CN113404450A - Deep water pile foundation slurry circulating construction system and circulating construction method - Google Patents

Deep water pile foundation slurry circulating construction system and circulating construction method Download PDF

Info

Publication number
CN113404450A
CN113404450A CN202110823718.0A CN202110823718A CN113404450A CN 113404450 A CN113404450 A CN 113404450A CN 202110823718 A CN202110823718 A CN 202110823718A CN 113404450 A CN113404450 A CN 113404450A
Authority
CN
China
Prior art keywords
pile foundation
mud
steel casing
foundation steel
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110823718.0A
Other languages
Chinese (zh)
Inventor
张凯
穆庆刚
王帅
张春光
杨旭东
杜云鹏
苑超
廖飞
郭云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202110823718.0A priority Critical patent/CN113404450A/en
Publication of CN113404450A publication Critical patent/CN113404450A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components

Abstract

The invention relates to a mud circulation construction system and a circulation construction method for a deepwater pile foundation, wherein the mud circulation construction system comprises: the upper part of the first pile foundation steel casing is provided with a first connecting port; the second pile foundation steel casing is arranged adjacent to the first pile foundation steel casing, and a second connecting port is formed in one side, opposite to the first connecting port, of the upper part of the second pile foundation steel casing; a first port of the connecting pipe is communicated with the first connecting port, a second port of the connecting pipe is communicated with the second connecting port, and a slurry filtering device is arranged in the connecting pipe; and the mud pump assembly is used for alternately pumping mud between the first pile foundation steel casing and the second pile foundation steel casing and comprises a mud pump body and a pumping pipe connected with the mud pump body. The mud circulation construction system can save construction space, improve construction efficiency, save construction materials and ensure construction quality.

Description

Deep water pile foundation slurry circulating construction system and circulating construction method
Technical Field
The invention relates to the field of deepwater pile foundation construction, in particular to a deepwater pile foundation mud circulation construction system and a circulation construction method.
Background
At present, slurry circulation in deepwater pile foundation construction is generally carried out by adopting a slurry tank, and the slurry tank needs to be welded by steel plates and put into water, so that the operation is difficult, the occupied space is large, the materials are wasted, and the transportation is troublesome, time-consuming and labor-consuming.
Disclosure of Invention
In order to solve the problems, the invention provides a deep water pile foundation mud circulation construction system and a circulation construction method, which can save construction space, improve construction efficiency, save construction materials and ensure construction quality.
The invention is realized by the following scheme: a deepwater pile foundation mud circulation construction system comprises:
the upper part of the first pile foundation steel casing is provided with a first connecting port;
the second pile foundation steel casing is arranged adjacent to the first pile foundation steel casing, and a second connecting port is formed in one side, opposite to the first connecting port, of the upper part of the second pile foundation steel casing;
a first port of the connecting pipe is communicated with the first connecting port, a second port of the connecting pipe is communicated with the second connecting port, and a slurry filtering device is arranged in the connecting pipe;
and the mud pump assembly is used for alternately pumping mud between the first pile foundation steel casing and the second pile foundation steel casing and comprises a mud pump body and a pumping pipe connected with the mud pump body.
According to the invention, the connecting pipe and the slurry pump assembly are arranged between two adjacent pile foundation steel casing pipes to form the slurry circulation construction system, so that one pile foundation steel casing pipe can be used as a circulation tank in the construction process, the problem of mud tank transportation and the problem of quality control in deep water pile foundation construction are solved, the construction space and the construction materials are saved, the construction efficiency is improved, the construction quality is ensured, and the problem of mud tank transportation is reduced.
The deepwater pile foundation mud circulation construction system is further improved in that the connecting pipe is provided with an opening for inserting the mud filtering device, and the section profile of the mud filtering device is matched with the section profile of the connecting pipe.
The invention also provides a deepwater pile foundation mud circulation construction method, which comprises the following steps:
a connecting pipe is communicated between the upper part of the first pile foundation steel casing and the upper part of the second pile foundation steel casing after installation is finished, and a slurry filtering device is arranged in the connecting pipe;
placing a mud pump body in the first pile foundation steel casing, and communicating a pumping pipe connected with the mud pump body to the second pile foundation steel casing;
starting to construct a first pile foundation at the first pile foundation steel casing, starting the slurry pump body, enabling slurry for constructing the first pile foundation to flow through the connecting pipe, filtering the slurry through the slurry filtering device, and then flowing into the second pile foundation steel casing, taking the second pile foundation steel casing as a circulating pool, and pumping the slurry in the second pile foundation steel casing into the first pile foundation steel casing through the pumping pipe by the slurry pump body;
and when the first pile foundation construction is finished, closing the mud pump body.
The further improvement of the deepwater pile foundation mud circulation construction method is that in the process of constructing the first pile foundation:
after the first pile foundation is constructed and initially set, placing the mud pump body in the second pile foundation steel casing, and communicating the pumping pipe to the first pile foundation steel casing;
starting to construct a second pile foundation at the second pile foundation steel casing, starting the slurry pump body, enabling slurry for constructing the second pile foundation to flow through the connecting pipe, filtering the slurry through the slurry filtering device, and then flowing into the first pile foundation steel casing, taking the first pile foundation steel casing as a circulating pool, and pumping the slurry in the first pile foundation steel casing into the second pile foundation steel casing through the pumping pipe by the slurry pump body;
and when the second pile foundation construction is finished, closing the mud pump body.
The deepwater pile foundation mud circulation construction method is further improved as follows:
an opening for inserting the slurry filtering device is formed in the connecting pipe, and the section profile of the slurry filtering device is matched with the section profile of the connecting pipe;
and in the process of opening the mud pump body, observing the mud condition in the mud filter device, temporarily closing the mud pump body when the mud reaches the designed maximum amount, taking the mud filter device out of the connecting pipe, pouring the mud, inserting the mud filter device into the connecting pipe from the opening, and then opening the mud pump body again.
Drawings
Fig. 1 is a schematic diagram showing a connection state of connecting pipes in a deepwater pile foundation mud circulation construction system.
Fig. 2 shows a schematic diagram of the whole structure of the deepwater pile foundation mud circulation construction system.
Detailed Description
In order to solve the problems that a mud circulation system is difficult to operate, occupies space, wastes materials, is troublesome to transport and wastes time and labor in the traditional deep water pile foundation construction, the invention provides a deep water pile foundation mud circulation construction system and a circulation construction method, which can save construction space, improve construction efficiency, save construction materials and ensure construction quality.
The following describes the deep water pile foundation mud circulation construction system and the circulation construction method with specific embodiments in combination with the accompanying drawings.
Referring to fig. 1 and 2, a deepwater pile foundation mud circulation construction system includes:
the pile foundation comprises a first pile foundation steel casing 1, wherein a first connecting port is formed in the upper part of the first pile foundation steel casing 1;
a second pile foundation steel casing 2 arranged adjacent to the first pile foundation steel casing 1, wherein a second connecting port is formed in one side, opposite to the first connecting port, of the upper part of the second pile foundation steel casing 2;
a first port of the connecting pipe 3 is communicated with the first connecting port, a second port of the connecting pipe 3 is communicated with the second connecting port, and a slurry filtering device 4 is arranged in the connecting pipe 3;
a mud pump assembly for alternately pumping mud between the first pile steel casing 1 and the second pile steel casing 2, the mud pump assembly comprising a mud pump body 51, a pumping pipe 52 connected to the mud pump body 51.
Specifically, an operation platform 7 is set up on the upper portions of the first pile foundation steel casing 1 and the second pile foundation steel casing 2, the mud pump body 51 is erected on the operation platform 7 through the tripod 6, so that the mud pump body 51 is hung from the top opening of the first pile foundation steel casing 1 (when constructing the second pile foundation) or the top opening of the second pile foundation steel casing 2 (when constructing the first pile foundation), and the pumping port of the pumping pipe 52 extends into the corresponding second pile foundation steel casing 2 (when constructing the second pile foundation) or the first pile foundation steel casing 1 (when constructing the first pile foundation), and further forms a mud circulation path with the connecting pipe 3 (as shown in fig. 2). In addition, it should be noted that the height of this first connector is higher than the top design elevation of first pile foundation in this first pile foundation steel casing 1, and the height of this second connector is higher than the top design elevation of second pile foundation in this second pile foundation steel casing 2. Through the highly injectd of this first connector and second connector, when not influencing the construction of first pile foundation and second pile foundation, can also be in this first pile foundation or this second pile foundation construction back that finishes, the upper portion space in corresponding first pile foundation steel casing 1 or the second pile foundation steel casing still can be used as the circulation pond.
This embodiment makes first pile foundation steel protect a section of thick bamboo 1 and second pile foundation steel protect a section of thick bamboo 2, each other is the circulation pond each other and uses each other in the work progress through set up connecting pipe 3 and mud pump assembly and form mud circulation construction system between first pile foundation steel protects a section of thick bamboo 1 and second pile foundation steel and protect a section of thick bamboo 2, has solved the deep water pile foundation construction mud pit and has had bad luck difficult problem and quality control difficult problem each other, has saved construction space and construction material, has improved the efficiency of construction, has ensured construction quality, has reduced the mud pit and has had bad luck difficult problem.
As a preferred embodiment, the connecting pipe 3 is provided with an opening for inserting the slurry filtering device 4, and the profile of the slurry filtering device 4 is matched with the profile of the connecting pipe 3. Through the adaptation structure of above-mentioned mud filter equipment 4 and connecting pipe 3, the mud of this mud circulation construction system of being convenient for filters and the mud sediment clearance, has further ensured construction quality.
The invention also provides a deep water pile foundation mud circulation construction method, which is shown in the figures 1 and 2 and comprises the following steps:
a connecting pipe 3 is communicated between the upper part of the first pile foundation steel casing 1 and the upper part of the second pile foundation steel casing 2 after installation is finished, and a slurry filtering device 4 is arranged in the connecting pipe 3;
placing a mud pump body 51 in the first pile foundation steel casing 1, and communicating a pumping pipe 52 connected with the mud pump body 51 to the second pile foundation steel casing 2;
starting to construct a first pile foundation at the first pile foundation steel casing 1, starting the slurry pump body 51, allowing slurry for constructing the first pile foundation to flow through the connecting pipe 3, filtering the slurry through the slurry filtering device 4, and then flowing into the second pile foundation steel casing 2, taking the second pile foundation steel casing 2 as a circulating pool, and pumping the slurry in the second pile foundation steel casing 2 into the first pile foundation steel casing 1 through the pumping pipe 52 by the slurry pump body 51;
when the first pile foundation is constructed, the mud pump body 51 is closed.
As a preferred embodiment, after the first pile foundation is constructed and initially set, the slurry pump body 51 is placed in the second pile foundation steel casing 2, and the pumping pipe 52 is communicated to the first pile foundation steel casing 1;
starting to construct a second pile foundation at the second pile foundation steel casing 2, starting the slurry pump body 51, allowing slurry for constructing the second pile foundation to flow through the connecting pipe 3, filtering the slurry through the slurry filtering device 4 and then flowing into the first pile foundation steel casing 1, taking the first pile foundation steel casing 1 as a circulating pool, and pumping the slurry in the first pile foundation steel casing 1 into the second pile foundation steel casing 2 through the pumping pipe 52 by the slurry pump body 51;
when the second pile foundation is constructed, the mud pump body 51 is closed.
Through adjusting the position of this slush pump body 51 and this pump pipe 52, form reverse mud circulation, and then realize filtration and the circulation to second pile foundation work in-process mud, further saved construction space and construction material, improved the efficiency of construction, reduced the mud pit and had bad luck the difficult problem.
Certainly, to pile group construction field, the pile foundation quantity that needs to be under construction is more than two, can be with the form that continues, set up this mud circulation construction system between per two adjacent pile foundation steel casings, that is to say, when the first pile foundation of construction, regard as the circulation pond with second pile foundation steel casing and use, when the second pile foundation of construction, regard as the circulation pond with third pile foundation steel casing and use, analogize in proper order, when being under construction to last pile foundation, regard as the circulation pond with its former pile foundation steel casing to use, through reverse mud circulation, realize the mud cycle work to the construction of last pile foundation.
As a preferred embodiment, in the process of constructing the first pile foundation:
an opening for inserting the slurry filtering device 4 is formed in the connecting pipe 3, and the section profile of the slurry filtering device 4 is matched with the section profile of the connecting pipe 3;
when the mud pump body 51 is opened, the mud condition in the mud filter device 4 is observed, when the mud reaches the designed maximum amount, the mud pump body 51 is temporarily closed, the mud filter device 4 is taken out from the connecting pipe 3, after the mud is poured, the mud filter device 4 is inserted into the connecting pipe 3 from the opening, and then the mud pump body 51 is opened again.
Through the connection form of detachably pegging graft in this connecting pipe 3 of mud filter equipment 4, be convenient for in time clear up the mud sediment that produces among the mud circulation process, further ensured construction quality.
The mud circulation construction method saves construction space and construction materials by flexibly using the mud circulation construction system, improves construction efficiency and reduces the problem of mud pit transportation.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the invention is to be determined by the appended claims.

Claims (5)

1. The deep water pile foundation mud circulation construction system is characterized by comprising:
the upper part of the first pile foundation steel casing is provided with a first connecting port;
the second pile foundation steel casing is arranged adjacent to the first pile foundation steel casing, and a second connecting port is formed in one side, opposite to the first connecting port, of the upper part of the second pile foundation steel casing;
a first port of the connecting pipe is communicated with the first connecting port, a second port of the connecting pipe is communicated with the second connecting port, and a slurry filtering device is arranged in the connecting pipe;
and the mud pump assembly is used for alternately pumping mud between the first pile foundation steel casing and the second pile foundation steel casing and comprises a mud pump body and a pumping pipe connected with the mud pump body.
2. The deep water pile foundation mud circulation construction system of claim 1, wherein the connecting pipe is provided with an opening for inserting the mud filter device, and the section profile of the mud filter device is matched with the section profile of the connecting pipe.
3. A deepwater pile foundation mud circulation construction method is characterized by comprising the following steps:
a connecting pipe is communicated between the upper part of the first pile foundation steel casing and the upper part of the second pile foundation steel casing after installation is finished, and a slurry filtering device is arranged in the connecting pipe;
placing a mud pump body in the first pile foundation steel casing, and communicating a pumping pipe connected with the mud pump body to the second pile foundation steel casing;
starting to construct a first pile foundation at the first pile foundation steel casing, starting the slurry pump body, enabling slurry for constructing the first pile foundation to flow through the connecting pipe, filtering the slurry through the slurry filtering device, and then flowing into the second pile foundation steel casing, taking the second pile foundation steel casing as a circulating pool, and pumping the slurry in the second pile foundation steel casing into the first pile foundation steel casing through the pumping pipe by the slurry pump body;
and when the first pile foundation construction is finished, closing the mud pump body.
4. The deep water pile foundation mud circulation construction method of claim 3, characterized in that:
after the first pile foundation is constructed and initially set, placing the mud pump body in the second pile foundation steel casing, and communicating the pumping pipe to the first pile foundation steel casing;
starting to construct a second pile foundation at the second pile foundation steel casing, starting the slurry pump body, enabling slurry for constructing the second pile foundation to flow through the connecting pipe, filtering the slurry through the slurry filtering device, and then flowing into the first pile foundation steel casing, taking the first pile foundation steel casing as a circulating pool, and pumping the slurry in the first pile foundation steel casing into the second pile foundation steel casing through the pumping pipe by the slurry pump body;
and when the second pile foundation construction is finished, closing the mud pump body.
5. The deep water pile foundation mud circulation construction method of claim 3 or 4, characterized in that:
an opening for inserting the slurry filtering device is formed in the connecting pipe, and the section profile of the slurry filtering device is matched with the section profile of the connecting pipe;
and in the process of opening the mud pump body, observing the mud condition in the mud filter device, temporarily closing the mud pump body when the mud reaches the designed maximum amount, taking the mud filter device out of the connecting pipe, pouring the mud, inserting the mud filter device into the connecting pipe from the opening, and then opening the mud pump body again.
CN202110823718.0A 2021-07-21 2021-07-21 Deep water pile foundation slurry circulating construction system and circulating construction method Pending CN113404450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110823718.0A CN113404450A (en) 2021-07-21 2021-07-21 Deep water pile foundation slurry circulating construction system and circulating construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110823718.0A CN113404450A (en) 2021-07-21 2021-07-21 Deep water pile foundation slurry circulating construction system and circulating construction method

Publications (1)

Publication Number Publication Date
CN113404450A true CN113404450A (en) 2021-09-17

Family

ID=77687180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110823718.0A Pending CN113404450A (en) 2021-07-21 2021-07-21 Deep water pile foundation slurry circulating construction system and circulating construction method

Country Status (1)

Country Link
CN (1) CN113404450A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114307336A (en) * 2021-11-24 2022-04-12 中国建筑一局(集团)有限公司 Be used for aquatic pile foundation construction mud and drilling slag filtering separation device
CN114961600A (en) * 2022-05-13 2022-08-30 中国铁建大桥工程局集团有限公司 Deep-water large-diameter pile foundation mud recycling device and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114307336A (en) * 2021-11-24 2022-04-12 中国建筑一局(集团)有限公司 Be used for aquatic pile foundation construction mud and drilling slag filtering separation device
CN114961600A (en) * 2022-05-13 2022-08-30 中国铁建大桥工程局集团有限公司 Deep-water large-diameter pile foundation mud recycling device and construction method

Similar Documents

Publication Publication Date Title
CN113404450A (en) Deep water pile foundation slurry circulating construction system and circulating construction method
CN107237313B (en) The system of joint deep layer supercharged vacuum ground preloading blowing-filling sludge of flocculating and the method for reinforcing blowing-filling sludge
CN107386307B (en) Anti-floating system of structure in foundation pit and construction method thereof
CN207878490U (en) A kind of precast dewatering well filtration
CN107226559A (en) A kind of artificial Lake Water Body bascule and its construction method
CN215672090U (en) Deep water pile foundation mud circulation construction system
CN206721904U (en) A kind of integrated precipitation pumping system
CN214883774U (en) Foundation pit dewatering and water stopping device
JP3445786B2 (en) Method and apparatus for pumping groundwater and returning it to underground again
CN114541993A (en) Totally-enclosed multistage sedimentation underground mud pit device and construction method
CN212003619U (en) Water source pool pumping system
JP3570807B2 (en) Pumping equipment
CN219100097U (en) Dredging hydraulic reclamation area drainage gate box
CN112921974A (en) Pile foundation mud circulating device on water
CN113957917B (en) Taiji type internal partition wall one-hole multi-channel mixing well
CN105126437A (en) Multi-stage composite filtration device
CN101158515A (en) Strong anti-block automatic pollution discharge breast wall type backflow device
CN216811612U (en) Water pile foundation mud circulation treatment device
CN220890469U (en) Energy-saving and environment-friendly chemical pump hydraulic test stand
CN219909016U (en) Foundation pit side wall leakage treatment device
CN220266610U (en) Local precipitation structure in foundation ditch
CN216664185U (en) Arrange precipitation well in foundation ditch based on green construction
CN216110675U (en) Desanding manifold
CN212248306U (en) Foundation pit drainage device
JP2004132177A (en) Pumping and draining device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination