CN107226559A - A kind of artificial Lake Water Body bascule and its construction method - Google Patents

A kind of artificial Lake Water Body bascule and its construction method Download PDF

Info

Publication number
CN107226559A
CN107226559A CN201710647430.6A CN201710647430A CN107226559A CN 107226559 A CN107226559 A CN 107226559A CN 201710647430 A CN201710647430 A CN 201710647430A CN 107226559 A CN107226559 A CN 107226559A
Authority
CN
China
Prior art keywords
water
baffle plate
dam body
proof baffle
filter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710647430.6A
Other languages
Chinese (zh)
Other versions
CN107226559B (en
Inventor
夏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuji Youli Needle Textile Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710647430.6A priority Critical patent/CN107226559B/en
Publication of CN107226559A publication Critical patent/CN107226559A/en
Application granted granted Critical
Publication of CN107226559B publication Critical patent/CN107226559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/14Maintenance of water treatment installations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention discloses a kind of artificial Lake Water Body bascule and its construction method, including water inlet component, outlet component, filter and purifier, water inlet component and outlet component are located at the both sides of dam body respectively, dam body is internally provided with cone-shaped cavity, filter is fixedly connected on the bottom surface of cone-shaped cavity, purifier connects filter by connection tube, water inlet component connects filter by the first collecting pipe, the second collecting pipe is connected with outlet component, second collecting pipe connects purifier by mozzle, and the top of dam body is provided with control room.Its method includes:Surveying and locating, dam construction, the construction of water body bascule, water proof baffle plate are removed and water body bascule trial operation.The construction method step of the present invention is simple, not only shortens the engineering time of water body bascule, reduces construction cost, and improves the overall strength and stability of dam body, is conducive to the water body of man-made lake to keep dynamic equilibrium, increases water quality.

Description

A kind of artificial Lake Water Body bascule and its construction method
Technical field
The present invention relates to a kind of artificial Lake Water Body bascule and its construction method.
Background technology
Water is most important resource allocation, is the material that all living things are depended on for existence on the mankind and the earth, while water resource Again be influence environmental system all key elements in it is most active and widest in area general.
Lake is the ecological pool for storing water resource, as the mankind reclaim land from a lake, increasing lake obliteration, not only Welding, and influence local weather to shape to a certain extent, therefore increasing man-made lake starts to occur, still The water body of man-made lake is typically in inactive state, easily forms stagnant water, not only influences water quality, and pollution environment.
The content of the invention
Present invention aims at for present in prior art deficiency and provide a kind of artificial Lake Water Body bascule and Water in the technical scheme of its construction method, river course passes through water inlet component and the first collecting pipe in the presence of the first suction pump Filter is directly entered, water after filtering enters purifier, through medicament in the presence of the second suction pump through connection tube Neutralization reduction water in N P and K etc., finally pass through the second collecting pipe in the presence of the 3rd suction pump and outlet component conveyed Into man-made lake, the water body of man-made lake can be not only set to keep dynamic equilibrium, and the water in man-made lake can be made to be in flowing State, prevents from forming stagnant water and influenceing water quality, improves the clarity of lake water, and construction method step of the invention is simple, not only The engineering time of water body bascule is shortened, construction cost is reduced, and improves the overall strength and stability of dam body, is had Dynamic equilibrium is kept beneficial to the water body of man-made lake, is increased water quality.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
A kind of artificial Lake Water Body bascule, it is characterised in that:Including water inlet component, outlet component, filter and net Makeup is put, and water inlet component and outlet component are respectively positioned at the both sides of dam body, and water inlet component is located at the side in river course, outlet component position In the side of man-made lake, dam body is internally provided with cone-shaped cavity, and filter is fixedly connected on the bottom surface of cone-shaped cavity, only Disguise the top setting in filter, purifier connects filter by connection tube, and being provided with second on connection tube takes out Water pump, water inlet component connects filter by the first collecting pipe, and the first collecting pipe is provided with the close to one end of filter The second collecting pipe is connected with one suction pump, outlet component, the second collecting pipe is connected on purifier, mozzle by mozzle The 3rd suction pump is provided with, the top of dam body, which is provided with below control room, control room, is provided with the first manhole and the second manhole, Second manhole via through holes are communicated to filter;Water in river course passes through water inlet component and in the presence of the first suction pump One collecting pipe is directly entered filter, and water after filtering enters purification in the presence of the second suction pump, through connection tube and filled Put, N P and K etc. in the neutralization reduction water through medicament, finally by the second collecting pipe and go out in the presence of the 3rd suction pump Water assembly is delivered in man-made lake, the water body of man-made lake is kept dynamic equilibrium, and can make in man-made lake Water is in flow regime, prevents from forming stagnant water and influenceing water quality, improves the clarity of lake water, and control room is used for water inlet component It is controlled with outlet component, is easy to be controlled the volume of artificial Lake Water Body, the first manhole and the second manhole are easy to manually Overhauled, extend the service life of water body bascule.
Further, water inlet component includes the first penstock, and the first penstock is uniformly arranged on dam body from top to bottom On side, the water inlet end of the first penstock, which is provided with the first screen pack, the first penstock, is provided with the first unidirectional electricity Magnet valve, the water side of the first penstock connects the first collecting pipe by the first connecting tube, passes through the first screen pack, Ke Yiyou Effect ground is filtered the impurity such as the pasture and water in river course, is prevented from entering water inlet component and resulting in blockage, is influenceed the work of water inlet component Make efficiency, the first Unidirectional solenoid valve can control the switch of the first penstock, meet the regulation needs to water body dynamic equilibrium.
Further, outlet component includes water output duct, and water output duct is uniformly arranged on the side of dam body, gone out from top to bottom The water side of water conduit is provided with the second screen pack, water output duct is provided with the second Unidirectional solenoid valve, and water output duct enters Water end (W.E.) connects the second collecting pipe by the second connecting tube, effectively can be entered the impurity in man-made lake by the second screen pack Row filtering, prevents from entering outlet component and resulting in blockage, influences the operating efficiency of outlet component, the second Unidirectional solenoid valve can be controlled The switch of water conduit is made, the regulation needs to water body dynamic equilibrium are met.
Further, clay is filled with cone-shaped cavity, clay can effectively improve the compression strength of cone-shaped cavity, improve dam The stability and reliability of body, extend the service life of water body bascule.
Further, filter includes the second casing, is provided with water inlet interface on the side of the second casing, water inlet interface with First collecting pipe matches, and water outlet mouthpiece is provided with the top surface of the second casing, and water outlet mouthpiece matches with connection tube, the second case Being internally provided with screen pack, screen pack for body is provided with filter net sheet, by the design of screen pack and filter net sheet, The impurity of the larger particles such as the sludge in water can be filtered, be increased water quality.
Further, purifier, which includes being provided with hybrid chamber, hybrid chamber in the first casing, the first casing, is provided with water outlet Pipe and buffer gear, outlet pipe are located at the end face center of hybrid chamber, and buffer gear is symmetricly set on the both sides of outlet pipe, mixing The both sides of chamber are symmetrically arranged with explosive box, and the top of explosive box is provided with the taper bucket, and the taper bucket connects drug discharging tube by branch pipe, gone out Pencil is located in hybrid chamber, and the second penstock, the second penstock and connection tube phase are provided with the bottom surface of the first casing Match somebody with somebody, after water enters hybrid chamber through the second penstock, in the presence of buffer gear, accelerate the mixing velocity of water and medicament, The purification efficiency increased water quality, explosive box is used to store the medicament needed, and is contacted by drug discharging tube with water, is dissolved in water, Reduce the N-P-K content in water.
Further, buffer gear includes locating rod, one-way guide flow plate and connecting rod, and locating rod is fixedly connected on the top of hybrid chamber On face, one-way guide flow plate uniform rotation is connected on the securing lever, connecting rod connection one-way guide flow plate, and the top of connecting rod passes through sealing gasket Pull bar is connected, the shift position of connecting rod can be adjusted by pull bar, and then adjusts the rotational angle of one-way guide flow plate, makes water Quick dissolving is well mixed in hybrid chamber with medicament.
Further, medicine outlet hole is evenly arranged with the side of drug discharging tube, medicine outlet hole is easy to medicament to be contacted with water, improves medicament Dissolution velocity.
A kind of construction method of artificial Lake Water Body bascule described above, it is characterised in that comprise the following steps:
1) surveying and locating
A, dam body width and the length between river course and man-made lake are determined according to design requirement first, and balanced according to water body The size of device carries out widening treatment to original dam body;
B, the width then along man-made lake determine the total length of dam body, and the length according to dam body and height selection construction Material;
C, after all material is ready, select corresponding construction equipment, and construction equipment is transported to the fixed area of picture In domain, work of confiding a technological secret is carried out;
2) dam construction
A, the position first close to dam body in man-made lake are transferred to man-made lake by lift-on and lift-off ship the first water proof baffle plate, are made The distance between width midpoint of first water proof baffle plate and dam body reaches the requirement of setting, is entered the first water proof baffle plate with hydraulic hammer Row compacting is handled, until the top of the first water proof baffle plate is higher than man-made lake 0.7~1.3m of the water surface, treats previous first water proof baffle plate After installation terminates, the installation of next first water proof baffle plate is carried out, until by the first water proof baffle plate in man-made lake along dam body Laying is finished;
B and then close to the position of dam body the second water proof baffle plate is transferred in river course to river course by lift-on and lift-off ship, make the The distance between width midpoint of two water proof baffle plates and dam body reaches the requirement of setting, and is entered the second water retaining separater with hydraulic hammer Row compacting is handled, until the top of the second water proof baffle plate is higher than river course 0.7~1.3m of the water surface, treats previous second water proof baffle plate peace After dress terminates, the installation of next second water proof baffle plate is carried out, until the second water proof baffle plate in river course is laid along dam body Finish;
C, then between the first water proof baffle plate and dam body, installing submersible pump between the second water proof baffle plate and dam body passes through Immersible pump respectively drains the water between dam body both sides and the first water proof baffle plate, the second water proof baffle plate respectively, when dam body both sides with Water level between first water proof baffle plate, the second water proof baffle plate often declines 0.5m, with reinforced pipe respectively by the first water proof baffle plate, second Consolidation process is carried out between water proof baffle plate and dam body, until the water between dam body and the first water proof baffle plate, the second water proof baffle plate is complete Drain in portion;
Pasture and water are cleared up in d, the both sides finally along dam body, make dam body exposed outside, and reinforced to dam body Processing;
3) water body bascule is constructed
A, after dam construction terminates, first according to the requirement of design, taken from top to bottom by excavator along dam body Cone-shaped cavity, per 0.5~0.8m is excavated downwards, is fitted on the inwall of cone-shaped cavity with steel plate and carries out supporting, until excavating extremely The depth of setting;
B and then the inwall of steel plate and cone-shaped cavity is poured into a mould with concrete, and by the bottom pouring water of cone-shaped cavity It is flat, after concrete reaches setting intensity, line is marked by the way that the inclined steel plate manually along both sides is equidistant, and with drilling Machine drill takes spacing hole, positioned at close to river course side steel plate on each spacing hole in inserting the first connecting tube, positioned at by The second connecting tube of insertion in each spacing hole on the steel plate of nearly man-made lake side, while being respectively mounted in the both sides of cone-shaped cavity First collecting pipe and the second collecting pipe, make the first connecting tube and the second connecting tube be evenly connected at the first collecting pipe and respectively On two collecting pipes;
C, then on the bottom surface of cone-shaped cavity filter is installed, the water inlet interface on filter is confluxed with first Pipe is attached, and carries out encapsulation process, and the bottom of the first collecting pipe is connected with the first suction pump, then built-in to cone-shaped cavity Clay is filled out, the height for loading clay is equal with the height of filter, hung down further along the water outlet mouthpiece on filter top surface Direct-connected tape splicing has the connection tube of the second suction pump, and installs a diameter of 0.8~1.0m pipeline in the side of connection tube, continues to fill Clay is filled out, filling height is equal with the height of connection tube;
C, to the top of connection tube purifier is installed again, continues to load clay after positioning is fixed, make the height of clay with The height of purifier is equal, draws mozzle from the top of purifier, and mozzle is fixed with the second collecting pipe Connection, installs the 3rd suction pump on mozzle, continues to backfill clay, until the port flush with pipeline, then in pipeline Top the first manhole and the second manhole be installed, and be controlled the construction and installation of room along the top surface of dam body;
D, the side wall finally along dam body are located at close to the side in river course, equidistantly mark, in corresponding marker bit Put and the first penstock with the first Unidirectional solenoid valve is installed, make the first penstock and the first connecting tube that company is fixed Connect, the first screen pack is installed in the water inlet end of the first penstock, be located at the one of close man-made lake then along the side wall of dam body Side, is equidistantly marked, and is installed the water output duct with the second Unidirectional solenoid valve in corresponding mark position, is made water output duct It is fixedly connected with the second connecting tube, the second screen pack is installed in the water side of water output duct;
4) water proof baffle plate is removed
After the construction of water body bascule terminates, reinforced pipe is removed first, then torn open water proof baffle plate by lift-on and lift-off ship Remove;
5) water body bascule trial operation
After the installation of whole water body bascule terminates, the first Unidirectional solenoid valve is first turned on, passes through the water in river course First penstock enters the first collecting pipe, and flow in filter, and the water after filtering is passed through in the presence of the second suction pump Connection tube enters in purifier, enters the second collecting pipe in the presence of the 3rd suction pump after purified device purification, opens Second Unidirectional solenoid valve, makes the water after processing be exported through water output duct.
The present invention is by adopting the above-described technical solution, have the advantages that:
1st, the water in river course is directly entered filtering in the presence of the first suction pump by water inlet component and the first collecting pipe Device, water after filtering enters purifier in the presence of the second suction pump through connection tube, the neutralization reduction water through medicament In N P and K etc., be finally delivered in the presence of the 3rd suction pump by the second collecting pipe and outlet component in man-made lake, It the water body of man-made lake is kept dynamic equilibrium, and the water in man-made lake can be made to be in flow regime, prevent shape Water quality is influenceed into stagnant water, the clarity of lake water is improved;
2nd, control room is used to be controlled water inlet component and outlet component, is easy to control the volume of artificial Lake Water Body System;
3rd, the first manhole and the second manhole are easy to manually be overhauled, and extend the service life of water body bascule;
4th, construction method step of the invention is simple, not only shortens the engineering time of water body bascule, reduction construction Cost, and the overall strength and stability of dam body is improved, be conducive to the water body of man-made lake to keep dynamic equilibrium, improve water Matter.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 illustrates for the installation of water body bascule in a kind of artificial Lake Water Body bascule of the present invention and its construction method Figure;
Fig. 2 is the structural representation of filter in the present invention;
Fig. 3 is the structural representation of purifier in the present invention.
In figure:1- dam bodys;2- man-made lakes;3- river courses;4- control rooms;The manholes of 5- first;The manholes of 6- second;7- purification dresses Put;8- filters;The penstocks of 9- first;The collecting pipes of 10- first;The Unidirectional solenoid valves of 11- first;The suction pumps of 12- first; 13- through holes;14- connection tubes;The suction pumps of 15- second;The collecting pipes of 16- second;The suction pumps of 17- the 3rd;18- mozzles;19- first Screen pack;20- water output ducts;The Unidirectional solenoid valves of 21- second;The screen packs of 22- second;23- water inlet interfaces;24- water outlet mouthpieces; 25- screen packs;26- filter net sheets;The casings of 27- first;28- hybrid chambers;29- outlet pipes;30- locating rods;31- one-way guide flows Plate;32- connecting rods;33- sealing gaskets;34- pull bars;35- explosive boxs;36- the taper buckets;37- branch pipes;38- drug discharging tubes;39- second Penstock;The casings of 40- second.
Embodiment
As shown in Figure 1 to Figure 3, be a kind of artificial Lake Water Body bascule of the present invention, including water inlet component, outlet component, Filter 8 and purifier 7, water inlet component and outlet component are located at the both sides of dam body 1 respectively, and water inlet component is located at river course 3 Side, water inlet component includes the first penstock 9, and the first penstock 9 is uniformly arranged on the side of dam body 1 from top to bottom On, the water inlet end of the first penstock 9, which is provided with the first screen pack 19, the first penstock 9, is provided with the first unidirectional electricity Magnet valve 11, the water side of the first penstock 9 connects the first collecting pipe 10 by the first connecting tube (not marked in figure), passes through First screen pack 19, effectively can be filtered the impurity such as the pasture and water in river course 3, prevent from entering water inlet component and causing to block up Plug, influences the operating efficiency of water inlet component, and the first Unidirectional solenoid valve 11 can control the switch of the first penstock 9, satisfaction pair The regulation of water body dynamic equilibrium needs.
Outlet component is located at the side of man-made lake 2, and outlet component includes water output duct 20, and water output duct 20 is equal from top to bottom Even to be arranged on the side of dam body 1, the water side of water output duct 20, which is provided with the second screen pack 22, water output duct 20, to be set There is the second Unidirectional solenoid valve 21, the water inlet end of water output duct 20 is confluxed by the second connecting tube (not marked in figure) connection second Pipe 16, effectively can be filtered the impurity in man-made lake 2 by the second screen pack 22, prevent from entering outlet component and making Into blocking, the operating efficiency of outlet component is influenceed, the second Unidirectional solenoid valve 21 can control the switch of water output duct 20, satisfaction pair The regulation of water body dynamic equilibrium needs.
Being internally provided with cone-shaped cavity, cone-shaped cavity for dam body 1 is filled with clay, and clay can effectively improve conical cavity The compression strength of body, improves the stability and reliability of dam body 1, extends the service life of water body bascule, and filter 8 is consolidated Surely it is connected on the bottom surface of cone-shaped cavity, filter 8 includes being provided with into water on the second casing 40, the side of the second casing 40 Interface 23, water inlet interface 23 matches with the first collecting pipe 10, and water outlet mouthpiece 24, water outlet are provided with the top surface of the second casing 40 Interface 24 matches with connection tube 14, and being internally provided with screen pack 25, screen pack 25 for the second casing 40 was provided with Filtering net plate 26, by the design of screen pack 25 and filter net sheet 26, can enter the impurity of the larger particles such as the sludge in water Row filtering, increases water quality.
Purifier 7 is located at the top of filter 8, and purifier 7 includes setting in the first casing 27, the first casing 27 Have and outlet pipe 29 and buffer gear are provided with hybrid chamber 28, hybrid chamber 28, outlet pipe 29 is located at the end face center of hybrid chamber 28 Place, buffer gear is symmetricly set on the both sides of outlet pipe 29, and the both sides of hybrid chamber 28 are symmetrically arranged with explosive box 35, explosive box 35 Top be provided with the taper bucket 36, the taper bucket 36 connects drug discharging tube 38 by branch pipe 37, and drug discharging tube 38 is located in hybrid chamber 28, the The second penstock 39 is provided with the bottom surface of one casing 27, the second penstock 39 matches with connection tube 14, when water is through Two penstocks 39 enter after hybrid chamber 28, in the presence of buffer gear, accelerate the mixing velocity of water and medicament, increase water quality Purification efficiency, explosive box 35 is used to store the medicament needed, and is contacted with water by drug discharging tube 38, is dissolved in water, reduction N-P-K content in water, buffer gear includes locating rod 30, one-way guide flow plate 31 and connecting rod 32, and locating rod 30 is fixedly connected on On the top surface of hybrid chamber 28, the uniform rotation of one-way guide flow plate 31 is connected in locating rod 30, the connection one-way guide flow of connecting rod 32 plate 31, The top of connecting rod 32 connects pull bar 34 by sealing gasket 33, and the shift position of connecting rod 32 can be adjusted by pull bar 34, is entered And the rotational angle of one-way guide flow plate 31 is adjusted, make the quick dissolving in hybrid chamber 28 of water and medicament well mixed, drug discharging tube 38 Side on be evenly arranged with medicine outlet hole, medicine outlet hole is easy to medicament to be contacted with water, improve medicament dissolution velocity, purifier 7 Connected by connection tube 14 and be provided with the second suction pump 15 on filter 8, connection tube 14, water inlet component passes through the first collecting pipe 10 connection filters 8, the first collecting pipe 10 is provided with the first suction pump 12, outlet component close to one end of filter 8 The second collecting pipe 16 is connected with, the second collecting pipe 16 is connected by mozzle 18 and is provided with the 3rd on purifier 7, mozzle 18 Suction pump 17, the top of dam body 1 is provided with control room 4, and the lower section of control room 4 is provided with the first manhole 5 and the second manhole 6, the The via through holes 13 of two manhole 6 are communicated to filter 8;Water in river course 3 passes through water inlet component in the presence of the first suction pump 12 Filter 8 is directly entered with the first collecting pipe 10, water after filtering is in the presence of the second suction pump 15, through connection tube 14 Into purifier 7, N P and K in the neutralization reduction water through medicament etc., finally by the in the presence of the 3rd suction pump 17 Two collecting pipes 16 and outlet component are delivered in man-made lake 2, the water body of man-made lake 2 is kept dynamic equilibrium, and The water in man-made lake 2 can be made to be in flow regime, prevent from forming stagnant water and influenceing water quality, improve the clarity of lake water, controlled Room 4 processed is used to be controlled water inlet component and outlet component, is easy to be controlled the volume of the water body of man-made lake 2, the first The manhole 6 of hole 5 and second is easy to manually be overhauled, and extends the service life of water body bascule.
A kind of construction method of artificial Lake Water Body bascule described above, comprises the following steps:
1) surveying and locating
A, the width of dam body 1 and the length between river course 3 and man-made lake 2 are determined according to design requirement first, and according to water body The size of bascule carries out widening treatment to original dam body 1;
B, the width then along man-made lake 2 determine the total length of dam body 1, and the length according to dam body 1 and height selection Construction material;
C, after all material is ready, select corresponding construction equipment, and construction equipment is transported to the fixed area of picture In domain, work of confiding a technological secret is carried out;
2) dam construction
A, the position first close to dam body 1 in man-made lake 2 are transferred the first water proof baffle plate to man-made lake 2 by lift-on and lift-off ship It is interior, the distance between width midpoint of the first water proof baffle plate and dam body 1 is reached the requirement of setting, with hydraulic hammer by the first water proof Baffle plate carries out compacting processing, until the top of the first water proof baffle plate is higher than the 0.7~1.3m of the water surface of man-made lake 2, treats previous first Water proof baffle plate is installed terminate after, the installation of next first water proof baffle plate is carried out, until by the first water proof baffle plate in man-made lake 2 Lay and finish along dam body 1;
B and then close to the position of dam body 1 the second water proof baffle plate is transferred in river course 3 to river course 3 by lift-on and lift-off ship, The distance between width midpoint of the second water proof baffle plate and dam body 1 is set to reach the requirement of setting, and with hydraulic hammer by the second dash Dividing plate carry out compacting processing, until the second water proof baffle plate top be higher than the 0.7~1.3m of the water surface of river course 3, treat previous second every Water baffle plate is installed terminate after, carry out the installation of next second water proof baffle plate, until by the second water proof baffle plate in river course 3 along Dam body 1 is laid and finished;
C, then between the first water proof baffle plate and dam body 1, installing submersible pump between the second water proof baffle plate and dam body 1 leads to Cross immersible pump respectively to drain the water between the both sides of dam body 1 and the first water proof baffle plate, the second water proof baffle plate respectively, when 1 liang of dam body Water level between side and the first water proof baffle plate, the second water proof baffle plate often declines 0.5m, with reinforced pipe respectively by the first water proof baffle plate, Consolidation process is carried out between second water proof baffle plate and dam body 1, until between the water proof baffle plate of dam body 1 and first, the second water proof baffle plate Water all drain;
Pasture and water are cleared up in d, the both sides finally along dam body 1, make dam body 1 exposed outside, and dam body 1 is added Gu processing;
3) water body bascule is constructed
A, after dam body 1 construction terminate after, first according to the requirement of design, excavator is passed through from top to bottom along dam body 1 Cone-shaped cavity is taken, per 0.5~0.8m is excavated downwards, is fitted in steel plate on the inwall of cone-shaped cavity and carries out supporting, until excavating To the depth of setting;
B and then the inwall of steel plate and cone-shaped cavity is poured into a mould with concrete, and by the bottom pouring water of cone-shaped cavity It is flat, after concrete reaches setting intensity, line is marked by the way that the inclined steel plate manually along both sides is equidistant, and with drilling Machine drill takes spacing hole, positioned at close to the side of river course 3 steel plate on each spacing hole in inserting the first connecting tube, positioned at by The second connecting tube of insertion in each spacing hole on the steel plate of the nearly side of man-made lake 2, while pacifying respectively in the both sides of cone-shaped cavity The first collecting pipe 10 and the second collecting pipe 16 are filled, the first connecting tube and the second connecting tube is evenly connected at first respectively and confluxes On the collecting pipe 16 of pipe 10 and second;
C, then the installation filter 8 on the bottom surface of cone-shaped cavity, by the water inlet interface 23 and first on filter 8 Collecting pipe 10 is attached, and carries out encapsulation process, and the bottom of the first collecting pipe 10 is connected with the first suction pump 12, then to cone Filling clay in shape cavity, the height for loading clay is equal with the height of filter 8, further along on the top surface of filter 8 Water outlet mouthpiece 24 vertically connection with the second suction pump 15 connection tube 14, and connection tube 14 side install it is a diameter of 0.8~1.0m pipeline, continues to load clay, filling height is equal with the height of connection tube 14;
C, to the top of connection tube 14 purifier 7 is installed again, continues to load clay after positioning is fixed, make the height of clay It is equal with the height of purifier 7, draw mozzle 18 from the top of purifier 7, and by the collecting pipe of mozzle 18 and second 16 are fixedly connected, and the 3rd suction pump 17 is installed on mozzle 18, continue to backfill clay, until equal with the port of pipeline Together, the first manhole 5 and the second manhole 6 then are installed on the top of pipeline, and applying for room 4 is controlled along the top surface of dam body 1 Work is installed;
D, the side wall finally along dam body 1 are located at close to the side in river course 3, equidistantly mark, are marked accordingly The first penstock 9 with the first Unidirectional solenoid valve 11 is installed in position, is consolidated the first penstock 9 and the first connecting tube Fixed connection, the first screen pack 19 is installed in the water inlet end of the first penstock 9, is located at then along the side wall of dam body 1 close to people The side in work lake 2, is equidistantly marked, and the water output duct with the second Unidirectional solenoid valve 21 is installed in corresponding mark position 20, water output duct 20 is fixedly connected with the second connecting tube, second screen pack 22 is installed in the water side of water output duct 20;
4) water proof baffle plate is removed
After the construction of water body bascule terminates, reinforced pipe is removed first, then torn open water proof baffle plate by lift-on and lift-off ship Remove;
5) water body bascule trial operation
After the installation of whole water body bascule terminates, the first Unidirectional solenoid valve 11 is first turned on, leads to the water in river course 3 Cross the first penstock 9 and enter the first collecting pipe 10, and flow in filter 8, the water after filtering is in the second suction pump 15 Enter under effect through connection tube 14 in purifier 7, purified device 7 enters the in the presence of the 3rd suction pump 17 after purifying Two collecting pipes 16, open the second Unidirectional solenoid valve 21, the water after processing is exported through water output duct 20.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover Among protection scope of the present invention.

Claims (9)

1. a kind of artificial Lake Water Body bascule, it is characterised in that:Including water inlet component, outlet component, filter and purification Device, the water inlet component and the outlet component are located at the both sides of dam body respectively, and the water inlet component is located at the side in river course, The outlet component is located at the side of man-made lake, and the dam body is internally provided with cone-shaped cavity, and the filter, which is fixed, to be connected On the bottom surface for being connected on the cone-shaped cavity, the purifier is located at the top of the filter, and the purifier passes through Connection tube connects and is provided with the second suction pump on the filter, the connection tube, and the water inlet component confluxes by first Pipe connects the filter, and first collecting pipe is provided with the first suction pump close to one end of the filter, described The second collecting pipe is connected with outlet component, second collecting pipe connects the purifier, the water conservancy diversion by mozzle Be provided with the 3rd suction pump on pipe, the top of the dam body be provided with below control room, the control room be provided with it is the first Hole and the second manhole, the second manhole via through holes are communicated to the filter.
2. a kind of artificial Lake Water Body bascule according to claim 1, it is characterised in that:The water inlet component includes the One penstock, first penstock is uniformly arranged on the side of the dam body from top to bottom, and first water inlet is led The water inlet end of pipe is provided with the first screen pack, first penstock and is provided with the first Unidirectional solenoid valve, described first The water side of penstock connects first collecting pipe by the first connecting tube.
3. a kind of artificial Lake Water Body bascule according to claim 1, it is characterised in that:The outlet component includes Water conduit, the water output duct is uniformly arranged on the side of the dam body from top to bottom, and the water side of the water output duct is equal It is provided with the second screen pack, the water output duct and is provided with the second Unidirectional solenoid valve, the water inlet end of the water output duct leads to Cross the second connecting tube and connect second collecting pipe.
4. a kind of artificial Lake Water Body bascule according to claim 1, it is characterised in that:Loaded in the cone-shaped cavity There is clay.
5. a kind of artificial Lake Water Body bascule according to claim 1, it is characterised in that:The filter includes the Water inlet interface is provided with two casings, the side of second casing, the water inlet interface matches with first collecting pipe, Water outlet mouthpiece is provided with the top surface of second casing, the water outlet mouthpiece matches with the connection tube, second case Being internally provided with screen pack, the screen pack for body is provided with filter net sheet.
6. a kind of artificial Lake Water Body bascule according to claim 1, it is characterised in that:The purifier includes the It is provided with one casing, first casing in hybrid chamber, the hybrid chamber and is provided with outlet pipe and buffer gear, the water outlet Pipe is at the end face center of the hybrid chamber, and the buffer gear is symmetricly set on the both sides of the outlet pipe, the mixing The both sides of chamber are symmetrically arranged with explosive box, and the top of the explosive box is provided with the taper bucket, and the taper bucket is connected by branch pipe Drug discharging tube, the drug discharging tube is located in the hybrid chamber, and the second penstock is provided with the bottom surface of first casing, described Second penstock matches with the connection tube.
7. a kind of artificial Lake Water Body bascule according to claim 6, it is characterised in that:The buffer gear includes fixed Position bar, one-way guide flow plate and connecting rod, the locating rod are fixedly connected on the top surface of the hybrid chamber, and the one-way guide flow plate is equal Even to be rotatably connected in the locating rod, the connecting rod connects the one-way guide flow plate, and the top of the connecting rod passes through sealing gasket Connect pull bar.
8. a kind of artificial Lake Water Body bascule according to claim 6, it is characterised in that:On the side of the drug discharging tube It is evenly arranged with medicine outlet hole.
9. a kind of construction method of artificial Lake Water Body bascule as claimed in claim 1, it is characterised in that including following step Suddenly:
1) surveying and locating
A, dam body width and the length between river course and man-made lake are determined according to design requirement first, and according to water body bascule Size to original dam body carry out widening treatment;
B, the width then along man-made lake determine the total length of dam body, and length and height selection construction material according to dam body Material;
C, after all material is ready, select corresponding construction equipment, and construction equipment is transported in the fixed region of picture, Carry out work of confiding a technological secret;
2) dam construction
A, the first water proof baffle plate is transferred to man-made lake by lift-on and lift-off ship close to the position of dam body in man-made lake first, make the The distance between width midpoint of one water proof baffle plate and dam body reaches the requirement of setting, is carried out the first water proof baffle plate with hydraulic hammer Compacting is handled, until the top of the first water proof baffle plate is higher than man-made lake 0.7~1.3m of the water surface, treats previous first water proof baffle plate peace After dress terminates, the installation of next first water proof baffle plate is carried out, until by the first water proof baffle plate in man-made lake along dam body cloth If finishing;
B and then close to the position of dam body the second water proof baffle plate is transferred in river course to river course by lift-on and lift-off ship, make second every The distance between width midpoint of water baffle plate and dam body reaches the requirement of setting, and is rammed the second water retaining separater with hydraulic hammer Crucial point is managed, until the top of the second water proof baffle plate is higher than river course 0.7~1.3m of the water surface, treats that previous second water proof baffle plate installs knot Shu Hou, carries out the installation of next second water proof baffle plate, is finished until the second water proof baffle plate in river course is laid along dam body;
C, then between the first water proof baffle plate and dam body, installing submersible pump between the second water proof baffle plate and dam body passes through diving Pump respectively drains the water between dam body both sides and the first water proof baffle plate, the second water proof baffle plate respectively, when dam body both sides and first Water level between water proof baffle plate, the second water proof baffle plate often declines 0.5m, with reinforced pipe respectively by the first water proof baffle plate, the second water proof Consolidation process is carried out between baffle plate and dam body, until the water between dam body and the first water proof baffle plate, the second water proof baffle plate is all taken out It is dry;
Pasture and water are cleared up in d, the both sides finally along dam body, make dam body exposed outside, and carry out consolidation process to dam body;
3) water body bascule is constructed
A, after dam construction terminates, first according to the requirement of design, taper is taken by excavator from top to bottom along dam body Cavity, excavates 0.5~0.8m per downward, is fitted in steel plate on the inwall of cone-shaped cavity and carries out supporting, until excavating to setting Depth;
B and then the inwall of steel plate and cone-shaped cavity is poured into a mould with concrete, and by the bottom pouring level of cone-shaped cavity, After concrete reaches setting intensity, line is marked by the way that the inclined steel plate manually along both sides is equidistant, and use drilling machine Spacing hole is drilled through, the first connecting tube is being inserted in each spacing hole on the steel plate of river course side, positioned at close The second connecting tube of insertion in each spacing hole on the steel plate of man-made lake side, while being respectively mounted the in the both sides of cone-shaped cavity One collecting pipe and the second collecting pipe, make the first connecting tube and the second connecting tube be evenly connected at the first collecting pipe and second respectively On collecting pipe;
C, then on the bottom surface of cone-shaped cavity filter is installed, the water inlet interface on filter is entered with the first collecting pipe Row connection, and encapsulation process is carried out, the bottom of the first collecting pipe is connected with the first suction pump, then loads viscous into cone-shaped cavity Soil, the height for loading clay is equal with the height of filter, vertically connects further along the water outlet mouthpiece on filter top surface Tape splicing has the connection tube of the second suction pump, and installs a diameter of 0.8~1.0m pipeline in the side of connection tube, continues to load viscous Soil, filling height is equal with the height of connection tube;
C, to the top of connection tube purifier is installed again, continues to load clay after positioning is fixed, make height and the purification of clay The height of device is equal, and mozzle is drawn from the top of purifier, and mozzle is fixedly connected with the second collecting pipe, 3rd suction pump is installed on mozzle, continues to backfill clay, until the port flush with pipeline, then on the top of pipeline First manhole and the second manhole be installed, and the construction and installation of room are controlled along the top surface of dam body;
D, the side wall finally along dam body are located at close to the side in river course, equidistantly mark, in corresponding mark position peace First penstock of the dress with the first Unidirectional solenoid valve, makes the first penstock be fixedly connected with the first connecting tube, The water inlet end of first penstock installs the first screen pack, is located at then along the side wall of dam body close to the side of man-made lake, etc. Spacing is marked, and the water output duct with the second Unidirectional solenoid valve is installed in corresponding mark position, makes water output duct and the Two connecting tubes are fixedly connected, and the second screen pack is installed in the water side of water output duct;
4) water proof baffle plate is removed
After the construction of water body bascule terminates, reinforced pipe is removed first, then water proof baffle plate is removed by lift-on and lift-off ship;
5) water body bascule trial operation
After the installation of whole water body bascule terminates, the first Unidirectional solenoid valve is first turned on, makes the water in river course by first Penstock enters the first collecting pipe, and flow in filter, and the water after filtering is in the presence of the second suction pump through linking Pipe enters in purifier, enters the second collecting pipe in the presence of the 3rd suction pump after purified device purification, opens second Unidirectional solenoid valve, makes the water after processing be exported through water output duct.
CN201710647430.6A 2017-08-01 2017-08-01 Artificial lake water body balancing device and construction method thereof Active CN107226559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710647430.6A CN107226559B (en) 2017-08-01 2017-08-01 Artificial lake water body balancing device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710647430.6A CN107226559B (en) 2017-08-01 2017-08-01 Artificial lake water body balancing device and construction method thereof

Publications (2)

Publication Number Publication Date
CN107226559A true CN107226559A (en) 2017-10-03
CN107226559B CN107226559B (en) 2020-10-30

Family

ID=59956188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710647430.6A Active CN107226559B (en) 2017-08-01 2017-08-01 Artificial lake water body balancing device and construction method thereof

Country Status (1)

Country Link
CN (1) CN107226559B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792953A (en) * 2017-11-07 2018-03-13 汤庆佳 A kind of Water-quality treater and its method of work for hydraulic engineering
CN108775433A (en) * 2018-08-13 2018-11-09 新昌县楷翔机电有限公司 What a kind of fluid pressure type landscape folded dam emptying water conservancy diversion lock automatically controls release mechanism
CN109626634A (en) * 2018-12-20 2019-04-16 北京师范大学 A kind of river water quality in-situ remediation system and method
CN110606588A (en) * 2019-11-06 2019-12-24 河南省水利勘测有限公司 Ecological dam with purification performance
CN112064589A (en) * 2020-09-18 2020-12-11 青海师范大学 A ecological overflow dam that permeates water for quality of water purifies

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845806A (en) * 2010-05-19 2010-09-29 河海大学 Permeable overflow dam combining functions of water level control and water purification
CN105585107A (en) * 2016-02-03 2016-05-18 浙江裕腾百诺环保科技有限公司 Assembled emergency water purification soft dam and method for purifying minitype river course by using water purification soft dam
CN106565057A (en) * 2016-11-01 2017-04-19 浙江水利水电学院 Lake water purification pipe network circulating system and construction method thereof
CN106759781A (en) * 2016-12-13 2017-05-31 浙江水利水电学院 A kind of intelligent city rainwater regulating pondage system and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845806A (en) * 2010-05-19 2010-09-29 河海大学 Permeable overflow dam combining functions of water level control and water purification
CN105585107A (en) * 2016-02-03 2016-05-18 浙江裕腾百诺环保科技有限公司 Assembled emergency water purification soft dam and method for purifying minitype river course by using water purification soft dam
CN106565057A (en) * 2016-11-01 2017-04-19 浙江水利水电学院 Lake water purification pipe network circulating system and construction method thereof
CN106759781A (en) * 2016-12-13 2017-05-31 浙江水利水电学院 A kind of intelligent city rainwater regulating pondage system and its construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792953A (en) * 2017-11-07 2018-03-13 汤庆佳 A kind of Water-quality treater and its method of work for hydraulic engineering
CN107792953B (en) * 2017-11-07 2020-08-18 马悦 Water quality treatment equipment for hydraulic engineering
CN108775433A (en) * 2018-08-13 2018-11-09 新昌县楷翔机电有限公司 What a kind of fluid pressure type landscape folded dam emptying water conservancy diversion lock automatically controls release mechanism
CN108775433B (en) * 2018-08-13 2023-10-13 新昌县楷翔机电有限公司 Automatic control safety mechanism of hydraulic landscape stacked dam emptying diversion gate
CN109626634A (en) * 2018-12-20 2019-04-16 北京师范大学 A kind of river water quality in-situ remediation system and method
CN110606588A (en) * 2019-11-06 2019-12-24 河南省水利勘测有限公司 Ecological dam with purification performance
CN112064589A (en) * 2020-09-18 2020-12-11 青海师范大学 A ecological overflow dam that permeates water for quality of water purifies

Also Published As

Publication number Publication date
CN107226559B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN107226559A (en) A kind of artificial Lake Water Body bascule and its construction method
CN107261587B (en) A kind of strainer automatically cleaning dregs filter
CN107489159A (en) Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction
CN102536253A (en) Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding
CN210066791U (en) A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation
CN104695879B (en) A kind of stake holes is rinsed and takes out sand hole method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN207073140U (en) A kind of well casing dewatering well dewatering device
CN105064383A (en) Pipe-inserting negative pressure air jet deep-well dewatering device
CN114606964B (en) Foundation pit dewatering method used under complex geological conditions
CN105804047A (en) Water drainage device and method for increasing water drainage and consolidation speed of filled sludge
CN205714215U (en) Tunnel-liner decompression section of jurisdiction and pipe-plate lining structure
CN107476322A (en) Well-points dewatering automatic servo compensation technique
CN110241788A (en) A kind of reservoir dam body culvert pipe reconstruction structure and construction method
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN209308079U (en) Water draw-off for Underground Building for Anti-floating
CN112031811B (en) Cliff water injection plugging system and method
CN206829163U (en) A kind of high artesian section construction Yield rainfall relation device
CN110185051A (en) Deep narrow excavation water discharge method
CN211816267U (en) Deep foundation pit support structure
CN211143104U (en) Precipitation well arranged at bottom of underground diaphragm wall
CN209227570U (en) Stratum dewatering construction device
JP2007009576A (en) Excavated earth and sand exhausting device and shield device
CN203462480U (en) Device for lowering underground water level by using home-made small tube wells
CN208023598U (en) A kind of base pit dewatering pipe well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201010

Address after: 311800 2701-1 langzhen building, No.88, Dongyi Road, Huandong street, Zhuji City, Shaoxing City, Zhejiang Province

Applicant after: Zhuji Xiuzhu building materials Co.,Ltd.

Address before: Anji County, Zhejiang province 313399 Huzhou City Dipu copper bridge old No. 1

Applicant before: Xia Feng

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211214

Address after: 311800 No. 139, Tianbao Road, Datang Town, Zhuji City, Shaoxing City, Zhejiang Province

Patentee after: Zhuji Youli needle textile Co.,Ltd.

Address before: 311800 2701-1 langzhen building, No.88, Dongyi Road, Huandong street, Zhuji City, Shaoxing City, Zhejiang Province

Patentee before: Zhuji Xiuzhu building materials Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An artificial lake water body balance device and its construction method

Effective date of registration: 20211220

Granted publication date: 20201030

Pledgee: Datang sub branch of Zhejiang Zhuji Rural Commercial Bank Co.,Ltd.

Pledgor: Zhuji Youli needle textile Co.,Ltd.

Registration number: Y2021980015348

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230104

Granted publication date: 20201030

Pledgee: Datang sub branch of Zhejiang Zhuji Rural Commercial Bank Co.,Ltd.

Pledgor: Zhuji Youli needle textile Co.,Ltd.

Registration number: Y2021980015348

PC01 Cancellation of the registration of the contract for pledge of patent right