CN113417325B - 一种盾构下穿桥梁桩基托换试验装置及实验方法 - Google Patents
一种盾构下穿桥梁桩基托换试验装置及实验方法 Download PDFInfo
- Publication number
- CN113417325B CN113417325B CN202110877887.2A CN202110877887A CN113417325B CN 113417325 B CN113417325 B CN 113417325B CN 202110877887 A CN202110877887 A CN 202110877887A CN 113417325 B CN113417325 B CN 113417325B
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- underpinning
- shield
- concrete
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110877887.2A CN113417325B (zh) | 2021-07-30 | 2021-07-30 | 一种盾构下穿桥梁桩基托换试验装置及实验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110877887.2A CN113417325B (zh) | 2021-07-30 | 2021-07-30 | 一种盾构下穿桥梁桩基托换试验装置及实验方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113417325A CN113417325A (zh) | 2021-09-21 |
CN113417325B true CN113417325B (zh) | 2022-07-29 |
Family
ID=77718708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110877887.2A Active CN113417325B (zh) | 2021-07-30 | 2021-07-30 | 一种盾构下穿桥梁桩基托换试验装置及实验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113417325B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482036B (zh) * | 2021-12-24 | 2023-06-02 | 中铁四局集团有限公司 | 用于修增立柱桩延性的束缩旋回裹包式智能装置 |
CN114441313B (zh) * | 2022-01-23 | 2023-05-23 | 中国地质大学(武汉) | 一种矿山法隧道开挖下穿桥梁桩基托换实验模型及方法 |
CN115262665A (zh) * | 2022-08-05 | 2022-11-01 | 广州市城市建设工程监理有限公司 | 一种用于桩基托换工程的沉降监测系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2892135A1 (fr) * | 2005-10-18 | 2007-04-20 | Jean Marie Renovation Sarl Sar | Organe de liaison entre un micropieu et un outil d'enfoncement, installation de test a l'arrachement comprenant un tel organe |
CN105572308A (zh) * | 2016-02-02 | 2016-05-11 | 长安大学 | 一种模拟隧道开挖过程的试验装置 |
CN107119732A (zh) * | 2017-06-07 | 2017-09-01 | 兰州交通大学 | 一种盾构隧道下穿建筑物的群梁主动托换方法 |
CN107367598A (zh) * | 2017-08-28 | 2017-11-21 | 天津大学 | 在基坑模型试验中通过指令破坏的支护桩试验装置及方法 |
CN207730761U (zh) * | 2018-01-05 | 2018-08-14 | 上海工程技术大学 | 一种模拟盾构隧道施工的试验装置 |
CN110230328A (zh) * | 2019-06-24 | 2019-09-13 | 广州市胜特建筑科技开发有限公司 | 桩基托换系统信息化施工电子监测方法 |
-
2021
- 2021-07-30 CN CN202110877887.2A patent/CN113417325B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2892135A1 (fr) * | 2005-10-18 | 2007-04-20 | Jean Marie Renovation Sarl Sar | Organe de liaison entre un micropieu et un outil d'enfoncement, installation de test a l'arrachement comprenant un tel organe |
CN105572308A (zh) * | 2016-02-02 | 2016-05-11 | 长安大学 | 一种模拟隧道开挖过程的试验装置 |
CN107119732A (zh) * | 2017-06-07 | 2017-09-01 | 兰州交通大学 | 一种盾构隧道下穿建筑物的群梁主动托换方法 |
CN107367598A (zh) * | 2017-08-28 | 2017-11-21 | 天津大学 | 在基坑模型试验中通过指令破坏的支护桩试验装置及方法 |
CN207730761U (zh) * | 2018-01-05 | 2018-08-14 | 上海工程技术大学 | 一种模拟盾构隧道施工的试验装置 |
CN110230328A (zh) * | 2019-06-24 | 2019-09-13 | 广州市胜特建筑科技开发有限公司 | 桩基托换系统信息化施工电子监测方法 |
Non-Patent Citations (1)
Title |
---|
地铁区间隧道下穿既有桥梁的桩基托换研究;黄希等;《铁道标准设计》;20161231;89-93页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113417325A (zh) | 2021-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113417325B (zh) | 一种盾构下穿桥梁桩基托换试验装置及实验方法 | |
Lai et al. | Shield-driven induced ground surface and Ming Dynasty city wall settlement of Xi’an metro | |
Cheng et al. | Shield tunnel uplift and deformation characterisation: a case study from Zhengzhou metro | |
CN110631560B (zh) | 一种密集建筑区地铁车站暗挖区间监控量测方法 | |
CN108894214B (zh) | 一种溶洞地质环境灌注桩及其成桩施工方法 | |
CN106988750B (zh) | 一种大跨度区间隧道超近距离下穿既有站的实施方式 | |
CN112881166B (zh) | 一种采矿全过程及采空塌陷区地基稳定性试验装置及方法 | |
CN108265996B (zh) | 一种砌体结构破墙开洞预顶恢复施工工法 | |
CN111560958A (zh) | 粉质黏土地层富水深基坑施工工法 | |
CN114908805B (zh) | 一种上跨地铁的明挖隧道抽条施工方法 | |
CN106284085B (zh) | 紧临既有线深水基础大跨度连续梁施工方法 | |
CN102704414B (zh) | 一种拱桥顶升的施工方法 | |
Zheng et al. | Environmental impact of ground deformation caused by underground construction in China | |
Gao et al. | Influence of Benoto bored pile construction on nearby existing tunnel: A case study | |
CN110513124B (zh) | 一种高应力层状卸荷裂隙岩体巷道的镶嵌式注浆管网支护结构 | |
CN104047305A (zh) | 房屋沉陷的快速修复方法 | |
CN111287177A (zh) | 密实卵石层地区大直径超长冲孔灌注桩施工方法 | |
CN114593927B (zh) | 一种利用中间风井进行盾构隧道原型试验的方法 | |
CN106284410A (zh) | 盖挖逆作地铁换乘车站成套快速施工方法 | |
CN114837209A (zh) | 岩溶发育地区深厚砂层大直径桩基施工方法 | |
CN211873014U (zh) | 贝雷架保护电缆的系统 | |
Wei et al. | Deformation characteristics of existing twin tunnels induced by double shield undercrossing with prereinforcement: A case study in Hangzhou | |
CN113685190A (zh) | 一种盾构穿越浅覆软弱粘土的加固体系及施工方法 | |
Yang et al. | Monitoring and controlling on surface settlement in sand and gravel strata caused by subway station construction applying pipe-roof pre-construction method (PPM) | |
CN207919602U (zh) | 基坑开挖临近既有浅基础的支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No.38 Jinqiao Road, Dongchuan Industrial Park, Xining City, Qinghai Province Applicant after: SINOHYDRO ENGINEERING BUREAU 4 Co.,Ltd. Applicant after: SOUTHWEST JIAOTONG University Address before: 610031 north section of two ring road, Sichuan, Chengdu Applicant before: SOUTHWEST JIAOTONG University Applicant before: SINOHYDRO ENGINEERING BUREAU 4 Co.,Ltd. |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Yu Jianwei Inventor after: Wang Quan Inventor after: Zhang Junchen Inventor after: Yao Chaofan Inventor after: Qi Baodong Inventor after: Wang Mingming Inventor after: Liu Shangxu Inventor after: Li Jie Inventor after: Yan Qixiang Inventor after: Zhao Xiaolong Inventor after: He Chuan Inventor before: Yao Chaofan Inventor before: Wu Feixiang Inventor before: Yu Jianwei Inventor before: Yan Qixiang Inventor before: Wang Mingming Inventor before: He Chuan Inventor before: Liu Shangxu Inventor before: Zhang Junchen Inventor before: Qi Baodong Inventor before: Li Jie |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |