CN113420956A - Method for managing planned receiving, transmitting and storing information of production auxiliary materials - Google Patents
Method for managing planned receiving, transmitting and storing information of production auxiliary materials Download PDFInfo
- Publication number
- CN113420956A CN113420956A CN202110578402.XA CN202110578402A CN113420956A CN 113420956 A CN113420956 A CN 113420956A CN 202110578402 A CN202110578402 A CN 202110578402A CN 113420956 A CN113420956 A CN 113420956A
- Authority
- CN
- China
- Prior art keywords
- plan
- management module
- uploading
- materials
- production auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 20
- 238000012545 processing Methods 0.000 claims abstract description 6
- 239000013307 optical fiber Substances 0.000 claims description 3
- 239000002994 raw material Substances 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract 6
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a method for managing plan receiving, dispatching and storing information of production auxiliary materials, which comprises a plan management module, a data processing module and a data processing module, wherein the plan management module is used for entering a material requirement plan book by a worker and leading the worker to confirm and sign the requirement plan book; the warehousing management module is used for gathering materials and uploading warehousing certificates; the inventory management module is used for classifying materials and recording inventory quantity; a delivery management module; the method for managing planned receiving and dispatching information of the production auxiliary materials more effectively provides powerful data support for leaders and related personnel to timely, accurately and comprehensively master a series of dynamic information of the production auxiliary materials from planned declaration to warehouse entry and dispatch and storage, greatly reduces the stock backlog of the production auxiliary materials, reduces the cost consumption of enterprises, and accordingly improves the overall quality and the modernized management level of the enterprises.
Description
Technical Field
The invention relates to the technical field of production auxiliary material management, in particular to a method for managing planned receiving, sending and storing information of production auxiliary materials.
Background
The original production auxiliary material management of the steel plant is a traditional accounting management mode, is gradually formed along with the development of production, and has the defects of information dispersion, high redundancy, complicated repeated labor and inaccurate and untimely information caused by various reasons. The staff is in a kind of repeated and tedious manual labor of filling up tables, looking up, counting, keeping accounts, etc., while spending much time and energy in the work, fail to meet the needs of management, only design and develop a set of practical and normative computer network management information system can make these deficiency solve. Therefore, a method for managing the storage information of the production auxiliary material plan is provided.
Disclosure of Invention
The present invention is directed to a method for managing planned receiving and storing information of production auxiliary materials, so as to solve the problems mentioned in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: a method for managing the plan receiving, sending and storing information of production auxiliary materials utilizes computer network oracle database management to configure an oracle database management server and a client computer, and carries out remote access management through an optical fiber network to realize the sharing of data resources.
Preferably, the method comprises the following steps:
the plan management module is used for entering a material requirement plan by a worker and confirming and signing the requirement plan by a leader;
the warehousing management module is used for gathering materials and uploading warehousing certificates;
the inventory management module is used for classifying materials and recording inventory quantity;
and the ex-warehouse management module is used for uploading out-warehouse certificates and sending the materials to the site.
Preferably, the method comprises the following management steps:
s1, the administrator of each area puts forward a demand plan;
s2, uploading a first-level requirement plan by a workshop material worker;
s3, signing after auditing by a chief manager, and uploading a secondary demand plan;
s4, reporting the raw materials to a company by a factory leader for approval and signature;
s5, uploading a warehousing certificate, and performing inventory management;
and S6, uploading the warehouse-out certificate and sending the certificate to the site.
Preferably, a data query module is arranged for querying the data information of the production auxiliary materials required from plan declaration to warehouse entry and exit through a network.
Preferably, an EXCEL table form is established, and resource sharing of data information is realized.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides powerful data support for leaders and related personnel to timely, accurately and comprehensively master a series of dynamic information of the production auxiliary materials from plan declaration to warehouse entry and warehouse exit for receiving and storing, greatly reduces the inventory backlog of the production auxiliary materials, reduces the cost consumption of enterprises and further improves the overall quality and the modernized management level of the enterprises.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a data flow diagram of the system of the present invention.
In the figure: 1-plan management module; 2-warehousing management module; 3-an inventory management module; and 4, a warehouse-out management module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a method for managing the plan receiving, sending and storing information of production auxiliary materials utilizes computer network oracle database management to configure an oracle database management server and a client computer, and carries out remote access management through an optical fiber network to realize the sharing of data resources.
The method comprises the following steps:
the system comprises a plan management module 1, a data processing module and a data processing module, wherein the plan management module 1 is used for enabling staff to enter a material requirement plan book and leading the staff to confirm and sign the requirement plan book;
the warehousing management module 2 is used for gathering materials and uploading warehousing certificates;
the inventory management module 3 is used for classifying materials and recording inventory quantity;
and the ex-warehouse management module 4 is used for uploading out-warehouse certificates and sending the materials to the site.
Strict receiving, sending and storing nested mode control flows exist among the functional modules of the four parts, and all links are restricted with each other, so that the accuracy of the dynamic data flow direction can be ensured.
The method comprises the following management steps:
s1, the administrator of each area puts forward a demand plan;
s2, uploading a first-level requirement plan by a workshop material worker;
s3, signing after auditing by a chief manager, and uploading a secondary demand plan;
s4, reporting the raw materials to a company by a factory leader for approval and signature;
s5, uploading a warehousing certificate, and performing inventory management;
and S6, uploading the warehouse-out certificate and sending the certificate to the site.
The data query module is arranged, so that the data information of the production auxiliary materials needed by the user can be conveniently and quickly queried through a network from plan declaration to warehouse entry and receiving.
And an EXCEL table form is established, so that resource sharing of data information can be fully realized.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A method for managing the receiving, sending and storing information of a production auxiliary material plan is characterized in that: the method comprises the steps of utilizing a computer network oracle database to manage, configuring an oracle database management server and a client computer, and carrying out remote access management through an optical fiber network to realize sharing of data resources.
2. The method of claim 1, wherein the method comprises: the method comprises the following steps:
the system comprises a plan management module (1), a data processing module and a data processing module, wherein the plan management module (1) is used for enabling staff to enter a material requirement plan book and leading a leader to confirm and sign the requirement plan book;
the warehousing management module (2), the warehousing management module (2) is used for collecting materials and uploading warehousing vouchers;
the inventory management module (3), the inventory management module (3) is used for classifying materials and recording inventory quantity;
and the ex-warehouse management module (4) is used for uploading out-warehouse certificates and sending the materials to the site.
3. The method of claim 2, wherein the method comprises: the method comprises the following management steps:
s1, the administrator of each area puts forward a demand plan;
s2, uploading a first-level requirement plan by a workshop material worker;
s3, signing after auditing by a chief manager, and uploading a secondary demand plan;
s4, reporting the raw materials to a company by a factory leader for approval and signature;
s5, uploading a warehousing certificate, and performing inventory management;
and S6, uploading the warehouse-out certificate and sending the certificate to the site.
4. The method of claim 3, wherein the method comprises: and a data query module is arranged for querying the data information of the required production auxiliary materials from plan declaration to warehouse entry and exit through a network.
5. The method of claim 4, wherein the method comprises: and establishing an EXCEL table form to realize resource sharing of data information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110578402.XA CN113420956A (en) | 2021-05-26 | 2021-05-26 | Method for managing planned receiving, transmitting and storing information of production auxiliary materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110578402.XA CN113420956A (en) | 2021-05-26 | 2021-05-26 | Method for managing planned receiving, transmitting and storing information of production auxiliary materials |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113420956A true CN113420956A (en) | 2021-09-21 |
Family
ID=77712967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110578402.XA Pending CN113420956A (en) | 2021-05-26 | 2021-05-26 | Method for managing planned receiving, transmitting and storing information of production auxiliary materials |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113420956A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101127104A (en) * | 2007-09-19 | 2008-02-20 | 渤海船舶重工有限责任公司 | Ship engineering material integrated handling computer management system |
CN104850968A (en) * | 2015-06-15 | 2015-08-19 | 中冶赛迪电气技术有限公司 | Equipment asset operation and maintenance management system for iron and steel enterprises |
CN105550835A (en) * | 2015-11-03 | 2016-05-04 | 武汉宝钢华中贸易有限公司 | Product processing and delivery automatic management system model based on internet plus technology |
CN106296087A (en) * | 2016-08-04 | 2017-01-04 | 中冶赛迪电气技术有限公司 | A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry |
CN207663279U (en) * | 2017-12-12 | 2018-07-27 | 包头钢铁(集团)有限责任公司 | Make steel JIT production planning comprehensive management platform |
CN109472474A (en) * | 2018-11-29 | 2019-03-15 | 山东钢铁集团日照有限公司 | Iron and steel enterprise based on full process flow refines cost accounting control method |
-
2021
- 2021-05-26 CN CN202110578402.XA patent/CN113420956A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101127104A (en) * | 2007-09-19 | 2008-02-20 | 渤海船舶重工有限责任公司 | Ship engineering material integrated handling computer management system |
CN104850968A (en) * | 2015-06-15 | 2015-08-19 | 中冶赛迪电气技术有限公司 | Equipment asset operation and maintenance management system for iron and steel enterprises |
CN105550835A (en) * | 2015-11-03 | 2016-05-04 | 武汉宝钢华中贸易有限公司 | Product processing and delivery automatic management system model based on internet plus technology |
CN106296087A (en) * | 2016-08-04 | 2017-01-04 | 中冶赛迪电气技术有限公司 | A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry |
CN207663279U (en) * | 2017-12-12 | 2018-07-27 | 包头钢铁(集团)有限责任公司 | Make steel JIT production planning comprehensive management platform |
CN109472474A (en) * | 2018-11-29 | 2019-03-15 | 山东钢铁集团日照有限公司 | Iron and steel enterprise based on full process flow refines cost accounting control method |
Non-Patent Citations (1)
Title |
---|
张意如: "保胜集团公司物资管理信息系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110009172B (en) | Asset full life cycle data modeling method based on SG-CIM model | |
CN110766528A (en) | Client credit self-evaluation factory real-time intelligent analysis management system | |
CN108320069A (en) | A kind of manufacturing execution system | |
CN110334950B (en) | Iron tower intelligent production and group management and control system | |
CN101256647A (en) | Item management system being suitable for garden engineering | |
CN103679322A (en) | Production data processing method, device thereof, and system thereof | |
CN105913211A (en) | Material managing and controlling system and method | |
CN104361445A (en) | Real-time labor management system and management method | |
CN112488612A (en) | Visualization-based full inventory resource monitoring and displaying method | |
CN103390218A (en) | Three-chain coupling integrated emergency security system and method for emergencies | |
CN108229824A (en) | A kind of enterprise management system | |
CN111260316A (en) | Management and control integrated platform for project management | |
CN111709702A (en) | Product full life cycle management system | |
CN114118921B (en) | System and method for realizing integration of material allocation based on ERP system | |
CN111080262A (en) | Intelligent logistics platform management method | |
CN112990886B (en) | Aviation industry data management display system based on mobile phone terminal | |
CN112434995A (en) | Warehouse management system based on financial data | |
CN113011743A (en) | Intelligent operation management platform for food industry | |
CN109829615A (en) | A kind of goal task multilevel monitor device and method based on proprietary cloud | |
DE102007013340A1 (en) | System and method for managing environmental impacts of companies | |
CN113420956A (en) | Method for managing planned receiving, transmitting and storing information of production auxiliary materials | |
CN202331554U (en) | Equipment management system | |
CN115775188A (en) | Asset financial integrated system | |
CN102890795A (en) | System and method for accounting production working hours of workshop | |
CN112330265A (en) | Land supply supervisory systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210921 |