CN113430392A - Efficient arc striking method for large-end-face electrode blank for electroslag smelting - Google Patents

Efficient arc striking method for large-end-face electrode blank for electroslag smelting Download PDF

Info

Publication number
CN113430392A
CN113430392A CN202110674740.3A CN202110674740A CN113430392A CN 113430392 A CN113430392 A CN 113430392A CN 202110674740 A CN202110674740 A CN 202110674740A CN 113430392 A CN113430392 A CN 113430392A
Authority
CN
China
Prior art keywords
stage
slag
arc striking
smelting
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110674740.3A
Other languages
Chinese (zh)
Other versions
CN113430392B (en
Inventor
刘佳伟
许立伟
郑壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN202110674740.3A priority Critical patent/CN113430392B/en
Publication of CN113430392A publication Critical patent/CN113430392A/en
Application granted granted Critical
Publication of CN113430392B publication Critical patent/CN113430392B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B9/00General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
    • C22B9/16Remelting metals
    • C22B9/18Electroslag remelting

Abstract

The invention relates to a method for efficiently striking an arc on a large end face electrode blank for electroslag smelting, belongs to the technical field of electroslag smelting, solves the technical problem that the large end face electrode blank cannot strike the arc and melt slag in time in the process of arc striking material consumption, and adopts the following technical scheme: the arc striking material is changed from the original 'a dummy bar plate, an arc striking plate and arc striking steel scraps' into 'the dummy bar plate, the arc striking steel scraps and a slag material cofferdam', so that the overlapping range of the impact range of the arc striking temperature and the arrangement range of the slag material is expanded; and matching the power distribution parameters in the arcing stage: the voltage and current of the first stage are started by adopting small current, the power of the second stage is gradually increased according to the slope of the curve, the power of the third stage is gradually and slowly increased to the peak value of the power along with the slag adding process, the power of the fourth stage is slowly increased to match the set melting speed, and the stable transition is implemented to enter the melting stage. By adopting the method of combining the arrangement of the arcing materials and the setting of the power distribution parameters, the high-efficiency arcing slagging is realized, the safety and the effectiveness are realized, the materials are saved, and the production efficiency is improved.

Description

Efficient arc striking method for large-end-face electrode blank for electroslag smelting
Technical Field
The invention belongs to the technical field of electroslag smelting, and particularly relates to a method for efficiently striking an arc on a large-end-face electrode blank for electroslag smelting.
Background
The large-end-face electrode blank is an electrode blank with the diameter larger than 700mm, the diameter of the end face of the electrode blank is large, a large-area barrier is formed below the end face of the electrode blank, slag materials descend to the arc striking plate and then form a slope at the edge, the slag materials cannot reach the arc striking temperature influence range of the arc striking materials, arc striking and slag melting cannot be carried out in time in the consumption process of the arc striking materials, partial insulation is caused to cause power transmission failure, safety and quality problems are easily caused, original auxiliary materials are wasted, and the production efficiency is reduced.
Disclosure of Invention
The invention provides a method for efficiently striking an arc on a large end face electrode blank for electroslag smelting, aiming at overcoming the defects of the prior art and solving the technical problem that the large end face electrode blank cannot strike the arc and melt slag in time in the process of arc striking material consumption. By adopting the method of combining the arrangement of the arcing materials and the setting of the power distribution parameters, the high-efficiency arcing slagging is realized, the safety and the effectiveness are realized, the materials are saved, and the production efficiency is improved.
The design concept of the invention is as follows: the arc striking material is changed from the original 'a dummy bar plate, an arc striking plate and arc striking steel scraps' into 'the dummy bar plate, the arc striking steel scraps and slag enclosure', so that the overlapping range of the impact range of the arcing temperature and the arrangement range of slag charge is ensured to be expanded.
The invention is realized by the following technical scheme.
A method for efficiently starting arc of a large-end-face electrode blank for electroslag smelting comprises the following steps:
s1, arranging an arc striking material:
placing a dummy bar plate on a bottom crystallizer, welding a run-on plate above the core of the dummy bar plate, then enclosing the edge of the run-on plate to form an annular slag cofferdam with the slag content of 5%, uniformly mixing slag and the contact edge of run-on steel scraps, wherein the height of the slag cofferdam is lower than that of the center of the run-on plate, and the width of the slag cofferdam is smaller than the diameter of the crystallizer and larger than that of an electrode blank;
s2, setting electroslag smelting power distribution parameters:
the first stage is as follows: within 0-5 minutes after power transmission, voltage is configured according to 60% of a given smelting electrical system, and current is configured according to 40% of the given smelting electrical system, so that low-current arcing is ensured;
and a second stage: within 5-8 minutes after power transmission, the voltage is increased to 70% of the configuration of the established smelting electrical system, the current is increased to 55% of the configuration of the established smelting electrical system, and the influence range of the arcing temperature is further expanded to form a preliminary slag pool;
and a third stage: adding 10% of the total slag charge every 10 minutes after power transmission for 8-95 minutes; the set voltage is gradually increased to 90% of the set smelting electrical system from the second-stage voltage configuration along with the slag adding process, and the current is gradually increased to 80% of the set smelting electrical system from the second-stage current configuration;
a fourth stage: after the power is supplied for 95 minutes to 2 hours, firstly, slowly adding all the residual slag into a smelting furnace, and slowly increasing the power to the peak power until the slag is completely melted down; then slowly reducing the power, matching with the set melting speed, and enabling the melting furnace to smoothly transit into a melting stage.
Further, the thickness of the arc striking plate is 20-35 mm.
Furthermore, in the established smelting electrical system, the voltage is set in a gradient configuration of 60% -90%, and the current is set in a gradient configuration of 40% -80%.
Further, the melting rate was set as: the initial peak value is 10-20% higher than the set value, and the peak value returns to the set value within 30 min.
Compared with the prior art, the invention has the beneficial effects that:
by adopting the arc striking method provided by the invention, the one-time success rate of electroslag arc striking of the large-end-face electrode blank reaches 100%, the quality hidden trouble caused by the damage of protective atmosphere due to the midway addition of arc striking materials is solved, the arc striking materials and slag materials are saved, and the production efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of an arrangement of arcing materials in the prior art;
FIG. 2 is a schematic top view of the arrangement of the arcing materials of the present invention;
fig. 3 is a front half-sectional structural schematic view of the arrangement of the arcing materials in the present invention.
In the figure, 1 is a dummy bar plate, 2 is an arc striking plate, and 3 is a slag cofferdam.
Detailed Description
The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention. Unless otherwise specified, the examples follow conventional experimental conditions.
In the specific embodiment, the steel grade is R1Cr18Ni9Ti, and the steel ingot weight is 8.5T. Refining the steel ingot by adopting an electroslag remelting method, wherein the diameter of a crystallizer is 1000mm, and the diameter of an electrode blank is 800 mm; in the existing established smelting electrical system: the set voltage of the melting period is 80V, the peak voltage is 85V, the set current of the melting period is 16KA and the peak current is 17KA, and the melting speed of the melting period is 900 Kg/h.
A method for efficiently starting arc of a large-end-face electrode blank for electroslag smelting comprises the following steps:
s1, arranging an arc striking material:
placing an ignition plate 1 on a bottom crystallizer, welding an arc striking plate 2 above the center of the ignition plate 1, wherein the thickness of the arc striking plate 2 is 35mm, then arranging an annular slag material cofferdam 3 with the slag content of 5% at the edge of the arc striking plate 2, and uniformly mixing slag materials and the contact edge of arc striking steel scraps, wherein the height of the slag material cofferdam 3 is lower than the height of the center of the arc striking plate 2, and the width of the slag material cofferdam 3 is smaller than the diameter of the crystallizer and larger than the diameter of an electrode blank;
s2, setting electroslag smelting power distribution parameters:
the first stage is as follows: within 0-5 minutes after power transmission, voltage is configured according to 60% of a given smelting electrical system, and current is configured according to 40% of the given smelting electrical system;
and a second stage: within 5-8 minutes after power transmission, the voltage is increased to 70% of the configuration of the established smelting electrical system, and the current is increased to 55% of the configuration of the established smelting electrical system;
and a third stage: adding 10% of the total slag charge every 10 minutes after power transmission for 8-95 minutes; the set voltage is gradually increased to 90% of the set smelting electrical system from the second-stage voltage configuration along with the slag adding process, and the current is gradually increased to 80% of the set smelting electrical system from the second-stage current configuration;
a fourth stage: after the power is supplied for 95 minutes to 2 hours, firstly, slowly adding all the residual slag into a smelting furnace, and slowly increasing the power to the peak power until the slag is completely melted down; then the power is slowly reduced, the melting speed is set to be 900Kg/h in the matching melting period, and the melting furnace smoothly transits to enter the melting stage.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.

Claims (4)

1. A method for efficiently starting arc of a large-end-face electrode blank for electroslag smelting is characterized by comprising the following steps:
s1, arranging an arc striking material:
placing a dummy bar plate (1) on a bottom crystallizer, welding an arc striking plate (2) above the center of the dummy bar plate (1), then enclosing the edge of the arc striking plate (2) to form an annular slag material cofferdam (3) with the slag content of 5%, uniformly mixing slag materials and the contact edge of arc striking steel scraps, wherein the height of the slag material cofferdam (3) is lower than the height of the center of the arc striking plate (2), and the width of the slag material cofferdam (3) is smaller than the diameter of the crystallizer and larger than the diameter of an electrode blank;
s2, setting electroslag smelting power distribution parameters:
the first stage is as follows: within 0-5 minutes after power transmission, voltage is configured according to 60% of a given smelting electrical system, and current is configured according to 40% of the given smelting electrical system;
and a second stage: within 5-8 minutes after power transmission, the voltage is increased to 70% of the configuration of the established smelting electrical system, and the current is increased to 55% of the configuration of the established smelting electrical system;
and a third stage: adding 10% of the set total slag charge within 10 minutes after power supply is carried out for 8-95 minutes, gradually increasing the set voltage from the second-stage voltage configuration to 90% configuration of the set smelting electrical system along with the slag adding process, and gradually increasing the current from the second-stage current configuration to 80% configuration of the set smelting electrical system;
a fourth stage: after the power is transmitted for 95 minutes to 2 hours, firstly, the residual slag is completely and slowly added into a smelting furnace, and the power is slowly increased to the peak power (the voltage and the current are increased to the set maximum value) until the slag is completely melted; then slowly reducing the power, matching with the set melting speed, and enabling the melting furnace to smoothly transit into a melting stage.
2. The method for efficiently starting the arc of the electrode blank with the large end face for electroslag smelting according to claim 1, wherein the method comprises the following steps: the thickness of the arc striking plate (2) is 20-35 mm.
3. The method for efficiently starting the arc of the electrode blank with the large end face for electroslag smelting according to claim 1, wherein the method comprises the following steps: in the established smelting electrical system, the voltage is set in a gradient configuration of 60% -90%, and the current is set in a gradient configuration of 40% -80%.
4. The method for efficiently starting the arc of the electrode blank with the large end face for electroslag smelting according to claim 1, wherein the method comprises the following steps: the melting speed is set as follows: the initial peak value is 10-20% higher than the set value, and the peak value returns to the set value within 30 min.
CN202110674740.3A 2021-06-18 2021-06-18 Efficient arc striking method for large-end-face electrode blank for electroslag smelting Active CN113430392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110674740.3A CN113430392B (en) 2021-06-18 2021-06-18 Efficient arc striking method for large-end-face electrode blank for electroslag smelting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110674740.3A CN113430392B (en) 2021-06-18 2021-06-18 Efficient arc striking method for large-end-face electrode blank for electroslag smelting

Publications (2)

Publication Number Publication Date
CN113430392A true CN113430392A (en) 2021-09-24
CN113430392B CN113430392B (en) 2022-07-01

Family

ID=77756380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110674740.3A Active CN113430392B (en) 2021-06-18 2021-06-18 Efficient arc striking method for large-end-face electrode blank for electroslag smelting

Country Status (1)

Country Link
CN (1) CN113430392B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114774764A (en) * 2022-05-09 2022-07-22 攀钢集团江油长城特殊钢有限公司 Control method for improving surface quality of Cr12 series cold-work die steel electroslag ingot

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1326091A (en) * 1971-04-19 1973-08-08 Ass Elect Ind Electroslag refining of metals
SU556569A1 (en) * 1975-11-18 1977-04-30 Всесоюзный Научно-Исследовательский Институт Автоматизации Черной Металлургии Apparatus for determining the stages of melting of a charge in an electric arc furnace
JPH0254727A (en) * 1988-08-19 1990-02-23 Daido Steel Co Ltd Two-mold continuous electroslag remelting method
CN101457272A (en) * 2009-01-08 2009-06-17 山东泰山钢铁集团有限公司 Two-step stainless steel smelting method
CN102041395A (en) * 2010-12-22 2011-05-04 本钢板材股份有限公司 Electroslag remelting arc initiator and arcing method thereof
CN102433447A (en) * 2011-11-25 2012-05-02 山西太钢不锈钢股份有限公司 Slag system for electro-slag re-melted high temperature alloy and using method for slag system
CN104862533A (en) * 2015-04-26 2015-08-26 邢桂生 High temperature alloy material for engine turbine and preparation method thereof
CN105463200A (en) * 2016-01-13 2016-04-06 内蒙古北方重工业集团有限公司 Arc striking agent for electroslag remelting and arc striking method
CN105695762A (en) * 2016-04-08 2016-06-22 大冶特殊钢股份有限公司 Solid slag ignition method applicable to electro-slag remelting
CN108728662A (en) * 2018-06-14 2018-11-02 湖州久立永兴特种合金材料有限公司 A kind of N06625 nickel-base alloys electro-slag re-melting method and the slag system used
CN111004976A (en) * 2019-12-30 2020-04-14 钢铁研究总院 Nickel-saving type air valve alloy and preparation method thereof
CN111270082A (en) * 2020-03-13 2020-06-12 山西太钢不锈钢股份有限公司 Arc striking method for electroslag furnace

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1326091A (en) * 1971-04-19 1973-08-08 Ass Elect Ind Electroslag refining of metals
SU556569A1 (en) * 1975-11-18 1977-04-30 Всесоюзный Научно-Исследовательский Институт Автоматизации Черной Металлургии Apparatus for determining the stages of melting of a charge in an electric arc furnace
JPH0254727A (en) * 1988-08-19 1990-02-23 Daido Steel Co Ltd Two-mold continuous electroslag remelting method
CN101457272A (en) * 2009-01-08 2009-06-17 山东泰山钢铁集团有限公司 Two-step stainless steel smelting method
CN102041395A (en) * 2010-12-22 2011-05-04 本钢板材股份有限公司 Electroslag remelting arc initiator and arcing method thereof
CN102433447A (en) * 2011-11-25 2012-05-02 山西太钢不锈钢股份有限公司 Slag system for electro-slag re-melted high temperature alloy and using method for slag system
CN104862533A (en) * 2015-04-26 2015-08-26 邢桂生 High temperature alloy material for engine turbine and preparation method thereof
CN105463200A (en) * 2016-01-13 2016-04-06 内蒙古北方重工业集团有限公司 Arc striking agent for electroslag remelting and arc striking method
CN105695762A (en) * 2016-04-08 2016-06-22 大冶特殊钢股份有限公司 Solid slag ignition method applicable to electro-slag remelting
CN108728662A (en) * 2018-06-14 2018-11-02 湖州久立永兴特种合金材料有限公司 A kind of N06625 nickel-base alloys electro-slag re-melting method and the slag system used
CN111004976A (en) * 2019-12-30 2020-04-14 钢铁研究总院 Nickel-saving type air valve alloy and preparation method thereof
CN111270082A (en) * 2020-03-13 2020-06-12 山西太钢不锈钢股份有限公司 Arc striking method for electroslag furnace

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
YULIU 等: "Cleanliness improvement and microstructure refinement of ingot processed by vacuum electroslag remelting", 《JOURNAL OF MATERIALS RESEARCH AND TECHNOLOGY》 *
余强等: "电渣炉智能控制系统的开发与应用", 《中国冶金》 *
李建军等: "高Cr高Mn钢电渣锭渣沟产生的原因及消除措施", 《山西冶金》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114774764A (en) * 2022-05-09 2022-07-22 攀钢集团江油长城特殊钢有限公司 Control method for improving surface quality of Cr12 series cold-work die steel electroslag ingot
CN114774764B (en) * 2022-05-09 2023-10-27 攀钢集团江油长城特殊钢有限公司 Control method for improving surface quality of Cr12 series cold-work die steel electroslag ingot

Also Published As

Publication number Publication date
CN113430392B (en) 2022-07-01

Similar Documents

Publication Publication Date Title
CN104032151A (en) An EB cold hearth smelting method of TC4 titanium alloy ingots
CN113430392B (en) Efficient arc striking method for large-end-face electrode blank for electroslag smelting
CN110719963B (en) Treatment method of lithium ion battery waste
CN104789787A (en) Electroslag remelting method for high-purity austenite nitrogenous stainless steel for nuclear power
CN102806426A (en) Welding process of auxiliary electrode for vacuum arc remelting furnace
CN102560136A (en) Smelting and arcing process for vacuum consumable electro-arc furnace, and smelting process
CN212778615U (en) Multi-electrode vacuum non-consumable arc melting device for titanium and titanium alloy
CN102978413B (en) Hundred-ton large-scale three-phase electroslag furnace feeding technique
CN110586903B (en) Electroslag remelting center feeding method
CN100363515C (en) Arcing and smelting technology for liquid slag in electroslag furnace
KR101823944B1 (en) Apparatus and method for manufacturing ingot of titanium
CN113403491B (en) Production method of high-temperature alloy
CN114273642A (en) Melting speed control method in electroslag remelting process
JP4263366B2 (en) Method and apparatus for melting rare earth magnet scrap
CN207619447U (en) A kind of recoverable shaped steel refining slag hearth
CN110793321A (en) Arc control device and method for improving surface quality of titanium cast ingot
CN103495715A (en) Vacuum continuous casting nickel and nickel alloy billet production method
CA2062636A1 (en) Electrolytic process for making alloys of rare earth and other metals
CN103014374B (en) Process for establishing kish on smelting cold bed of EB (Electronic Beam) furnace
CN205133703U (en) Electroslag remelting furnace's scratch start device
CN115323186B (en) Process for controlling height of high-temperature alloy vacuum arc remelting ingot crown
CN201545898U (en) Dummy ingot composition plate for electroslag remelting
KR100506389B1 (en) Lower Electrode Cooling Mold of DC Electric Furnace
CN212451574U (en) Cold arcing type electroslag furnace arcing bottom plate device
JPH0931558A (en) Vacuum arc remelting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant