CN113501077B - Ship crane bracket and highlight lamp mast integrated installation method - Google Patents

Ship crane bracket and highlight lamp mast integrated installation method Download PDF

Info

Publication number
CN113501077B
CN113501077B CN202110717328.5A CN202110717328A CN113501077B CN 113501077 B CN113501077 B CN 113501077B CN 202110717328 A CN202110717328 A CN 202110717328A CN 113501077 B CN113501077 B CN 113501077B
Authority
CN
China
Prior art keywords
crane bracket
crane
column body
bracket
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110717328.5A
Other languages
Chinese (zh)
Other versions
CN113501077A (en
Inventor
宋锋
王忠强
李永福
吴安
戴天凌
陈一强
倪庆健
姜志强
喻义华
季建洲
童南汨
赵志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN202110717328.5A priority Critical patent/CN113501077B/en
Publication of CN113501077A publication Critical patent/CN113501077A/en
Application granted granted Critical
Publication of CN113501077B publication Critical patent/CN113501077B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B15/00Superstructures, deckhouses, wheelhouses or the like; Arrangements or adaptations of masts or spars, e.g. bowsprits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B45/00Arrangements or adaptations of signalling or lighting devices
    • B63B45/06Arrangements or adaptations of signalling or lighting devices the devices being intended to illuminate vessels' decks or interior
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Lighting Device Outwards From Vehicle And Optical Signal (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

The invention provides an integrated mounting method of a ship crane bracket and a highlight lamp mast, which comprises the following steps: step one, determining the installation position of a crane bracket; step two, manufacturing a crane bracket and a strong light lamp holder; firstly, manufacturing a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body, welding the crane bracket column body and the suspension arm supporting seat into a whole, manufacturing an operating platform, wherein the operating platform is arranged along the circumferential direction of the crane bracket column body, is positioned at the upper part of the crane bracket column body, and is used for installing a highlight lamp holder at the outer side part of the operating platform; step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring; step four, checking the strength; and carrying out finite element analysis on the integral strength of the crane bracket and the lamp holder platform. The invention integrates the strong light mast on the crane bracket, effectively reduces the arrangement space required by the deck, saves the manufacturing cost of the strong light mast and the purchasing cost of binding the stable cable, and saves the manufacturing cost of the ship.

Description

Integrated mounting method for ship crane bracket and highlight lamp mast
Technical Field
The invention relates to the technical field of ship construction, in particular to an integrated mounting method of a ship crane bracket and a highlight lamp mast.
Background
According to the requirements of OCIMF industry specifications on the transportation of goods of a liquid cargo ship, a liquid transportation operation area of the LNG ship is generally provided with a hose crane for hoisting tools, maintaining equipment and the like, and the hose crane is generally composed of two parts, namely a crane body and a bracket for storing a suspension arm. Meanwhile, according to the recommendation of arrangement of LNG ship cargo conveying areas in the SIGTTO industry standard, a strong light mast is required to be arranged on a deck of an operation area to illuminate night operation. The hose crane and the mast of the strong light lamp are indispensable devices and are all arranged near the gas collection platform. Meanwhile, the pipelines on the deck are dense, the crane bracket and the highlight lamp mast are large in size and should be separated from each other to avoid interference, but the crane bracket and the highlight lamp mast are functionally required to be close to each other, and a helicopter hovering area nearby limits the space, so that the area is always a difficult point in arrangement. The conventional method is to place the two parts at a certain distance, the strong light mast cannot block the rotation of the crane, and the light mast is blocked by a crane bracket to illuminate to a greater or lesser extent after being far away, so that the illumination effect is influenced to a certain extent. In addition, the occupied areas of the LNG carrier and the LNG carrier are large, the anti-wave cable is required to be pulled, the occupied areas are large, and great difficulty is brought to deck arrangement of crowded LNG carriers.
Disclosure of Invention
In view of the above disadvantages of the prior art, the present invention provides an integrated installation method of a boat crane bracket and a glare light mast, which is used to solve the problem of the prior art that the arrangement of the crane bracket and the glare light mast is crowded.
In order to achieve the above and other related objects, the present invention provides an integrated mounting method for a boat crane bracket and a highlight lamp mast, comprising the steps of:
firstly, determining the installation position of a crane bracket on a deck;
step two, manufacturing a crane bracket and a strong light lamp holder; firstly, manufacturing a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body, welding the crane bracket column body and the suspension arm supporting seat into a whole, then manufacturing an operating platform, wherein the operating platform is arranged along the circumferential direction of the crane bracket column body, is positioned at the upper part of the bracket column body, and is used for installing the highlight lamp holder at the outer side part of the operating platform;
step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform and the crane bracket column, the boarding straight ladder is arranged along the height direction of the crane bracket column, and the straight ladder protection ring is arranged around the outside of the boarding straight ladder;
step four, checking the strength; and carrying out finite element analysis on the integral strength of the crane bracket and the lamp holder platform, and judging whether the integral strength meets the requirement.
As a preferable technical scheme, in the first step, the installation position of the crane bracket is 2-8 m away from the lifting hook, and the distance between the position of the floodlight arranged on the crane bracket and the edge of the deck is 0-100 mm.
As a preferred technical solution, in the second step, the width of the channel of the operation platform is greater than 600 mm.
As a preferable technical scheme, in the third step, the straight ladder protection ring extends to the top of the operation platform, and a channel notch is formed in one side, facing the operation platform, of the straight ladder protection ring.
As described above, the integrated mounting method of the present invention has the following advantageous effects:
(1) The invention integrates the strong light mast on the crane bracket, effectively reduces the arrangement space required by the deck, saves the manufacturing cost of the strong light mast and the purchasing cost of binding the stable cable, and saves the manufacturing cost of the ship.
(2) After the high-light lamp masts are reduced, deep fusion welding during installation of each high-light lamp mast is reduced, welding seam detection and paint spraying work of a mast body structure are reduced, and the construction period is shortened.
(3) The invention avoids the defects that the position of the strong light mast is too close to the crane bracket and the strong and stable cable of the light mast is difficult to install, thereby avoiding the problem of vibration of the strong light mast in the sailing process of a ship.
(4) The strong light mast is integrated on the crane bracket and is closer to a broadside operation area, so that the lighting effect of the strong light mast is enhanced.
Drawings
Fig. 1 is a layout structure diagram of a bracket and a strong light mast of an LNG ship crane in the prior art.
Fig. 2 is a layout structure diagram of the bracket and the strong light mast of the LNG ship crane of the present invention.
Fig. 3 is a schematic view of an installation structure of the bracket and the strong light mast of the LNG ship crane of the present invention.
Fig. 4 is a view of fig. 3 in the direction B.
Fig. 5 is a view in the Y direction of fig. 3.
Wherein the reference numerals are specified as follows: the crane comprises a crane bracket column 1, a crane arm supporting seat 2, an operating platform 3, a boarding vertical ladder 4, a vertical ladder guard ring 5 and a highlight lamp holder 6.
Detailed Description
The following description of the embodiments of the present invention is provided for illustrative purposes, and the present invention is not limited to the embodiments described herein.
Please refer to fig. 1 to 5. It should be understood that the structures, ratios, sizes, etc. shown in the drawings and described in the specification are only used for matching the disclosure and are not used for limiting the practical limitations of the present invention, so that the modifications, ratios, sizes, etc. of the structures, ratios, and sizes, which are not used in the technical spirit, should be within the scope of the disclosure and the technical content of the present invention without affecting the efficacy and the achievable purpose of the present invention. In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
The embodiment provides a method for integrally installing a bracket of a ship crane and a mast of a strong light lamp, which comprises the following steps:
step one, determining the installation position of a crane bracket on a deck; the installation position of the crane bracket can meet the requirements of storing and filling the suspension arm and filling lubricating oil, and can also cover the requirement of lighting of a strong light mast. And the balance with a nearby pipeline and a cable model is also needed, and the avoidance of a channel is considered. Generally speaking, the crane carriage is 2m to 8m from the hook, which facilitates boom storage and lubricant filling. The strong light arranged on the crane bracket is 0-100 mm away from the edge of the deck, so that the lighting requirement can be met to the maximum extent. In the aspect of arrangement interference, a passage for a person to normally ride on the crane bracket cannot be shielded by a pipe, a cable and other parts, and a walkway for a shipman to normally pass on the deck cannot be blocked by the crane bracket.
Step two, manufacturing a crane bracket and a strong light lamp holder 6; firstly, a crane bracket column 1 and a suspension arm supporting seat 2 installed at the top of the crane bracket column 1 are manufactured, the crane bracket column 1 and the suspension arm supporting seat 2 are welded into a whole, then an operating platform 3 is manufactured, the operating platform 3 is arranged along the circumferential direction of the crane bracket column 1, the operating platform 3 is positioned at the upper part of the crane bracket column 1, and a highlight lamp holder 6 is installed at the outer side part of the operating platform 3; the size of the operation platform 3 is considered in arrangement, which can meet the space required by normal lubricating oil filling, and generally, the channel width of the operation platform 3 is more than 600 mm. The arrangement of the strong light lamp holder 6 needs to consider that as many lamps as possible are close to the edge of the deck and project to the operation area of the gas collecting platform, so that the lighting efficiency is highest, the height of the light arrangement platform needs to consider avoiding the dangerous area of the deck, the general deck surface is 2.4m upwards to be the dangerous area, and if a fan for ventilating the dangerous cabin exists nearby, the light arrangement platform needs to avoid the center of the fan by 4.5 m. In addition, the arrangement direction of the ascending vertical ladder 4 selected at the bottom of the crane bracket can not interfere with nearby pipes, connecting cables and the like, and can not block the main passing channel of the deck.
Step three, installing a reinforced toggle plate, riding a straight ladder 4 and a straight ladder guard ring 5, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform 3 and the crane bracket column 1, the riding the straight ladder 4 is arranged along the height direction of the crane bracket column 1, the straight ladder guard ring 5 is arranged around the outside of the riding the straight ladder 4, the straight ladder guard ring 5 extends to the top of the operating platform 3, and a channel notch is formed in one side, facing the operating platform 3, of the straight ladder guard ring 5. Therefore, the traffic is ensured, and the safety of the personnel is well protected.
Fourthly, checking the strength; after the highlight lamp mast and the crane bracket are integrated, finite element analysis is carried out on the overall strength of the highlight lamp mast, and structural parameters of the bracket are optimized, such as the thickness of a 1 plate of the crane bracket column body, the diameter of the column body, the form of a reinforcing toggle plate and the like. The strength calculation analysis is carried out on the crane bracket and the whole ship structure according to the data such as the bracket maximum overturning moment, the gyration moment and the vertical force provided by a crane manufacturer, and the standard requirements of corresponding classification society are met.
The foregoing embodiments are merely illustrative of the principles of the present invention and its efficacy, and are not to be construed as limiting the invention. Those skilled in the art can modify or change the above-described embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (3)

1. A ship crane bracket and highlight lamp mast integrated installation method is characterized by comprising the following steps:
firstly, determining the installation position of a crane bracket on a deck, wherein the installation position of the crane bracket is 2-8 meters away from a lifting hook;
step two, manufacturing a crane bracket and a strong light lamp holder; firstly, a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body are manufactured, the crane bracket column body and the suspension arm supporting seat are welded into a whole, then an operating platform is manufactured, the operating platform is arranged along the circumferential direction of the crane bracket column body and is positioned at the upper part of the bracket column body, and the highlight lamp holder is arranged at the outer side part of the operating platform;
step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform and the crane bracket column, the boarding straight ladder is arranged along the height direction of the crane bracket column, and the straight ladder protection ring is arranged around the outside of the boarding straight ladder;
step four, checking the strength; and carrying out finite element analysis on the integral strength of the crane bracket and the operation platform, and judging whether the integral strength meets the requirement.
2. The integrated installation method of the boat crane bracket and the glare light mast of claim 1, wherein in the second step, the channel width of the operating platform is larger than 600 mm.
3. The method for integrally installing the boat crane bracket and the glare light mast, as claimed in claim 1, wherein in the third step, the vertical ladder protection ring extends to the top of the operation platform, and a channel notch is formed on one side of the vertical ladder protection ring facing the operation platform.
CN202110717328.5A 2021-06-28 2021-06-28 Ship crane bracket and highlight lamp mast integrated installation method Active CN113501077B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110717328.5A CN113501077B (en) 2021-06-28 2021-06-28 Ship crane bracket and highlight lamp mast integrated installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110717328.5A CN113501077B (en) 2021-06-28 2021-06-28 Ship crane bracket and highlight lamp mast integrated installation method

Publications (2)

Publication Number Publication Date
CN113501077A CN113501077A (en) 2021-10-15
CN113501077B true CN113501077B (en) 2022-12-30

Family

ID=78011152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110717328.5A Active CN113501077B (en) 2021-06-28 2021-06-28 Ship crane bracket and highlight lamp mast integrated installation method

Country Status (1)

Country Link
CN (1) CN113501077B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114771766B (en) * 2022-05-31 2023-06-23 中船黄埔文冲船舶有限公司 Sectional construction method of front mast and breakwater and ship

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2717126A1 (en) * 2010-10-07 2012-04-07 John Brock Mast, ladder, platform (mlp) assembly and method
KR200475627Y1 (en) * 2012-06-04 2014-12-18 대우조선해양 주식회사 Navigation Light Installation Structure of Ship
KR20140026696A (en) * 2012-08-23 2014-03-06 대우조선해양 주식회사 Suez lighting containing apparatus
CN204452802U (en) * 2014-12-25 2015-07-08 大连船舶重工集团有限公司 Hingeless chain type foldable mast
CN105109635A (en) * 2015-09-28 2015-12-02 上海船舶研究设计院 Auxiliary light mast for mounting ship navigation signal light
CN206181261U (en) * 2016-11-16 2017-05-17 天津海运职业学院 Mast structure with boats and ships storehouse lid monitoring function
CN110440196B (en) * 2019-06-26 2021-10-08 武汉船用机械有限责任公司 Mast lamp support suitable for crane boom
CN110949607A (en) * 2019-12-10 2020-04-03 中国船舶工业集团公司第七0八研究所 Combined front mast used as liquefied natural gas ventilating mast

Also Published As

Publication number Publication date
CN113501077A (en) 2021-10-15

Similar Documents

Publication Publication Date Title
CN113501077B (en) Ship crane bracket and highlight lamp mast integrated installation method
CN1976866B (en) Offshore vessel for laying pipelines on seabed
KR20150128693A (en) Emergency release
CN101357736A (en) Method for hoisting and turning over large articles using frame crane
CN101746481B (en) Close inspection method for inner shell oblique structure of ship side tank and manned nacelle inspection device
CN101607677B (en) Telescopic crane gib arm
US10625991B2 (en) Deck hoist tractor, rescue chute and tote tank
CN113071631B (en) Process for enabling generator set of 18-thousand-ton bulk carrier to enter and exit cabin
JP5391270B2 (en) Equipment for ship split rampway
CN2851099Y (en) Inclinable signal lamp mast
KR20070053967A (en) Crane master apparatus for scaffolding
CN210563333U (en) All-round intelligent maintenance platform in spherical tank
CN112455621B (en) Hoisting method for ship bridge
KR20180032863A (en) deck structure for topside Module of floating prpduction storage offloading, topside Module and pipe rack Arrange structure using the same
CN109368508B (en) The offshore lifting method of large size valve on floating production storage offloading's standpipe
CN220334516U (en) Integral hoisting unhooking platform
CN201545170U (en) Close viewing hanging basket inspecting device of vertical structure for ship
KR100234454B1 (en) Traveling type jib crane for ship
US20180169802A1 (en) Articulated welding boom
CN104417721A (en) Mobile accommodation ladder
CN115594067B (en) Hoisting system and hoisting method
CN211943665U (en) Boarding device suitable for ocean platform
CN208585966U (en) The high pedestal jib crane at floating dock
CN215858191U (en) Steel arm with limiting function
JPH08253191A (en) Traveling type jib crane for ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant