CN113408976A - Transportation method and transportation system based on BIM prefabricated part - Google Patents

Transportation method and transportation system based on BIM prefabricated part Download PDF

Info

Publication number
CN113408976A
CN113408976A CN202110497731.1A CN202110497731A CN113408976A CN 113408976 A CN113408976 A CN 113408976A CN 202110497731 A CN202110497731 A CN 202110497731A CN 113408976 A CN113408976 A CN 113408976A
Authority
CN
China
Prior art keywords
data
bim
vehicle
component
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110497731.1A
Other languages
Chinese (zh)
Inventor
刘兴发
林炬光
颜清源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayang International Engineering Design Co ltd
Original Assignee
Shenzhen Huayang International Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huayang International Engineering Design Co ltd filed Critical Shenzhen Huayang International Engineering Design Co ltd
Priority to CN202110497731.1A priority Critical patent/CN113408976A/en
Publication of CN113408976A publication Critical patent/CN113408976A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Geometry (AREA)
  • Strategic Management (AREA)
  • Computer Hardware Design (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Computational Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Evolutionary Computation (AREA)
  • Development Economics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a transportation method and a transportation system based on BIM prefabricated parts, wherein the method comprises the following steps: acquiring BIM model data, and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data; acquiring matched vehicle data according to the component size data and the component quantity data; and determining a transportation scheme of the BIM prefabricated part according to the matched vehicle data. The invention can make a proper transportation scheme for the BIM prefabricated part in real time in the early design link of the project and provide more data support for the project.

Description

Transportation method and transportation system based on BIM prefabricated part
Technical Field
The invention relates to the technical field of assembly type buildings, in particular to a transportation method and a transportation system based on BIM prefabricated parts.
Background
In recent years, the country has greatly popularized assembly type buildings, the minimum unit of which is: a prefabricated part relates to the links of design, production, transportation, construction and the like. The problem of the main body consideration in each stage is mainly concentrated in its own link, and the subsequent influence is considered less, for example: more consideration in the design stage is whether the fabricated building meets the requirements of relevant regulations, the cost of prefabricated components, the production difficulty and the like, but less consideration is given to the requirements of a transportation link, so that the transportation scheme of the prefabricated components cannot be determined in the design stage.
Thus, there is a need for improvements and enhancements in the art.
Disclosure of Invention
The technical problem to be solved by the present invention is to provide a transportation method and a transportation system based on BIM prefabricated components, aiming at solving the problem that the transportation scheme of the prefabricated components cannot be determined in the design stage in the prior art.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
in a first aspect, the present invention provides a transportation method based on BIM prefabricated parts, wherein the method comprises:
acquiring BIM model data, and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data;
acquiring matched vehicle data according to the component size data and the component quantity data;
and determining a transportation scheme of the BIM prefabricated part according to the matched vehicle data.
In one implementation, the determining, according to the BIM model data, component size data and component number data of the BIM prefabricated component includes:
acquiring category parameters of all BIM prefabricated parts in the BIM model data;
determining the component size data of the BIM prefabricated component and the component number data of the BIM prefabricated component according to the category parameters.
In one implementation, the component size data and the component quantity data are stored in the form of database tables in the form of SQL, Mysql or SQLite generic databases.
In one implementation, the obtaining matched vehicle data from the component size data and the component quantity data includes:
acquiring a carrying vehicle management library, wherein vehicle data are stored in the carrying vehicle management library in advance;
determining the carrying requirement data of the BIM prefabricated part according to the part size data and the part quantity data;
determining the matched vehicle data from the delivery vehicle management library based on the delivery requirement data.
In one implementation, the pre-stored vehicle data includes: vehicle name, vehicle model, vehicle length, vehicle cargo surface height, vehicle maximum load parameter.
In one implementation, the delivery vehicle management library has modification functionality and/or addition and subtraction functionality.
In one implementation, the determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data includes:
integrating and screening the matched vehicle data;
outputting the transportation scheme of the BIM prefabricated parts.
In one implementation, the determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data further includes:
and displaying the transportation scheme in a table form.
In one implementation, the determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data further includes:
and generating a document file by the transportation scheme, and storing or sharing the document file.
In a second aspect, an embodiment of the present invention further provides a transportation system based on the transportation method of the BIM prefabricated parts according to any one of the above aspects, the system including:
the component data acquisition module is used for acquiring BIM model data and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data;
the vehicle data matching module is used for acquiring matched vehicle data according to the component size data and the component quantity data;
and the transportation scheme determining module is used for determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data.
Has the advantages that: compared with the prior art, the invention provides a transportation method based on the BIM prefabricated parts. And then acquiring matched vehicle data according to the component size data and the component quantity data. And finally, determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data. The invention can make a proper transportation scheme in real time in the early design link of the project and provide more data support for the project.
Drawings
Fig. 1 is a flowchart of a specific implementation of a transportation method based on BIM prefabricated parts according to an embodiment of the present invention.
Fig. 2 is a schematic block diagram of a transportation system based on BIM prefabricated parts according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and effects of the present invention clearer and clearer, the present invention is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As used herein, the singular forms "a", "an", "the" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. It will be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element or intervening elements may also be present. Further, "connected" or "coupled" as used herein may include wirelessly connected or wirelessly coupled. As used herein, the term "and/or" includes all or any element and all combinations of one or more of the associated listed items.
It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
In recent years, the country has greatly popularized assembly type buildings, the minimum unit of which is: a prefabricated part relates to the links of design, production, transportation, construction and the like. The problem of the main body consideration in each stage is mainly concentrated in its own link, and the subsequent influence is considered less, for example: more consideration in the design stage is whether the fabricated building meets the requirements of relevant regulations, the cost of prefabricated components, the production difficulty and the like, but less consideration is given to the requirements of a transportation link, so that the transportation scheme of the prefabricated components cannot be determined in the design stage.
In order to solve the above problem, the present embodiment provides a transportation method based on BIM prefabricated parts, specifically as shown in fig. 1, the transportation method based on BIM prefabricated parts specifically includes the following steps:
and S100, acquiring BIM model data, and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data.
Since the transportation scheme of the Building Information Modeling (BIM) prefabricated part needs to be determined in the design stage, the BIM prefabricated part can be designed to obtain the BIM model data, and the BIM model data is collected by the BIM model data collecting device. The present embodiment may acquire the category parameters of all BIM prefabricated parts in the BIM model data, that is, determine which category the prefabricated parts belong to, through a BIM model data collection device. When the category parameters of all prefabricated parts are determined, the present embodiment can determine the part size data and the part number data of the BIM prefabricated parts belonging to each category parameter according to the category parameters. When the BIM prefabricated parts are transported, corresponding vehicles are arranged to carry the BIM prefabricated parts according to the part size data and the part number data. Therefore, the present embodiment is prepared for transportation to obtain the component size data and the component number data.
In one implementation, the component size data and the component quantity data are stored in a database table, where the database table is in a form of SQL (Structured Query Language), Mysql (relational database management system), or SQLite (a lightweight database) general database, and is convenient for searching corresponding component size data and component quantity data according to component category parameters.
And S200, acquiring matched vehicle data according to the component size data and the component quantity data.
In specific implementation, after the component size data and the component quantity data are obtained, the carrying requirement data of the BIM prefabricated components can be obtained based on the component size data and the component quantity data, for example, the type of vehicle required, the stacking form of the components, the stacking height and the like. Matching vehicle data is determined from the delivery vehicle management library based on the delivery request data. In this embodiment, the delivery vehicle management library stores vehicle data in advance, where the vehicle data includes: vehicle name, vehicle model, vehicle length, vehicle cargo surface height, vehicle maximum load parameter. For example, the present embodiment may record the model identification of the vehicle, the vehicle length, the vehicle width, the vehicle height, the load weight, the clear height of the transportation surface, and other basic data into the transportation vehicle management library in advance. After the carrying requirement data is obtained according to the component size data and the component quantity data, the embodiment can determine the matched vehicle data from the carrying vehicle management library according to the carrying requirement data. The matched vehicle data is the vehicle used for transporting the prefabricated parts. For example, the matched vehicle is a trailer of a vehicle A type, the length of the vehicle is 10 meters, the width of the vehicle is 1.8 meters, the height of the vehicle is 2.5 meters, and the maximum load is 20 tons. In the present embodiment, the delivery vehicle management library has a modification function and/or an addition/subtraction function. That is, the present embodiment can modify and increase or decrease the vehicle data in the delivery vehicle management library, for example, modify the vehicle data already recorded, or supplement blank data.
And S300, determining a transportation scheme of the BIM prefabricated part according to the matched vehicle data.
In this embodiment, after the vehicle data is matched, the transportation scheme of the BIM prefabricated part is determined according to the matched vehicle data. Specifically, the present embodiment may integrate and screen the matched vehicle data, and then output a transportation scheme of the BIM prefabricated part. For example, when the suitable vehicle data matched according to the component size data and the component quantity data are a trailer of a vehicle type A, the vehicle length is 10 meters, the vehicle width is 1.8 meters, the vehicle height is 2.5 meters, and the highest load is 20 tons. Therefore, the embodiment can filter and screen the vehicle data, for example, the conditions of the maximum height being less than or equal to 2.8 m/the minimum number of vehicles/the number of vehicles being less than or equal to 2. The transportation scheme of the embodiment comprises the number of the carrying vehicles of various components, the carrying height of the single vehicle, the carrying total weight of the single vehicle and the required cost.
After the transportation scheme is obtained, the present embodiment may display the vehicle data in the form of a table according to the transportation scheme, for example, visually display the vehicle loading conditions (number of components and types of components) assigned to the basic information of the vehicle, and the required vehicle. The embodiment can also generate a document file from the transportation scheme, and store or share the document file. Of course, the embodiment may also modify the transportation scheme in real time in the interface to adjust the transportation scheme.
In summary, the present embodiment first obtains the BIM model data, and determines the component size data and the component number data of the BIM prefabricated component according to the BIM model data. And then acquiring matched vehicle data according to the component size data and the component quantity data. And finally, determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data. The embodiment can manufacture a proper transportation scheme in real time in the early design link of the project, and provide more data support for the project.
The present invention also provides a transportation system based on the transportation method of BIM prefabricated parts, as shown in fig. 2, the system including: a component data acquisition module 10, a vehicle data matching module 20, and a transportation scenario determination module 30. Specifically, the component data acquiring module 10 is configured to acquire the BIM model data, and determine component size data and component number data of the BIM prefabricated component according to the BIM model data. The vehicle data matching module 20 is configured to obtain matched vehicle data according to the component size data and the component number data. And the transportation scheme determining module 30 is used for determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data.
Specifically, in this embodiment, since the transportation scheme of the BIM (Building Information Modeling) prefabricated component needs to be determined in the design stage, the BIM prefabricated component may be designed to obtain the BIM model data, which is collected by the BIM model data collecting device. The present embodiment may acquire the category parameters of all BIM prefabricated parts in the BIM model data, that is, determine which category the prefabricated parts belong to, through a BIM model data collection device. When the category parameters of all prefabricated parts are determined, the present embodiment can determine the part size data and the part number data of the BIM prefabricated parts belonging to each category parameter according to the category parameters. When the BIM prefabricated parts are transported, corresponding vehicles are arranged to carry the BIM prefabricated parts according to the part size data and the part number data. Therefore, the present embodiment is prepared for transportation to obtain the component size data and the component number data.
In one implementation, the component size data and the component quantity data are stored in a database table, and the database table is in a SQL, Mysql or SQLite universal database form, so that the corresponding component size data and the component quantity data can be conveniently searched according to the component category parameters.
When the component size data and the component number data are obtained, based on the component size data and the component number data, the carrying requirement data of the BIM prefabricated components can be obtained, such as the type of vehicle required, the stacking form of the components, the stacking height and the like. Matching vehicle data is determined from the delivery vehicle management library based on the delivery request data. In this embodiment, the delivery vehicle management library stores vehicle data in advance, where the vehicle data includes: vehicle name, vehicle model, vehicle length, vehicle cargo surface height, vehicle maximum load parameter. For example, the present embodiment may record the model identification of the vehicle, the vehicle length, the vehicle width, the vehicle height, the load weight, the clear height of the transportation surface, and other basic data into the transportation vehicle management library in advance. After the carrying requirement data is obtained according to the component size data and the component quantity data, the embodiment can determine the matched vehicle data from the carrying vehicle management library according to the carrying requirement data. The matched vehicle data is the vehicle used for transporting the prefabricated parts. For example, the matched vehicle is a trailer of a vehicle A type, the length of the vehicle is 10 meters, the width of the vehicle is 1.8 meters, the height of the vehicle is 2.5 meters, and the maximum load is 20 tons. In the present embodiment, the delivery vehicle management library has a modification function and/or an addition/subtraction function. That is, the present embodiment can modify and increase or decrease the vehicle data in the delivery vehicle management library, for example, modify the vehicle data already recorded, or supplement blank data.
After the vehicle data are matched, the embodiment determines the transportation scheme of the BIM prefabricated part according to the matched vehicle data. Specifically, the present embodiment may integrate and screen the matched vehicle data, and then output a transportation scheme of the BIM prefabricated part. For example, when the suitable vehicle data matched according to the component size data and the component quantity data are a trailer of a vehicle type A, the vehicle length is 10 meters, the vehicle width is 1.8 meters, the vehicle height is 2.5 meters, and the highest load is 20 tons. Therefore, the embodiment can filter and screen the vehicle data, for example, the conditions of the maximum height being less than or equal to 2.8 m/the minimum number of vehicles/the number of vehicles being less than or equal to 2. The transportation scheme of the embodiment comprises the number of the carrying vehicles of various components, the carrying height of the single vehicle, the carrying total weight of the single vehicle and the required cost.
After the transportation scheme is obtained, the present embodiment may display the vehicle data in the form of a table according to the transportation scheme, for example, visually display the vehicle loading conditions (number of components and types of components) assigned to the basic information of the vehicle, and the required vehicle. The embodiment can also generate a document file from the transportation scheme, and store or share the document file. Of course, the embodiment may also modify the transportation scheme in real time in the interface to adjust the transportation scheme.
In summary, the invention discloses a transportation method and a transportation system based on BIM prefabricated parts, wherein the method comprises the following steps: acquiring BIM model data, and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data; acquiring matched vehicle data according to the component size data and the component quantity data; and determining a transportation scheme of the BIM prefabricated part according to the matched vehicle data. The invention can make a proper transportation scheme for the BIM prefabricated part in real time in the early design link of the project and provide more data support for the project.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A BIM prefabricated part-based transportation method is characterized by comprising the following steps:
acquiring BIM model data, and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data;
acquiring matched vehicle data according to the component size data and the component quantity data;
and determining a transportation scheme of the BIM prefabricated part according to the matched vehicle data.
2. The BIM prefabricated part-based transportation method according to claim 1, wherein the determining of the part size data and the part number data of the BIM prefabricated parts according to the BIM model data comprises:
acquiring category parameters of all BIM prefabricated parts in the BIM model data;
determining the component size data of the BIM prefabricated component and the component number data of the BIM prefabricated component according to the category parameters.
3. The BIM prefabricated component-based transportation method according to claim 2, wherein the component size data and the component quantity data are stored in a database table in a SQL, Mysql or SQLite general database form.
4. The BIM prefabricated part-based transportation method according to claim 1, wherein the acquiring of the matched vehicle data according to the part size data and the part number data comprises:
acquiring a carrying vehicle management library, wherein vehicle data are stored in the carrying vehicle management library in advance;
determining the carrying requirement data of the BIM prefabricated part according to the part size data and the part quantity data;
determining the matched vehicle data from the delivery vehicle management library based on the delivery requirement data.
5. The BIM prefabricated part-based transportation method according to claim 4, wherein the pre-stored vehicle data comprises: vehicle name, vehicle model, vehicle length, vehicle cargo surface height, vehicle maximum load parameter.
6. The BIM prefabricated part-based transportation method according to claim 5, wherein the carrier vehicle management library has a modification function and/or an addition/subtraction function.
7. The BIM prefabricated part-based transportation method according to claim 1, wherein the determining of the transportation scheme of the BIM prefabricated part according to the matched vehicle data comprises:
integrating and screening the matched vehicle data;
outputting the transportation scheme of the BIM prefabricated parts.
8. The BIM prefabricated part-based transportation method according to claim 7, wherein the determining of the transportation scheme of the BIM prefabricated part according to the matched vehicle data further comprises:
and displaying the transportation scheme in a table form.
9. The BIM prefabricated part-based transportation method according to claim 7, wherein the determining of the transportation scheme of the BIM prefabricated part according to the matched vehicle data further comprises:
and generating a document file by the transportation scheme, and storing or sharing the document file.
10. A transportation system based on the BIM prefabricated part-based transportation method according to any one of the above claims 1 to 9, wherein the system comprises:
the component data acquisition module is used for acquiring BIM model data and determining component size data and component quantity data of the BIM prefabricated component according to the BIM model data;
the vehicle data matching module is used for acquiring matched vehicle data according to the component size data and the component quantity data;
and the transportation scheme determining module is used for determining the transportation scheme of the BIM prefabricated part according to the matched vehicle data.
CN202110497731.1A 2021-05-07 2021-05-07 Transportation method and transportation system based on BIM prefabricated part Pending CN113408976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110497731.1A CN113408976A (en) 2021-05-07 2021-05-07 Transportation method and transportation system based on BIM prefabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110497731.1A CN113408976A (en) 2021-05-07 2021-05-07 Transportation method and transportation system based on BIM prefabricated part

Publications (1)

Publication Number Publication Date
CN113408976A true CN113408976A (en) 2021-09-17

Family

ID=77678110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110497731.1A Pending CN113408976A (en) 2021-05-07 2021-05-07 Transportation method and transportation system based on BIM prefabricated part

Country Status (1)

Country Link
CN (1) CN113408976A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017083930A1 (en) * 2015-11-19 2017-05-26 Furry Dice Pty Ltd "a computer system and a computer implemented method for arranging transport of a load"
CN109388879A (en) * 2018-09-30 2019-02-26 河北建设集团股份有限公司 Component handling technigue based on BIM technology
CN110705805A (en) * 2019-10-15 2020-01-17 秒针信息技术有限公司 Cargo assembling method and device, storage medium and electronic device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017083930A1 (en) * 2015-11-19 2017-05-26 Furry Dice Pty Ltd "a computer system and a computer implemented method for arranging transport of a load"
CN109388879A (en) * 2018-09-30 2019-02-26 河北建设集团股份有限公司 Component handling technigue based on BIM technology
CN110705805A (en) * 2019-10-15 2020-01-17 秒针信息技术有限公司 Cargo assembling method and device, storage medium and electronic device

Similar Documents

Publication Publication Date Title
US7487173B2 (en) Self-generation of a data warehouse from an enterprise data model of an EAI/BPI infrastructure
US9477950B2 (en) Prognostics-based estimator
US20180096001A1 (en) System for importing data into a data repository
US20050055669A1 (en) Specification to ABAP code converter
CN106372963A (en) Inference engine-based logistics billing system and logistics billing method
CN103440273A (en) Data cross-platform migration method and device
CN107291471B (en) Meta-model framework system supporting customizable data acquisition
CN102799634A (en) Data storage method and device
CN108427772B (en) Online report generation method, system, equipment and storage medium
US6760734B1 (en) Framework for storing metadata in a common access repository
CN111400363A (en) Index data processing method and device, electronic equipment and storage medium
CN115641034A (en) Logistics distribution method and device considering cargo volume and computer equipment
CN102054219A (en) Product-line based content management system and method thereof
CN104008209A (en) Reading-writing method for MongoDB cluster geographic data stored with GeoJSON format structuring method
CN113408976A (en) Transportation method and transportation system based on BIM prefabricated part
CN103927402A (en) Control logic diagram modular design management system implementation method
CN108108448A (en) A kind of method and system for generating national road portrait
CN114049016A (en) Index similarity judgment method, system, terminal device and computer storage medium
US20040181506A1 (en) System and method for sorting bills of material
CN105045848B (en) A kind of data base management system for supporting Boolean expression to inquire
CN114791882A (en) Method and device for solving variable naming conflict, electronic equipment and storage medium
CN112925960B (en) Automobile part data query method and system
CN115510021B (en) Method and system for constructing data warehouse standard layer
CN117272493B (en) Automatic updating method and system for building function and structural load
CN115953111B (en) Verification method, system, terminal and storage medium for order picking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210917