand is filled in the embedded cylinder.
Has the advantages that:
according to the invention, the isolation plate is pre-embedded before the reinforcement cage is lifted, and an isolation effect is formed between pile top concrete and floating slurry concrete; meanwhile, the embedded jacks jack the pile head concrete after the concrete is solidified, floating slurry concrete can be broken, and the construction is simple and efficient.
Drawings
FIG. 1 is a top view of the present invention.
FIG. 2 is a cross-sectional view taken along line A-A of the present invention.
Fig. 3 is a schematic view of the embedding cylinder of the present invention.
In the figure: the steel reinforcement cage comprises a steel reinforcement cage body 1, a main reinforcement 11, a spiral reinforcement 12, a reinforcement stirrup 13, a steel reinforcement cage positioning reinforcement 14, a sounding pipe 15, a pile top of 16 design, a pre-embedded cylinder 2, a circular steel plate 21, a conical cylinder 22, an isolation plate 3, a mortar penetration hole 31, a jack 4, a steel wire 5 and coarse sand 6.
Detailed Description
The invention is further described with reference to the following figures and specific embodiments:
as shown in fig. 1 to 3, a device for rapidly chiseling a pile head of a pile foundation, wherein a reinforcement cage 1 of the pile foundation is provided with a main reinforcement 11 and a sounding pipe 15, and comprises a jack 4 and an arc-shaped partition plate 3 matched with the reinforcement cage 1, the partition plate 3 is provided with a row of mounting holes through which the main reinforcement 11 can pass and a plurality of grout-permeable holes 3131, the partition plate 3 is discontinuously mounted on the main reinforcement 11 above a designed pile top 16 of the pile foundation, and the partition plate 3 is obliquely mounted at intervals by using the sounding pipe 15; a plurality of embedded cylinders 2 are arranged on a main rib 11 between a designed pile top 16 and an isolation plate 3, jacks 4 can be placed in the embedded cylinders 2, and one ends of the jacks 4 connected with a pressure pump face to the inner side of a reinforcement cage 1.
Specifically, the main reinforcement 11, the spiral reinforcement 12, the reinforcement stirrup 13 and the reinforcement cage positioning reinforcement 14 of the reinforcement cage 1 are arranged on the cage rolling machine, so that the reinforcement cage 1 can be conveniently hoisted and connected with the installed reinforcement cage 1 after installation; and the acoustic pipe 15 is bound on the reinforcing stirrup 13, so that the pile foundation can be conveniently detected.
As shown in fig. 3, the embedded cylinder 2 can be made of an iron sheet with a certain thickness into a cylinder, and the top surface and the bottom surface of the embedded cylinder 2 are both welded with a round steel plate 21 with a diameter larger than that of the embedded cylinder 2, so that the embedded cylinder 2 forms a totally closed area to prevent concrete from entering; the pre-buried section of thick bamboo 2 utilizes steel wire 5 ligature on main muscle 11, and coarse sand 6 in the pre-buried section of thick bamboo 2 intussuseption avoids the pre-buried section of thick bamboo 2 of concrete pouring in-process to be shriveled.
Preferably, the circular steel plate 21 on the bottom surface of the embedded cylinder 2 is provided with a conical cylinder 2222, so that the floating concrete can float upwards by using the conical cylinder 2222, and the jack 4 can fully exert the function thereof.
In the embodiment, two embedded cylinders 2 are provided, and an included angle formed by the two embedded cylinders 2 and a central connecting line of the reinforcement cage 1 is 120 degrees, so that the stability and symmetry of the jack 4 in the jacking process are ensured; the installation position of the embedded cylinder 2 is marked, wherein the circular steel plate 21 can extend out of the inner side of the reinforcement cage 1, so that the installation position of the embedded cylinder 2 can be identified.
When the concrete floating-grouting device is used, the embedded cylinder 2 and the isolation plate 3 are correspondingly installed on the reinforcement cage 1, medium coarse sand 6 is filled in the embedded cylinder 2, concrete is poured into the reinforcement cage 1, the pile top concrete and the floating mortar concrete are isolated by the isolation plate 3, and the connection between the pile top concrete and the floating mortar concrete is blocked; after the concrete hardens, the concrete protective layer at the position of the embedded cylinder 2 is broken, the iron sheet outer wall of the embedded cylinder 2 is broken at the same time, after medium coarse sand 6 in the embedded cylinder is dug out, the jack 4 is placed in the embedded cylinder 2, the electric pressure pump is connected with the jack 4, floating slurry concrete is quickly formed to penetrate through cracks through jacking of the jack 4, and therefore the pile head concrete is jacked open at the concrete weak position formed by the isolation plate 3, and the purpose of chiseling the pile head is achieved.
Claims (5)
1. The utility model provides a device of quick chisel pile foundation pile head, install owner muscle, sounding pipe on the steel reinforcement cage of pile foundation, its characterized in that: the device comprises a jack and an arc-shaped isolation plate matched with a reinforcement cage, wherein a row of mounting holes allowing main reinforcements to pass through and a plurality of slurry penetration holes are formed in the isolation plate; a plurality of embedded cylinders are arranged on a main rib between the designed pile top and the isolation plate, jacks can be placed in the embedded cylinders, and one ends of the jacks, which are connected with the pressure pumps, face the inner side of the reinforcement cage.
2. A device for rapidly chiseling pile heads according to claim 1, wherein: and the top surface and the bottom surface of the embedded cylinder are both welded with a circular steel plate with the diameter larger than that of the embedded cylinder.
3. A device for rapidly chiseling pile heads according to claim 2, wherein: and a conical cylinder is arranged on the round steel plate on the bottom surface of the embedded cylinder.
4. A device for rapidly chiseling pile heads according to claim 3, wherein: the embedded cylinders are two, and an included angle formed by the two embedded cylinders and a central connecting line of the reinforcement cage is 120 degrees.
5. A device for rapidly chiseling pile heads according to claim 4, wherein: before grouting is carried out in the pile foundation, medium coarse sand is filled in the embedded cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110842615.9A CN113502809B (en) | 2021-07-26 | 2021-07-26 | Device for rapidly chiseling pile foundation pile head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110842615.9A CN113502809B (en) | 2021-07-26 | 2021-07-26 | Device for rapidly chiseling pile foundation pile head |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113502809A true CN113502809A (en) | 2021-10-15 |
CN113502809B CN113502809B (en) | 2023-10-24 |
Family
ID=78014652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110842615.9A Active CN113502809B (en) | 2021-07-26 | 2021-07-26 | Device for rapidly chiseling pile foundation pile head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113502809B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425159A (en) * | 2011-08-31 | 2012-04-25 | 浙江大学城市学院 | Pile cutting construction method of bored concrete pile |
CN108411918A (en) * | 2018-03-27 | 2018-08-17 | 中国冶集团有限公司 | Pore-creating filling pile pile crown abolishes device and its construction method |
CN207919550U (en) * | 2018-01-19 | 2018-09-28 | 中建筑港集团有限公司 | A kind of Quick Release pile crown bored concrete pile |
CN111218936A (en) * | 2019-12-11 | 2020-06-02 | 山东鲁桥建设有限公司 | Construction method for rapidly and nondestructively breaking pile head |
CN111576419A (en) * | 2020-05-09 | 2020-08-25 | 广州市泰基工程技术有限公司 | Pile head breaking method |
-
2021
- 2021-07-26 CN CN202110842615.9A patent/CN113502809B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425159A (en) * | 2011-08-31 | 2012-04-25 | 浙江大学城市学院 | Pile cutting construction method of bored concrete pile |
CN207919550U (en) * | 2018-01-19 | 2018-09-28 | 中建筑港集团有限公司 | A kind of Quick Release pile crown bored concrete pile |
CN108411918A (en) * | 2018-03-27 | 2018-08-17 | 中国冶集团有限公司 | Pore-creating filling pile pile crown abolishes device and its construction method |
CN111218936A (en) * | 2019-12-11 | 2020-06-02 | 山东鲁桥建设有限公司 | Construction method for rapidly and nondestructively breaking pile head |
CN111576419A (en) * | 2020-05-09 | 2020-08-25 | 广州市泰基工程技术有限公司 | Pile head breaking method |
Also Published As
Publication number | Publication date |
---|---|
CN113502809B (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100572683C (en) | The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices | |
CN108894214B (en) | Karst cave geological environment cast-in-place pile and pile-forming construction method thereof | |
CN110158582A (en) | A method of trestle steel pipe pile is set on intectate riverbed | |
CN111395330B (en) | Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery | |
CN203729424U (en) | Modified horseback-riding inspection well for top pipe construction | |
CN106988302A (en) | A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method | |
CN110700248A (en) | Miniature steel pipe pile for grouting small and medium-sized span bridge, pile foundation and construction method | |
CN110820742A (en) | Construction method for breaking underwater cast-in-place pile head | |
CN111254918A (en) | Steel trestle steel pipe pile anchoring method reinforced by pile bottom anchor rod | |
CN106930274B (en) | A kind of a full set of cylinder rotatory boring castinplace pile construction method that reinforcing bar cage location is fixed | |
CN108179759A (en) | The underwater drill core slotting of driftway is without bottom sealing method | |
CN113502809A (en) | Device for rapidly chiseling pile foundation pile head | |
CN212865915U (en) | Special machine tool for realizing drilling cast-in-place pile without chiseling pile head | |
CN113685190B (en) | Reinforcing system for shield to penetrate shallow soft clay and construction method | |
CN215715241U (en) | Novel post-tensioned prestressing rectangular cast-in-place pile | |
CN107476293A (en) | A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method | |
CN114837209A (en) | Construction method of deep sand layer large-diameter pile foundation in karst development area | |
CN104727305B (en) | Boring high-pressure slip-casting uplift pile construction method | |
CN113668529A (en) | Construction method for breaking and removing pile head with template based on steel wedge-shaped gap | |
CN112523225A (en) | Construction method for supporting foundation pit by combining static pressure steel sheet pile with reinforced concrete inner support | |
CN101481912A (en) | Construction method for overhead bridge large diameter drill hole pile in tunnel dock type structure scope | |
CN112095377B (en) | Off-pit construction road structure next to subway deep foundation pit and construction method thereof | |
KR100348794B1 (en) | A method of repair on the base of a bridge | |
CN203429642U (en) | Bored pile structure | |
CN211596764U (en) | Ecological pile cutting system for cast-in-situ bored pile at bottom of foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |