CN113487076A - Project task fund prediction system based on room management - Google Patents

Project task fund prediction system based on room management Download PDF

Info

Publication number
CN113487076A
CN113487076A CN202110737399.1A CN202110737399A CN113487076A CN 113487076 A CN113487076 A CN 113487076A CN 202110737399 A CN202110737399 A CN 202110737399A CN 113487076 A CN113487076 A CN 113487076A
Authority
CN
China
Prior art keywords
module
electrically connected
data
room
leads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110737399.1A
Other languages
Chinese (zh)
Inventor
王�琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hollow Technology Co ltd
Original Assignee
Wuhan Hollow Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hollow Technology Co ltd filed Critical Wuhan Hollow Technology Co ltd
Priority to CN202110737399.1A priority Critical patent/CN113487076A/en
Publication of CN113487076A publication Critical patent/CN113487076A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project task fund prediction system based on room management, which comprises a main control module, a project task fund prediction module and a project task fund prediction module, wherein the main control module is used for controlling the project task fund prediction module; the main control module is respectively electrically connected with the room creation module and the label coding module through leads, the room creation can be carried out, the integration processing of subsequent data information is convenient, the setting of the label coding module can be carried out, the number of department responsible persons participating in project tasks can be carried out, the setting of the authority selection module can be used for effectively selecting the authority of the persons participating in the project tasks, the discussion of budget in the room is convenient to add, the data collection module can be used for effectively collecting the obtained data of fund prediction, the subsequent summary checking is convenient, the data storage module is arranged, the obtained information can be effectively stored, the data review can be favorably carried out after the final project task is completed, and the fund prediction can be more accurate.

Description

Project task fund prediction system based on room management
Technical Field
The invention belongs to the technical field of project fund prediction, and particularly relates to a project task fund prediction system based on room management.
Background
Before a project task begins, a preliminary prediction is firstly made on the use condition of funds, and the funds can be effectively predicted aiming at the corresponding links only by fully knowing and familiarizing each department and each link.
The conventional project fund prediction system cannot accurately predict fund, and large errors often occur due to lack of communication space and time among all departments and links, so that misjudgment on the whole project task is caused, the late fund is insufficient, and the normal operation of a construction period is influenced.
Disclosure of Invention
The technical problem to be solved by the invention is to overcome the existing defects, and provide a project task fund prediction system based on room management to solve the problems that the existing project fund prediction system proposed in the background technology cannot accurately predict fund, large errors often occur due to lack of communication space and time among departments and links, misjudgment on the whole project task is caused, late-stage fund deficiency is caused, and normal operation of a construction period is influenced.
In order to achieve the purpose, the invention provides the following technical scheme: a project task fund prediction system based on room management comprises a main control module, wherein the main control module is respectively and electrically connected with a room creation module and a tag coding module through conducting wires, the room creation module is electrically connected with the tag coding module through conducting wires, the room creation module and the tag coding module are both electrically connected with an authority selection module through conducting wires, the authority selection module is electrically connected with a data collection module through conducting wires, and the data collection module is electrically connected with a data storage module through conducting wires.
Preferably, the room creating module is electrically connected with the password setting module and the permission setting module through wires respectively, the password setting module and the permission setting module are electrically connected with a corresponding room through wires, the corresponding room is electrically connected with the tag checking module through wires, and the tag checking module is electrically connected with the room information inquiring module through wires.
Preferably, the tag coding module is electrically connected with the tag grouping module and the authority giving module through wires respectively, and the tag grouping module and the authority giving module are electrically connected with the tag serial number through wires.
Preferably, the data collection module is respectively electrically connected with the data recording module and the voice recording module through wires, the voice recording module is electrically connected with the radio equipment through wires, and the radio equipment is electrically connected with the audio recording module through wires.
Preferably, the data recording module is electrically connected to the data transmitting module through a wire, the data transmitting module is electrically connected to the data generating module and the data integrating module through wires, the data generating module is electrically connected to the data integrating module through a wire, the data generating module and the data integrating module are both electrically connected to the data analyzing module through wires, the data analyzing module is electrically connected to the chart drawing module through a wire, the chart drawing module is electrically connected to the data presenting module through a wire, the data presenting module is electrically connected to the data returning module through a wire, and the data returning module is electrically connected to the data transmitting module through a wire.
Preferably, the corresponding room is provided with a password through a password setting module, and the password is acquired and stored by a room creator.
Preferably, the permission setting module is electrically connected with the label coding module through a wire.
Preferably, the tag grouping module is electrically connected with the tag coding module through a wire.
Preferably, the audio recording module is electrically connected with the voice recording module through a wire.
Preferably, the data transmission module is electrically connected with the main control module through a wire.
Compared with the prior art, the invention provides a project task fund prediction system based on room management, which has the following beneficial effects:
1. the invention electrically connects the main control module with the room establishing module and the label coding module respectively through wires, can establish a room, is convenient for integrating and processing subsequent data information, is convenient for subsequent checking and comparison, can number the responsible persons of departments participating in a project task through the arrangement of the label coding module, is convenient for knowing the budget fund situation of each department, can effectively select the authority of the persons participating in the project task through the arrangement of the authority selecting module, is convenient for being added into the room for budget discussion, can effectively collect the obtained fund predicted data through the arrangement of the data collecting module, is convenient for subsequent summary checking, can effectively store the obtained information through the arrangement of the data storage module, and is beneficial to completing the final project task, the data is rechecked, so that the fund prediction can be more accurate;
2. according to the invention, the room creating module is electrically connected with the password setting module and the permission setting module through the wires respectively to create a corresponding room, the password setting module can set a password for the room to prevent other people from entering the room to damage data information and prevent other people from obtaining key information, and through the setting of the permission setting module, the permission setting can be carried out on a responsible person participating in the project task, so that related personnel can conveniently discuss and collect data in and out of the room, the room information is inquired by the room information inquiring module when the person wants to enter the room, the room name is ensured to be correct, the identity is verified by the tag checking module, and the information of the person entering the room is ensured to be accurate;
3. according to the invention, the tag grouping module and the permission endowing module are electrically connected through the wires respectively, so that related personnel from different departments can be effectively grouped, confusion is avoided, permission endowing module is arranged, permission endowing can be carried out on related personnel participating in the project task at the same time, related personnel can conveniently enter and exit a room to discuss and collect data, and other unrelated personnel are prevented from entering the room, the setting can avoid confusion in the room, so that information exchange in the room can be carried out more quickly and accurately;
4. the data collection module is electrically connected with the data recording module and the voice recording module through the wires respectively, the data recording module can record data provided by each member in a room, so that the data can be more complete and comprehensive, and the accuracy of the data is improved;
5. the data recording module is electrically connected with the data transmission module through a lead, the data transmission module is electrically connected with the data generation module through a lead, the data generation module is electrically connected with the data integration module through a lead, the data integration module is electrically connected with the data analysis module through a lead, the data analysis module is electrically connected with the chart drawing module through a lead, the chart drawing module is electrically connected with the data presentation module through a lead, the data presentation module is electrically connected with the data return module through a lead, and the data return module is electrically connected with the data transmission module through a lead, so that the obtained data can be effectively collected, sorted and drawn into a table, the data can be conveniently observed, the data can be transmitted into a room for discussion of each member, and the prediction accuracy is further improved, and after the final project task is finished, comparing the data of the actual used fund with the predicted data to obtain an error, thereby facilitating the assistance of the subsequent fund prediction work.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention without limiting the invention in which:
FIG. 1 is a flow chart of a project task fund prediction system based on room management according to the present invention;
FIG. 2 is a flow diagram of a room creation module in a project task fund prediction system based on room management according to the present invention;
FIG. 3 is a flow chart of a tag encoding module in a room management based project task fund prediction system according to the present invention;
FIG. 4 is a flow diagram of a data collection module in a room management based project task funding prediction system according to the present invention;
fig. 5 is a flowchart of a data recording module in a project task fund prediction system based on room management according to the present invention.
In the figure: the system comprises a main control module 1, a room creating module 2, a label coding module 3, an authority selecting module 4, a data collecting module 5, a data storage module 6, a password setting module 7, an authority setting module 8, a corresponding room 9, a label checking module 10, a room information inquiring module 11, a label grouping module 12, an authority endowing module 13, a label serial number 14, a data recording module 15, a voice recording module 16, a radio device 17, an audio recording module 18, a data transmitting module 19, a data generating module 20, a data integrating module 21, a data analyzing module 22, a chart drawing module 23, a data presenting module 24, a data returning module 25 and a data transmitting module 26.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1-5, the present invention provides a technical solution: a project task fund prediction system based on room management comprises a main control module 1, wherein the main control module 1 is respectively electrically connected with a room creation module 2 and a label coding module 3 through leads, the room creation module 2 is electrically connected with the label coding module 3 through leads, the room creation module 2 and the label coding module 3 are both electrically connected with an authority selection module 4 through leads, the authority selection module 4 is electrically connected with a data collection module 5 through leads, and the data collection module 5 is electrically connected with a data storage module 6 through leads.
The working principle and the using process of the invention are as follows: when the system is used, a general responsible person creates a room through the room creating module 2, a department responsible person for setting label admission is bound through the label coding module 3, the department responsible person comes from each department, the department comprises a research and development department, a design department, a production department and the like, the number of the label is carried out on the responsible person from different departments, related personnel participating in each time are selected through the setting of the authority selecting module 4, the responsible person from different departments enters the room, the form can be created as required, the report filling is carried out according to the fund requirement prepared in advance, the fund use instruction is carried out according to the actual use condition, the data collecting module 5 can collect data, and finally the obtained data is stored through the data storage module 6.
Example two
Referring to fig. 1-5, the present invention provides a technical solution: a project task fund prediction system based on room management comprises a main control module 1, wherein the main control module 1 is respectively electrically connected with a room creation module 2 and a label coding module 3 through leads, the room creation module 2 is electrically connected with the label coding module 3 through leads, the room creation module 2 and the label coding module 3 are both electrically connected with an authority selection module 4 through leads, the authority selection module 4 is electrically connected with a data collection module 5 through leads, and the data collection module 5 is electrically connected with a data storage module 6 through leads.
In the invention, preferably, the room creating module 2 is electrically connected with the password setting module 7 and the permission setting module 8 respectively through wires, the password setting module 7 and the permission setting module 8 are both electrically connected with the corresponding room 9 through wires, the corresponding room 9 is electrically connected with the tag checking module 10 through a lead, the tag checking module 10 is electrically connected with the room information inquiry module 11 through a lead, the tag coding module 3 is electrically connected with the tag grouping module 12 and the authority giving module 13 through leads respectively, the tag grouping module 12 and the authority giving module 13 are electrically connected with the tag serial number 14 through leads respectively, the data collecting module 5 is electrically connected with the data recording module 15 and the voice recording module 16 through leads respectively, the voice recording module 16 is electrically connected with the radio equipment 17 through leads, and the radio equipment 17 is electrically connected with the audio recording module 18 through leads.
In the present invention, preferably, the data recording module 15 is electrically connected to the data transmitting module 19 through a conducting wire, the data transmitting module 19 is electrically connected to the data generating module 20 and the data integrating module 21 through conducting wires, the data generating module 20 is electrically connected to the data integrating module 21 through a conducting wire, both the data generating module 20 and the data integrating module 21 are electrically connected to the data analyzing module 22 through conducting wires, the data analyzing module 22 is electrically connected to the graph drawing module 23 through a conducting wire, the graph drawing module 23 is electrically connected to the data presenting module 24 through a conducting wire, the data presenting module 24 is electrically connected to the data returning module 25 through a conducting wire, and the data returning module 25 is electrically connected to the data transmitting module 26 through a conducting wire.
The working principle and the using process of the invention are as follows: when the system is used, a general responsible person creates a room through the room creating module 2, the topic of the room is used for predicting the capital requirement of each project task, a corresponding room 9 is determined through the password setting module 7 and the authority setting module 8, the department responsible persons allowed by label setting are bound through the label coding module 3, the department responsible persons come from each department, the departments comprise a research and development part, a design part, a production part and the like, label numbering is carried out on the responsible persons from different departments, the label information of individuals is respectively obtained through the label grouping module 12 and the authority giving module 13, the label serial number 14 is obtained, subsequent use is convenient, the related persons participating each time are selected through the setting of the authority selecting module 4, and the room information is firstly inquired through the room information inquiring module 11 before the responsible persons of different departments enter the room, the method comprises the steps of ensuring that a room is a correct room, verifying whether the person entering the room is a person determining the project or not through the tag checking module 10 after a password is input, creating a form according to needs by the person entering the room, reporting and filling according to fund requirements prepared in advance, performing fund use description according to actual use conditions, collecting data through the data collecting module 5, performing voice discussion in the room after reporting is completed according to different conditions, recording voice data through the voice recording module 16 through the radio equipment 17, storing the data through the audio recording module 18, and transmitting information to each other so as to refine fund use conditions of all steps, achieve corresponding unification, and facilitate later-stage checking of the specific fund use conditions of the project.
EXAMPLE III
Referring to fig. 1-5, the present invention provides a technical solution: a project task fund prediction system based on room management comprises a main control module 1, wherein the main control module 1 is respectively electrically connected with a room creation module 2 and a label coding module 3 through leads, the room creation module 2 is electrically connected with the label coding module 3 through leads, the room creation module 2 and the label coding module 3 are both electrically connected with an authority selection module 4 through leads, the authority selection module 4 is electrically connected with a data collection module 5 through leads, and the data collection module 5 is electrically connected with a data storage module 6 through leads.
In the invention, preferably, the room creating module 2 is electrically connected with the password setting module 7 and the permission setting module 8 respectively through wires, the password setting module 7 and the permission setting module 8 are both electrically connected with the corresponding room 9 through wires, the corresponding room 9 is electrically connected with the tag checking module 10 through a lead, the tag checking module 10 is electrically connected with the room information inquiry module 11 through a lead, the tag coding module 3 is electrically connected with the tag grouping module 12 and the authority giving module 13 through leads respectively, the tag grouping module 12 and the authority giving module 13 are electrically connected with the tag serial number 14 through leads respectively, the data collecting module 5 is electrically connected with the data recording module 15 and the voice recording module 16 through leads respectively, the voice recording module 16 is electrically connected with the radio equipment 17 through leads, and the radio equipment 17 is electrically connected with the audio recording module 18 through leads.
In the present invention, preferably, the data recording module 15 is electrically connected to the data transmitting module 19 through a conducting wire, the data transmitting module 19 is electrically connected to the data generating module 20 and the data integrating module 21 through conducting wires, respectively, the data generating module 20 is electrically connected to the data integrating module 21 through a conducting wire, both the data generating module 20 and the data integrating module 21 are electrically connected to the data analyzing module 22 through conducting wires, the data analyzing module 22 is electrically connected to the graph drawing module 23 through a conducting wire, the graph drawing module 23 is electrically connected to the data presenting module 24 through a conducting wire, the data presenting module 24 is electrically connected to the data returning module 25 through a conducting wire, the data returning module 25 is electrically connected to the data transmitting module 26 through a conducting wire, a password is set corresponding to the room 9 through the password setting module 7, and the password is obtained and stored by a room creator, the authority setting module 8 is electrically connected with the tag coding module 3 through a conducting wire, the tag grouping module 12 is electrically connected with the tag coding module 3 through a conducting wire, the audio recording module 18 is electrically connected with the voice recording module 16 through a conducting wire, and the data transmission module 26 is electrically connected with the main control module 1 through a conducting wire.
The working principle and the using process of the invention are as follows: when the system is used, a general responsible person creates a room through the room creating module 2, the topic of the room is used for predicting the capital requirement of each project task, a corresponding room 9 is determined through the password setting module 7 and the authority setting module 8, the department responsible persons allowed by label setting are bound through the label coding module 3, the department responsible persons come from each department, the departments comprise a research and development part, a design part, a production part and the like, label numbering is carried out on the responsible persons from different departments, the label information of individuals is respectively obtained through the label grouping module 12 and the authority giving module 13, the label serial number 14 is obtained, subsequent use is convenient, the related persons participating each time are selected through the setting of the authority selecting module 4, and the room information is firstly inquired through the room information inquiring module 11 before the responsible persons of different departments enter the room, the person entering the room is ensured to be a correct room, after a password is input, whether the person is a determining person of the project or not is verified through the tag checking module 10, the person entering the room can create a form according to needs, report and fill the form according to fund requirements prepared in advance, a fund use instruction is carried out according to actual use conditions, the data collection module 5 collects data, voice discussion can be carried out in the room after the report is finished according to different conditions, the voice recording module 16 records the voice data through the radio equipment 17, the audio recording module 18 stores the data and mutually transmits the information to refine the fund use conditions of each step so as to achieve corresponding unification, the condition of specific use funds of the project can be checked at the later stage, and a general responsible person can check the summarized fund budget, the data recording module 15 will record these data finally, and predict the fund demand of this project task finally, get the relatively accurate prediction result, and store it through the data storage module 6, say that the data recorded by the data recording module 15 passes the data transmission module 19, the data generation module 20, the data integration module 21, the data analysis module 22, the chart drawing module 23 and the data presentation module 24, finally pass the data back module 25 to return the prediction result into the room, and feedback discussion with each department responsible person about the fund use condition of the project task, ensure the accuracy of the prediction result, after the project task is completed, each department responsible person enters the room to report the actual fund use condition, and compare with the previous prediction result, improve the accuracy of the fund prediction of the project task, and each time when the project comes, each department responsible person enters the room to perform the reporting work of the fund budget again, and the general responsible person performs the summary prediction on all project task funds and performs the discussion work.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. A project mission capital forecasting system based on room management, comprising a main control module (1), characterized in that: the intelligent house building system is characterized in that the main control module (1) is respectively and electrically connected with the room building module (2) and the label coding module (3) through leads, the room building module (2) is electrically connected with the label coding module (3) through leads, the room building module (2) and the label coding module (3) are both electrically connected with the permission selection module (4) through leads, the permission selection module (4) is electrically connected with the data collection module (5) through leads, the data collection module (5) is electrically connected with the data storage module (6) through leads, the room building module (2) is respectively and electrically connected with the password setting module (7) and the permission setting module (8) through leads, the password setting module (7) and the permission setting module (8) are both electrically connected with the corresponding room (9) through leads, and the corresponding room (9) is electrically connected with the label checking module (10) through leads, the label checking module (10) is electrically connected with the room information inquiry module (11) through a lead.
2. A room management based project mission funds prediction system as claimed in claim 1 wherein: the label coding module (3) is respectively electrically connected with the label grouping module (12) and the permission giving module (13) through leads, and the label grouping module (12) and the permission giving module (13) are electrically connected with the label serial number (14) through leads.
3. A room management based project mission funds prediction system as claimed in claim 2 wherein: the data collection module (5) is respectively electrically connected with the data recording module (15) and the voice recording module (16) through leads, the voice recording module (16) is electrically connected with the radio equipment (17) through leads, and the radio equipment (17) is electrically connected with the audio recording module (18) through leads.
4. A room management based project mission funds prediction system as claimed in claim 3 wherein: the data recording module (15) is electrically connected with the data transmission module (19) through a lead, the data transmission module (19) is electrically connected with the data generation module (20) and the data integration module (21) through wires, the data generating module (20) is electrically connected with the data integrating module (21) through a lead, the data generation module (20) and the data integration module (21) are both electrically connected with the data analysis module (22) through leads, the data analysis module (22) is electrically connected with the chart drawing module (23) through a lead, the chart drawing module (23) is electrically connected with the data presentation module (24) through a lead, the data presentation module (24) is electrically connected with the data return module (25) through a conducting wire, the data return module (25) is electrically connected with the data transmission module (26) through a conducting wire.
5. A room management based project mission funds prediction system as claimed in claim 4 wherein: and the corresponding room (9) is provided with a password through a password setting module (7), and the password is acquired and stored by a room creator.
6. A room management based project mission funds prediction system as claimed in claim 5 wherein: the permission setting module (8) is electrically connected with the label coding module (3) through a lead.
7. A room management based project mission funds prediction system as claimed in claim 6 wherein: the label grouping module (12) is electrically connected with the label coding module (3) through a lead.
8. A room management based project mission funds prediction system as claimed in claim 7 wherein: the audio recording module (18) is electrically connected with the voice recording module (16) through a lead.
9. A room management based project mission funds prediction system as claimed in claim 8 wherein: the data transmission module (26) is electrically connected with the main control module (1) through a lead.
CN202110737399.1A 2021-06-30 2021-06-30 Project task fund prediction system based on room management Pending CN113487076A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110737399.1A CN113487076A (en) 2021-06-30 2021-06-30 Project task fund prediction system based on room management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110737399.1A CN113487076A (en) 2021-06-30 2021-06-30 Project task fund prediction system based on room management

Publications (1)

Publication Number Publication Date
CN113487076A true CN113487076A (en) 2021-10-08

Family

ID=77937018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110737399.1A Pending CN113487076A (en) 2021-06-30 2021-06-30 Project task fund prediction system based on room management

Country Status (1)

Country Link
CN (1) CN113487076A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108933673A (en) * 2017-05-25 2018-12-04 中兴通讯股份有限公司 A kind of video meeting implementing method, terminal, server and storage medium
CN109065055A (en) * 2018-09-13 2018-12-21 三星电子(中国)研发中心 Method, storage medium and the device of AR content are generated based on sound
CN111212259A (en) * 2020-03-24 2020-05-29 腾讯科技(深圳)有限公司 Method, system and related device for realizing audio and video conference
CN111263103A (en) * 2020-01-19 2020-06-09 尚阳科技股份有限公司 Teleconference method and system
CN113055635A (en) * 2021-02-05 2021-06-29 福建中会智通信息科技有限公司 Method and system for carrying out terminal conference

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108933673A (en) * 2017-05-25 2018-12-04 中兴通讯股份有限公司 A kind of video meeting implementing method, terminal, server and storage medium
CN109065055A (en) * 2018-09-13 2018-12-21 三星电子(中国)研发中心 Method, storage medium and the device of AR content are generated based on sound
CN111263103A (en) * 2020-01-19 2020-06-09 尚阳科技股份有限公司 Teleconference method and system
CN111212259A (en) * 2020-03-24 2020-05-29 腾讯科技(深圳)有限公司 Method, system and related device for realizing audio and video conference
CN113055635A (en) * 2021-02-05 2021-06-29 福建中会智通信息科技有限公司 Method and system for carrying out terminal conference

Similar Documents

Publication Publication Date Title
US7617245B2 (en) Workflow definition and management system
CN104240342A (en) Access control method and device
CN104240013A (en) Door access control method and door access control platform
CN111124917B (en) Method, device, equipment and storage medium for managing and controlling public test cases
CN110430081A (en) The intelligent method for inspecting and device of automatic editing based on instruction
CN104240014A (en) Door access control method and door access control platform
CN109800278A (en) Data assets map application method, device, computer equipment and storage medium
CN109726830A (en) Equipment routing inspection method, apparatus, electronic equipment and storage medium
CN107733710A (en) Construction method, device, computer equipment and the storage medium of link call relation
CN115373669B (en) Application program development platform and method based on low codes
CN110837496A (en) Data quality management method and system based on dynamic sql
CN102945628B (en) Accident consequence information acquiring method, device and training system
CN112463892A (en) Early warning method and system based on risk situation
CN115828390A (en) Four-pre-function implementation method for safety monitoring of hydraulic and hydroelectric engineering
CN109118097A (en) A kind of reliability and maintanability, r&m Supportability Evaluation method and apparatus
EP4258190A1 (en) Human reliability evaluation method and system, and computer device and storage medium
CN110084473A (en) Project monitoring and managing method, device, computer equipment and storage medium
CN112270422A (en) Knowledge service-based electricity maintenance auxiliary system and method
CN113487076A (en) Project task fund prediction system based on room management
CN110415136B (en) Service capability evaluation system and method for power dispatching automation system
CN109299910A (en) Data summarization method, device, computer equipment and storage medium
CN115903720A (en) Fault diagnosis system and method for rail transit, and storage medium
CN111597068A (en) IT operation and maintenance management method and IT operation and maintenance management device
CN110674197A (en) Visual configuration and capture system for business operation
CN103678636A (en) System and method for improving reliability of component software system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211008