CN113478622B - City piping lane integration pouring device - Google Patents

City piping lane integration pouring device Download PDF

Info

Publication number
CN113478622B
CN113478622B CN202110609727.XA CN202110609727A CN113478622B CN 113478622 B CN113478622 B CN 113478622B CN 202110609727 A CN202110609727 A CN 202110609727A CN 113478622 B CN113478622 B CN 113478622B
Authority
CN
China
Prior art keywords
fixing plate
plate
base
pouring device
connecting ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202110609727.XA
Other languages
Chinese (zh)
Other versions
CN113478622A (en
Inventor
田洁楠
邱继峰
杨新民
刘帅
刘鑫
李琨
杨浩
高熊
谢如锋
邱岱宸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Engineering Co Ltd of China Railway 19 Bureau Group Co Ltd
Original Assignee
Guangzhou Engineering Co Ltd of China Railway 19 Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Engineering Co Ltd of China Railway 19 Bureau Group Co Ltd filed Critical Guangzhou Engineering Co Ltd of China Railway 19 Bureau Group Co Ltd
Priority to CN202110609727.XA priority Critical patent/CN113478622B/en
Publication of CN113478622A publication Critical patent/CN113478622A/en
Application granted granted Critical
Publication of CN113478622B publication Critical patent/CN113478622B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/02Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an integrated pouring device for an urban pipe gallery, which comprises a pouring device main body and is characterized in that bases are arranged on two sides of the bottom end of the pouring device main body, a support frame is arranged on the inner side of each base, a side fixing plate is arranged on the surface of the inner wall of each support frame, a first side fixing strip is arranged at the bottom end of the inner side of each support frame, a bottom fixing plate is arranged at one end of each first side fixing strip, a movable plate is arranged at one end of each bottom fixing plate, a telescopic rod is arranged on the surface of each movable plate, a second side fixing strip is arranged at one end of each movable plate, and a mounting plate is arranged at the bottom end of the inner side of each side fixing strip. According to the invention, by arranging the pouring module of the urban pipe gallery, through the expandable structure at the bottom, under the condition that the template faces the tunnel with a complex structure or tunnels with different sizes, the template can be stretched according to the required size, so that the subsequent concrete can be poured according to the specified size conveniently, and the use of wood is reduced.

Description

City piping lane integration pouring device
Technical Field
The invention relates to the field of concrete templates, in particular to an integrated pouring device for an urban pipe gallery.
Background
The city pipe gallery is characterized in that a tunnel space is built in the underground of a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, important infrastructures and 'life lines' for guaranteeing city operation are generally manufactured by concrete pouring, templates are placed in an excavated tunnel after being detached, finally, landfill operation is carried out, and other structures such as roads, bridges and the like are built at the upper end of the tunnel.
However, in the prior art, for longer urban management, after external pouring is usually completed, the long urban management is assembled and connected in the tunnel, wherein the production of the formwork is more complicated, and because the pipelines in different areas have different sizes, the width and the size of the tunnel are different, and the shapes of the formworks are different, a plurality of formworks need to be produced in the construction process, so that the construction is inconvenient, the floor area of the tunnel is increased simultaneously, the time spent is increased, and the construction period is prolonged.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides an integrated pouring device for an urban pipe gallery.
In order to solve the technical problems, the invention provides the following technical scheme:
the invention discloses an integrated pouring device for an urban pipe gallery, which comprises a pouring device main body, wherein bases are installed on two sides of the bottom end of the pouring device main body, a support frame is installed on the inner side of each base, a standing frame is installed on the surface of the outer side of the middle of each support frame, a side fixing plate is installed on the surface of the inner wall of each support frame, a first side fixing strip is installed at the bottom end of the inner side of each support frame, a bottom fixing plate is installed at one end of each first side fixing strip, a movable plate is installed at one end of each bottom fixing plate, a telescopic rod is installed on the surface of each movable plate, a second side fixing strip is installed at one end of each movable plate, an installation plate is installed at the bottom end of the inner side of each side fixing plate, each telescopic rod comprises a middle rod, a connecting support, a rotary seat and a cross rod, each rod is installed at the top end of the inner side surface of each bottom fixing plate, and each rotary seat comprises a top connecting ring, a bottom connecting ring and a bottom connecting ring, The cross rod is arranged on the inner side of the rotating seat.
As a preferred technical solution of the present invention, the base and the supporting frame are fixedly connected, the length of the base is smaller than that of the supporting frame, the standing frame and the supporting frame are fixedly connected, an inclined strut structure is arranged at the bottom end of the standing frame, the side fixing plate and the supporting frame are fixedly connected, the mounting plate is located at the bottom end of the side fixing plate, and the mounting plate is embedded inside the bottom end of the side fixing plate.
As a preferred technical scheme of the invention, a bearing base is installed at the bottom end of the rotating base, the bearing base is fixedly connected with the movable plate, the bearing base is connected with the top connecting ring through a bottom connecting ring, threaded holes are formed in the top connecting ring and the bottom connecting ring, the top connecting ring and the bottom connecting ring are rotatably connected, and the cross rod is fixedly connected with the top connecting ring and the bottom connecting ring respectively.
As a preferred technical scheme of the invention, the connecting support and the fixed plate are fixedly connected through the middle bar, the inner side of the connecting support is fixedly connected with the top connecting ring at the top end of the rotating seat, the two ends of the bottom fixed plate are respectively provided with a bolt hole, the bottom end of the base is provided with a connecting plate, and the middle part of the connecting plate is provided with a roller.
According to a preferable technical scheme, the bottom end of one side of the bottom fixing plate is provided with a supporting rod, the top end of the supporting rod is provided with a pressed layer, the pressed layer is made of waterproof foam cotton materials, the bottom end of the pressed layer is bonded with H-shaped steel, bolts are arranged on the inner side of the H-shaped steel and used for being fixedly connected with the bottom fixing plate, the bottom end of the H-shaped steel is provided with a wear-resistant layer, the surface of the wear-resistant layer is provided with oxford cloth, a steel wire mesh is arranged inside the oxford cloth, and the oxford cloth, the steel wire mesh and the H-shaped steel are fixedly connected with the bottom end of the H-shaped steel.
As a preferred technical scheme of the invention, the bottom end of the bottom fixed plate is provided with a concrete seat, and the top end surface shape of the concrete seat is arranged corresponding to the fixed plate and the movable plate.
As a preferable technical scheme of the invention, a fastener is arranged on one side of the surface of the base, and a lap joint piece is arranged on the other side of the surface of the base.
Compared with the prior art, the invention has the following beneficial effects:
1: according to the invention, by arranging the pouring module of the urban pipe gallery, through the expandable structure at the bottom, under the condition that the template faces the tunnel with a complex structure or tunnels with different sizes, the template can be stretched according to the required size, so that the subsequent concrete can be poured according to the specified size conveniently, and the use of wood is reduced.
2: according to the invention, simple splicing among the templates can be realized in the integral casting process required according to the requirements of users, the integral casting length is increased, and the condition that a plurality of templates need to be fixed and installed again is avoided.
3: according to the invention, the independent movement of the template can be realized through the sliding of the roller, and after the poured whole is lifted, the next part of pouring can be performed again after the template moves to the front end, so that in a single small-sized engineering pouring flow, the pouring operation of the whole pipeline can be completed by only using one template structure, the replacement is not required, and the cost performance is higher.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of embodiment 1;
FIG. 2 is a schematic view of the telescopic rod structure of embodiment 1;
FIG. 3 is a schematic view of a rotary base structure of embodiment 1;
FIG. 4 is a side view of the base structure of embodiment 1;
FIG. 5 is a schematic view of the structure of the H-shaped steel of example 1;
FIG. 6 is a front view of a base structure of embodiment 1;
FIG. 7 is a side view of the construction of a bottom fixing plate in accordance with embodiment 2;
in the figure: 1. pouring a device main body; 2. a base; 201. a connecting plate; 202. a roller; 203. a fastener; 204. a lap joint; 3. a support frame; 4. a standing frame; 5. a side fixing plate; 6. a first side fixing strip; 7. a bottom fixing plate; 701. a pin hole; 702. a support bar; 703. a pressure receiving layer; 704. h-shaped steel; 705. a wear layer; 706. a concrete seat; 8. a movable plate; 9. a telescopic rod; 901. a middle bar; 902. connecting a support; 903. a rotating base; 9031. a top coupling ring; 9032. a bottom coupling ring; 9033. a bearing mount; 904. a cross bar; 10. a second side fixing strip; 11. and (7) mounting the plate.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Example 1
As shown in fig. 1-6, the invention provides an integrated pouring device for an urban pipe gallery, which comprises a pouring device main body 1, wherein bases 2 are installed at two sides of the bottom end of the pouring device main body 1, a support frame 3 is installed at the inner side of the base 2, a standing frame 4 is installed at the outer side surface of the middle part of the support frame 3, a side fixing plate 5 is installed at the inner wall surface of the support frame 3, a first side fixing strip 6 is installed at the inner side bottom end of the support frame 3, a bottom fixing plate 7 is installed at one end of the first side fixing strip 6, a movable plate 8 is installed at one end of the bottom fixing plate 7, an expansion link 9 is installed at the surface of the movable plate 8, a second side fixing strip 10 is installed at one end of the movable plate 8, an installation plate 11 is installed at the inner side bottom end of the side fixing plate 5, the expansion link 9 comprises a middle strip 901, a connecting support 902, a rotary seat 903 and a cross rod 904, wherein the strip 901 is installed at the top end of the inner side surface of the bottom fixing plate 7, the rotary seat 903 includes a top coupling ring 9031, a bottom coupling ring 9032, and a bearing seat 9033, and the crossbar 904 is mounted inside the rotary seat 903.
Further, base 2 and support frame 3 are fixed connection, and the length of its base 2 is less than the length of support frame 3, and stand 4 and support frame 3 be fixed connection, and stand 4 bottoms and be provided with the bracing structure, and side fixing plate 5 and support frame 3 are fixed connection, and mounting panel 11 is located the bottom of side fixing plate 5, and mounting panel 11 inlays in 5 bottoms inboardly of side fixing plate.
The bearing base 9033 is installed to the roating seat 903 bottom, and its bearing base 9033 and fly leaf 8 are fixed connection, and bearing base 9033 and top clamping ring 9031 are connected through end clamping ring 9032, and its top clamping ring 9031 and the inside screw hole that all is provided with of end clamping ring 9032, and for rotating the connection between top clamping ring 9031 and the end clamping ring 9032, cross rod 904 respectively with top clamping ring 9031 and end clamping ring 9032 fixed connection.
Connecting support 902 and fixed plate are fixed connection through median rod 901, and its connecting support 902 inboard is fixed connection with the top connecting ring 9031 on swivel mount 903 top, and the both ends of bottom fixed plate 7 all are provided with bolt hole 701, and connecting plate 201 is installed to the bottom of base 2, and the mid-mounting of its connecting plate 201 has gyro wheel 202.
The bracing piece 702 is installed to one side bottom of bottom fixed plate 7, the top of bracing piece 702 is provided with receives layer 703, it receives layer 703 and comprises waterproof foam material, the bottom that receives layer 703 bonds has H shaped steel 704, its H shaped steel 704 inboard is provided with the bolt, be used for forming fixed connection with bottom fixed plate 7, wearing layer 705 is installed to the bottom of H shaped steel 704, its wearing layer 705 surface is provided with oxford cloth internally mounted and has the wire net, and all be fixed connection with H shaped steel 704 bottom, make bracing piece 702 top via receiving the even burden pressurized area of layer 703, the bottom then is provided with wearing layer 705 and increases the frictional force of bottom and ground, and according to the oxford cloth spread area of wire net support bottom, make it level and smooth.
The surface of the base 2 is provided with a fastener 203 on one side and a strap 204 on the other side.
Specifically, the whole pouring device body 1 is arranged in a U shape, two sides of the bottom end of the pouring device body are provided with bases 2 which can be horizontally placed to the ground, when a template is required to move independently, a roller 202 structure can be additionally arranged through a connecting plate 201, at least four rollers 202 are distributed at four corners, displacement operation is carried out through the rollers 202, the inner sides of the bases 2 are respectively provided with a support frame 3 and a standing frame 4, the support frame 3 is used as a basic support of the whole structure to carry out stress support, and the standing frame 4 is mainly used for allowing workers to stand, so that the workers can conveniently carry out concrete pouring operation on the inner sides;
the inner side of the supporting frame 3 is provided with a side fixing plate 5 which is a side structure of the template, the template mainly made of light aluminum alloy material is adopted, the bottom end is provided with a mounting plate 11, the material property is the same as that of the side fixing plate 5, the mounting plate 11 is fixed by bolts through bolt holes 701 on a bottom fixing plate 7, the bottom fixing plate 7 is fixed by a first side fixing strip 6 and the supporting frame 3, the other end is fixed by a telescopic rod 9 and a second fixing strip 10, the second fixing strip 10 is fixedly connected with the supporting frame 3, a sliding space is arranged inside the bottom fixing plate 7, a movable plate 8 is arranged inside the bottom fixing plate 7, the telescopic rod 9 is arranged in a folding way, the telescopic rod 9 is mainly fixed by a thread groove inside a rotating seat 903 and the movable plate 8, the fixing effect of each joint is realized, and because a middle strip bar 901 is arranged between the telescopic rod 9 and the bottom fixing plate 7, the limit of the whole structure is mainly limited by an inserting tenon structure formed between the middle strip bar 901 and the movable plate 8, in the pouring process, the bottom fixing plate 7 is stressed integrally, a supporting effect is formed by a supporting rod 702 arranged at the bottom end of the bottom fixing plate 7, and the supporting rod 702 is positioned in the middle of the bottom fixing plate 7;
When the bottom of the pouring device main body 1 needs to be unfolded, firstly, the bolt pin between the middle bar 901 and the movable plate 8 is disassembled, the bolt pin structure is fixed in a mode of inserting a tenon structure, after the bolt pin structure is disassembled, the fixing bolt at the threaded hole on the inner side of the rotating seat 903 is disassembled again, so that the bottom end of the bottom connecting ring 9032 and the bearing base 9033 form an edge slideway to rotate, the bottom connecting ring 9032 and the top connecting ring 9031 also form an inner edge slideway to rotate, then the bottom fixing plate 7 and the second side fixing bar 10 can be pulled from two ends, because the movable plate 8 does not have any limit structure at the moment, the movable plate directly slides out from the inner part of the bottom fixing plate 7, the cross bar 904 formed by the telescopic rod 9 is stretched and lengthened in a telescopic way by taking the rotating seat 903 as an axis, the top connecting rings 9031 of the rotating seats 3 positioned at two ends respectively form a hinged support structure with the middle bar 901 and the second side fixing bar 10, and is convenient to rotate independently, inboard crossbar 904 is mainly after drawing certain length according to the user demand, it is spacing via bolt fastening and tenon fourth of the twelve earthly branches mode through roating seat 903 and median pole 901 once more, it is fixed with holistic bottom structure, can be finally according to the screw hole on surface with mounting panel 11, it is fixed with roating seat 903 or the bolt hole 701 on bottom fixed plate 7 surface respectively to make its four corners department screw hole, then be well accuse bolt at the inside bolt of roating seat 903, can further fix the bolt by 11 screw ins in of mounting panel, realize the fixed operation of secondary, remove bracing piece 702 to the well position bolt fastening once more of the whole degree in bottom simultaneously, realize the supporting effect.
After the integral fixing is finished, the installation operation of the inner formwork can be directly carried out, the fixing inserting fibers are inserted and fixed from the side fixing plate 5 and the installation plate 11, and finally the top formwork is covered, because the concrete is mainly arranged on the inner sides of the side fixing plate 5 and the installation plate 11, the integral structure forms an outer formwork, only the top formwork and the inner formwork are dismounted after the pouring is finished, and the outer formwork can still be used again;
when the front and rear pouring body main bodies 1 are required to be spliced, the buckle latch arrangement is mainly carried out through the fasteners 203 on the side surfaces of the base 2 and the lap joints 204 of other pouring body main bodies 1, the lap joints 204 of the pouring body main bodies 1 of the body are spliced with the fasteners 203 of other pouring body main bodies 1 to form the front and rear lapping effect, meanwhile, the convex and concave slot designs are respectively arranged at the two ends of the base 2 to limit in the front and rear splicing process and avoid the inconsistent lapping height, meanwhile, the length of the base 2 is smaller than that of the support frame 3, the mutual splicing tightness is mainly the tension between the fasteners 203 and the lap joints 204, and the pressure splicing can be carried out more conveniently;
if need pour through pouring device main part 1 repeatedly, then place on the concrete bench after hoisting after the inner structure is poured, will pour device main part 1 afterwards and remove to the concrete front end concatenation of pouring completion via gyro wheel 202 to install inner formword top form and side form board once more, the sealed operation of having done the side form board can continue to pour according to the paragraph, can make things convenient for the operation of pouring repeatedly in the single template use flow more.
Example 2
The bottom end of the bottom fixed plate 7 is provided with a concrete seat 706, the top end surface shape of the concrete seat is correspondingly arranged with the fixed plate and the movable plate 8, and other structures are the same as those of the embodiment 1.
Make overall structure mainly place on concrete seat 706, the atress of the substructure of being convenient for is supported, and its loading capacity can be more even share to ground, and concrete seat 706 can be convenient for place the overall structure who has pour when pouring device main part 1 and pour repeatedly simultaneously.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a city piping lane integration pouring device, includes pours device main part (1), its characterized in that, base (2) are installed to the bottom both sides of pouring device main part (1), support frame (3) are installed to the inboard of base (2), the middle part outside surface mounting of support frame (3) has stand frame (4), the inner wall surface mounting of support frame (3) has side fixing plate (5), first side fixed strip (6) are installed to the inboard bottom of support frame (3), bottom fixed plate (7) are installed to the one end of first side fixed strip (6), fly leaf (8) are installed to the one end of bottom fixed plate (7), the surface mounting of fly leaf (8) has telescopic link (9), second side fixed strip (10) are installed to the one end of fly leaf (8), mounting panel (11) are installed to the inboard bottom of side fixed plate (5), the telescopic rod (9) comprises a middle rod (901), a connecting support (902), a rotating seat (903) and a cross rod (904), wherein the middle rod (901) is installed at the top end of the inner side surface of the bottom fixing plate (7), the rotating seat (903) comprises a top connecting ring (9031), a bottom connecting ring (9032) and a bearing base (9033), and the cross rod (904) is installed on the inner side of the rotating seat (903).
2. The integrated pouring device for the urban pipe gallery according to claim 1, wherein the base (2) and the support frame (3) are fixedly connected, the length of the base (2) is smaller than that of the support frame (3), the standing frame (4) and the support frame (3) are fixedly connected, the bottom end of the standing frame (4) is provided with a diagonal bracing structure, the side fixing plate (5) and the support frame (3) are fixedly connected, the mounting plate (11) is located at the bottom end of the side fixing plate (5), and the mounting plate (11) is embedded inside the bottom end of the side fixing plate (5).
3. The integrated pouring device for the urban pipe gallery according to claim 2, wherein a bearing base (9033) is installed at the bottom end of the rotating base (903), the bearing base (9033) is fixedly connected with the movable plate (8), the bearing base (9033) is connected with the top connecting ring (9031) through a bottom connecting ring (9032), threaded holes are formed in the top connecting ring (9031) and the bottom connecting ring (9032), the top connecting ring (9031) is rotatably connected with the bottom connecting ring (9032), and the cross rod (904) is fixedly connected with the top connecting ring (9031) and the bottom connecting ring (9032) respectively.
4. The integrated pouring device for the urban pipe gallery according to claim 3, wherein the connecting support (902) and the fixing plate are fixedly connected through a middle bar (901), the inner side of the connecting support (902) is fixedly connected with a top connecting ring (9031) at the top end of the rotating seat (903), both ends of the bottom fixing plate (7) are provided with bolt holes (701), the bottom end of the base (2) is provided with a connecting plate (201), and the middle part of the connecting plate (201) is provided with a roller (202).
5. The integrated pouring device for the urban pipe gallery according to claim 4, wherein a supporting rod (702) is installed at the bottom end of one side of the bottom fixing plate (7), a pressed layer (703) is arranged at the top end of the supporting rod (702), the pressed layer (703) is made of waterproof foam cotton materials, H-shaped steel (704) is bonded to the bottom end of the pressed layer (703), bolts are arranged on the inner side of the H-shaped steel (704) and are used for being fixedly connected with the bottom fixing plate (7), a wear-resistant layer (705) is installed at the bottom end of the H-shaped steel (704), a steel wire mesh is installed inside Oxford cloth on the surface of the wear-resistant layer (705), and the steel wire mesh and the bottom end of the H-shaped steel (704) are fixedly connected.
6. The integrated pouring device for the urban pipe gallery according to claim 4, wherein the bottom end of the bottom fixing plate (7) is provided with a concrete seat (706), and the top end surface shape of the concrete seat is arranged corresponding to the fixing plate and the movable plate (8).
7. A city pipe gallery integrated pouring device according to claim 5 or 6, characterized in that the surface of the base (2) is provided with a fastener (203) on one side and the surface of the base (2) is provided with a lap joint (204) on the other side.
CN202110609727.XA 2021-06-01 2021-06-01 City piping lane integration pouring device Expired - Fee Related CN113478622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110609727.XA CN113478622B (en) 2021-06-01 2021-06-01 City piping lane integration pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110609727.XA CN113478622B (en) 2021-06-01 2021-06-01 City piping lane integration pouring device

Publications (2)

Publication Number Publication Date
CN113478622A CN113478622A (en) 2021-10-08
CN113478622B true CN113478622B (en) 2022-07-19

Family

ID=77934243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110609727.XA Expired - Fee Related CN113478622B (en) 2021-06-01 2021-06-01 City piping lane integration pouring device

Country Status (1)

Country Link
CN (1) CN113478622B (en)

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0790535B2 (en) * 1993-02-25 1995-10-04 新貝工業株式会社 Formwork equipment for concrete product molding
CN202528306U (en) * 2011-12-23 2012-11-14 中铁四局集团第五工程有限公司 Trough beam template
CN204249053U (en) * 2014-08-07 2015-04-08 中铁一局集团厦门建设工程有限公司 A kind of continuously adjustabe group mould
CN104999547A (en) * 2015-06-30 2015-10-28 中铁二十三局集团有限公司 Automatic template system for maglev curve track beam and use method of automatic template system
CN104985674A (en) * 2015-07-22 2015-10-21 湖南中铁五新钢模有限责任公司 Formwork for prefabrication of prestressed concrete beam with adjustable curve radius
CN106426525A (en) * 2016-11-15 2017-02-22 湖南三筑工有限公司 Prefabricated pipe rack mold
CN108638296A (en) * 2018-05-09 2018-10-12 中国建筑第五工程局有限公司 A kind of template system and application method of straddle type monorail rail tracks
CN210151779U (en) * 2019-03-27 2020-03-17 中交二公局东萌工程有限公司 Municipal administration utility tunnel hydraulic template platform truck
CN211415604U (en) * 2019-12-16 2020-09-04 内蒙古中科装备有限公司 Connecting structure for prefabricated box girder forming template
CN211646021U (en) * 2019-12-25 2020-10-09 中铁九局集团第七工程有限公司 External mold mobile device is pour to case roof beam
CN213005824U (en) * 2020-07-20 2021-04-20 中铁大桥局第九工程有限公司 Automatic change box girder template of control

Also Published As

Publication number Publication date
CN113478622A (en) 2021-10-08

Similar Documents

Publication Publication Date Title
CN207348483U (en) The working portable rain-proof shelter of underground pipe gallery
CN208934425U (en) Self-propelled multifunctional material distributing machine
CN104343086A (en) Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon
CN109595017A (en) A kind of tunnel top support device of the constructing tunnel with defencive function
CN114717981B (en) Multifunctional ramp-spliced wide beam construction equipment
CN113478622B (en) City piping lane integration pouring device
CN211472518U (en) Removable supporting is used in building engineering construction
CN107268987A (en) Across formula adjustable climb seat in the plane reaction frame and its construction method
CN215164433U (en) Integral road surface basic unit resin template support frame
CN214942392U (en) Construction reinforced concrete beam mold fixing device
CN212773578U (en) Independent support system of assembled building quick detach
CN203238589U (en) Formwork trolley applied to inverted siphon project
CN113700203A (en) Umbrella-shaped modeling installation design structure of ultrahigh stone-like GRG
CN208088101U (en) A kind of splicing of Zhongting is floatd bridge
CN2308640Y (en) Percolation-proof rear pouring verticle form appts. of building cellar
CN212105042U (en) Construction foot rest for highway bridge
CN220396766U (en) Utility tunnel inner tube installing support
CN114776072B (en) Device and method for reinforcing outer wall of history building reconstruction
CN214573964U (en) Support arrangement for concrete placement elephant trunk
CN217760046U (en) Building templates connects steelframe for civil engineering
CN209892240U (en) I-shaped steel arch support convenient to installation for pipe gallery underground excavation construction
CN213540410U (en) Tunnel upward slope reinforcement engineering structure
CN212897760U (en) A consolidate strutting arrangement for building engineering
CN215055374U (en) Novel template is easy to be dismantled device
CN215038760U (en) Prefabricated part based on high-performance concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220719