CN1134581C - Steel tower for electric power transmission - Google Patents

Steel tower for electric power transmission Download PDF

Info

Publication number
CN1134581C
CN1134581C CNB991121902A CN99112190A CN1134581C CN 1134581 C CN1134581 C CN 1134581C CN B991121902 A CNB991121902 A CN B991121902A CN 99112190 A CN99112190 A CN 99112190A CN 1134581 C CN1134581 C CN 1134581C
Authority
CN
China
Prior art keywords
head tree
electric power
short column
short
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB991121902A
Other languages
Chinese (zh)
Other versions
CN1271802A (en
Inventor
卡尔・弗里德里克・威廉・萨普拉
潘炳孝
严沛钦
翁炳华
郭跃明
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGAN IRON TOWER Co Ltd WEIFANG
Original Assignee
CHANGAN IRON TOWER Co Ltd WEIFANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGAN IRON TOWER Co Ltd WEIFANG filed Critical CHANGAN IRON TOWER Co Ltd WEIFANG
Priority to CNB991121902A priority Critical patent/CN1134581C/en
Publication of CN1271802A publication Critical patent/CN1271802A/en
Application granted granted Critical
Publication of CN1134581C publication Critical patent/CN1134581C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to the improvement on an electric power iron tower, which comprises pillars, supporting rods, drawing wires and cross arms. The present invention is characterized in that tower legs are composed of main pillars 1 and short pillars 3, the top of the short pillar 3 is connected with the main pillar 1 via a horizontal bar 5, and the drawing wires are arranged between the main pillars and the short pillars. A horizontal strut 4 is arranged between the tops of two short pillars 3. The present invention has the advantages of low steel consumption and ground occupancy, no damage of the drawing wires in the iron tower contour, standardized production of most of components, good anti-theft performance and small acting force to base from the iron tower.

Description

Electric power pylon
The present invention relates to the overhead transmission line iron tower, belong to transmission facility.
Traditional iron tower of power transmission line mainly contains self-supporting tower and stayed tower.Self-supporting tower is less because of its occupation of land, body of the tower intensity height, and advantage such as be difficult for toppling adopted widely, but its steel consumption amount is higher, and the tower material is stolen easily.The stayed tower steel consumption is lower, and cost is lower, but its floor space is bigger, and it is outer and not obvious that backguy is exposed to body of the tower, so be damaged easily and cause the accident of falling the tower.
The iron tower that the purpose of this invention is to provide a kind of new structure makes it have the advantage of above two kinds of iron towers concurrently.
Electric power pylon provided by the present invention comprises column, strut, and backguy and cross-arm is characterized in that: the iron tower tower leg is made up of head tree and short column, and the top of short column connects firmly through horizon bar and head tree, is provided with backguy between head tree and short column.
The quantity of head tree is selected two for use, makes its installation site on the long axis of cross-arm, preferred two and its axial line is overlapped with the minor axis of cross-arm of the quantity of short column.
Preferred scheme is divided into two parts up and down with backguy, and an end of last main drawing line is positioned at the junction of cross-arm and head tree, and the other end is positioned at the top of short column, and an end of following main drawing line is positioned at the top of short column, and the other end is positioned on the bottom or basis of head tree.
In order to prevent that the prismatic framework that horizon bar is formed is out of shape because of stressed, the present invention is provided with triatic stay between two relative short columns.
In order to reduce the slenderness ratio of head tree, make it can bear bigger pressure, perhaps satisfy lighter weight designing requirement, the present invention is provided with at least two group auxiliary rods on head tree.
In order to increase the bulk strength of body of the tower, the present invention is provided with auxiliary stay between the top of auxiliary rod between the top of head tree and auxiliary rod and on the same group.
The present invention considers from the aspect of structure optimization to select steel pipe to make head tree, and short column, strut and horizon bar make it to have the alternative advantage such as strong of the little and specification of structure blast.
Advantage of the present invention is: 1, reduce steel consumption 10~25% than self-supporting tower, reduce investment outlay 11~18%; 2, most of member can standardized production, helps ensuring the quality of products, reducing manufacturing cost; 3, the member theftproof performance is good, and antitheft, anti-handler need be set specially; 4, the shaft tower parts are few, and construction, the installing engineering amount is little, can accelerate construction, installation rate, reduces operating expenses; 5, basic role power reduces, and stress condition improves, and therefore can reduce foundation cost; 6, because backguy partly is connected with the body of the tower self-support, backguy all within the outline line of iron tower, so be difficult for being damaged, has improved the application life and the safety in utilization of body of the tower.
Introduce embodiment of the present invention below in conjunction with Figure of description:
Figure of description 1 is an agent structure schematic diagram of the present invention;
Figure of description 2 is left side views of accompanying drawing 1;
Figure of description 3 is vertical views of accompanying drawing 1.
In above-mentioned accompanying drawing 1---head tree, 2------short column, 4---triatic stay of going up main drawing line, 3,5---horizon bar, 6---auxiliary rod, 7---cross-arm, 8---following main drawing line, 9---auxiliary stay.
As shown in the figure: the present invention supports conventional cross-arm 7 with two steel pipe system head trees 1, and lead and lightning conducter are fixed on the cross-arm 7 in the usual way.Short column 3 is also made with steel pipe, and short column 3 is selected two usually for use, constitutes the tower leg of iron tower jointly with head tree.The layout of tower leg is compared with traditional iron tower and has been rotated miter angle, promptly the cross-arm 7 with iron tower is an object of reference, the installation site of two head trees 1 should make the long axis of its line and cross-arm 7 coincide, and the line of two short columns 3 is vertical with the line of two head trees 1, and itself and cross-arm 7 minor axis are coincided.Four horizon bars 5 join with an end and short column 3 separately, and the other end and head tree 1 join, and form a prismatic from vertical view.Triatic stay 4 its two ends lay respectively at the intersection of horizon bar 5 and short column 3 to increase the intensity of body of the tower.Last main drawing line 2 is pulled in from the head tree 1 and the junction of cross-arm 7 on the prismatic be made up of four horizon bars 5 and two angles that short column 3 is connected, and the prismatic that following main drawing line 8 is formed from horizon bar 5 and short column 3 two crossing angles are pulled on the bottom or basis of head tree 1.The starting point at the radical of main drawing line and two ends should be done corresponding adjustment when the body of the tower height change, and particular location design and calculation method is routinely determined.The bottom of head tree 1 and short column 3 is connected with the basis.When being subjected to vertical force, mainly bear by two head trees 1.When being subjected to lateral force to do the time spent, main drawing line is subjected to pulling force, and head tree 1 is stressed.Be subjected to pulling force when being subjected to vertical body to make the time spent main drawing line, head tree 1 is stressed, and a short column 3 is stressed, and the short column 3 of another root is subjected to pulling force.
In order to reduce the slenderness ratio of head tree 1, make it can bear bigger pressure or make it lighter, can add an above auxiliary rod 6, accompanying drawing 1 is depicted as bilevel structural form, and every layer has one group of auxiliary rod 6.One end and the head tree 1 of auxiliary rod 6 connect firmly, and the other end links to each other with head tree 1 or/and other auxiliary rods through auxiliary stay 9.

Claims (7)

1, a kind of electric power pylon, comprise column, strut, backguy and cross-arm, it is characterized in that: the iron tower leg is made up of head tree (1) and short column (3), and the top of short column (3) connects firmly through horizon bar (5) and head tree (1), is provided with backguy between head tree (1) and short column (3).
2, electric power pylon according to claim 1 is characterized in that: the quantity of head tree (1) is two, is arranged on the long axis place of cross-arm (7); The quantity of short column (3) is two, and its axial line overlaps with the minor axis of cross-arm (7).
3, electric power pylon according to claim 1 and 2, it is characterized in that: an end of going up main drawing line (2) is positioned at the junction of cross-arm (7) and head tree (1), the other end is positioned at the top of short column (3), one end of following main drawing line (8) is positioned at the top of short column (3), and the other end is positioned on the bottom or basis of head tree (1).
4, electric power pylon according to claim 1 and 2 is characterized in that: between relative two short columns (3) triatic stay (4) is set.
5, electric power pylon according to claim 1 is characterized in that: set up at least two group auxiliary rods (6) on head tree (1).
6, electric power pylon according to claim 4 is characterized in that: between the top of auxiliary rod (6) between the top of head tree (1) and auxiliary rod (6) and on the same group auxiliary stay (9) is set.
7, electric power pylon according to claim 1 is characterized in that: head tree (1), short column (3) and strut all select for use steel pipe to make.
CNB991121902A 1999-04-26 1999-04-26 Steel tower for electric power transmission Expired - Fee Related CN1134581C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB991121902A CN1134581C (en) 1999-04-26 1999-04-26 Steel tower for electric power transmission

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB991121902A CN1134581C (en) 1999-04-26 1999-04-26 Steel tower for electric power transmission

Publications (2)

Publication Number Publication Date
CN1271802A CN1271802A (en) 2000-11-01
CN1134581C true CN1134581C (en) 2004-01-14

Family

ID=5275519

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB991121902A Expired - Fee Related CN1134581C (en) 1999-04-26 1999-04-26 Steel tower for electric power transmission

Country Status (1)

Country Link
CN (1) CN1134581C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187268B (en) * 2007-08-08 2010-09-29 安徽省电力公司淮北供电公司 Height adjustable transmission iron tower capable of even precipitation
CN104018720A (en) * 2014-05-27 2014-09-03 国家电网公司 High-voltage stringing method
CN105089325A (en) * 2015-09-17 2015-11-25 广东电网有限责任公司电力科学研究院 Improved distribution network overhead line windproof guy wire device
CN112392318B (en) * 2019-08-13 2022-04-05 绍兴文理学院元培学院 Assembled cantilever beam power transmission tower

Also Published As

Publication number Publication date
CN1271802A (en) 2000-11-01

Similar Documents

Publication Publication Date Title
CN206071140U (en) The full association type frame construction of transformer station
CN102674136A (en) Lifting method for large-scale tower equipment
CN102330470B (en) Single-layer prestressing frame structure
CN104847156A (en) Unit-assembly type communication tower
CN1134581C (en) Steel tower for electric power transmission
CN2371270Y (en) Power transmission iron tower
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN101555732B (en) Tension-compression main material type electric power pylon
CN205025154U (en) 330kVGIS distribution device place rigid connection sail formula framework
CN113875468B (en) Construction method of double-layer sunshade net arched shed for crop planting
CN213682493U (en) Large-diameter spherical steel structure
CN215484501U (en) Withstand voltage type construction platform
CN201635470U (en) Steel-structured communication tower
CN203742030U (en) Stone curtain wall keel structure
CN207183801U (en) One kind uses new sail type power distribution equipment framework made of composite insulating material
CN108104349B (en) Oblique compression bar truss beam chord beam combined structure and implementation method
CN201883728U (en) DC filter structural frame for converter station
CN206438424U (en) A kind of bridge strengthening device with shock insulation function
CN2401647Y (en) Prestressed iron tower for power transmission
CN105064760A (en) Four tube-single tube switching joint for narrow-foundation steel tube poles
CN219315513U (en) Buckling and hanging system for splicing arch bridge cantilever
CN212026320U (en) Iron tower cushion cap foundation structure
CN211524274U (en) Communication tower adds synthetic bill-board reinforced structure of stand newly
CN215498808U (en) Vertical string solar photovoltaic support
CN214653166U (en) Novel rail of tower machine standard festival

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee